This document contains a pre-bid request for information log and related federal contract opportunity solicitation for construction of a multi-purpose machine gun range. The pre-bid log details 55 contractor questions received between June 20 and July 21, along with the government's responses. Key issues addressed include site visits, drawings, specifications, licensing requirements, utilities, and environmental procedures. The related solicitation provides additional context, seeking construction of the MPMG Range at Camp James A. Garfield Joint Maneuver Training Center in Ohio. Work includes all specifications and drawings and has an estimated value between $5-10 million. The solicitation is identified as a priority for the Ohio Army National Guard if funds become available by September 30. Award will be made to the responsible bidder providing the most advantageous price.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Signed Abstract Of Offers MPMG SF1409.pdf | ||
| W91364-20-B-0001-0004 AMENDMENT.pdf | ||
| W91364-20-B-0001 Amendment 3.pdf | ||
| OHD03 Option 4 North Utility Line Demolition Plan.pdf | ||
| W91364-20-B-0001-0001 SF30.pdf | ||
| OHD02 Base Bid Utility Line Demolition Plan.pdf | ||
| PRE BID RFIs ANSWERS.pdf | ||
| W91364-20-B-0001-0002 SF30.pdf | ||
| OHD01 Overall Utility Line Demolition Plan.pdf | ||
| Amendment 1 Drawings.pdf | ||
| 9JUL 2020 Site Visit Sign in Sheet.pdf | ||
| AF66_List_Material_Submittals.pdf | ||
| W91364-20-B-0001 SOLICITATION.pdf | ||
| SPECS_MPMG_BidFinal_R2_20200124.pdf | ||
| RFI Template.pdf | ||
| DRWGS_MPMG_BidFinal_20200122.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| OHARNG RFI # | CTR RFI # | Contractor | Information Requested | Request Date | Reponse Date | Reponder Initial | Response/Notes |
| 1 | RFI 001 | Dawn/AM Higley | Request for additional site visit | 06202020 | 07102020 | GS | Per KO No additional site visits |
| 2 | Knoch | 312000 Earthwork Request for CADD Drawings | 06252020 | 07142020 | GS | Civil CADD Files to be provided | |
| 3 | Knoch | 081113 HM Doors and Frames | 06262020 | 07142020 | GS | Comply with specs and Plans S-001 | |
| 4 | Knoch | 074113 Roof and Wall Panels specification and colors | 06262020 | 07102020 | GS | Comply with specs and Plans S-001 | |
| 5 | Nisou LGC | Ohio Applicator License for pesticides | 06262020 | 07142020 | GS | Applicator must be liscensed | |
| 6 | DRS Enterprises | Request For CAD Files | 06302020 | 07142020 | GS | Civil CADD Files to be provided | |
| 7 | DRS Enterprises | What are the on-site supervisor requirements | 07012020 | 07142020 | GS | 29 CFR 1926.1101(b) | |
| 8 | RFI-005 | Erie Affiliates | Erie Multiple Telecom Questions. Data/Telecommunication drawings inconsistant | 07062020 | 07202020 | GS | Multiple MTDP and TDP answers |
| 9 | RFI 002 | Erie Affiliates | How many PA speakers are there | 07062020 | 07142020 | GS | 11 ea PA speakers & 9 ea firing line poles |
| 10 | RFI 003 | Erie Affiliates | Monitoring Wells drawing CD-100 | 07062020 | 07142020 | GS | All wells to have surface protections removed |
| 11 | RFI 001 | SAF Inc | Culvert Pipe sizes, The Erosion Plan & Grading Plan show different culvert pipe sizes | 07062020 | HH | Follow Grading Plans C-101 to C-112 | |
| 12 | RFI 001 | Erie Affiliates | Missing Technical Plans | 07062020 | GS | Other than T-110 there are no T series drawings. The T series have been replaced with E 120, E130, E140, E150, E160, E 511, E512, E513, E514 and ES400 to ES 412 Range Data and E602 Range Single line. | |
| 13 | RFI-004 | Erie Affiliates | Clarrification on drawing E602 PA Speakers | 07072020 | 07142020 | GS | Request Clarification to question and resubmit |
| 14 | RFI-001 | Cavanaugh | Clarrification on Drawing ES100 | 07082020 | HH | Multiple questions and answers | |
| 15 | RFI 002 | Cavanaugh | Drawing E140 Covered Mess bldg, Confirm desired panel location | 07082020 | GS | Multiple questions and answers | |
| 16 | Knoch | 012200 Environmental Procedures | 07092020 | 07152020 | TM | Reference Env Procedures | |
| 17 | Knoch | 330513 Precast Structures manufactured in segmented lengths | 07092020 | 07142020 | GS | Per note #2 segmented lenghts permitted | |
| 18 | Knoch | 011000 Summary not conforming to bid form | 07102020 | 07142020 | GS | Refer to the Bid Form | |
| 19 | Knoch | 042200 Concrete Masonry Units | 07102020 | 07142020 | GS | Multiple questions and answers | |
| 20 | RFI 1 | IAP Design Build | Piers & Foundations Please advise which pier is to be used. | 07142020 | HH | Contractor to follow P1 Detail | |
| 21 | RFI-005 | Moloney | Is the project subject to Sales Tax | 07152020 | 07162020 | GS | Project is tax exempt |
| 22 | RFI-001 | Moloney | 003000 Concrete Flooring Slip Resistance | 07152020 | 07162020 | GS | All Inteior finishes slip resistant, exterior broom finish |
| 23 | RFI-002 | Moloney | 003000 Concrete Flooring Dry Shake Hardener | 07152020 | 07162020 | GS | Need to reaccess the answer |
| 24 | RFI-003 | Maloney | 003000 Concrete Flooring Liquid Hardener | 07152020 | 07162020 | GS | Either liquid or seal coat authorized |
| 25 | RFI-004 | Maloney | What is the grade material below the Control Tower | 07152020 | 07162020 | GS | Gravel per sidewalks |
| 26 | RFI-006 | Maloney | Spec 329100 Turf Grasses refers to non-existent spec 329113 | 07152020 | 07162020 | GS | Reference Env Procedures |
| 27 | RFI-007 | Maloney | Request For CAD Files | 07152020 | 07162020 | GS | Civil CADD Files to be provided |
| 28 | Knoch | Roof and Wall Panel drawings not clear | 07152020 | 07202020 | GS | Contractor to follow the contract documents | |
| 29 | Knoch | Control Tower Stairs - by Others? | 07162020 | 07162020 | GS | By Othes is the GC Subcontactor. Provide shop drawing for a complete tower with all accessories | |
| 30 | RFI #1 | Abbot Electric | Multiple Data Questions | 07172020 | 07202020 | GS | Folow contract documents, No additional T series drawings beside T-110 |
| 31 | RFI #2 | Abbot Electric | Multiple Data Questions | 07172020 | 07192020 | Building E does not get power. Not all underground electric and data is concrete encased. | |
| 32 | RFI #3 | Abbot Electric | Multiple Data Questions | 07172020 | 07212020 | GS | Follow contract documments |
| 33 | RFI 006 | Erie Affiliates | Fire cabinets and window coverings | 07162020 | 07202020 | GS | 1. Refer to 010000, 1.45 Regulations and 015000, 2.3, A. Fire Extinguishers. 2. Refer to 08113, 2.4, Accessories, A. Horizontal Louver Blinds. |
| 34 | RFI-3 | DRS Enterprises | Grading, UXO Questions & Delays | 07162020 | 07212020 | GS | Contractor responsible for grass maintenance. Contractor not responsible for UXO clearing |
| 35 | RFI 2 | IAP Design Build | Requesting a one week bid extension | 07172020 | 07172020 | GS | Refered to KO |
| 36 | RFI log #1 | Abbot Electric | Division 26 multiple electrical questions | 07172020 | 07212020 | GS | Multiple Electric Answers to include no other T series drawings except for T-110 |
| 37 | RFI log #2 | Abbot Electric | Division 26 multiple electrical questions | 07172020 | 07192020 | GS | No Power to Bldg E & Not all underground electric and data is encased in concrete |
| 38 | RFI-2 | SAF Inc | Multiple Electrical Questions | 07202020 | 07212020 | GS | Multiple Electric Answers to include estimated power line distances. |
| 39 | RFI-3 | SAF Inc | Request For CAD Files | 07202020 | 07/20/2020 | GS | CIVIL CADD drawings to be provided |
| 40 | RFI 02 | Thompson Electric | Missing and distorted drawings | 07202020 | 07/20/2020 | GS | No additional drawings to be provided. No additional T drawings except for T-110 |
| 41 | RFI #1 | Thompson Electric | Junction Boxes - Via Thompson | 07202020 | 07/21/2020 | GS | |
| 42 | RFI # 2 | MCS | ASIC Certification | 07202020 | 07/20/2020 | GS | |
| 43 | RFI | Thompson Electric | Junction Boxes | 07/20/20 | 07/21/2020 | GS | |
| 44 | Knoch | MPMG RFI Form 07.16.20 a Knoch (Is AISC requirement waveable) | 07162020 | 07/20/2020 | GS | ||
| 45 | RFI 007 | Erie Affiliates | Multiple Electric Question | 07202020 | 07/21/2020 | GS | |
| 46 | w9136420B0001RFI#1 | Inner City Steel | Bid Submission Process, permitting, & target part of scope | 07172020 | 07/20/2020 | GS | |
| 47 | Knoch | MPMG RFI Form 07.20.20 Knoch (missing & distorted drawings) | 07202020 | 07/21/2020 | GS | ||
| 48 | Knoch | Junction boxes | 07/21/2020 | 07/21/2020 | GS | ||
| 49 | Great Lakes Construction | Clarification on Down Range Lane Markers | 07/21/2020 | 07/21/2020 | GS | ||
| 50 | RFI 002 | Dawn/AM Higley | ATFP Requirements | 07/21/2020 | 07/21/2020 | GS | |
| 51 | RFI 003 | Dawn/AM Higley | Applicator License requirement/termite treatment | 07/21/2020 | 07/21/2020 | GS | |
| 52 | RFI 004 | Dawn/AM Higley | Tree clearing and merchantable saw timber | 07/21/2020 | 07/21/2020 | GS | |
| 53 | RFI 005 | Dawn/AM Higley | General condition question/who supplies bleacher/demoed bldgs | 07/21/2020 | 07/21/2020 | GS | |
| 54 | RFI 006 | Dawn/AM Higley | Emplacement labeling/ Questions drwgs c501,502,506,503 & A-150 | 07/21/2020 | 07/21/2020 | GS | |
| 55 | RFI 007 | Dawn/AM Higley | AISC certification | 07/21/2020 | 07/21/2020 | GS | AISC waved if ODOT certified |
| 56 | RFI 008 | Dawn/AM Higley | Fees for overhead connections/E-602 Cat5e Cable exceding 90m lengths | 07/21/2020 | 07/21/2020 | GS | |
| 57 | RFI 009 | Dawn/AM Higley | Erosion Conrol/Storm water management | 07/21/2020 | 07/21/2020 | GS | |
| 58 | rfi-4 | DRS Enterprises | Power to latrine/trench E-510 detail/E-603 indicates coduit to power center | 07/21/2020 | 07/21/2020 | GS | |
| 59 | Ravenna Machine Gun Range JWD LLC | JW Didado | Junction boxes/general electrical | 07/21/2020 | 07242020 | GS | |
| 60 | RFI-01 | Cold Harbor | ceiling grid system | 07/21/2020 | 07/21/2020 | GS | |
| 61 | RFI 010 | Dawn/AM Higley | Lightning Protection | 07/21/2020 | 07232020 | GS | |
| 62 | RFI 011 | Dawn/AM Higley | Lightning Protection | 07/21/2020 | 07232020 | GS | |
| 63 | Penn Ohio Electric | MTDP | 07/21/2020 | 07/21/2020 | GS | ||
| 64 | Ravenna gun range RFI #3 | Data Questions on MTDP | 07172020 | 07232020 | GS | Believe this is a duplicate submission | |
| 65 | Ravenna gun range RfI #4 | Who is responible for the overhead comm and temporary comm | 07212020 | 07232020 | GS | 1. All Data and Power systems to be provided by the Contractor as specified in the contract documents, drawings, and specifications. |
a. Refer to the contract documents, drawings, and specifications
2. Contractor is responsible for providing and removal of all temporary utilities as required in the contract documents, drawings, and specifications.
a. To be determined by the Contractor.
| 66 | RFI-MGR-01 | LC Fluharty | UXO and MEC hazards, who pays for downtime | 07212020 | 07232020 | GS | Refer to drawings and specs |
| 67 | RFI-MGR-02 | LC Fluharty | Has a NEPA been completed | 07212020 | 07222020 | GS | Wetland studies and NEPA documents are complete. Contractor still required to follow all contact requirements and Environmental Procedures guidance. |
| 68 | RFI-MGR-03 | LC Fluharty | Is there an environmental Impact Study, Other environemental questions | 07212020 | 07222020 | GS | Please refer to the contract documents and environmental specifications. |
| 69 | RFI-MGR-04 | LC Fluharty | Transformer Detail | 07212020 | 07242020 | GS | Refer to Plans and Specs |
| 70 | RFI #2 | Cold Harbor | HDPE details, Is Pipe 12 inch or 18 Inch | 07212020 | 07232020 | GS | Contractor shall use the Grading and Drainage Plans (C-101 to C-112) as the piping Basis for pricing the Drainage. |
| 71 | RFI-5 | DRS Enterprises | Down range Tranformers, electric testing, power poles | 07212020 | 07242020 | GS | Tangent poles are 40ft, End and Road Crossing poles are 50ft. |
| 72 | Masonry | Hummel Const | Multiple structural & masonry questions | 07222020 | 07232020 | GS | Masonry to match existing campus façade |
| 73 | Ravenna gun range RFI #5 | Data Questions on E-602 and cable lengths | 07222020 | 07242020 | GS | ||
| 74 | RFI 01 | Hummel Const | Junction Boxes | 07202020 | 07232020 | GS | Believe this is a duplicate submission |
| 75 | RFI 02 | Hummel Const | Missing /distorted drawings | 07202020 | 07232020 | GS | Believe this is a duplicate submission |
| 76 | RFI 009 | Erie Affiliates | A/A-501 and 1/C508 Architectural Questions | 07202020 | 07232020 | GS | |
| 77 | RFI log #3 | Electrical overhead power questions | 07212020 | 07242020 | GS | Government Owned overhead lines. Contractor provided per means and methods. | |
| 78 | RFI_008 | Erie Affiliates | HDPE details, Is Pipe 12 inch or 18 Inch | 07222020 | 07232020 | GS | Believe this is a duplicate submission. Contractor are to use the Grading and Drainage Plans (C-101 to C-112) as the Basis for pricing the Drainage. |
| 79 | RFI-04 | SAF Inc | Who Designates wetland limits and other envrionmental questions | 07222020 | 07242020 | GS | Contractor to follow contract document, drawings and specifications |
| 80 | RFI-010 | Erie Affiliates | Who provides the control panels and juntion boxes. Who provides programming | 07222020 | 07232020 | GS | |
| 81 | Pre-Bid RFI-RJR 001 | RJ Runge | Who takes care of mowing and multiple environmental questions | 07242020 | GS | KO to Answer Question 4 | |
| 82 | Pre-Bid RFI-RJR 002 | RJ Runge | Signage schedule, limit markers are max occupancy limit sign required | 07242020 | GS | ||
| 83 | GLC RFI-02 | Paul Incorvati | HDPE details, Is Pipe 12 inch or 18 Inch, RCP Flared End sections? | 07212020 | 07232020 | GS | 1. Contractor shall follow the Grading and Drainage Plans (C-101 to C-112) as the Basis for pricing the Culvert Piping. |
2. Change detail 2 on C-508 to HDPE flared ends to be installed on corresponding sized HDPE culvert pipes identified in the contract documents, drawings and specification. NOTE: There shall be no Reinforced Concrete Pipe or Concrete Flared Ends installed downrange of the Firing Positions.
| 84 | |
| 85 | |
| 86 | |
| 87 | |
| 88 | |
| 89 | |
| Add New Utility Line Site Tree Clearing Drawings to Addendum 2 | |
| OHD01 | Overall Site Utility Line Tree Clearing Drawing |
| OHD02 | Base Bid Utility Line Tree Clearing Drawing |
| OHD03 | Option 4 Utility from the North Tree Clearing Drawing |
MPMG Pre-Bid RFI Log Sheet