CJAGJMTC_SOW_Perimeter_Fence_Rep_3916441_.pdf
PDF 4 MB Posted
- Attached to
- Fence Replacement at CJAGMTC Federal contract opportunity
- Solicitation number
- W91364-20-B-0002
About this file
This document outlines a solicitation for fence replacement services at Camp James A. Garfield Joint Military Training Center in Ravenna, Ohio. The scope of work involves removing approximately 6,175 linear feet of existing perimeter security fence and replacing it with a new fence, top rail, barbed wire, posts and gates per military standards. Work will be conducted in phases, starting with a base bid section and followed by multiple alternate sections proceeding clockwise along the perimeter road. Environmental and antiterrorism requirements must be followed. The pre-qualification period closes on August 14, 2020, with bids due by August 28, 2020 and work expected to be completed within 180 calendar days of award. The solicitation is set aside for service-disabled veteran-owned small businesses but may be opened to unrestricted competition if an insufficient number of SDVOSBs pursue the work. The contracting agency is the U.S. Department of the Army Ohio Army National Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 1409 Signed 8SEP.pdf | ||
| Fence Replacement Amendment 003.pdf | ||
| 91364-20-B-0002_Fence sign in sheet_13-08-2020.pdf | ||
| Fence Solicitations Q_A UPDATED 25AUG2020_Answered.xlsx | XLSX spreadsheet | |
| Fence Solicitations Q_A UPDATED 18AUG2020.xlsx | XLSX spreadsheet | |
| Fence Solicitation Modification 2.0 UPDATED 18AUG2020.docx | DOCX document | |
| CJAGJMTC Fence Solicitation Modification.pdf | ||
| 10_BidForm_CJAG_Perimeter_Fence_rem_rep.docx | DOCX document | |
| RFI Template.pdf | ||
| CJAGMTC Fence Solicitation.pdf | ||
| 9_AF Form 66_3916441_Perimeter_Fence_rem rep.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Camp James A Garfield Joint Military Training Center Perimeter Fence Replacement Project # 3916441
CAMP JAMES A. GARFIELD JOINT MILITARY TRAINING CENTER
Facility Engineering Department Building 1068
8451 SR 5 Ravenna Ohio, 44266 Project # 3916441
Scope of Work for Perimeter Fence improvement, Camp James A. Garfield Joint Military Training Center
Article 1) – General
1.1 Project site is located on the Camp James A. Garfield Joint Military Training Site
(CJAGJMTC), 8451 State Route 5 Ravenna, Ohio 44266. CJAGJMTC is requiring the removal and replacement of Base Bid amount of 6,175 lineal feet of existing fence around the perimeter road. This project will be broken down into the base bid and Alternate options of various lineal feet and work scope. The Base Bid work begins at approximately Southern, Latitude & Longitude 41.162900, -81.097756 at the area known as the “Dormitory Road Gate”. The Alternate options are contiguous to the Base Bid and each other. These Options proceed clockwise (west) along the perimeter road and are detailed as shown on the bid schedule and attachment A.
Article 2) - Scope
2.1 The scope of the project includes the complete removal of the fence and gates for the extents that are referenced in Article 3, Article 5, and the attachments delineating the work areas. This work also includes:
2.1.1 Necessary clearing, grubbing and cleanup of stumps and limbs that may impact the work area and the 10 foot security line of site. Vegetation clearing outside of the work area will be the minimum required to facilitate access to the work area. Vegetation clearing will comply with the Environmental Procedures (Attachment A) regarding size, seasonal restrictions, and protection of nesting birds, bats, and other species.
2.1.2 Installation of temporary fence to maintain the security of the Base. The fence line shall be secured at the end of each working shift by the contractor.
If the contractor chooses, the fabric from the fence to be removed can be used for temporary fence with steel posts driven to secure.
2.1.3 Area under and around the new fence shall be adequately graded to maintain clearances between the top and bottom as well as the 10 foot security zone.
The fence line shall also be graded to drain as much as possible away from the fence to allow for future mowing and maintenance of the 10 foot security zone.
2.1.4 All areas disturbed by construction shall be reseeded and mulched and a grass cover established as required in the Environmental Procedures (Attachment A).
2.2 The selected Contractor shall furnish all labor, equipment and materials to perform this contract per the scope. All work shall be met in strict accordance with the Statement of Work and Specifications for the project. Contractor will provide all site marking and survey, plans and materials prior to arrival. If the area to be disturbed will be more than 1 acre, the contractor shall develop (or hire an environmental consulting company to develop) a storm water pollution prevention plan (SWPPP), and will get approval of the Storm water pollution prevention plan from the Camp James A. Garfield Environmental office prior to submittal to Portage County Soil and Water Conservation for their review and approval. The Contractor will obtain coverage under the Ohio EPA General NPDES Permit for Storm Water Discharges Associated with Construction Activity. The Contractor will submit a Notice of Intent (NOI) as the Operator and pay the applicable fee. The NOI must be approved by the OHARNG Environmental Office prior to submittal to the Ohio EPA. The contractor will also be responsible to complete an Environmental Work Plan (described in the Environmental Procedures section 2.0) that addresses environmental issues specific to this scope. The Environmental Work Plan must be approved by CJAGJMTC Environmental Office at the beginning of the Project.
2.3 Most of the work area is not wetland, but in places there are wetlands adjacent to the work area and in some places within the fence line work area. Wetlands not within the work area must be avoided and left undisturbed. Where wetlands are within the work area, vegetation cutting/chipping within the designated clear zone is required. Filling, grading, excavating, or draining is not permitted. When working in wetlands or otherwise saturated soil, removable matts will be used and removed when work is complete and the wetland returned to the pre-work grade if there are ruts or other damage. The Environmental Work Plan will describe how work will be conducted in wetlands and areas saturated soil.
Article 3) – Work areas described below and as shown on Attachment “A”
3.1 Base Bid - Work begins at approximately Southern, Latitude & Longitude 41.162900, -81.097756 at the area known as the “Dormitory Road Gate”. The work will continue approximately 6,175 lineal feet following the existing perimeter road to the west.
Replacement of existing 24 foot gate at the end of Dormitory Road and the existing 24 foot gate at Greenleaf in kind is part of the work. Replacement of Greenleaf Road gate will conclude the Base Bid work.
The Alternates will continue west and will be adjoining and contiguous to the base bid or the previous option as indicated in attachment A and the descriptions below.
3.2 Alternate 1 – Work begins at the end of Base Bid work at the replaced Greenleaf road gate. Work will continue west for approximately 1,000 lf.
3.3 Alternate 2 – Work begins at the end of Alternate 1 work and continues west for approximately 1,000 lf.
3.4 Alternate 3 – Work begins at the end of Alternate 2 work and continues west for approximately 1,154 lf where it joins the existing fence installed for the Hinkley Creek crossing. Replacement of 20 foot gate at approximately Lat. 41.16336933 Long. -
81.12866028 in kind is part of the work.
3.5 Alternate 4 – Work begins at the end of the existing fence installed for the Hinkley Creek crossing and continues west for approximately 1,070 lf.
3.6 Alternate 5 - Work begins at the end of Alternate 4 and continues south for approximately 178 lf and turns west for 850 lf for a total of 1,028 lf.
3.7 Alternate 6 – Work begins at the end of Alternate 5 and continues west for approximately 1,000 lf.
3.8 Alternate 7 – Work begins at the end of Alternate 6 and continues west for
3.9 Alternate 8 – Work begins at the end of Alternate 7 and continues west for approximately 1,104 lf.
3.10 Alternate 9 - Work begins at the end of Alternate 8 and continues north for approximately 1,254 lf
3.11 Alternate 10 – Work begins at the end of Alternate 9 and continues west for approximately 1,000 lf. Replacement of 20 foot gate on rollers at Rock Springs Road/SR 80 is part of the work.
3.12 Alternate 11 – Work begins at the end of Alternate 10 and continues west for approximately 1,280 lf. Approximately 280 lf is existing fence segregating an existing pipe that will remain. Approximately 1,000 lf of remove and replaced fence will tie into the ends of the existing fence.
3.13 Alternate 12 – Work begins at the end of Alternate 11 and continues west for approximately 1,000 lf.
3.14 Alternate 13 – Work begins at the end of Alternate 12 and continues west for approximately 1,000 lf. A Portion of the Work in this section is in wetlands. The approximately length of the wetlands is 350 lf. Disturbance of the wetlands shall be kept to a minimum with the use of mats and other devices that will prevent rutting.
The area shall be restored to the pre-work grade at the conclusion of the work.
3.15 Alternate 14 – Work begins at the end of Alternate 13 and continues west for approximately 1,000 lf
3.16 Alternate 15 – Work begins at the end of Alternate 14 and continues west for approximately 1,000 lf
Article 4) -Work to be accomplished
4.1 The Base Bid and accepted Alternate Options as noted of perimeter fence shall be removed and replaced to ensure the security of Camp James A. Garfield Joint Military Training Center (CJAGJMTC). This area does not include sections of fence that have been newly replaced prior to this scope of work. All replacement shall be done in accordance with applicable laws and safety practices. The new posts, fabric, top rail, outriggers, bottom wire and barbed wire shall meet the criteria set forth on Standard Drawing “FE6 Chain-Link Security Fence Details-STD 872-90-03” and in UFC 4-022-03.
This project is to include all gates that are not newly installed prior to this scope of work.
Also In accordance with UFC 4-022-03, all culverts and drainage areas shall follow the specifications under this standard as well.
a. CHAIN LINK FENCING
i. The Chain link Fence fabric shall be 9 gauge galvanized steel and 72” (seventy two inches) high, with 2 x 2 standard weave. Chain link fence is a fencing material made from wire helically wound and interwoven in such a manner as to provide a continuous mesh without knots or ties. Chain link fences and gates must comply with specification requirements in UFGS 32 31 13, Chain Link Fences and Gates and UFGS 32 31 13.53, High-Security Chain Link Fences and Gates. Consult with ASTM F2611 and ASTM F1712 for additional guidance (fabric, post, framework, fittings, and other accessories) regarding chain link fencing. Refer also to the Chain Link Manufacturers Institute’s Security Fencing Recommendations (CLF-SFR0111) and Product Manual (CLF0PM0610) for additional information.
ii. Additional Fencing Fabric Requirements The fencing fabric must be extended to within 2 inches (51 mm) of firm ground and anchored, using horizontal tension wires. This anchoring will prevent the fencing fabric from being able to be lifted by hand more than 5 inches (125 mm) in height. Mesh openings in chain link fencing are not intended to be covered, blocked, or laced with material which would prevent a clear view of personnel, vehicles, or material in outer clear zones. Locate all posts, rails, bracing and tension wires on the secure/protected side, i.e. inner side, of the fencing fabric.
Select the framework components and material from ASTM F626, ASTM F1043, and ASTM F1083.
iii. Chain Link Fencing Fabric
Fencing fabric must be minimum 9-gage wire mesh and mesh openings must not be greater than 2-inches (51 mm) per side. Fence fabric material will be galvanized steel, or aluminum coated steel fabric (use aluminum coated if located in corrosive environment). See Corrosion Prevention Control for additional information regarding material selection.
iv. Top and Bottom Selvages
Selvage is the edge finish on woven chain link fabric joining pairs of pickets. The selvage may be knuckled or twisted depending on application. Knuckled selvage is defined as the type of selvage obtained by interlocking adjacent pairs of wire ends and bending the wire back into a loop. Twisted is obtained by twisting adjacent pairs of wire ends together in a close helix of 11⁄2 machine turns, which is equivalent to three full twists. See UFC 4-022-03 Figure 2-2 for selvage examples. Twisted selvage must be provided on the top of the fence fabric to deter climbing. Twisted selvage must be provided at the bottom of the fence fabric to deter borrowing unless the fence has a bottom rail, is buried, or encased in concrete. In these applications the selvage may be knuckled.
v. Fence Posts
Fencing fabric must be mounted on steel posts that are set in concrete with additional bracing at corners and gate openings, as necessary. If steel posts are not available, reinforced concrete posts will be used. Posts, bracing, and all other structural members must be placed on the secure-side of the fencing fabric.
Posts must be vertical within plus or minus 2 degrees in each direction.
Determine the embedment depth of the fence posts and associated footings considering wind load, local soil conditions, and the potential for wind and water erosion. Posts for security fencing must be embedded and encased in concrete (ODOT QC-1 mix design) according to the design details in STD 872-90-03. The use of a set retarder admixture may be used to extend the batch time of discharge as described in ODOT 499.08.
vi. Fence Bracing
Steel truss rods used for bracing must have a minimum nominal diameter of 5/16 inch (8 mm) and provided with turnbuckles for tensioning. Provide bracing for each gate, terminal and end post. Install truss rods diagonally from near ground level of the gate, terminal or end post to within 6 inches (152 mm) from the top of the fabric at the adjacent line post. Fencing fabric can be securely fastened to tension wires on the top and bottom with 9 gage (3.76 mm) galvanized tie wires incorporating at least three full twists, 9 gage (3.76 mm) round wire galvanized hog rings, or in a manner that provides a tensile strength equal to or greater than the strength of the fencing fabric. Consider securing all fastening and hinge hardware by peening or welding to prevent disassembly of fencing and gate components where warranted by the required level of protection.
b. TOP GUARDS
i. Outrigger/Barbed Wire Arm Material Specifications Top guards must be constructed of the same material as the other fencing components in accordance to ASTM F626. See Drawing STD 872-90-03 for details.
ii. Barbed Wire
1. Fences requiring barbed wire must use a minimum of 3 strands of barbed wire equally spaced. Additional strands may be added as required. Barbed wire must consist of two 12.5 -gage /0.099-inch (2.5
mm) (+0. 005- inch (.127 mm)) twisted line wires with 15- gage /0.080-inch (2 mm)(+0, 005-inch (.127 mm)) round barbs. Barbed wire must be zinc-coated steel, aluminum coated steel, aluminum alloy, or PVC over zinc-coated steel as specified. All barbs must consist of four points and spacing of barbs must be at 5- inch (127 mm) (+1- inch (25.4 mm)) centers.
iii. Special Security Features None required.
iv. Clear Zones A minimum of 10 (ten) feet clear zone will be established by the contractor for security during the installation of the fence.
v. Drainage Culverts and Utility Openings Provide protective measures for culverts, storm drains, sewers, air intakes, exhaust tunnels, and utility openings, that have a cross-section area of 96 square inches (61,939 square mm) or greater, with the smallest dimension being more than 6 inches (152.4 mm) and:
1. Pass through clear zones.
2. Traverse under or through security fences.
Such openings and barrier penetrations will be protected by securely fastened grills, locked manhole covers, or equivalent means to prevent entry or provide forced entry penetration resistance equal that of the fence. Regarding material selection for securing openings/penetrations see Material Selection and Coatings.
Large Diameter Pipes – Multiple Pipes If drainage conditions require large diameter pipes, or if it is a more economical approach to provide security protection, drainage openings may be constructed of multiple pipes having individual diameters of 10 inches (250 mm) or less Extend multiple pipes through the entire conduit, secured to each other and to the large opening. As an economical alternative, reduce the pipe lengths to short segments approximately 6-inches (152 mm) long. Place the short segments at the attack side of the opening and secure them to the welded bar grill.
4.2 Contractor will provide all survey and design work for this project. Contractor will provide material, labor and transportation required for construction of this project. All existing fencing material shall either be retained by Camp Ravenna Joint Military Training Center (CRJMTC) or recycled on behalf of CRJMTC with a monetary credit to the original bid.
Upon completion, the area surrounding the work site will be restored.
Article 5) – Bid Quantities.
5.1 Bid items are as detailed below:
Item Description of work Quan. Unit Total 1 Base Bid - Work begins at approximately Southern, Latitude & Longitude 41.162900, -81.097756 at the area known as the “Dormitory Road Gate”. The work will continue approximately 6,175 lineal feet following the existing perimeter road to the west.
Replacement of existing 24 foot gate at the end of Dormitory Road and the existing 24 foot gate at Greenleaf in kind is part of the work. Replacement of Greenleaf Road gate will conclude the Base Bid work.
1 LS
Total Base bid
The Alternates will continue west and will be adjoining and contiguous to the base bid or the previous option as indicated in attachment A and the descriptions below.
2 Alternate 1 – Work begins at the end of Base Bid work at the replaced Greenleaf road gate. Work will continue west for approximately 1,000 lf.
1 LS
3 Alternate 2 – Work begins at the end of Alternate 1 work and continues west for approximately 1,000 lf.
1 LS
4 Alternate 3 – Work begins at the end of Alternate 2 work and continues west for approximately 1,004 lf where it joins the existing fence installed for the Hinkley Creek crossing. Replacement of 20 foot gate at approximately Lat. 41.16336933 Long. -81.12866028 in kind is part of the work.
1 LS
5 Alternate 4 – Work begins at the end of the existing fence installed for the Hinkley Creek crossing and continues west for approximately 1,070 lf.
1 LS
6 Alternate 5 - Work begins at the end of Alternate 4 and continues south for approximately 178 lf and turns west for 850 lf for a total of 1,028 lf.
1 LS
7 Alternate 6 – Work begins at the end of Alternate 5 and continues west for
1 LS
8 Alternate 7 – Work begins at the end of Alternate 6 and continues west for approximately 1,000 lf.
1 LS
9 Alternate 8 – Work begins at the end of Alternate 7 and continues west for approximately 1,104 lf.
1 LS
10 Alternate 9 - Work begins at the end of Alternate 8 and continues north for approximately 1,254 lf
1 LS
11 Alternate 10 – Work begins at the end of Alternate 9 and continues west for approximately 1,000 lf. Replacement of 20 gate on rollers at Rock Springs Road/SR 80 is part of the work.
1 LS
12 Alternate 11 – Work begins at the end of Alternate 10 and continues west for approximately 1,280 lf. Approximately 280 lf is existing fence segregating an existing pipe that will remain.
Approximately 1,000 lf of remove and replaced fence will tie into the ends of the existing fence.
1 LS
13 Alternate 12 – Work begins at the end of Alternate 11 and continues west for approximately 1,000 lf.
1 LS
14 Alternate 13 – Work begins at the end of Alternate 12 and continues west for approximately 1,000 lf. A Portion of the Work in this section is in wetlands. The approximate length of the wetlands is 350 lf. Disturbance of the wetlands shall be kept to a minimum with the use of mats and other devices that will prevent rutting. The area shall be restored at the conclusion of the work.
1 LS
15 Alternate 14 – Work begins at the end of Alternate 13 and continues west for approximately 1,000 lf
1 LS
16 Alternate 15 – Work begins at the end of Alternate 14 and continues west for approximately 1,000 lf
1 LS
Total all Alternates
Total base bid and all Alternates
Article 6) – Security Requirements
6.1 The CONTRACTOR shall ensure all personnel AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website:http://jko.jten .mil.
6.2 The CONTRACTOR shall ensure all personnel complete the Defense Security Service (DSS) computer based course, OPSEC Awareness for Military Members, DoD Employees and Contractors (GS130.16training). This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete the OPSEC awareness training identified within 15 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 15 calendar days after completion of training by all employees and subcontractor personnel. OPSEC Awareness for Military Members, DoD Employees and Contractors (GS130.16) at: https://securityawareness.usalearning.gov/opsec/index.htm
Article 7) Site Visitation
7.1 If a site visit occurs prior to bidding, contractors will be shown the locations and the portions to be replaced will be marked. Pre-Construction visits if necessary, shall be arranged through Josh Lenhart or Hugh Holley, DIMR Construction Specialist 2, Camp James A Garfield Joint Military Training Center (CJAGJMTC).
Camp James A. Garfield Joint Military Training Center (CJAGJMTC) 8451 State Route 5 S.W.
Ravenna, Ohio 44266.
Article 8) - Point of Contact
Questions concerning the specifications should be directed to Josh Lenhart or Hugh Holley, DIMR Construction Specialist 2 at (614) 336-6567 or (614) 336-4306, Monday through Friday, between 7:00 AM and 3:00 PM, or via Email at joshua.r.lenhart.nfg@mail.mil or hugh.r.holley.nfg@mail.mil .
Article 9) General Environmental Compliance
See Attachment A
Article 10) – Attachments http://jko.jten/ https://web-cols04.mail.mil/owa/redir.aspx?C=cgbJNVl6x-dXmvc2LV9sjZBRPQ2GzYsaemnEpXMUgNF3YPZp29TXCA..&URL=https%3a%2f%2fsecurityawareness.usalearning.gov%2fopsec%2findex.htm mailto:joshua.r.lenhart.nfg@mail.mil mailto:hugh.r.holley.nfg@mail.mil
Attachment A. -Environmental Procedures.
Attachment B. -Plan sheets Attachment C. -Military Fence Standard
Attachment “A”
Environmental Procedures 25 January 2018
1. General
1.1. These Environmental Procedures identify environmental compliance requirements for Ohio Army National Guard (OHARNG) projects. The Environmental Procedures are intentionally broad in scope to ensure contractors have information needed to price and complete work knowing all the requirements. In general these Environmental Procedures are applicable to all OHARNG projects, but some of the conditions are specific to certain types of work such as pest control, renovation, and demolition. Contractors conducting work not specified in these procedures are considered to be in compliance with no specific action required.
1.2. The OHARNG is committed to environmental stewardship at all of our facilities and within our communities as a whole. The Adjutant General’s Department maintains an Environmental Management System (EMS) in accordance with (IAW) ISO 14000 standards.
If implemented accordingly, following the guidelines outlined in the following Environmental Procedures will ensure Contractor compliance with the EMS policy. Through sound environmental management, the OHARNG is committed to:
• Assuring the sustainability and availability of training lands and facilities to enable soldier training and unit readiness.
• Setting and reviewing environmental objectives and target to manage OHARNG significant environmental aspects.
• Establishing the means to enable continual improvement of our environmental program.
• Complying with all relevant environmental legislation and regulations.
• Ensuring soldiers and employees of the OHARNG are informed of environmental program requirements and are able to execute individual and organizational responsibilities.
• Improving upon pollution prevention and reduction strategies through the application of innovative processes and technologies.
• Considering the environmental requirements and impacts in all planning processes relative to training, equipment fielding, and construction.
1.3. The Contractor must comply with all applicable local, state, and federal environmental requirements to include applicable Army and OHARNG regulations. This includes, but is not limited to, the proper characterization, management and disposal of wastes; proper storage, use and transportation of hazardous materials; spill prevention and clean up;
obtaining proper permits and submitting proper notifications as applicable to the work being conducted; and protection of surface water and natural resources.
1.4. The Contractor (to include subcontractors) will not correspond with any regulatory agency regarding an OHARNG project without approval of the OHARNG. This includes meetings, phone calls, emails, permit/application submittals, or other written or verbal communications.
The OHARNG will review and approve all correspondence, to include permit applications and notifications, before they are sent to a regulatory agency to include but not limited to the federal or Ohio Environmental Protection Agency (EPA), the US Fish and Wildlife Service, the Ohio Historic Preservation Office, the US Army Corps of Engineers, County Engineer offices, and local Soil and Water Conservation offices.
1.5. The Contractor is responsible for paying all fees and acquiring all applicable permits or regulatory approvals associated with the work they are performing. Depending upon the permit/notification, it may need to be issued in the OHARNG’s name. Coordination will be done with the OHARNG to determine this and as applicable the Contractor will complete the application/notification for OHARNG signature and submit the application and associated fees. All permit submittals will be coordinated, reviewed and approved by the OHARNG before submittal regardless of who signs the application.
1.6. Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade, establishes a federal integrated strategy toward sustainability including efforts to “eliminate waste, recycle, and prevent pollution.” Additionally, EO 13693 establishes targets to divert at least 50% of non-hazardous solid waste, including construction and demolition debris, from the waste stream. The Contractor will utilize the most current waste prevention, waste diversion (salvage, reuse, recycle), and waste minimization guidelines to ensure this target is met.
1.7. Burning of waste, brush, rubbish, and/or any other debris is not permitted. If brush or vegetation burning is desired, a request to do so must be submitted to the OHARNG for review. If the OHARNG concurs that burning is needed, the Contractor is required to submit a burn permit to the Ohio EPA along with any associated fee. If the Ohio EPA approves the application and issues a permit, the contractor is required to comply with all conditions of the permit. Upon receipt of the Ohio EPA burn permit the contractor will obtain any additional permits required by the OHARNG and/or local fire departments/districts, if any.
2. Environmental Work Plan
2.1. The Contractor will develop an Environmental Work Plan that provides details on the work to be performed and how it will be performed to ensure compliance with applicable environmental requirements. The complexity and content of the plan is directly related to work being performed. Topics addressed within the environmental work plan will include as applicable: description and location of the work to be performed; Contractor and OHARNG points of contact; storm water and sediment and erosion controls (may reference a SWP3 if applicable); site stabilization/seeding; hazardous materials to be used; spill prevention, response, and notification; emergency plan and emergency contact information; the qualified personnel responsible for waste management; waste to be generated (hazardous and non-hazardous waste); materials to be recycled; methods to be used to minimize hazardous waste generation; methods and laboratories to be used to characterize the waste; waste haulers and disposal/treatment facilities to be used (Defense Reutilization Management Office (DRMO) approved waste haulers and treatment, storage, and disposal facilities (TSDFs) must be used for hazardous waste); proposed on site waste storage locations; on site waste management and inspection procedures to be implemented to include maximum storage time/proposed waste pickup/transport date; discharges from secondary containment and de-watering activities; and any other information pertinent to environmental compliance associated with the specific work being performed. The Environmental Work Plan will be reviewed by the OHARNG Environmental Office and edited by the Contractor as necessary to correct deficiencies. Work cannot not begin until this work plan has been approved by the OHARNG Environmental Office. A copy of the final work plan will be available at the project site at all times.
2.2. Two (2) hardcopies and two (2) electronic copy each of the draft version of the Environmental Work Plan will be submitted to the OHARNG for review and approval. The draft plan will have the word “Draft” in the title and at the top or across each page. In addition, lines will be numbered in draft reports to facilitate ease of comments. Initial draft work plan submission must be received by the Environmental Office no later than 30 calendar days from issuance of the notice to proceed. The OHARNG will review the draft work plan and return any comments/changes to the Contractor within two weeks of receipt.
The Contractor will have no more than 10 working days to address comments/changes and resubmit the final draft for approval. The Contractor will resolve all comments to the satisfaction of the OHARNG and provide a final Environmental Work Plan to the Environmental Office. The OHARNG reserves the right to re-evaluate the work plan in the event that unforeseen work conditions are encountered.
2.3. The Contractor will provide two (2) hardcopies and two (2) electronic copies each of the final Environmental Work Plan to the OHARNG. The OHARNG will review the final document to make sure all comments/revisions have been incorporated prior to final acceptance and approval.
2.4. Below is a sample outline for an Environmental Work Plan. Not all sections of the work plan may be applicable. If the section is not applicable insert “NOT APPLICABLE” below the section title, but do not remove the section from the table of contents. If a section is needed that is not included, add it at the end before the appendices.
1.0 Introduction, Site Location, and History
2.0 Contractor and Government Points of Contact
3.0 Description of Work to be Accomplished
4.0 Storm Water Management, Sediment, and Erosion Controls
5.0 Cultural and Natural Resources
6.0 Hazardous Materials Inventory and Management
7.0 Spill Prevention, Response, Notification, and Reporting
8.0 Emergency Plan and Points of Contact
9.0 Air Management, Discharges, Permits
10.0 Pesticide Use
11.0 Waste Management
11.1 Waste Management Point of Contact
11.2 Waste Streams/Types
11.3 Waste Characterization Methods and Labs
11.4 Waste Minimization Strategies and Recycling
11.5 Waste Management Procedures and Processes
11.6 Waste Hauler(s)
11.7 Waste Disposal/Treatment Facility/Facilities
12.0 Summary of Identified Environmental Hazards
13.0 Procedures for Environmental Hazards Abatement/Removal
13.1 Asbestos
13.2 Lead-containing Materials
13.3 PCB-containing Materials
13.4 Floor Sweep
13.5 Mercury-containing Materials/Equipment
13.6 Smoke Detectors
13.7 Exit Signs
13.8 Air Conditioners
13.9 Other Environmental Hazards
14.0 Building Demolition/Renovation Procedures/Methodology
14.1 Pre-demolition/renovation Submittals and Notifications
14.2 Pre-demolition/renovation Site Inspection
14.3 Mobilization
14.4 Demolition/Renovation Methodology
14.4.1 Structural Demolition
14.4.2 Utility Decommissioning
14.4.3 Storm Water Management
14.4.4 Dewatering Procedures
14.4.5 Protection of Environmental Resources
14.4.6 Site Restoration
14.5 Demobilization and Project Closeout
14.6 Job-site clearance report with the air monitoring results
Appendices Appendix A – Site Plan/Aerial Photo Map Appendix B - OHARNG Environmental Environmental Procedures Appendix C – OHARNG Waste Management Guidelines Appendix D – OHARNG Waste Inspection Form Appendix E – OHARNG Demolition Diversion and Waste Disposal Form Appendix F – OHARNG Asbestos Abatement Closeout Form Appendix G – Site-specific Health and Safety Plan
Appendix H – Contractor Licensure Appendix I – OHARNG Daily Pest Control Summary Appendix J – OHARNG Supplemental Pesticide Application Report
3. Emergency Spill Response and Petroleum, Oil, and Lubricant (POL) Management
3.1. The Contractor must comply with the local OHARNG Spill Contingency Plan and implement appropriate measure to prevent spills/releases to the environment and to respond, notify, and report when a release occurs. The Contractor is required to inspect equipment, fuel, and hazardous materials storage areas to ensure there are no leaks or releases. The Contractor is responsible for implementing spill response and cleanup of all spills/leaks within the project area immediately upon discovery. Clean up must be satisfactory to the OHARNG and/or the Ohio EPA or other applicable regulatory agency. Wastes will be managed as described in the waste management section of these Environmental Procedures.
3.2. The OHARNG will be notified of all spills/releases. Incidental releases (petroleum product less than 25 gallons, a release that stays of OHARNG property, not in water, and not a reportable quantity) will be responded to by the contractor and the OHARNG notified by telephone within 2-hours. Any spill of petroleum products over 25 gallons, a spill that goes off of OHARNG property, a spill of any amount into a body of water, or a reportable quantity release must be reported to the OHARNG immediately. All spills/releases must be reported in writing on the OHARNG Spill Report Form (Attachment 1) and submitted to the OHARNG within 24 hours. The Contractor will be provided with a copy of the OHARNG Spill Report Form and a point of contact for submitting such reports/notifications.
3.3. The Contractor is required to have a spill kit with appropriate absorbents, plastic bags, drums, shovels, and other supplies and equipment suitable to clean up any releases or spills from their activities.
3.4. Contractor stationary fuel pods must be in/on secondary containment with a storage capacity of 110% of the container. A double walled container is sufficient secondary containment.
Releases of rain water from secondary containment can only be initiated after approval from the OHARNG Environmental Office and after inspection and verification/absorption of all petroleum, oil, and lubricants (POL) and/or other contaminants in the water by the Contractor. Discharge of POL or other contaminants/pollutants from secondary containment is not permitted. At minimum, discharging through an oil only boom/filter or an oil absorption filter bag is required. If the contractor cannot show proof of lack of contaminants, the water will need to be sampled and characterize to determine the proper discharge/disposal method. The contractor will document all discharges/disposal from secondary containments to include name and signature of person conducting discharge/disposal, date of discharge/disposal, volume discharged/disposed, method of discharge/disposal, method of determining water was clean to discharge (analytical result if applicable), and a statement that any discharge did not contain POL or other contaminants. Discharges from secondary containment will be addressed in the Waste Management Section of the Environmental Work Plan.
3.5. Individual fuel/POL cans (5 gallon or less) and hazardous materials used on job sites must be stored in a manner that prevents release to the environment. This will usually involve a covered storage area with appropriate secondary containment that protects them from rain and accidental damage. Chainsaw fuel and bar oil on logging jobs can be left at the tree felling site in the woods or brought out to the log landing each day.
4. Erosion Control, Storm Water and Other Surface Water Management
4.1. For all projects, regardless of the disturbance acreage, the Contractor will use all methods appropriate and required to prevent soil from leaving the project site either by wind, water, or on vehicles and equipment. Silt fence and other temporary soil run off detention methods will be used as needed. Spoil piles and disturbed areas will be managed in accordance with the stipulations outlined in the Ohio EPA General National Pollutant Discharge Elimination system (NPDES) Storm Water Construction Permit and the most current version of the Ohio Department of Natural Resources’ Rainwater and Land Development Manual; Ohio’s Standards for Storm Water Management, Land Development, and Urban Stream Protection (available on-line). The site must be seeded with a temporary seed mix if left idle for the designated period of time. The project site will be closed out by preparing the soil as a seed bed and seeding and mulching with the appropriate seed mix. Temporary erosion control measures (silt fence) will be removed by the contractor once vegetation has been established and soil on the project area is stabilized.
4.2. Post construction permanent storm water / water quality controls must be designed and installed in accordance with Section 438 of the Energy Independence and Security Act of 2007 (EISA) and the Ohio EPA General NPDES Storm Water Construction Permit. The current technical guidance on implementation of the Section 438 storm water runoff requirements is available on-line. The post construction requirements will be incorporated into all designs/plans and implemented/constructed by construction contractors as part of the initial site preparation.
4.3. Native seed mixes will be used where suitable and compatible with maintenance requirements. An appropriate turf grass mix will be used for high traffic and high maintenance areas. Annual ryegrass can be added to mixes to provide quick cover. For late season seeding, winter wheat/rye can be added to provide a quick cover. Contractors will use the approved grass seed mixes listed below or propose alternative seed mixes. The OHARNG Environmental Office must approve all seed mixes. The seed mixes that will be used will be identified in the Storm Water Management, Sediment, and Erosion Controls section of the Environmental Work Plan.
The following seed is approved for establishment of temporary cover. Species can be mixed if/as necessary for specific application.
• Annual Rye Grass (Lolium multiflorum), broadcast @ 40 lbs/acre, drilled at 30 lbs/acre, mulch with a minimum of 3 bales of straw per 1000 square feet. Use mulch netting or fiber mat on slopes greater than 6%. Grows quickly but of short duration. Good growth during hot summer period.
• Winter Rye (Secale cereal) broadcast @ 112 lbs/acre, drilled at 80 lbs/acre, mulch with a minimum of 3 bales of straw per 1000 square feet. Use mulch netting or fiber mat on slopes greater than 6%. Good for fall seeding. Select a hardy variety.
• Oats (Avena sativa) broadcast @ 80 lbs/acre, drilled at 65 lbs/acre, mulch with a minimum of 3 bales of straw per 1000 square feet. Use mulch netting or fiber mat on slopes greater than 6%. Best for spring seeding. Fall seeding will die when winter sets in.
• 40% Nodding Wild Rye (Elymus canadensis), 40% Virginia wild rye (Elymus virginicus), 15% Partridge Pea (Chamaecrista fasciculata), and 5% Black-eyed Susan (Rudbeckia hirta), broadcast @ 35 lbs/acre, drilled at 25 lbs/acre, mulch with a minimum of 3 bales of straw per 1000 square feet. Add 20 lbs/acre of Annual Rye Grass (Lolium multiflorum) to the broadcast mix and 15 lbs/acre to the drilled mix. Good for areas that will remain unfinished indefinitely.
• 23.5% Nodding Wild Rye (Elymus canadensis), 25% Virginia wild rye (Elymus virginicus), 18.75% Partridge Pea (Chamaecrista fasciculata), 1.5% Black-eyed Susan (Rudbeckia hirta), and 31.25% Little Bluestem (Schizachyrium scoparium), broadcast @ 25 lbs/acre, drilled at 18 lbs/acre), mulch with a minimum of 3 bales of straw per 1000 square feet. Add 20 lbs/acre of Annual Rye Grass (Lolium multiflorum) to the broadcast mix and 15 lbs/acre to the drilled mix. Good for late season (after 15 September) quick temporary cover.
The following seed is approved for establishment of permanent cover in areas that are not maintained as turf grass or high foot traffic areas such as range impact areas that are not regularly mowed, roadsides outside of cantonment areas, fence lines outside of cantonment areas, etc. Substitution with similar species is permitted but must be approved by the OHARNG Environmental Office.
• 23.5% Nodding Wild Rye (Elymus canadensis), 25% Virginia wild rye (Elymus virginicus), 22% Little Bluestem (Schizachyrium scoparium), 18.75% Partridge Pea (Chamaecrista fasciculata), 7.75% Thin-leaved Coneflower (Rudbeckia triloba), 1.5% Brown fox sedge (Carex vulpinoidea), 1.5% Black-eyed Susan (Rudbeckia hirta), broadcast @ 18 lbs/acre, drilled at 12 lbs/acre, mulch with a minimum of 3 bales of straw per 1000 square feet. Add 20 lbs/acre of Annual Rye Grass (Lolium multiflorum) to the broadcast mix and 15 lbs/acre to the drilled mix. This mix is for use in open areas that receive good sunlight.
• 31% Deertongue (Dichanthelium clandestinum), 25% Virginia wild rye (Elymus virginicus), 25% Nodding Wild Rye (Elymus canadensis), 10% Big Bluestem (Andropogon gerardii), and 9% Side-Oats Grama (Bouteloua curtipendula), broadcast @ 30 lbs/acre, drilled at 20 lbs/acre), mulch with a minimum of 3 bales of straw per 1000 square feet. Add 20 lbs/acre of Annual Rye Grass (Lolium multiflorum) to the broadcast mix and 15 lbs/acre to the drilled mix. This mix is for use in shaded areas, partial sun, and openings in the forest canopy.
Areas that are maintained with regular mowing during the growing season and receive heavy foot traffic will be seeded with an appropriate turf grass mix. Such areas include lawns in cantonment areas, parade fields, and range operational control areas (ROCAs). Turf grass mixes of Kentucky blue grass, fine fescue, and perennial ryegrass using varieties appropriate for the specific application will be identified by the contractor and reviewed and approved by the OHARNG prior to application. Contractors will provide draught resistant varieties in seed mixes. A potential mix and varieties are as follows.
• 40% Kentucky Bluegrass (applicable varieties), 30% Perennial Ryegrasses (applicable varieties), 20% Hard Fescue (applicable varieties), and 10% Creeping Red Fescue (applicable varieties)
4.4. For projects that disturb one (1) or more acres of ground (or otherwise meet the Ohio EPA criteria for permit coverage), the Prime Contractor will obtain coverage under the Ohio EPA General NPDES Permit for Storm Water Discharges Associated with Construction Activity.
The Contractor will submit a Notice of Intent (NOI) as the Operator and pay the applicable fee. The NOI must be approved by the OHARNG Environmental Office prior to submittal to the Ohio EPA. The Contractor will coordinate the content of the NOI with the OHARNG Environmental Office and will make modifications as directed. The contractor is required to have a Storm Water Pollution Prevention Plan (SWP3) prior to submitting the NOI (see below for SWP3 information). Subcontractors, as applicable, will submit co-permittee NOI’s after the Prime Contractor has obtained authorization and a permit number from the Ohio EPA. All co-permittee NOI’s must be approved by the OHARNG Environmental Office prior to submittal to the Ohio EPA. Copies of all NOI’s and Ohio EPA authorization letters will be provided to the OHARNG project manager and Environmental Office. In situations where the construction permit is in the name of the OHARNG, the Contractor and applicable subcontractors will be co-permittees under the OHARNG’s permit.
4.5. In the absence of an Architect and Engineer (A&E), the Contractor is responsible for the development of Erosion and Storm Water Control (E&S) Plans and Details and the subsequent development of a Storm Water Pollution Prevention Plan (SWP3) in accordance with the requirements contained in the Ohio EPA General NPDES Permit for Storm Water Discharges Associated with Construction Activity. The Contractor will ensure that E&S controls and permanent post construction / water quality controls comply with Section 438 of the Energy Independence and Security Act of 2007 (EISA) and the latest version of the Ohio Department of Natural Resources publication titled "Rainwater and Land Development - Ohio's Standards for Storm Water Management and Land Development and Urban Stream Protection" (available on-line). If A&E E&S and post construction storm water / water quality control designs are available, the Contractor will prepare a SWP3 based on the plans and details provided by the A&E. The Contractor will submit a draft SWP3 to the Environmental Office no later than 30 calendar days from issuance of the notice to proceed.
The OHARNG will review the draft SWP3 and return any comments/changes to the Contractor within two weeks of receipt. The SWP3 will be evaluated using the Ohio EPA Storm Water Pollution Prevention Plan Checklist for Construction Activities (OHC000004) (Attachment 2). The Contractor will have no more than 10 working days to address comments/changes and resubmit the final draft for approval. Once approved by the Environmental Office, the SWP3 will be provided to the local Soil and Water Conservation District (SWCD) and local County Engineer (if required by County or other regulations) by the Contractor for their review and approval. The Contractor will make corrections to the SWP3 based upon OHARNG, SWCD and Engineer comments. The SWP3 will be signed by an authorized representative of the Contractor. The final copy of the SWP3 will be put in a three ring binder and a signed copy of the SWP3 will be given to the OHARNG Environmental Office, the project manager, and a copy will remain at the work site during project execution. If an A&E developed SWP3 is provided, the Contractor will modify it to include missing required project specific information. The OHARNG reserves the right to re-evaluate the SWP3 in the event that unforeseen work conditions are encountered.
4.6. When an A&E firm is hired to do a design, the A&E will design post construction permanent storm water/water quality controls in accordance with Section 438 of the Energy Independence and Security Act of 2007 (EISA) and the Ohio EPA General NPDES Storm Water Construction Permit as part of the design. The A&E will also develop Erosion and Storm Water Control (E&S) Plans and Details, notes, and details suitable for inclusion in the project Storm Water Pollution Prevention Plan (SWP3). Post-construction and construction controls will conform to the latest version of the Ohio Department of Natural Resources publication titled "Rainwater and Land Development - Ohio's Standards for Stormwater Management and Land Development and Urban Stream Protection" (available on-line). If required in the design scope of work/contract, the A&E will develop a complete SWP3 in compliance with the requirements in the Ohio EPA General National Pollutant Discharge Elimination System (NPDES) Permit for Storm Water Discharges Associated with the Construction Activity. The SWP3 will be evaluated using the Ohio EPA Storm Water Pollution Prevention Plan Checklist for Construction Activities (OHC000004) (Attachment 2). The A&E will submit the draft SWP3 to the Environmental Office no later than 30 calendar days from issuance of the notice to proceed. The OHARNG will review the draft SWP3 and return any comments/changes to the A&E within two weeks of receipt. The
A&E will have no more than 10 working days to address comments/changes and resubmit the final draft for approval. After review and approval by the OHARNG Environmental Office the A&E will coordinate review of the E&S plans and SWP3 with the local County Engineer and local Soil and Water Conservation District as applicable and make required revisions based on agency reviews. The final copy of the SWP3 will be put in a three ring binder. A signed copy of the SWP3 will be given to the OHARNG Environmental Office and the project manager. A copy of the SWP3 will made for and kept at the work site. The A&E will complete a draft NOI. The General Contractor will add any required project specific information to the E&S plans, SWP3, and draft NOI as applicable. Upon approval by the OHARNG, the General Contractor will submit the NOI and payment to the Ohio EPA. The OHARNG reserves the right to re-evaluate the SWP3 in the event that unforeseen work conditions are encountered.
4.7. The Contractor will implement the SWP3 and conduct all inspections and maintain storm water/erosion controls in accordance with the SWP3. The Contractor will use the inspection checklist for storm water controls in the SWP3 and will complete and maintain signed inspections on site in the SWP3 binder. Copies of weekly/post storm event inspections will be provided to the OHARNG project manager and Environmental Office monthly. The Contractor will notify the OHARNG project manager and Environmental Office immediately if there is a storm water control failure and off site discharge from the project area. Any proposed changes to the SWP3 must be coordinated with and approved by the OHARNG.
4.8. The Contractor will notify the OHARNG project manager and Environmental Office within 45 days of final site stabilization. The OHARNG Environmental Office will inspect the site to determine if adequate site stabilization has been achieved.