MPMG Pre-Bid RFI Log.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
MPMG Range Construction Federal contract opportunity
Solicitation number
W9136420B0001
Issued by
Department of the Army Ohio Army National Guard

About this file

This document contains a pre-bid request for information log and related federal contract opportunity solicitation for construction of a multi-purpose machine gun range. The pre-bid log details 55 contractor questions received between June 20 and July 21, along with the government's responses. Key issues addressed include site visits, drawings, specifications, licensing requirements, utilities, and environmental procedures. The related solicitation provides additional context, seeking construction of the MPMG Range at Camp James A. Garfield Joint Maneuver Training Center in Ohio. Work includes all specifications and drawings and has an estimated value between $5-10 million. The solicitation is identified as a priority for the Ohio Army National Guard if funds become available by September 30. Award will be made to the responsible bidder providing the most advantageous price.

View the file

Other files for this federal contract opportunity

Other files attached to MPMG Range Construction, newest first.
File Type Posted
Signed Abstract Of Offers MPMG SF1409.pdf PDF
W91364-20-B-0001-0004 AMENDMENT.pdf PDF
W91364-20-B-0001 Amendment 3.pdf PDF
OHD03 Option 4 North Utility Line Demolition Plan.pdf PDF
W91364-20-B-0001-0001 SF30.pdf PDF
OHD02 Base Bid Utility Line Demolition Plan.pdf PDF
PRE BID RFIs ANSWERS.pdf PDF
W91364-20-B-0001-0002 SF30.pdf PDF
OHD01 Overall Utility Line Demolition Plan.pdf PDF
Amendment 1 Drawings.pdf PDF
9JUL 2020 Site Visit Sign in Sheet.pdf PDF
AF66_List_Material_Submittals.pdf PDF
W91364-20-B-0001 SOLICITATION.pdf PDF
SPECS_MPMG_BidFinal_R2_20200124.pdf PDF
RFI Template.pdf PDF
DRWGS_MPMG_BidFinal_20200122.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

OHARNG RFI #CTR RFI #ContractorInformation RequestedRequest DateReponse DateReponder InitialResponse/Notes
1RFI 001Dawn/AM HigleyRequest for additional site visit0620202007102020GSPer KO No additional site visits
2Knoch312000 Earthwork Request for CADD Drawings0625202007142020GSCivil CADD Files to be provided
3Knoch081113 HM Doors and Frames0626202007142020GSComply with specs and Plans S-001
4Knoch074113 Roof and Wall Panels specification and colors0626202007102020GSComply with specs and Plans S-001
5Nisou LGCOhio Applicator License for pesticides0626202007142020GSApplicator must be liscensed
6DRS EnterprisesRequest For CAD Files0630202007142020GSCivil CADD Files to be provided
7DRS EnterprisesWhat are the on-site supervisor requirements0701202007142020GS29 CFR 1926.1101(b)
8RFI-005Erie AffiliatesErie Multiple Telecom Questions. Data/Telecommunication drawings inconsistant0706202007202020GSMultiple MTDP and TDP answers
9RFI 002Erie AffiliatesHow many PA speakers are there0706202007142020GS11 ea PA speakers & 9 ea firing line poles
10RFI 003Erie AffiliatesMonitoring Wells drawing CD-1000706202007142020GSAll wells to have surface protections removed
11RFI 001SAF IncCulvert Pipe sizes, The Erosion Plan & Grading Plan show different culvert pipe sizes07062020HHFollow Grading Plans C-101 to C-112
12RFI 001Erie AffiliatesMissing Technical Plans07062020GSOther than T-110 there are no T series drawings. The T series have been replaced with E 120, E130, E140, E150, E160, E 511, E512, E513, E514 and ES400 to ES 412 Range Data and E602 Range Single line.
13RFI-004Erie AffiliatesClarrification on drawing E602 PA Speakers0707202007142020GSRequest Clarification to question and resubmit
14RFI-001CavanaughClarrification on Drawing ES10007082020HHMultiple questions and answers
15RFI 002CavanaughDrawing E140 Covered Mess bldg, Confirm desired panel location07082020GSMultiple questions and answers
16Knoch012200 Environmental Procedures0709202007152020TMReference Env Procedures
17Knoch330513 Precast Structures manufactured in segmented lengths0709202007142020GSPer note #2 segmented lenghts permitted
18Knoch011000 Summary not conforming to bid form0710202007142020GSRefer to the Bid Form
19Knoch042200 Concrete Masonry Units0710202007142020GSMultiple questions and answers
20RFI 1IAP Design BuildPiers & Foundations Please advise which pier is to be used.07142020HHContractor to follow P1 Detail
21RFI-005MoloneyIs the project subject to Sales Tax0715202007162020GSProject is tax exempt
22RFI-001Moloney003000 Concrete Flooring Slip Resistance0715202007162020GSAll Inteior finishes slip resistant, exterior broom finish
23RFI-002Moloney003000 Concrete Flooring Dry Shake Hardener0715202007162020GSNeed to reaccess the answer
24RFI-003Maloney003000 Concrete Flooring Liquid Hardener0715202007162020GSEither liquid or seal coat authorized
25RFI-004MaloneyWhat is the grade material below the Control Tower0715202007162020GSGravel per sidewalks
26RFI-006MaloneySpec 329100 Turf Grasses refers to non-existent spec 3291130715202007162020GSReference Env Procedures
27RFI-007MaloneyRequest For CAD Files0715202007162020GSCivil CADD Files to be provided
28KnochRoof and Wall Panel drawings not clear0715202007202020GSContractor to follow the contract documents
29KnochControl Tower Stairs - by Others?0716202007162020GSBy Othes is the GC Subcontactor. Provide shop drawing for a complete tower with all accessories
30RFI #1Abbot ElectricMultiple Data Questions0717202007202020GSFolow contract documents, No additional T series drawings beside T-110
31RFI #2Abbot ElectricMultiple Data Questions0717202007192020Building E does not get power. Not all underground electric and data is concrete encased.
32RFI #3Abbot ElectricMultiple Data Questions0717202007212020GSFollow contract documments
33RFI 006Erie AffiliatesFire cabinets and window coverings0716202007202020GS1. Refer to 010000, 1.45 Regulations and 015000, 2.3, A. Fire Extinguishers. 2. Refer to 08113, 2.4, Accessories, A. Horizontal Louver Blinds.
34RFI-3DRS EnterprisesGrading, UXO Questions & Delays0716202007212020GSContractor responsible for grass maintenance. Contractor not responsible for UXO clearing
35RFI 2IAP Design BuildRequesting a one week bid extension0717202007172020GSRefered to KO
36RFI log #1Abbot ElectricDivision 26 multiple electrical questions0717202007212020GSMultiple Electric Answers to include no other T series drawings except for T-110
37RFI log #2Abbot ElectricDivision 26 multiple electrical questions0717202007192020GSNo Power to Bldg E & Not all underground electric and data is encased in concrete
38RFI-2SAF IncMultiple Electrical Questions0720202007212020GSMultiple Electric Answers to include estimated power line distances.
39RFI-3SAF IncRequest For CAD Files0720202007/20/2020GSCIVIL CADD drawings to be provided
40RFI 02Thompson ElectricMissing and distorted drawings0720202007/20/2020GSNo additional drawings to be provided. No additional T drawings except for T-110
41RFI #1Thompson ElectricJunction Boxes - Via Thompson0720202007/21/2020GS
42RFI # 2MCSASIC Certification0720202007/20/2020GS
43RFIThompson ElectricJunction Boxes07/20/2007/21/2020GS
44KnochMPMG RFI Form 07.16.20 a Knoch (Is AISC requirement waveable)0716202007/20/2020GS
45RFI 007Erie AffiliatesMultiple Electric Question0720202007/21/2020GS
46w9136420B0001RFI#1Inner City SteelBid Submission Process, permitting, & target part of scope0717202007/20/2020GS
47KnochMPMG RFI Form 07.20.20 Knoch (missing & distorted drawings)0720202007/21/2020GS
48KnochJunction boxes07/21/202007/21/2020GS
49Great Lakes ConstructionClarification on Down Range Lane Markers07/21/202007/21/2020GS
50RFI 002Dawn/AM HigleyATFP Requirements07/21/202007/21/2020GS
51RFI 003Dawn/AM HigleyApplicator License requirement/termite treatment07/21/202007/21/2020GS
52RFI 004Dawn/AM HigleyTree clearing and merchantable saw timber07/21/202007/21/2020GS
53RFI 005Dawn/AM HigleyGeneral condition question/who supplies bleacher/demoed bldgs07/21/202007/21/2020GS
54RFI 006Dawn/AM HigleyEmplacement labeling/ Questions drwgs c501,502,506,503 & A-15007/21/202007/21/2020GS
55RFI 007Dawn/AM HigleyAISC certification07/21/202007/21/2020GSAISC waved if ODOT certified
56RFI 008Dawn/AM HigleyFees for overhead connections/E-602 Cat5e Cable exceding 90m lengths07/21/202007/21/2020GS
57RFI 009Dawn/AM HigleyErosion Conrol/Storm water management07/21/202007/21/2020GS
58rfi-4DRS EnterprisesPower to latrine/trench E-510 detail/E-603 indicates coduit to power center07/21/202007/21/2020GS
59Ravenna Machine Gun Range JWD LLCJW DidadoJunction boxes/general electrical07/21/202007242020GS
60RFI-01Cold Harborceiling grid system07/21/202007/21/2020GS
61RFI 010Dawn/AM HigleyLightning Protection07/21/202007232020GS
62RFI 011Dawn/AM HigleyLightning Protection07/21/202007232020GS
63Penn Ohio ElectricMTDP07/21/202007/21/2020GS
64Ravenna gun range RFI #3Data Questions on MTDP0717202007232020GSBelieve this is a duplicate submission
65Ravenna gun range RfI #4Who is responible for the overhead comm and temporary comm0721202007232020GS1. All Data and Power systems to be provided by the Contractor as specified in the contract documents, drawings, and specifications.

a. Refer to the contract documents, drawings, and specifications

2. Contractor is responsible for providing and removal of all temporary utilities as required in the contract documents, drawings, and specifications.

a. To be determined by the Contractor.

66RFI-MGR-01LC FluhartyUXO and MEC hazards, who pays for downtime0721202007232020GSRefer to drawings and specs
67RFI-MGR-02LC FluhartyHas a NEPA been completed0721202007222020GSWetland studies and NEPA documents are complete. Contractor still required to follow all contact requirements and Environmental Procedures guidance.
68RFI-MGR-03LC FluhartyIs there an environmental Impact Study, Other environemental questions0721202007222020GSPlease refer to the contract documents and environmental specifications.
69RFI-MGR-04LC FluhartyTransformer Detail0721202007242020GSRefer to Plans and Specs
70RFI #2Cold HarborHDPE details, Is Pipe 12 inch or 18 Inch0721202007232020GSContractor shall use the Grading and Drainage Plans (C-101 to C-112) as the piping Basis for pricing the Drainage.
71RFI-5DRS EnterprisesDown range Tranformers, electric testing, power poles0721202007242020GSTangent poles are 40ft, End and Road Crossing poles are 50ft.
72MasonryHummel ConstMultiple structural & masonry questions0722202007232020GSMasonry to match existing campus façade
73Ravenna gun range RFI #5Data Questions on E-602 and cable lengths0722202007242020GS
74RFI 01Hummel ConstJunction Boxes0720202007232020GSBelieve this is a duplicate submission
75RFI 02Hummel ConstMissing /distorted drawings0720202007232020GSBelieve this is a duplicate submission
76RFI 009Erie AffiliatesA/A-501 and 1/C508 Architectural Questions0720202007232020GS
77RFI log #3Electrical overhead power questions0721202007242020GSGovernment Owned overhead lines. Contractor provided per means and methods.
78RFI_008Erie AffiliatesHDPE details, Is Pipe 12 inch or 18 Inch0722202007232020GSBelieve this is a duplicate submission. Contractor are to use the Grading and Drainage Plans (C-101 to C-112) as the Basis for pricing the Drainage.
79RFI-04SAF IncWho Designates wetland limits and other envrionmental questions0722202007242020GSContractor to follow contract document, drawings and specifications
80RFI-010Erie AffiliatesWho provides the control panels and juntion boxes. Who provides programming0722202007232020GS
81Pre-Bid RFI-RJR 001RJ RungeWho takes care of mowing and multiple environmental questions07242020GSKO to Answer Question 4
82Pre-Bid RFI-RJR 002RJ RungeSignage schedule, limit markers are max occupancy limit sign required07242020GS
83GLC RFI-02Paul IncorvatiHDPE details, Is Pipe 12 inch or 18 Inch, RCP Flared End sections?0721202007232020GS1. Contractor shall follow the Grading and Drainage Plans (C-101 to C-112) as the Basis for pricing the Culvert Piping.

2. Change detail 2 on C-508 to HDPE flared ends to be installed on corresponding sized HDPE culvert pipes identified in the contract documents, drawings and specification. NOTE: There shall be no Reinforced Concrete Pipe or Concrete Flared Ends installed downrange of the Firing Positions.

84
85
86
87
88
89
Add New Utility Line Site Tree Clearing Drawings to Addendum 2
OHD01Overall Site Utility Line Tree Clearing Drawing
OHD02Base Bid Utility Line Tree Clearing Drawing
OHD03Option 4 Utility from the North Tree Clearing Drawing

MPMG Pre-Bid RFI Log Sheet