AF66_List_Material_Submittals.pdf
PDF 60 KB Posted
- Attached to
- MPMG Range Construction Federal contract opportunity
- Solicitation number
- W9136420B0001
About this file
This document is a schedule of material submittals for a federal contract to construct a multipurpose machine gun (MPMG) range at Camp James A. Garfield Joint Maneuver Training Center in Ohio. The schedule lists over 190 items requiring submittals from the contractor, including qualifications, shop drawings, samples, test reports, warranties and more for concrete, structural steel, roofing, doors, glazing and mechanical systems. It also includes submittal requirements for communications, electrical, lighting and other infrastructure. The related federal contract opportunity is for construction of the MPMG range between $5-10 million, solicited by the Department of the Army Ohio Army National Guard under solicitation number W9136420B0001. Award will be made to the responsible bidder offering the most advantageous price, with funds expected to become available by September 30, 2020.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Signed Abstract Of Offers MPMG SF1409.pdf | ||
| W91364-20-B-0001-0004 AMENDMENT.pdf | ||
| W91364-20-B-0001 Amendment 3.pdf | ||
| OHD03 Option 4 North Utility Line Demolition Plan.pdf | ||
| W91364-20-B-0001-0001 SF30.pdf | ||
| OHD02 Base Bid Utility Line Demolition Plan.pdf | ||
| PRE BID RFIs ANSWERS.pdf | ||
| W91364-20-B-0001-0002 SF30.pdf | ||
| MPMG Pre-Bid RFI Log.xlsx | XLSX spreadsheet | |
| OHD01 Overall Utility Line Demolition Plan.pdf | ||
| Amendment 1 Drawings.pdf | ||
| 9JUL 2020 Site Visit Sign in Sheet.pdf | ||
| W91364-20-B-0001 SOLICITATION.pdf | ||
| SPECS_MPMG_BidFinal_R2_20200124.pdf | ||
| RFI Template.pdf | ||
| DRWGS_MPMG_BidFinal_20200122.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPROVED DISAPPROVED
1 017700 Closeout Procedures - Project Warranties x 2 033000 Cast-In-Place Concrete - Qualification Data x 3 033000 Cast-In-Place Concrete - Reinforcing Bar
Layouts and Details x
4 033000 Cast-In-Place Concrete - Welding Certificates x 5 033000 Cast-In-Place Concrete - Material Certificates x 6 033000 Cast-In-Place Concrete - Material Test
Reports x
7 033000 Cast-In-Place Concrete - Floor Surface
Flatness and Levelness Measurements x
8 033000 Cast-In-Place Concrete - Field Quality-
Control Reports x
9 033000 Cast-In-Place Concrete - Minutes of
Preinstallation Conference x
10 042200 Concrete Unit Masonry - Qualification Data x 11 042200 Concrete Unit Masonry - Material Certificates x 12 042200 Concrete Unit Masonry - Mix Designs x 13 042200 Concrete Unit Masonry - Statement of
Compressive Strength of Masonry x
14 042200 Concrete Unit Masonry - Cold-Weather and
Hot-Weather Procedures x
15 047200 Cast Stone Masonry - Qualification Data x 16 047200 Cast Stone Masonry -Material Test Reports x 17 051200 Structural Steel Framing - Qualification Data x 18 051200 Structural Steel Framing - Steel Fabrication
Drawings x x x
19 051200 Structural Steel Framing - Welding
Certificates x
20 051200 Structural Steel Framing - Paint Compatibility
Certificates x
21 051200 Structural Steel Framing - Mill Test Reports x 22 051200 Structural Steel Framing - Product Test
Reports x
23 051200 Structural Steel Framing - Field Quality-
Control and Special Inspection Reports x
24 53100 Steel Decking - Layout and Details x x
C A
T A
L O
G D
A T
A
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
F
IE
L D
R E
P O
R T
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
D A
T E
R E
C E
IV
E
D I
N C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
(To be completed by Contract Administrator)
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
REMARKS
R E
T U
R N
S U
S P
E N
S E
D A
T E
DATE CONTRACTOR
NOTIFIED
T E
S T
R E
P O
R T
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
C H
N
IC
A L
D A
T A
S C
H E
D U
L E
S
L
IS
T
IN
G S
R
E P
O R
T S
P
L A
N S
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
C A
T A
L O
G D
A T
A
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
F
IE
L D
R E
P O
R T
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
D A
T E
R E
C E
IV
E
D I
N C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
(To be completed by Contract Administrator)
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
REMARKS
R E
T U
R N
S U
S P
E N
S E
D A
T E
DATE CONTRACTOR
NOTIFIED
T E
S T
R E
P O
R T
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
C H
N
IC
A L
D A
T A
S C
H E
D U
L E
S
L
IS
T
IN
G S
R
E P
O R
T S
P
L A
N S
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
25 53100 Steel Decking - Welding Certificates x 26 53100 Steel Decking - Product Certificates x 27 53100 Steel Decking - Product Test Reports x 28 53100 Steel Decking - Field Quality-Control Reports x 29 054400 Cold-Formed Metal - Welding Certificates x 30 054400 Cold-Formed Metal - Field Quality-Control
Reports x
31 055000 Metal Fabrications - Qualification Data x 32 055000 Metal Fabrications - Mill Certificates x 33 055000 Metal Fabrications - Welding Certificates x 34 055000 Metal Fabrications - Paint Compatibility
Certificates x
35 055119 Metal Grating Stairs - Welding Certificates x 36 055119 Metal Grating Stairs - Paint Compatibility
Certificates x x
37 055213 Pipe and Tube Railings - Qualification Data x 38 055213 Pipe and Tube Railings - Welding Certificates x 39 055213 Pipe and Tube Railings - Mill Certificates x 40 055213 Pipe and Tube Railings - Paint Compatibility
Certificates x x
41 055213 Pipe and Tube Railings - Product Test
Reports x
42 055213 Pipe and Tube Railings - Evaluation Reports x 43 055313 Bar Gratings - Mill Certificates x 44 055313 Bar Gratings - Welding Certificates x 45 055313 Bar Gratings - Paint Compatibility Certificates x x 46 061000 Rough Carpentry - Material Certificates x 47 072100 Thermal Insulation - Product Test Reports x 48 074113.16 Standing-Seam Metal Roof Panels -
Qualification Data x x
49 074113.16 Standing-Seam Metal Roof Panels -
Product Test Reports x
A
T A
L O
G D
A T
A
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
F
IE
L D
R E
P O
R T
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
D A
T E
R E
C E
IV
E
D I
N C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
(To be completed by Contract Administrator)
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
REMARKS
R E
T U
R N
S U
S P
E N
S E
D A
T E
DATE CONTRACTOR
NOTIFIED
T E
S T
R E
P O
R T
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
C H
N
IC
A L
D A
T A
S C
H E
D U
L E
S
L
IS
T
IN
G S
R
E P
O R
T S
P
L A
N S
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
50 074113.16 Standing-Seam Metal Roof Panels - Field
Quality-Control Reports x
51 074113.16 Standing-Seam Metal Roof Panels -
Sample Warranties x
52 074113.23 Insulated Metal Roof Panels - Qualification
Data x
53 074113.23 Insulated Metal Roof Panels - Product
Test Reports x
54 074113.23 Insulated Metal Roof Panels - Field Quality-
Control Reports x
55 074113.23 Insulated Metal Roof Panels - Sample
Warranties x
56 074213.19 Insulated Metal Wall Panels - Qualification
Data x x
57 074213.19 Insulated Metal Wall Panels - Product Test
Reports x
58 074213.19 Insulated Metal Wall Panels - Field Quality-
Control Reports x
59 074213.19 Insulated Metal Wall Panels - Sample
Warranties x
60 074213.53 Metal Soffit Panels - Qualification Data x x 61 074213.53 Metal Soffit Panels - Product Test Reports x 62 074213.53 Metal Soffit Panels - Sample Warranties x 63 076200 Sheet Metal Flashing and Trim - Qualification
Data x x
64 076200 Sheet Metal Flashing and Trim - Product
Certificates x
65 076200 Sheet Metal Flashing and Trim - Product Test
Reports x
66 076200 Sheet Metal Flashing and Trim - Sample
Warranties x
67 077253 Snow Guards - Product Test Reports x 68 079200 Joint Sealants - Qualification Data x x 69 079200 Joint Sealants - Product Test Reports x 70 079200 Joint Sealants - Preconstruction Laboratory
Test Reports x
71 079200 Joint Sealants - Preconstruction Field-
Adhesion-Test Reports x
72 079200 Joint Sealants - Field-Adhesion-Test Reports x 73 079200 Joint Sealants - Sample Warranties x
A
T A
L O
G D
A T
A
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
F
IE
L D
R E
P O
R T
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
D A
T E
R E
C E
IV
E
D I
N C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
(To be completed by Contract Administrator)
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
REMARKS
R E
T U
R N
S U
S P
E N
S E
D A
T E
DATE CONTRACTOR
NOTIFIED
T E
S T
R E
P O
R T
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
C H
N
IC
A L
D A
T A
S C
H E
D U
L E
S
L
IS
T
IN
G S
R
E P
O R
T S
P
L A
N S
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
74 081113 Hollow Metal Doors and Frames - Product
Test Reports x x
75 081113 Hollow Metal Doors and Frames - Oversize
Construction Certification x
76 083313 Coiling Counter Doors - Qualification Data x x 77 083313 Coiling Counter Doors - Oversize
Construction Certification x
78 083313 Coiling Counter Doors - Closeout Submittals -
Maintenance Da ta x
79 085113 Aluminum Windows - Qualification Data x x 80 085113 Aluminum Windows - Product Test Reports x 81 085113 Aluminum Windows - Field Quality-Control
Reports x
82 085113 Aluminum Windows - Sample Warranties x 83 087100 Door Hardware - Qualification Data x x 84 087100 Door Hardware - Product Certificates x 85 087100 Door Hardware - Product Test Reports x 86 087100 Door Hardware - Warranty x 87 087100 Door Hardware - Closeout Submittals -
Maintenance Data x
88 088000 Glazing - Qualification Data x 89 088000 Glazing - Product Certificates x 90 088000 Glazing - Product Test Reports x 91 088000 Glazing - Preconstruction Adhesion and
Compatibility Test Report x
92 088000 Glazing - Sample Warranties x 93 089119 Fixed Louvers - Product Test Reports x x 94 089119 Fixed Louvers - Windborne-Debris-Impact-
Resistance Test Reports x
95 092216 Non-Structural Metal Framing - Evaluation
Reports x
96 096513 Resilient Base and Accessories -
Maintenance Material Submittals x x
A
T A
L O
G D
A T
A
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
F
IE
L D
R E
P O
R T
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
D A
T E
R E
C E
IV
E
D I
N C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
(To be completed by Contract Administrator)
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
REMARKS
R E
T U
R N
S U
S P
E N
S E
D A
T E
DATE CONTRACTOR
NOTIFIED
T E
S T
R E
P O
R T
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
C H
N
IC
A L
D A
T A
S C
H E
D U
L E
S
L
IS
T
IN
G S
R
E P
O R
T S
P
L A
N S
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
97 099123 Interior Painting - Furnish Extra Materials x x 98 230510 Basic HVAC Materials and Methods -
Equipment Warranties x
99 230510 Basic HVAC Materials and Methods -
Contractors' Warranties x
100 230510 Basic HVAC Materials and Methods - Parts
List and Manuals for All Equipment x
101 230510 Basic HVAC Materials and Methods -
Operating Instructions (In Writing) x
102 230510 Basic HVAC Materials and Methods - Written
Instruction on Maintenance and Care of the Systems x
103 230510 Basic HVAC Materials and Methods - Shop
Drawings and Manufacturer's Data x
104 230513 Common Motor Requirements for HVAC
Equipment - Product Data x
105 230513 Common Motor Requirements for HVAC
Equipment - Manufacturer Qualification Certification x
106 230513 Common Motor Requirements for HVAC
Equipment - Field Quality-Control Test Reports x
107 230513 Common Motor Requirements for HVAC
Equipment - Operation and Maintenance Data x
108 230513 Common Motor Requirements for HVAC
Equipment - Load-Current and Overload-Relay
Heater List x
109 230513 Common Motor Requirements for HVAC
Equipment - Load-Current and List of Settings of
Adjustable Overload Relays x
110 233423 HVAC Power Ventilators - Product Data x 111 233423 HVAC Power Ventilators - Field Quality-
Control Test Reports x
112 233423 HVAC Power Ventilators - Operation and
Maintenance Data x
113 238113 Packaged Terminal Air-Conditioners -
Product Data x
114 238113 Packaged Terminal Air-Conditioners - Shop
Drawings x
115 238113 Packaged Terminal Air-Conditioners - Color
Samples x
116 238113 Packaged Terminal Air-Conditioners - Field
Quality-Control Reports x
117 238113 Packaged Terminal Air-Conditioners -
Operation and Maintenance Data x
118 260508 Testing, Acceptances, and Certifications -
Summary of Project x x
A
T A
L O
G D
A T
A
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
F
IE
L D
R E
P O
R T
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
D A
T E
R E
C E
IV
E
D I
N C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
(To be completed by Contract Administrator)
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
REMARKS
R E
T U
R N
S U
S P
E N
S E
D A
T E
DATE CONTRACTOR
NOTIFIED
T E
S T
R E
P O
R T
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
C H
N
IC
A L
D A
T A
S C
H E
D U
L E
S
L
IS
T
IN
G S
R
E P
O R
T S
P
L A
N S
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
119 260508 Testing, Acceptances, and Certifications -
Description of Equipment Tested x x
120 260508 Testing, Acceptances, and Certifications -
Description of Test x x
121 260508 Testing, Acceptances, and Certifications -
Test Results x x
122 260508 Testing, Acceptances, and Certifications -
Conclusions and recommendations x x
123 260508 Testing, Acceptances, and Certifications -
Appendix, including appropriate test forms x x
124 260508 Testing, Acceptances, and Certifications -
List of Test Equipment Used and Calibration Date x x
125 260508 Testing, Acceptances, and Certifications -
Conditions for Future Access to Secured Computer
Database of all Test Data x x
126 260513 Medium-Voltage Cables - Shop Drawings x 127 260513 Medium-Voltage Cables - Test Results x 128 260572 Short Circuit, Component Protection, Flash
Hazard and Selective Coordination Study -
Descriptions, Purpose, Basis, and Scope of Study x
129 260572 Short Circuit, Component Protection, Flash
Hazard and Selective Coordination Study - Fault current calculations including definition of terms and guide for interpretation of computer printout x
130 260572 Short Circuit, Component Protection, Flash
Hazard and Selective Coordination Study -
Tabulations of protective device and equipment ratings versus calculated short-circuit duties, and commentary regarding same x
131 260572 Short Circuit, Component Protection, Flash
Hazard and Selective Coordination Study - Flash hazard analysis report for electrical distribution equipment x
132 260572 Short Circuit, Component Protection, Flash
Hazard and Selective Coordination Study - Time versus current curves or fuse selectivity ratio analysis, with tabulations of overcurrent protective device settings, and selective coordination analysis and commentary regarding same x
133 260924 Occupancy Sensor - Catalog cut sheets with performance specifications including historical testing data demonstrating complete compliance to all of the
A
T A
L O
G D
A T
A
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
F
IE
L D
R E
P O
R T
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
D A
T E
R E
C E
IV
E
D I
N C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
(To be completed by Contract Administrator)
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
REMARKS
R E
T U
R N
S U
S P
E N
S E
D A
T E
DATE CONTRACTOR
NOTIFIED
T E
S T
R E
P O
R T
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
C H
N
IC
A L
D A
T A
S C
H E
D U
L E
S
L
IS
T
IN
G S
R
E P
O R
T S
P
L A
N S
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
134 261313 Medium Voltage Circuit Breaker Switchgear -
Master Drawing Index x
135 261313 Medium Voltage Circuit Breaker Switchgear -
Front View Elevation x
136 261313 Medium Voltage Circuit Breaker Switchgear -
Floor Plan x
137 261313 Medium Voltage Circuit Breaker Switchgear -
Top View x
138 261313 Medium Voltage Circuit Breaker Switchgear -
Single Line Diagram x
139 261313 Medium Voltage Circuit Breaker Switchgear -
Nameplate Schedule x
140 261313 Medium Voltage Circuit Breaker Switchgear -
Component List x
141 261313 Medium Voltage Circuit Breaker Switchgear -
Conduit Entry/Exit Location x
142 261313 Medium Voltage Circuit Breaker Switchgear -
Assembly Ratings for Short-Circuit Rating, Voltage, Continuous Current, Basic Impulse Level for
Equipment over 600 Volts x
143 261313 Medium Voltage Circuit Breaker Switchgear -
Major Components Ratings including Voltage, Continuous Current, Interrupting Ratings x
144 261313 Medium Voltage Circuit Breaker Switchgear -
Cable Terminal Sizes x
145 261313 Medium Voltage Circuit Breaker Switchgear -
Product Data Sheets x
146 262213 Dry Type Distribution Transformers (1500
KVA and Below) - Outline Dimensions and Weights x
147 262213 Dry Type Distribution Transformers (1500
KVA and Below) - Technical Certification Sheet x
148 262213 Dry Type Distribution Transformers (1500
KVA and Below) - Transformer Ratings Including
KVA, Primary and Secondary Voltage, Taps, Basic
Impulse Level (BIL) for Equipment over 600 Volts, Design Impedance, Insulation Class and Temperature
Rise, Sound Level x
149 262213 Dry Type Distribution Transformers (1500
KVA and Below) - Product Data Sheets
A
T A
L O
G D
A T
A
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
F
IE
L D
R E
P O
R T
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
D A
T E
R E
C E
IV
E
D I
N C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
(To be completed by Contract Administrator)
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
REMARKS
R E
T U
R N
S U
S P
E N
S E
D A
T E
DATE CONTRACTOR
NOTIFIED
T E
S T
R E
P O
R T
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
C H
N
IC
A L
D A
T A
S C
H E
D U
L E
S
L
IS
T
IN
G S
R
E P
O R
T S
P
L A
N S
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
150 262416 Panelboards - Each Panelboard Drawing the following is required: Show main devices and lug sizes; branch circuit device sizes and arrangement;
bus ampacities; withstandability and short circuit rating; dimensions and construction; gutter and backbox dimensions; nameplate and legend;
protective coating; and all pertinent details of panel, enclosure, cover, and method of securing cover and lock.
x x
151 262726 Wiring Devices - Manufacturers' Product Data
Sheets x
152 262726 Wiring Devices - Occupancy Sensor Layout
Drawings x
153 262813 Fuses - Complete set of shop drawings to include let-thru curves for each type of fuse, a schedule of spare fuse cabinets with a listing of fuses provided within each spare fuse cabinet, and dimensioned drawings of each spare fuse cabinet by type and size x x
154 262816 Enclosed Switches and Circuit Breakers -
Manufacturers' Data x
155 264113 Lightning Protection for Structures - Complete
Shop Drawings x
156 264113 Lightning Protection for Structures - Product
Data x
157 265100 Interior Lighting - Shop Drawings and
Manufacturers' Data x
158 265600 Exterior Lighting - Product Data x 159 265600 Exterior Lighting - Shop Drawings x 160 270500 Common Work Results for Communications -
Product Data x
161 271100 Communications Equipment Room Fittings -
Product Data x
162 271100 Communications Equipment Room Fittings -
Shop Drawings x
163 271100 Communications Equipment Room Fittings -
Qualification Data x
164 271300 Communications Backbone Cabling - Product
Data x
165 271300 Communications Backbone Cabling - Shop
Drawings x
166 271300 Communications Backbone Cabling -
Qualification Data
A
T A
L O
G D
A T
A
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
F
IE
L D
R E
P O
R T
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
D A
T E
R E
C E
IV
E
D I
N C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
(To be completed by Contract Administrator)
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
REMARKS
R E
T U
R N
S U
S P
E N
S E
D A
T E
DATE CONTRACTOR
NOTIFIED
T E
S T
R E
P O
R T
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
C H
N
IC
A L
D A
T A
S C
H E
D U
L E
S
L
IS
T
IN
G S
R
E P
O R
T S
P
L A
N S
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
167 271300 Communications Backbone Cabling - Source
Quality-Control Reports x
168 271300 Communications Backbone Cabling - Field
Quality-Control Reports x
169 271300 Communications Backbone Cabling -
Maintenance Data x
170 271500 Communications Horizontal Cabling - Product
Data x
171 271500 Communications Horizontal Cabling - Shop
Drawings x
172 271500 Communications Horizontal Cabling -
Samples x
173 271500 Communications Horizontal Cabling -
Qualification Data x
174 271500 Communications Horizontal Cabling - Source
Quality-Control Reports x
175 271500 Communications Horizontal Cabling - Field
Quality-Control Reports x
176 271500 Communications Horizontal Cabling -
Maintenance Data x
177 312000 Earth Moving - Qualification Data x 178 312000 Earth Moving - Material Test Reports x 179 312000 Earth Moving - Preexcavation Photographs or
Videotape x
180 321313 Concrete Paving - Qualification Data x 181 321313 Concrete Paving - Material Certificates x 182 321313 Concrete Paving - Material Test Reports x 183 321313 Concrete Paving - Field Quality-Control
Reports x
184 321373 Concrete Paving Joint Sealants - Product
Certificates x
185 329113 Soil Preparation - Qualification Data x 186 329113 Soil Preparation - Preconstruction Test
Reports x
187 329113 Soil Preparation - Field Quality-Control
Reports x
188 329200 Turf and Grasses - Qualification Data x 189 329200 Turf and Grasses - Certification of Grass
Seed
190 329200 Turf and Grasses - Product Certificates x
A
T A
L O
G D
A T
A
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N D
A T
E
L
IN
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
S H
O P
D R
A W
IN
G
S
F
IE
L D
R E
P O
R T
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
SCHEDULE OF MATERIAL SUBMITTALS
(To be completed by Project Engineer)
NUMBER OF COPIES REQUIRED
D A
T E
R E
C E
IV
E
D I
N C
O N
T R
A C
T
IN
G
D A
T E
T O
C
IV
IL
E
N G
IN
E
E R
IN
G
(To be completed by Contract Administrator)
S U
B M
IT
T
A L
N U
M B
E R
S
C O
N T
R A
C T
O R
R E
S U
B M
IT
T
A L
F
IN
A L
A P
P R
O V
A L
REMARKS
R E
T U
R N
S U
S P
E N
S E
D A
T E
DATE CONTRACTOR
NOTIFIED
T E
S T
R E
P O
R T
S
M A
N U
F A
C T
U R
E R
'S W
A R
R A
N T
Y
O P
E R
A T
IN
G
I N
S T
R U
C T
IO
N
S
T E
C H
N
IC
A L
D A
T A
S C
H E
D U
L E
S
L
IS
T
IN
G S
R
E P
O R
T S
P
L A
N S
M A
N U
F A
C T
U R
E R
'S R
E C
O M
M E
N D
A T
IO
N
191 329200 Turf and Grasses - Pesticides and Herbicides x 192 334100 Storm Utility Drainage Piping - Coordination
Drawings x
193 334100 Storm Utility Drainage Piping - Profile
Drawings x
194 334100 Storm Utility Drainage Piping - Product
Certificates x
195 334100 Storm Utility Drainage Piping - Field Quality-
Control Reports
Schedule of Material Submittals Template, Feb 05 (SAF/AQCP)
| Bid Final MPMG Specifications 191 |
| Bid Final MPMG Specifications 192 |
| Bid Final MPMG Specifications 193 |
| Bid Final MPMG Specifications 194 |
| Bid Final MPMG Specifications 195 |
| Bid Final MPMG Specifications 196 |
| Bid Final MPMG Specifications 197 |
| Bid Final MPMG Specifications 198 |
| Bid Final MPMG Specifications 199 |
| Bid Final MPMG Specifications 200 |
File details come from the government source that posted it. Updated .