Solicitation W912WJ26QA153.pdf
PDF 3 MB Posted
- Solicitation number
- W912WJ26QA153
About this file
This is a Request for Quotations (RFQ) for janitorial services at two U.S. Army Corps of Engineers facilities in Middlebury, Connecticut. The solicitation number is W912WJ26QA153, issued on 28 July 2026 with quotes due by 12 August 2026 at 2:00 PM. The contract is set aside for Women-Owned Small Businesses (WOSB) with a NAICS code 561720 and size standard of USD 22,000,000. The base year performance period runs from 15 September 2026 through 14 September 2027, with one optional year available through 14 September 2028. The previous contract was awarded to MSL Housekeeping Services LLC for $19,120, though the scope may differ from the previous requirement.
The contractor must provide weekly office cleaning and litter pickup services (52 occurrences annually) at both the Hop Brook Lake Project Office (1,600 square feet with 2 restrooms) and Naugatuck River Basin Area Office (1,200 square feet with 2 restrooms), as well as semi-annual window cleaning (2 occurrences annually, in May and October). Work hours are restricted to 8:00 AM to 3:00 PM, Monday through Friday, excluding weekends and holidays unless approved. The government furnishes trash cans, liners, toilet tissue, paper towels, liquid hand soap, sanitizer, and potable water; the contractor provides all cleaning equipment, supplies, and environmentally preferable products compliant with EPA Safer Choice and USDA BioPreferred standards. Evaluation criteria are technical capability, price, and past performance. Submission requirements include completion of the mandatory solicitation survey, SF 1449 signature, and all bid schedules with pricing for base year and option year. Quotes must be submitted via email with signed copies of all material amendments. The Government may award without discussions but reserves the right to conduct discussions if deemed necessary.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA153-0002.pdf | ||
| Amendment W912WJ26QA153-0001.pdf | ||
| Solicitation Survey 26QA153.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
calls)
Section A - Solicitation/Contract Form
Janitorial Services, Hop Brook Lake and Naugatuck River Basin, Middlebury, CTInstrument Name:
Product Service Code : S201
W912WJ26QA153
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
BID SCHEDULE:
JANITORIAL SERVICES
U.S. ARMY CORPS OF ENGINEERS
HOP BROOK LAKE AND NAUGATUCK RIVER BASIN
MIDDLEBURY, CT
PERFORMANCE WORK STATEMENT
Bid Schedule
Base Year
TASK / ITEM NUMBER UNIT QTY UNIT PRICE TOTAL
1. Hop Brook Lake Project Office
Cleaning & Litter Pick-Up
Weekly
EA
2. Hop Brook Lake Project
Window Cleaning Semi-Annually
3. Naugatuck River Basin
4. Naugatuck River Basin
TOTAL $
Option Year
TASK / ITEM NUMBER UNIT QTY UNIT PRICE TOTAL
1. Hop Brook Lake Project Office
2. Hop Brook Lake Project Office
3. Naugatuck River Basin Office
4. Naugatuck River Basin Office
TOTAL $
*** END OF NARRATIVE ***
Section C - Description/Specifications/Statement of Work
INTERESTED VENDORS SHALL REVIEW SECTION L AND SECTION M OF THE
SOLICITATION FOR INSTRUCTIONS AND EVALUATION CRITERIA. VENDORS ARE
RESPONSIBLE FOR ENSURING THEIR QUOTE SUBMISSION MEETS ALL REQUIREMENTS.
FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND
REMOVED FROM CONSIDERATION.
THE MANDATORY SOLICITATION SURVEY ISSUED FOR THE SOLICITATION SHALL BE
COMPLETED IN ITS ENTIRETY AND RETURNED WITH QUOTES. FAILURE TO DO SO MAY
RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND REMOVED FROM
CONSIDERATION. USE OF A SOLICITATION SURVEY NOT ISSUED FOR THE RELEVANT
SOLICITATION WILL RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND
REMOVED FROM CONSIDERATION.
PERFORMANCE WORK STATEMENT:
JANITORIAL SERVICES
U.S. ARMY CORPS OF ENGINEERS
HOP BROOK LAKE AND NAUGATUCK RIVER BASIN
MIDDLEBURY, CT
PERFORMANCE WORK STATEMENT
A. GENERAL
1. Scope - Furnish all necessary labor, equipment, and materials (unless noted otherwise) to perform cleaning and maintenance services of reservoir operations facilities (offices, garages, storage buildings) and surrounding lawn/landscape areas at the Hop Brook Lake and Naugatuck River Basin Offices in Middlebury, Connecticut. Contractor's work and responsibility shall include, but not be limited to, all job planning, programming, scheduling, administration, inspection, personnel, equipment, vehicles, fuel, materials, supplies, supervision, and quality control necessary to perform the various services required herein. All work will be performed in a timely manner to the satisfaction of the Technical Point of Contact and in accordance with the following Performance Work Statement.
Note: It is the Contractor's responsibility to comply with all state and local refuse and recycling laws.
2. Locations - The Hop Brook Lake Project Office is located at 4 Straits Turnpike in Middlebury, Connecticut. The Naugatuck River Basin Area Office is located at 100 Allerton Road in Middlebury, Connecticut.
3. Site Visit - Contact the Technical Point of Contact, Park Ranger Marci Montrose (978) 318-8379 or Marci.M.Montrose@usace.army.mil to arrange a site visit.
4. Schedule - The Base Year's period of performance shall run from 15 September 2026 through 14 September 2027. In addition, the Government may exercise one (1) option year with the same scope of services. The Option year would include a period of performance from 15 September 2027 through 14 September 2028.
Work will not be performed before 8:00 am or after 3:00 pm, unless approved in advance by the Technical Point of Contact. No work will be performed on Saturdays, Sundays, and holidays unless approved in advance by the Technical Point of Contact. The quantities and schedules shown in the specifications are estimated amounts only and are not guaranteed.
All pre-work submittals shall be submitted within 21 days of contract award. The Government reserves up to 21 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 14 days of the Government's response, unless additional time is granted by the Government in writing.
The following table identifies the task, general descriptions and frequencies to be performed.
Item # Description Frequency Quantity
1 Hop Brook Lake Project Office & Naugatuck River Basin Office - Cleaning & Litter Pick-Up
Weekly
(Monday or Tuesday)
2 Hop Brook Lake Project Office & Naugatuck River Basin Office - Window Cleaning
Semi-Annually
(May & October)
5. Safety Requirements
a. General:
All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:
https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE% 2015March2024.pdf
Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
b. Accident Prevention Plan (APP):
The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.
The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:
https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_2023Aug31.pdf
A preparatory meeting shall be conducted by the prime contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
Daily safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact upon request.
c. Activity Hazard Analysis (AHA):
An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.
For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_2023Aug24.pdf
d. First-Aid and CPR Personnel Requirements:
For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.
Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.
e. Additional Personnel Requirements:
Other Competent Person (CP) or Qualified Persons (QP) may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the definable features of work for this project.
f. Accident Reporting:
All accidents and near misses shall be investigated by the Contractor and reported to the Technical Point of Contact in accordance with EM 385-1-1, Table 2-1.
The mandatory ENG Form 3394 shall be completed and submitted to the Technical Point of Contact within seven (7) days of an incident: https://www.publications.usace.army.mil/Portals/76 /Publications/EngineerForms/Eng_Form_3394_2021Aug.pdf
g. Employee Exposure Data:
The Contractor shall electronically report total employee work hours (including subcontractors) to the Technical Point of Contact by close of business on the 10th calendar day of the following month.
6. Pre-Work Conference- Prior to the start of any work, the TPOC will schedule and conduct a "Pre- Work Conference." The Contractor's Project Manager and Quality Control Personnel shall be physically present at this meeting. The Contractor shall directly oversee all work on the project, and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the TPOC to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Work Conference the Contractor shall provide the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this Pre-work Conference:
i. Authority of the Technical Point of Contact and Quality Assurance Inspectors
ii. Contractor's Safety Program (including sub-contractors)
iii. Mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) and Activity Hazard Analysis for each Definable Feature of Work (DFOW)
iv. Safety Meetings
v. ENG Form 3394 (Mandatory if needed for Accident Reporting)
vi. Safety Data Sheet (SDS) requirements
vii. Contractor's Quality Control Plan.
viii. Contractor's Equipment (including a current written safety inspection).
ix. Correspondence, Communication and Administrative Procedures
x. Invoice and Payment
7. Permits - The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable federal, state, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
8. Damage to Government and Private Property - The Contractor shall be responsible for restoring any Government facilities, structures, or landscape features damaged as a result of the Contractor's actions. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the firm's operations. The Contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the Contractors' operation. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore structures and or landscape features (shrubs, grass, parking bumpers, curbs, guardrails, fencing, etc.), which are damaged or destroyed by the firm's operation. Damaged or destroyed structures and features shall be replaced as directed by the Technical Point of Contact. Also, the Contractor shall notify the Technical Point of Contact of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed.
9. Security - The Contractor shall comply with all established security policies at each USACE location identified. If applicable, Contractor shall comply with Projects Key Control Management Program. Due to periods of heightened security, which may affect access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor's ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least a 24-hour notice of any such closure.
10. Contractor Conduct -
i. Employee Conduct:
The Contractor shall be responsible for seeing that the Contractor's employees strictly comply with all Federal, state, and municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.
Examples of unbecoming actions or conduct include but are not limited to the following:
a. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other contractors
b. Recurring written and/or verbal complaints from visitors, USACE personnel, or other contractors.
c. Unsafe operation of vehicles while on USACE property.
ii. Removal of Contractor's Employees:
The Technical Point of Contact may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the Technical Point of Contact, endangers persons or property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone and shall be confirmed in writing as soon as possible.
No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
Note: At least one of the Contractor employees on site shall be able to communicate effectively and efficiently with all project staff.
11. Payment - The Contractor will furnish the Technical Point of Contact with one monthly invoice, stating the service performed and the amount to be paid. (The invoice shall have the contract number, contractors mailing address and phone number, invoice number, date of services, date of invoice and charges by contract item number.) Payment shall be made monthly for the actual services performed at the applicable contract unit price.
All invoices may be mailed to:
U.S. Army Corps of Engineers
Hop Brook Lake Project Office
4 Straits Turnpike
Middlebury, CT. 06762
Attn: Marci Montrose
Or Emailed to marci.m.montrose@usace.army.mil
B. TECHNICAL REQUIREMENTS
1. Submittals:
Although the Government reviews submissions required by this Performance Work Statement, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to 21 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in an acceptable form within 14 days of the Government's response, unless additional time is granted by the Government in writing.
The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of Contact for review and must be accepted by the Government.
Pre-work Submittals: Submitted within 21 days of contract award. Submittals must be accepted prior to the commencement of any field work.
i. ENG Form 6293 (Accident Prevention Plan Worksheet)
ii. Activity Hazard Analysis; non-mandatory template available: ENG Form 6206
iii. ENG Form 6282 (Site Safety and Health Officer Designation Letter)
iv. First-Aid and CPR Personnel requirements
v. Safety Data Sheet (SDS) for applicable materials
vi. Licenses and Certifications as determined by the scope of work.
2. Clean Up:
The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials.
Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government. Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the Government.
3. Government Resources:
The Contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the Government will not provide any equipment, water, electricity, telephone services or other resources.
4. Omissions:
This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable and functional product.
5. Quality Assurance:
The Contractor is responsible for the quality control of all contract work. The Government retains the right to inspect and test all work items required under the contract, to the extent practicable, at any time and at any location during the contract period. The Government will monitor the Contractor's performance and apply deductions in accordance with the contract when services do not meet required standards.
6. Other Contracts:
The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other contractors and Government employees. The Contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor or by Government employees.
7. Environmental Protection:
Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the Contractor at the site, and the site will be inspected/ cleaned daily. No burning is permissible. Water, air, and land resources shall not be adversely impacted during work. The Contractor will take necessary steps to ensure all Federal, State, and Local environmental regulatory requirements are met at no additional cost to the Government. Assurance of compliance with this section by subcontractors shall be the responsibility of the Contractor.
8. Storage Area:
No Government space or facilities shall be provided under this contract unless specifically agreed upon and approved in advance by the Technical Point of Contact (TPOC). The availability of any storage area for Contractor use will be discussed and determined at the PreWork Conference. If a storage area is authorized, it will be located at the Hop Brook Project Office and shall be limited to the boundaries designated or approved by the TPOC. Upon completion of the contract, and at no additional cost to the Government, the Contractor shall remove all equipment and materials and restore the site to its original condition as approved by the TPOC.
9. Equipment:
All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with EM 385-1-1, Army Corps of Engineers Safety and Health Requirements.
All vehicles utilized under this contract will be presentable, serviceable, and shall comply with safety standards. The Contractors' vehicles will be clearly marked with the business name while in all service areas.
10. Products:
Sustainability
To the maximum extent practicable, the Contractor shall use environmentally preferable cleaning products, including those containing recovered materials, biobased content, and nontoxic formulations. Cleaning products designated under the Environmental Protection Agency's (EPA) Comprehensive Procurement Guidelines (CPG) shall meet the minimum recoveredmaterial content levels established by EPA (https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program). Cleaning products eligible for the EPA Safer Choice program shall be Safer Choicelabeled when available (https://www.epa.gov/saferchoice/products). Cleaning products designated under the United States Department of Agriculture (USDA) BioPreferred Program shall meet the minimum biobased content levels established by USDA (https://www.
biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml). The Contractor shall provide documentation demonstrating compliance with these requirements upon Government request.
C. EXECUTION
1. General Service Requirements: The Contractor shall furnish all necessary labor, equipment and materials (unless noted otherwise) to perform cleaning and maintenance services of reservoir operations facilities (offices, garages, storage buildings) and surrounding lawn /landscape areas at the Hop Brook Lake and Naugatuck River Basin Offices in Middlebury, Connecticut.
2. Materials and Supplies:
a. Provided by Government
i. Trash cans & liners
ii. Toilet tissue
iii. Paper towels
iv. Liquid hand soap
v. Liquid hand sanitizer
vi. Potable water source
b. Provided by Contractor
i. Mops
ii. Dusters
iii. Rags, Cloth towels
iv. Sponges, scrub brushes
v. Vacuum
vi. Broom, Dustpan
x. Buckets
xi. Disinfectants and detergents
xii. Garden hose, power washer etc.
NOTE:
1. All materials to be used shall be approved in advance by the Technical Point of Contact.
2. The contractor shall submit one copy of the manufacturer's Safety Data Sheet for each chemical proposed for use prior to using the chemicals on-site. Refer to the Sustainability & Environmentally Preferred Products section identified above in B. Technical Requirements, Section j. Products.
3. Government furnished supplies valued under $100 each.
3. Office Cleaning Requirements: The Contractor shall furnish all labor, equipment and materials necessary to perform cleaning services at the specified location and frequency. Cleaning services will include thoroughly and uniformly cleaning and disinfecting of the inside and outside of all surfaces. This work includes but not limited to: toilets, urinal, sinks, doors, interior walls and doors, interior railings, counter tops, floors, windows, mirrors, etc. When cleaning restrooms and kitchen areas, the Contractor will replenish toilet tissue, paper towels, and soap as necessary. All carpeted floors will be vacuumed. Hard surface floors will be swept or vacuumed and be washed at each cleaning using an approved disinfectant diluted in water in accordance with the manufacturer's recommendations. All other items will be dusted to include but not limited to; walls, interior corners from floor to ceiling, interior doors from floor to ceiling, windowsills, ceilings, interior railings, office furniture, office equipment, fans, light fixtures etc.
The Contractor will empty all waste receptacles located throughout both office buildings and replenish with new trash bags. Trash will be disposed of in a dumpster located outside of the Hop Brook Lake Project Office. The Contractor will empty all recycling bins located throughout both office buildings and return waste receptacles and recycle bins to their original locations. Recycling materials will be place into the marked recycling dumpster located outside Hop Brook Lake Project Office.
4. Office Area Litter Pick-Up Requirements: The Contractor shall furnish all labor, equipment, and materials necessary to perform all litter pickup (to include cans, bottles, paper, cigarette butts, bottle caps, bags, wrappers, plastic, glass etc.) found at specified locations outside of the facility buildings. All collected litter will be picked up and disposed of in a dumpster located outside of the Hop Brook Lake Project Office. All recyclable materials will be separated from trash and placed in the recycle bins.
5. Interior and Exterior Office Window Cleaning Requirements: The Contractor shall furnish all labor, equipment and materials necessary to perform interior and exterior window cleaning services at specified locations and frequencies. The interior and exterior surfaces of all windows shall be thoroughly and uniformly cleaned and streak free.
As applicable, the Contractor will remove all screens from the windows prior to cleaning and use an approved cleaning solution to remove all dirt, insect nests/webs, contaminants, etc., from all glass surfaces. Cleaning will result in glass being streak-free. All loose debris and dust from around the windows, to include window tracks and the framework will be removed. Before reinstalling window screens, the contractor will gently brush clean all screens to remove any dirt /debris/dust.
6. Service Locations
The services for this contract are located at the two locations and are identified as follows:
a. Hop Brook Lake Project (HBL) Office is located at 4 Straits Turnpike (Rte. 63), Middlebury, CT 06762
b. Naugatuck River Basin Area (NRB) Office is located at 100 Allerton Farms Road in Middlebury, CT 06762.
7. Task Schedules-Details
The Contractor shall furnish all labor, materials, and equipment necessary to perform the following tasks:
a. HBL & NRB - Office Cleaning
1) Service Requirement: Office Cleaning
2) Service Area:
a. Hop Brook Lake Project Office
Two Level Building - approx. 1600 sqft
2 restrooms
Some carpeting, some laminate flooring
Windows - 16 windows including doors; varying in size
b. Naugatuck River Basin Area Office
Two-Story Building - approx. 1200 sqft
2 restrooms
Some carpeting, some laminate flooring
Windows - 20 including screen doors; varying in size
3) Service Schedule: (Sep-Sep)
a. Once Weekly (same day every week shall be agreed upon by TPOC and contractor) between the hours of 8:00 a.m. and 3:00 p.m.
b. Base Year: September 15, 2026 - September 14, 2027
c. Option Year: September 15, 2027 - September 14, 2028
Note: Duties may be performed other days/times as deemed necessary with prior approval from the Technical Point of Contact.
b. HBL & NRB- Office Area Litter Pick-Up
1) Service Requirement: Litter Pick-Up - of all lawns, parking areas, roadways and planting beds surrounding listed service areas and facilities.
2) Service Area:
a. Hop Brook Lake Project Office
Office Building with attached three bay garage
Back Storage Garage
Power Transfer Utility Shed
Dam site access road and turnaround
b. Naugatuck River Basin Area Office
Office Building and Garage/Storage Area
Steel storage Building
Workcamper camp sites and shed
Roadside pull off/parking area and lawn area along Allerton Farm Rd
3) Service Schedule: (Sep - Sep)
a. Once Weekly (same day every week shall be agreed upon by TPOC and contractor) between the hours of 8:00 a.m. and 3:00 p.m.
b. Base Year: September 15, 2026- September 14, 2027
c. Option Year: September 15, 2027 - September 14, 2028
Note: Duties may be performed other days/times as deemed necessary with prior approval from the Technical Point of Contact.
Note: Duties can coincide with scheduled Office Cleanings
c. HBL & NRB - Office Window Cleaning
1) Service Requirements: Window Cleaning
2) Service Area:
a. Hop Brook Lake Project Office
b. Naugatuck River Area Office
3) Service Schedule: (Sep-Sep)
a. Twice a Year (Monday-Friday) between the hours of 8:00 a.m. and 3:00 p.m.
i. Base Year:
-First cleaning will be done during the month of October 2026 or within 45 calendar days of contract award, whichever is later.
-Second cleaning will be done during the month of May 2027
ii. Option Year:
-First cleaning will be done during the month of October 2027
-Second cleaning will be done during the month of May 2028
Note: Work under this item may need to be rescheduled or cancelled during extremely cold weather.
*** END OF NARRATIVE ***
Requirements Janitorial Services, Hop Brook Lake and Naugatuck River Basin, Middlebury, CT
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
DFARS Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7006 Wide Area WorkFlow Payment Instructions.
2023-01
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC ____ Issue By DoDAAC ____ Admin DoDAAC ____ Inspect By DoDAAC ____ Ship To Code ____ Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
SECURITY REQUIREMENTS:
General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as "RAMs"), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures -this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clauses of this contract, should FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
WAGE DETERMINATIONS:
The Wage Determination for this project can be found at:
https://sam.gov/wage-determination/2015-4131/35
W912WJ26QA153
https://sam.gov/wage-determination/2015-4131/35
Wage Determination No.: 2015-4131
Modification No.: 35
Revised Date: 25 June 2026
*** END OF NARRATIVE ***
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-9 Personal Identity Verification of Contractor Personnel.
2011-01
52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)
2026-02
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
(Deviation 2026-O0038)
2026-02
52.212-4 Terms and Conditions- Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-02
52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026- O0038)
2026-02
52.222-3 Convict Labor. (Deviation 2026- O0038)
2026-02
52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026- O0038)
2026-02
52.222-41 Service Contract Labor 2026-02
Standards. (Deviation 2026- O0038)
52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)
2026-02
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (Deviation 2026-O0038)
2026-02
52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation 2026- O0038)
2026-02
52.222-90 Addressing DEI Discrimination by Federal Contractors.
(Deviation 2026-O0040, Revision 1)
2026-04
52.223-23 Sustainable Products. (Deviation 2026-O0038)
2026-02
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.
2024-05
52.232-33 Payment by Electronic Funds Transfer-System for Award Management.
2018-10
52.232-40 Providing Accelerated Payments to Small Business Subcontractors.
2023-03
52.233-1 Disputes. (Deviation 2026- O0038)
2026-02
52.233-3 Protest after Award. (Deviation 2026-O0038)
2026-02
52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026- O0038)
2026-02
52.240-91 Security Prohibitions and Exclusions. (Deviation 2026- O0038)
2026-02
52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-04
52.245-1 Government Property. 2021-09
52.245-9 Use and Charges. 2012-04
DFARS Clauses Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
2011-09
252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
2022-12
252.204-7003 Control of Government Personnel Work Product.
1992-04
252.204-7004 Antiterrorism Awareness Training for Contractors.
2023-01
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident
2024-05 Deviation 2024-
2024-05
Reporting. (DEVIATION 2024-
O0013 REVISION 1)
O0013
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
2023-01
252.204-7020 NIST SP 800-171 DoD Assessment Requirements.
2023-11
252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.
2023-01
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.
2023-06
252.232-7010 Levies on Contract Payments. 2006-12
252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel.
2023-01
252.243-7001 Pricing of Contract Modifications. 1991-12
252.244-7999 Subcontracts for Commercial Products or Commercial Services. (DEVIATION 2026- O0015)
2026-02 Deviation 2026- O0015
2026-01
252.245-7003 Contractor Property Management System Administration
2025-01
252.245-7005 Management and Reporting of Government Property.
2024-01
252.247-7023 Transportation of Supplies by 2024-10
Sea.
FAR Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
52.217-9 Option to Extend the Term of the Contract.
2000-03
Option to Extend the Term of the Contract (Mar 2000)
The Government may extend the term of this contract by written notice to the Contractor (a) within ; provided that the Government gives the Contractor a preliminary 15 calendar days written notice of its intent to extend at least before the contract expires. The 30 calendar days preliminary notice does not commit the Government to an extension.
If the Government exercises this option, the extended contract shall be considered to (b) include this option clause.
The total duration of this contract, including the exercise of any options under this clause, (c) shall not exceed 2 . years
(End of clause)
52.219-28 Postaward Small Business Program Rerepresentation.
(Deviation 2026-O0038)
2026-02
Postaward Small Business Program Rerepresentation (Feb 2026) (Deviation 2026-O0038)
(a) . As used in this clause-Definitions
Long-term contract means a contract of more than five years in duration, including options.
However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern-
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.
(2) , as used in this definition, means business concerns, one of whom directly or Affiliates indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.
(b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts-
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document /support--table-size-standards.
(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition-
(1) Was set aside for small business and has a value above the simplified acquisition threshold;
(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or
(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause, that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it is, is not a small business concern under NAICS 561720 Code assigned to contract number.W912WJ26PXXXX
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph .] The Contractor represents that it is, is not, a small disadvantaged (g)(1) of this clause business concern as defined in .13 CFR 124.1001
(3) . The Women-owned small business (WOSB) joint venture eligible under the WOSB Program Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity ____ identifier of each party to the joint venture: __.]
(4) . The Economically disadvantaged women-owned small business (EDWOSB) joint venture Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique entity ____ identifier of each party to the joint venture: __ .]
(5) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the . The Contractor represents that it is, is not an SDVOSB joint venture eligible SDVOSB Program under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [ The ____ Contractor shall enter the name and unique entity identifier of each party to the joint venture:
(6) [ HUBZone joint venture eligible under the HUBZone Program. Complete only if the offeror is ] The offeror represents, as part of its offer, that It is, is not a HUBZone small business concern.
a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c).
[ The Contractor shall enter the name and unique entity identifier of each party to the joint ____ venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern. [ Contractor to sign and date and insert ____ authorized signer's name and title.]
(End of clause)
52.222-42 Statement of Equivalent Rates for Federal Hires.
2014-05
Statement of Equivalent Rates for Federal Hires (May 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .