RFI Template.pdf
PDF 183 KB Posted
- Attached to
- Fence Replacement at CJAGMTC Federal contract opportunity
- Solicitation number
- W91364-20-B-0002
About this file
This document contains a request for information (RFI) template and details of a related federal contract opportunity for fence replacement services. The contract opportunity is a solicitation issued by the Department of the Army Ohio Army National Guard to remove and replace approximately 6,175 lineal feet of perimeter security fence at the Camp James A. Garfield Joint Military Training Center in Ravenna, Ohio. The base bid requires fence removal and replacement along the perimeter road from the dormitory road gate to the south. Optional additional work is included for contiguous sections proceeding clockwise along the perimeter. The replacement fence must meet current military standards. Temporary fencing must be installed and the work area secured each day. All disturbed areas must be reseeded and mulched. The response due date for the solicitation is not provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 1409 Signed 8SEP.pdf | ||
| Fence Replacement Amendment 003.pdf | ||
| 91364-20-B-0002_Fence sign in sheet_13-08-2020.pdf | ||
| Fence Solicitations Q_A UPDATED 25AUG2020_Answered.xlsx | XLSX spreadsheet | |
| Fence Solicitations Q_A UPDATED 18AUG2020.xlsx | XLSX spreadsheet | |
| Fence Solicitation Modification 2.0 UPDATED 18AUG2020.docx | DOCX document | |
| CJAGJMTC Fence Solicitation Modification.pdf | ||
| 10_BidForm_CJAG_Perimeter_Fence_rem_rep.docx | DOCX document | |
| CJAGMTC Fence Solicitation.pdf | ||
| 9_AF Form 66_3916441_Perimeter_Fence_rem rep.xlsx | XLSX spreadsheet | |
| CJAGJMTC_SOW_Perimeter_Fence_Rep_3916441_.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NUMBER: REQUEST FOR INFORMATION RFI NUMBER:
PROJECT NUMBER / CONTRACT TITLE:
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.