PRE BID RFIs ANSWERS.pdf
PDF 12 MB Posted
- Attached to
- MPMG Range Construction Federal contract opportunity
- Solicitation number
- W9136420B0001
About this file
This solicitation is for the construction of a Multi-Purpose Machine Gun (MPMG) Range at Camp James A. Garfield Joint Maneuver Training Center in Ohio. The proposed work consists of building the MPMG Range as detailed in the attached specifications and drawings. The range will provide the Ohio Army National Guard and other users of the training center the ability to qualify on strategic weapons. The estimated value is between $5-10 million. Responses are not due at this time as funds are not presently available, but the government anticipates funds will be allocated by September 30, 2020. The award will be fixed-price and made to the responsible bidder offering the lowest price that conforms to the solicitation requirements. The North American Industry Classification System code for this project is 236220. The small business size standard is $39.5 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Signed Abstract Of Offers MPMG SF1409.pdf | ||
| W91364-20-B-0001-0004 AMENDMENT.pdf | ||
| W91364-20-B-0001 Amendment 3.pdf | ||
| OHD02 Base Bid Utility Line Demolition Plan.pdf | ||
| W91364-20-B-0001-0002 SF30.pdf | ||
| OHD03 Option 4 North Utility Line Demolition Plan.pdf | ||
| W91364-20-B-0001-0001 SF30.pdf | ||
| MPMG Pre-Bid RFI Log.xlsx | XLSX spreadsheet | |
| OHD01 Overall Utility Line Demolition Plan.pdf | ||
| Amendment 1 Drawings.pdf | ||
| 9JUL 2020 Site Visit Sign in Sheet.pdf | ||
| RFI Template.pdf | ||
| AF66_List_Material_Submittals.pdf | ||
| W91364-20-B-0001 SOLICITATION.pdf | ||
| SPECS_MPMG_BidFinal_R2_20200124.pdf | ||
| DRWGS_MPMG_BidFinal_20200122.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT NUMBER:
W91364-20-B-0001 REQUEST FOR INFORMATION
RFI NUMBER:
PROJECT NUMBER / CONTRACT TITLE:
Project 390285 MPMG (Multi-Purpose Machine Gun) Range on CJAGJMTC
PRIME CONTRACTOR:
Dawn/AM Higley JV
SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
Site Visit
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE:
330-658-7711 X105
FAX: COST IMPACT: X
YES NO
DATE SUBMITTED:
10 July 2020
RESPOND BY:
20 July 2020
INFORMATION REQUESTED
1. Is it possible to schedule another site visit to review existing conditions due the limited time attendees had during the initial site visit?
By: Dave Butler Date: 10 July 2020
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
Per the KO no other site visits are allowed.
Grant Stoner, SGT CJAG DPW 07/14/2020
CONTRACT NUMBER: REQUEST FOR INFORMATION RFI NUMBER:
PROJECT NUMBER / CONTRACT TITLE:
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
W9136420B0001 / Muliti-Purpose Machine Gun Range
Knoch Corporation DiGioia-Suburban Excavating
Request for CAD Files
CIVIL 312000 EARTHWORK
330.244.1440 330.244.1445 X 6-25-2020
Request for CAD files for the purposes of grading and site-work take-offs. The software tools produce detailed and accurate information - and thereby the best possible pricing for the owner.
Yes Civil CAD files will be provided.
07/14/2020Grant Stoner, SGT CJAG DPW
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
W9136420B0001 / Muliti-Purpose Machine Gun Range
Knoch Corporation Botzum Bros. Hardware
Hollow Metal Doors - Specifications Clarification
ARCHITECTURAL 081113 HM Doors and Frames
330.244.1440 330.244.1445 X 6-26-2020
Are we to furnish “Steel-Stiffened” doors or “Standard” 16ga. with “Standard” cores?
The specification lists both.
Contractor is to comply with specifications 074113.16, 074113.23, 074113.13, 074113.19 and 074113.53.
Contractor to comply with the Design Criteria on plan sections S-001 for Roof and Wall panel performance requirements.
07/14/2020CJAG DPW
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
Contractor is to comply with Specifications sections 074113.16, 074113.23, 074113.13, 071113.19 and
074113.53 and the design criteria listed on plan page S-001 for Roof and Wall panel performance requirements.
ckirkpatrick Text Box W9136420B0001 / Muliti-Purpose Machine Gun Range ckirkpatrick Text Box Knoch Corporation Courtad-Dalton ckirkpatrick Text Box Sole Spec Product ckirkpatrick Text Box ARCHITECTURAL MAT'L LEGEND 074113 Roof and Wall Panels ckirkpatrick Text Box
330.244.1440 330.244.1445 X 6-26-2020 ckirkpatrick Text Box Architectural Drawings A-112, A-121, A-131, A-140, A-150, A-160
Butler Buildings is called for Metal Roof and Metal Wall Panels. Please provide a performance specification and/or other allowable manufacturer's.
Butler Buildings distribution system precludes contractors from purchasing or installing their products.
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
The person applying pesticides is required to have a commercial applicator certification in their name for applicable categories. If the general contractor subcontracts pesticide applications, the individual from the subcontractor who does the application is required to hold an applicable certification in their name and the General Contractor would not need to be certified.
Tim Morgan 13 July 2020
Grant Stoner, SGT CJAG DPW 07/14/2020 dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text W9136420B0001 / dharmaja.koka Typewritten Text MPMG (Multi-Purpose Machine Gun) Range on CJAGJMTC dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text Nisou LGC JV, LLC dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text Ohio Applicator License for pesticides.
dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text C-002 dharmaja.koka Typewritten Text Pesticides Note 1.
dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text
(248) 229-9789 dharmaja.koka Typewritten Text 06/26/2020 dharmaja.koka Typewritten Text Dharmaja Koka dharmaja.koka Typewritten Text 06/26/2020 dharmaja.koka Typewritten Text
1. As per C-002, notes under dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text pesticide state " dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text
THE GENERAL CONTRACTOR MUST POSSESS A CURRENT OHIO APPLICATOR LICENSE AS A
COMMERCIAL PESTICIDE APPLICATOR CERTIFIED IN THE APPLICABLE CATEGORIES FOR THE
TASKS TO BE PERFORMED. ALL INDIVIDUALS WHO APPLY HERBICIDES AT OHARNG FACILITIES
MUST BE CERTIFIED BY THE STATE OF OHIO IN THE APPROPRIATE CATEGORIES.
NON-CERTIFIED INDIVIDUALS MAY NOT MIX OR APPLY HERBICIDES, TO INCLUDE OPERATING
VEHICLE MOUNTED EQUIPMENT, REGARDLESS IF THEY ARE SUPERVISED BY A CERTIFIED
INDIVIDUAL OR NOT"
dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text Does this mean the General contractor will still require Ohio applicator license even though this scope of work is subcontracted to a certified subcontractor? Please advise.
dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text dharmaja.koka Typewritten Text
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
DRS Enterprises, Inc.
AutoCAD Drawings
Can you please provide the drawings in AutoCAD.
DRS Enterprises 6/30/20
W9136420B0001 MPMG RANGE on CJAGJMTC
Yes Civil CAD files will be provided.
Grant Stoner, SGT CJAG DPW 07/14/2020
Grant Stoner, SGT CJAG DPW 07/14/2020
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
DRS Enterprises, Inc.
Personnel Requirements
What are the on-site supervision requirements for this contract?
DRS Enterprises 7/1/20
W9136420B0001 MPMG RANGE on CJAGJMTC
Grant Stoner, SGT CJAG DPW 07/14/2020
Grant Stoner, SGT CJAG DPW 07/14/2020
The onsite Superintendent must be a ‘competent person’ as defined in 29 CFR 1926.1101(b) and must be onsite full time during the project.
CONTRACT NUMBER: REQUEST FOR INFORMATION RFI NUMBER: 005
PROJECT NUMBER / CONTRACT TITLE: 390285 FY19 / Multiple Purpose Machine Gun Range
PRIME CONTRACTOR: Erie Affiliates SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
Data/Telecommunications Drawings
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: 216-402-3027 FAX: 440-943-5013 COST IMPACT:
YES NO
DATE SUBMITTED:
7/6/2020
RESPOND BY:
INFORMATION REQUESTED
During the review of the electrical/telecommunications drawings, the following questions were raised.
The following drawings do not match:
MTDP 1-100 ES404 DOES NOT MATCH E-602
MTDP 5-400 ES405 DOES NOT MATCH E-602
MTDP 9-200 ES400 DOES NOT MATCH E-602
The following questions were also raised and drawings were not able to be located.
E-512 Size of Telecommunications Rack Tag on Rack shows 24Wx36Dx84H note state 22WX36DX84H What size of rack should be installed?
Drawing E-508 mentions T-101,T102, T502 I have been unable to find these drawings Drawing T-110 mentions CT T-401, T-502, T-501, T501, T-601, T506 AND T-001 I have been unable to find these drawings Drawing E512 mentions T Drawing that could not be located
By: Steve Visocky Date: 7/8/2020
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
RESPONSE
• ES404 Change MIT-1-100 Data Panel to TDP-1-1 Panel.
• ES405 Change WSIT-5-400 Data Panel to MTDP 5-4, Label SIT-6-300 Panel TDP-6-3.
• ES400 Change SIT-9-200 Data Panel to TDP-9-2.
• Per E512 Floor Rack Size will be 24x36Dx84H.
• Drawings T101, T102 & T502 have been deleted from the project, refer to Detail 3/513 & 7/514. All exterior electrical and data boxes shall be weather proof.
• Other than T-110 there are no T series drawings. The T series have been replaced with E 120, E130, E140, E150, E160, E
511, E512, E513, E514 and ES400 to ES 412 Range Data and E602 Range Single line.
• See above regarding T Drawings
Grant Stoner, SGT CJAG DPW 07-20-20
REQUEST FOR INFORMATION
RFI NUMBER: 002
PRIME CONTRACTOR: Erie Affiliates SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI: Public Address Speakers
DRAWING(S): T-110,
E-512, E-513
DETAIL(S): 1, 3, 4 SPECIFICATION: CPM ACTIVITY #:
PHONE: 440-943-5995 FAX:440-943-5013 COST IMPACT:
YES NO
DATE
SUBMITTED:7/6/2020
RESPOND BY:
INFORMATION REQUESTED
Detail 1/T110 shows the Control Room Plan. Note 11 shows 2 speakers at the corner of the control tower.
Detail 3/E-512 shows the Public Address One-Line Diagram
Detail 4/E-512 shows the PA System Riser Diagram
Detail 3/E-513 shows the Speaker Mounting Detail at the firing line pole.
The site drawings are mute as to how many Firing Line Poles there are.
How many public address speakers are there?
By: William Brown Date: 7/6/2020
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance
11 PA speakers, 9 Firing Lane poles.
07/14/2020Grant Stoner, SGT CJAG DPW
CONTRACT NUMBER: REQUEST FOR INFORMATION RFI NUMBER: 003
PRIME CONTRACTOR: Erie Affiliates SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI: Monitoring Well Modifications
DRAWING(S): CD-
100; C-509
DETAIL(S): #3 SPECIFICATION: CPM ACTIVITY #:
PHONE: 216-402-3027 FAX: 440-943-5013 COST IMPACT:
YES NO
DATE SUBMITTED:
7/6/2020
RESPOND BY:
INFORMATION REQUESTED
Per Drawing CD-100 Note #3, the existing monitoring wells that have been disturbed greater than 12” will need to be evaluated and adjusted by a licensed driller. Please provide additional information regarding the depths of the wells located within the project area, additional information regarding the adjustments that are anticipated, and/or specifications, beyond Drawing D-509 Detail #3 for the removal and re-installation of the monitoring wells/well pads that will need to be adjusted.
By: Steven Visocky Date: 7/6/2020
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
All wells will have the surface protection removed and the 2-inch PVC casing cut down to accommodate a new flush mount surface completion complete with a 3ft x 3ft 4-inch thick pad with rebar reinforcing installed. See enclosed manhole specifications.
The final height of the monitoring well casing (if altered) must be surveyed by a licensed surveyor for the new elevation taken on the north side of the 2-inch PVC casing. The new ground elevation for the concrete pad must also be surveyed. The survey must be accurate to 1/100th of a ft. tied to mean sea level. The amount of well adjustment will be determined by the final grade at the well locations. If wells need to be raised, no glues can be applied to the well casing. Extreme care must be taken in adjusting the wells.
If any wells are damaged, contaminated, or made unusable, they will require proper abandonment, replacement, and sampling by the contractor. Some of the monitoring wells have dedicated pumps installed. These will be removed and stored by the OHARNG.
A 48 hour notice will be required to achieve this task prior to any well work. All work will be inspected by a representative of the OHARNG. The enclosed table provides current ground, top of PVC casing, and height of protective structure elevations.
CJAG Environmental Office 07/14/2020
WELL CONSTRUCTION DETAILS
RVAAP-05 WINKLEPECK BURNING GROUNDS
RVAAP Area Well ID Ohio State
Plane Easting
Ohio State Plane
Northing
Ground Level
Elevation a
Total Drilled Depth b
TOC
Elevation a
Well Head Type c
Monitored Zone
Top of Screen
(ft, BGS)
Bottom of
Screen (ft, BGS)
Bottom of Inner
Casing, Plug or
End Cap (ft, BGS)
Stickup Height
(ft, AGS)
Reported Bottom of
Inner Casing (ft, BTOC)
Aug 2013 Measured Bottom of Casing (ft, BTOC)
Sediment
Accumulation (ft)
Description of Bottom
Winklepeck Burning Grounds
WBGmw-005 2357163.55 563037.18 1,052.20 19.0 1,054.70 A Unconsolidated 8.3 18.3 18.6 2.50 21.1 21.12 -0.02 hard
WBGmw-006 2359087.79 563008.87 1,012.16 19.0 1,014.66 A Unconsolidated 7.6 17.6 17.9 2.50 20.4 20.14 0.26 hard
WBGmw-007 2360420.44 562479.87 998.09 24.0 1,000.59 A Unconsolidated 13.5 23.5 23.8 2.50 26.3 26.38 -0.08 hard
WBGmw-008 2359700.57 562010.35 1,005.71 18.5 1,008.21 A Unconsolidated 8.1 18.2 18.5 2.50 21.0 20.80 0.20 hard
WBGmw-009 2357159.20 561603.54 1,045.03 24.0 1,047.53 A Unconsolidated 11.4 21.4 21.5 2.50 24.0 24.27 -0.27 medium
WBGmw-010 2356051.96 562893.20 1,067.10 21.0 1,069.85 A Unconsolidated 10.5 20.5 20.8 2.75 23.6 23.29 0.31 hard
WBGmw-011 2356187.29 562609.18 1,069.70 22.0 1,072.38 A Unconsolidated 11.0 21.0 21.3 2.68 24.0 23.75 0.25 medium
WBGmw-014 2360439.22 562061.26 994.10 23.0 996.78 A Unconsolidated 12.0 22.0 22.3 2.68 25.0 24.93 0.07 hard
WBGmw-015 2359182.41 562340.12 1,009.10 22.0 1,011.60 A Unconsolidated 11.0 21.0 21.3 2.50 23.8 23.43 0.37 hard
WBGmw-016 2360645.88 562709.13 994.90 24.0 997.03 A Unconsolidated 13.0 23.0 23.3 2.13 25.4 25.05 0.35 hard
WBGmw-017 2359603.84 562913.24 1,004.00 22.0 1,006.62 A Unconsolidated 11.0 21.0 21.3 2.62 23.9 23.33 0.57 hard
WBGmw-018 2361302.00 562659.00 990.50 24.0 991.45 A Unconsolidated 13.5 23.5 23.8 0.95 24.8 24.77 0.03 hard
WBGmw-019 2361304.00 562645.00 989.30 50.0 990.25 A Sharon 39.55 49.55 49.85 0.95 50.5 50.48 0.02 medium
WBGmw-020 2357161.00 561623.00 1,043.40 43.3 1,044.31 A Sharon 32.9 42.9 43.2 0.91 43.8 43.59 0.21 medium
WBGmw-021 2359106.00 563009.00 1,010.00 42.5 1,010.92 A Sharon 32 42 42.3 0.92 43.1 43.08 0.02 hard a elevations are in feet above mean sea level (amsl) b total drilled well borehole depth relative to ground surface.
c A = above grade completion; F = flush-mount completion
NA = Not available
AGS = above ground surface
BGS = below ground surface
BTOC = below top of casing
Morrison Bros. 519 Series 12 in. Watertight Test Well Manhole w/ 8 in. Skirt
SKU: MO5190200AMP
Manufacturer: Morrison Bros.
Size: 12 in.
Length: 8 in. Skirt
Type: Manhole
Material: Cast Iron
Weight: 67.00 LBS
REQUEST FOR INFORMATION 1
R E
Q U
E S
T O
R S
E C
T
IO
N
From: SAF INC Date: 7/6/20
To: Jamison Harned
1. Solicitation Number:
W9136420B0001
2. Location of Project:
Camp James A Garfield
3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)
The erosion control plan sheets show the proposed culverts as 18” HDPE.
The grading & drainage plan sheets show the same culverts as 12” HDPE.
Can you please verify which is correct?
Thank you
Attachments:
N/A
Date Response Required:
By:
Zach Bloss
Title:
Project Manager Requestor's Email: Zbloss@safinc.us.com Requestor's Telephone Number:
330-206-1206
R E
S P
O N
S E
To: Date:
Response:
This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.
This information is a proposed change to the solicitation/contract. An amendment will be issued.
Contracting Officer:
Contractor are to use the Grading and Drainage Plans (C-101 to C-112) as the Basis for pricing the Drainage.
mailto:Zbloss@safinc.us.com
RFI NUMBER: 001
PROJECT NUMBER / CONTRACT TITLE: 390285 FY19 / Multiple Purpose Machine Gun Range
PRIME CONTRACTOR: Erie Affiliates SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI: Missing Technical Plans
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: 440-943-5995 FAX:440-943-5013 COST IMPACT:
YES NO
DATE
SUBMITTED:7/6/2020
RESPOND BY:
INFORMATION REQUESTED
Where are plans T-001, T-401, T-501 thru T-506 and T-602?
E-512 mentions T-601 and T-602 E-514 mentions T-506 T-110 mentions T-001, T-401, T-501 thru T-506, T-601 and T-602
By: William Brown Date: 7/6/2020
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
• Other than T-110 there are no T series drawings. The T series have been replaced with E 120, E130, E140, E150, E160, E 511, E512, E513, E514 and ES400 to ES 412 Range Data and E602 Range Single line.
RFI NUMBER: 004
PRIME CONTRACTOR: Erie Affiliates SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI: Public Address Speakers
DRAWING(S): E602, DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: 440-943-5995 FAX:440-943-5013 COST IMPACT:
YES NO
DATE
SUBMITTED:7/7/2020
RESPOND BY:
INFORMATION REQUESTED
Drawing E-602 does not match some of the Branch Data Distribution Drawings
• MTDP 1-100 ES404 DOES NOT MATCH E-602
• MTDP 5-400 ES405 DOES NOT MATCH E-602
• MTDP 9-200 ES400 DOES NOT MATCH E-602
By: William Brown Date: 7/6/2020
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance
Please clarify your question, and resubmit the RFI.
Grant Stoner, SGT CJAG DPW
RFI NUMBER: 1
PROJECT NUMBER / CONTRACT TITLE: 390285 MPMG Range on CJAGJMTC
PRIME CONTRACTOR: Cavanaugh Building Corp
SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI: Pre-Bid Questions
DRAWING(S):
Electrical & Tech
DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED:
July 8, 2020
RESPOND BY:
1. On drawing ES101, all of the scales for the 3 views are NTS. I couldn’t find a drawing that I could go off of for scaling purposes. Is there any way that they can provide scaling for these? We are dealing with 10,000 feet of overhead transmission lines that could get ugly and someone will get this wrong.
2. I’ve included 3 pictures, I want to confirm that we are only providing (1) 3” conduit from the MV switch to the power pole. Picture 1 and 2 shows (1) 3”C, but picture 3 mentions (2) 4”C in the detail. Do they want (1) 3”C? Do they want (1) 3”C and (1) 3”C spare? Do they want (2) 4”C?
Picture 1
Picture 2
Picture 3
3. Drawing E603, picture #4, the grounding for all of the 50kVA transformers mention #2 grounding, however on drawing E510, detail 2, picture #5, shows #4/0 grounding. Which is correct?
4. Drawing E510, detail 2, is a transformer “pad” grounding detail, (Picture 5), mentions 15’ of slack is to be left in
“vault”. Do they want a transformer pad? Or a transformer vault?
Picture 4
Picture 5
5. Drawing ES102, Building “E” Enclosure Latrine, keyed note 5 refers to drawings E110, 120, 130, 140, 150, 160, none of these drawings are for the Enclosure Latrine. Are there any power requirements for this enclosure? Drawing E603, 1-line drawing does not show a feed for this. Please confirm that this is not required.
6. Drawing T110, mentions “continuation on T100”, there isn’t a drawing T100. Also, General Notes on T110 refer you to T001 through T602, however these are not included in the plan set. Please Advise.
By: Date:
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
RESPONSE
A 1. Contractor to use estimated:
6,100 LF for distance of power lines, data and poles for ES101 Detail 1 base bid, 1,400 LF for distance of power lines, data and poles for ES101 Detail 2, 9,000 LF for distance of power lines, data and poles for ES101 Detail 5 (OP4 Option 4).
A 2. Contractor to use 2 each 4” conduits.
A 3. Transformer T-DP1 is to be grounded per detail 2 on E-510. The remaining Power Control Center Emplacement.
Transformers shall be grounded using #2 AWG.
A 4. A transformer pad is required.
A 5. No electrical service is required for the Enclosure Latrine.
A 6. Other than T-110 there are no T series drawings. The T series have been replaced with E 120, E130, E140, E150, E160, E 511, E512, E513, E514 and ES400 to ES 412 Range Data and E602 Range Single line.
RFI NUMBER: 2
PROJECT NUMBER / CONTRACT TITLE: 390285 MPMG Range on CJAGJMTC
PRIME CONTRACTOR: Cavanaugh Building Corp
SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI: Pre-Bid Questions
DRAWING(S):
Electrical & Tech
DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED:
July 15, 2020
RESPOND BY:
1. Drawing E140, Covered Mess Building, shows the electrical panel CM1 being mounted on a column. Drawing
ES102, is the picture I included, and placed the possible location that the panel will go. Do they want the panel on the backside of the building or the front? Keyed note 5 shows it on the opposite side, please confirm desired location.
2. Drawing C-507, shows the transformer for where the transformer will be located, but it doesn’t show where the electrical panel will be located. Do they want the electrical panel mounted on the wall? Or will it be free standing next to the transformer?
3. Drawing ES300, shows specific routing of the conduits to feed the 108 panels. Are we allowed to run “best possible means and methods” while avoiding the wetlands? Or are we required to run these specific routes?
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
A: 1. Contractor will install the panel as shown on drawing E 140
A: 2. Place the electrical panel on the full wall of the Power Control Emplacement. The 1’-6” clearance required for the Transformer shall apply to the panel as well.
A. 3. For bid purposes the contractor shall follow the routes shown on the plans.
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
W9136420B0001 / Muliti-Purpose Machine Gun Range
Knoch Corporation
Mowing Requirements
Civil 012200 Environmental Procedures
330.244.1440 330.244.1445 X 7-09-2020
With regards to Specification 012200 Environmental Procedures, Environmental Work Plan:
Is the General Contractor responsible for regular mowing during the growing season?
Is the General Contractor responsible for mowing the entire 200 acre work limits to maintain less than 10" tall?
Is the General Contractor responsible for mowing the ROCA only?
With regards to Specification 329200 Turf and Grasses. Do these mowing and maintenance requirements apply only to new plantings or existing areas as well?
Regarding Section 012200 ENV Procedures and specifically sub-section 10.2 Mowing, it is not the intent of this section to require mowing of the entire 200 acre area. The requirement is to not disturb or kill birds during nesting season. Keeping grass mowed short all year prevents nesting and avoids killing. The need for mowing will depend upon timing of construction activity. The expectation is to mow or clear grass and brush only at locations where construction is taking place (access lanes, target berms, ROCA facilities, etc.) and to keep the vegetation short if construction will continue into nesting season. Currently the OHARNG mows the road sides and target berms without restriction and the 200 acre expanse area once a year after nest season. The OHARNG will coordinate with the contractor to gain access for our mowers so we can mow grass in the expanse area outside of construction locations after nesting season. The OHARNG will not mow construction locations. The contractor is responsible to keep grass low where they are working during nesting season.
329200 turf and grass requirements only apply to new plantings in areas disturbed by construction.
Tim Morgan 15 July 2020
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
General note #2 notes "Precast Sections shall be keyed." This permits segmented lengths.
Grant Stoner, SGT CJAG DPW 07/14/2020
07/14/2020Grant Stoner, SGT CJAG DPW ckirkpatrick Text Box W9136420B0001 / Muliti-Purpose Machine Gun Range ckirkpatrick Text Box Knoch Corporation Lindsay Precast ckirkpatrick Text Box Moving Infantry Target ckirkpatrick Text Box C-503 Surface/Fill Slope 330513 Precast Structures ckirkpatrick Text Box
330.244.1440 330.244.1445 X 7-09-2020 ckirkpatrick Text Box Is the precast structure for the MIT's shown on sheet C-503 intended to be full length at 18m?
If so, can we assume that these can be manufactured in segmented lengths?
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance
W9136420B0001 / Muliti-Purpose Machine Gun Range
Knoch Corporation
Work Summary / Options
011000 Summary
330.244.1440 330.244.1445 X 7-10-2020
Work Summary indicated on specification sheet 011000-2 does not conform with the bid form, drawings, or specification section 012300 Options. Please advise.
Craig Kirkpatrick, Estimator 7-10-2020
Grant Stoner, SGT CJAG DPW
Grant Stoner, SGT CJAG DPW 07/14/2020
Please refer to the bid form, not the spec sheet. Spec sheet 01100-2 is incorrect.
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
W9136420B0001 / Muliti-Purpose Machine Gun Range
Knoch Corporation Valentine Masonry
Masonry
Structural / Arch Varies 042200 Conc Unit Masonry
330.244.1440 330.244.1445 X 7-10-2020
Craig Kirkpatrick, Estimator 7-10-2020
Contractor to use the Structural Drawings for the Grades.
CMU is to be split face to match an existing building
Yes, refer to finish schedule on the Architectural Drawings
Contractor is to supply samples for approval for CMU's. Or equal can be used.
CMU's to have approved sealer product per plan notes.
No cast stone is required.
CMU 1 and CMU2 are to be split face and match an existing building on the base.
Grant Stoner, SGT CJAG DPW
07/14/2020
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Evan Sanders, IAP Design Build Date:7/14/20
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
W9136420B0001
IAP Design Build
S140 / S301 7-S501
Sheet S140 calls for a foundation system of column C1, footing F60, and pier P1. The detail thats called out on sheet S140, 3-S301, calls for a pier P2. Please advise which pier is to be used.
614-981-0834
Contractor is to use P1 detail.
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance
This project is tax exempt.
Grant Stoner, SGT CJAG DPW
07/16/2020
07/16/2020
Mike.Moloney Typewritten Text Is the project subject to Sales Tax?
Mike.Moloney Typewritten Text 7-15-2020
Mike.Moloney Typewritten Text Mike Moloney
Mike.Moloney Typewritten Text 7-15-2020
Mike.Moloney Typewritten Text Prebid Question
Mike.Moloney Typewritten Text 330-575-5517
Mike.Moloney
MPMG (Multi-Purpose Machine Gun) Range On CJAGJMTC
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance
Grant Stoner SGT CJAG DPW 07/16/2020
07/16/2020Grant Stoner SGT CJAG DPW
All exterior finishes will be broom finished, all interior finishes will be slip resistant per spec section
3.11 page 262
Mike.Moloney Typewritten Text 003000
Mike.Moloney Typewritten Text Reference Specification Section 003000- Concrete, Par: 2.8, A & B (page 253). What floors get the Slip-Resistive finish or dry-shake hardener
Mike.Moloney Typewritten Text 7-15-2020
Mike.Moloney Typewritten Text Mike Moloney
Mike.Moloney Typewritten Text 7-15-2020
Mike.Moloney Typewritten Text Concrete Flooring
Mike.Moloney Typewritten Text 330-575-5517
Mike.Moloney
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance
07/16/2020
07/16/2020
All exterior finishes will be broom finished, all interior finishes will be slip resistant per spec section
3.11 page 262
Mike.Moloney Typewritten Text 003000
Mike.Moloney Typewritten Text Reference Specification Section 003000- Concrete, Par: 3.11, H (page 262). What floors receive the dry-shake hardener
Mike.Moloney Typewritten Text 7-15-2020
Mike.Moloney Typewritten Text Mike Moloney
Mike.Moloney Typewritten Text 7-15-2020
Mike.Moloney Typewritten Text Concrete Flooring
Mike.Moloney Typewritten Text 330-575-5517
Mike.Moloney
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance
07/16/2020
07/16/2020
Either a Penetrating Liquid Floor Treatment or a Seal Coat can be used per section 3.14 pg 264
Mike.Moloney Typewritten Text 003000
Mike.Moloney Typewritten Text Reference Specification Section 003000- Concrete, Par: 3.14, (page 264). Are liquid floor hardeners required, or can one of the other options listed by used?
Mike.Moloney Typewritten Text 7-15-2020
Mike.Moloney Typewritten Text Mike Moloney
Mike.Moloney Typewritten Text 7-15-2020
Mike.Moloney Typewritten Text Concrete Flooring
Mike.Moloney Typewritten Text 330-575-5517
Mike.Moloney
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance
Gravel to match walkway details 1-C509
Grant Stoner, SGT CJAG DPW 07/16/2020
07/16/2020Grant Stoner, SGT CJAG DPW
Mike.Moloney Typewritten Text What is the materail required at grade below the Control (Ranger) Tower? Is this stone, re-seed, concrete or other?
Mike.Moloney Typewritten Text 7-15-2020
Mike.Moloney Typewritten Text Mike Moloney
Mike.Moloney Typewritten Text 7-15-2020
Mike.Moloney Typewritten Text Prebid Question
Mike.Moloney Typewritten Text 330-575-5517
Mike.Moloney
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance
Should use environmental 012200 section 10.5 vegetative establishment.
Grant Stoner, SGT CJAG DPW
07/16/2020
07/16/2020
Mike.Moloney Typewritten Text Specification 329200 Turf & Grasses, Par. 1.3 section D makes reference to Soil Preparation Specification 329113. Please provide specification 329113
Mike.Moloney Typewritten Text 7-15-2020
Mike.Moloney Typewritten Text Mike Moloney
Mike.Moloney Typewritten Text 7-15-2020
Mike.Moloney Typewritten Text Prebid Question
Mike.Moloney Typewritten Text 330-575-5517
Mike.Moloney Typewritten Text MPMG (Multi-Purpose Machine Gun) Range On CJAGJMTC
Mike.Moloney
329200
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
Grant Stoner, SGT CJAG DPW
Grant Stoner, SGT CJAG DPW 07/16/2020
07/16/2020
Yes Civil CAD files will be provided to the bidders.
Mike.Moloney Typewritten Text Can C.A.D files be made available to bidders?
Mike.Moloney Typewritten Text 7-15-2020
Mike.Moloney Typewritten Text Mike Moloney
Mike.Moloney Typewritten Text 7-15-2020
Mike.Moloney Typewritten Text Prebid Question
Mike.Moloney Typewritten Text 330-575-5517
Mike.Moloney
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
W9136420B0001 / Muliti-Purpose Machine Gun Range
Knoch Corporation Norman Eckinger
Metal Panel Siding / Roofing
Architectural Material Legend 074113 Roof and Wall Panels
330.244.1440 330.244.1445 X 7-15-2020
Craig Kirkpatrick, Estimator 7-15-2020 it does not look we will be bidding this project.
The drawings are not clear on some items and Butler does not have an insulated VSR metal roof panel. The panel colors they are noting also are not Butler colors.
Contractor is to comply with Specifications sections 074113.16, 074113.23, 074113.13, 071113.19 and
074113.53 and the design criteria listed on plan page S-001 for Roof and Wall panel performance requirements. Color selection is to be Forest Green for the roof and Artic White for the walls to be approved by the owner
Grant Stoner, SGT CJAG DPW 07/20/2020
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
W9136420B0001 / Muliti-Purpose Machine Gun Range
Knoch Corporation Pioneer Pipe, Inc
Control Tower Stairs - by others?
S-110 / A-110
330.244.1440 330.244.1445 X 7-16-2020
Craig Kirkpatrick, Estimator 7-16-2020
The drawing show that the C12 stairs on the Tower are by others – I assume that includes the treads and handrail?
There is handrail called out on the floor and shows on the outside deck – is that by others also or do I include it? There isn’t a detail showing what they are wanting and it also looks like there is some kind of mesh
RESPONSE
"To be provided by others" indicates general contractor's subcontractor and will be provided in the shop drawings submitted by the contractor for the pre-engineered tower.
Grant Stoner, SGT CJAG DPW 07/16/2020
07/16/2020Grant Stoner, SGT CJAG DPW
The Contractor is responsible to supply the completed tower and all accessories.
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
W9136420B0001 - MPMG Range Construction
Data & Technology Questions
Div 27
330-452-6601 07/17/2020
1. Can we use Berk-Tek cable?
2. Can we use Leviton faceplates, jacks, etc.?
3. On drawing E-130 on detail #1 it shows a wall phone jack with a subscript of “3”. What does that represent? There is no detail for that subscript.
4. On the same drawing and detail it shows a tele/data outlet with a subscript “P”. What does that represent? There is no detail for that subscript.
5. On drawing E-508 on detail #3 it references a drawing T-502. That drawing is not online. Can you provide that please?
6. Is the telecommunications rack on drawing E-512 the same rack as on T-110? If so, which one is preferred? One is shown as 24” W and the other as 22” W.
7. Who is providing the UPS?
8. Who is to furnish and install the BEP's?
1.
2.
3.
4.
5.
6.
7.
8.
As long as they meet all applicable requirements laid out in spec sections and drawings As long as they meet all applicable requirements laid out in spec sections and drawings ignore the 3 ignore the P
24' Contractor
Contractor
Grant Stoner, SGT CJAG DPW 07/20/2020
Other than T-110 there are no T series drawings. The T series have been replaced with E 120, E130, E140, E150, E160, E 511, E512, E513, E514 and ES400 to ES 412 Range Data and E602 Range Single line
PRIME CONTRACTOR: SUBCONTRACTOR/SUPPLIER:
SUBJECT/TITLE OF RFI:
DRAWING(S): DETAIL(S): SPECIFICATION: CPM ACTIVITY #:
PHONE: FAX: COST IMPACT:
YES NO
DATE SUBMITTED: RESPOND BY:
INFORMATION REQUESTED
By: Date:
RESPONSE
By: Date:
COR Concurrence: Date:
CO Concurrence: Date:
The RFI system is intended to provide an efficient mechanism for responding to contractor’s request for information ONLY. This system DOES NOT authorize the contractor to proceed with work - to do so, the contractor proceeds at his own risk. If the contractor considers the RFI response a change in conditions, scope of work or contract time, submit proposal request in accordance with FAR Clause 52.243-4 Changes or FAR Clause 52.236-2 Differing Site Conditions, as applicable.
W9136420B0001 - MPMG Range Construction
Data & Technology Questions
Div 27
330-452-6601 07/17/2020
1. Is the…
This is the start of the file's text. The full file is on GovTribe.