Amendment W912WJ24Q0140-0001.pdf

PDF 433 KB Posted

Attached to
Generator Replacement, Wings Neck Radar Site, Cape Cod Canal Project , Pocasset, MA
Solicitation number
W912WJ24Q0140
Issued by

About this file

This document is an Amendment to Solicitation W912WJ24Q0140 for the Generator Replacement project at the Wings Neck Radar Site, Cape Cod Canal Project in Pocasset, MA. The Amendment provides responses to industry questions and revises the Period of Performance from 90 days to 180 days after Notice to Proceed.

The Contractor shall remove and dispose of the existing 35 kW propane generator, exhaust muffler, automatic transfer switch, and components, and install a new 24 kW propane generator, automatic transfer switch, exhaust silencer/muffler, and connect the existing louvers. The Government will disconnect and reconnect power to the building. The Contractor must submit various safety and technical submittals within 15 days of Notice to Proceed. The Solicitation closing date remains August 12, 2024 at 5:00 PM Eastern. This is a set-aside for small businesses under NAICS code 238210, and vendors must have an active SAM.gov registration to be considered.

View the file

Other files

File Type Posted
Amendment W912WJ24Q0140-0002.pdf PDF
Solicitation W912WJ24Q0140.pdf PDF
Attachment.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is necessary to provide responses to questions from industry and revise the Period of Performance to 180 days after Notice to Proceed in the Statement of Work, Delivery, and FAR clause 52.211-10.

Solicitation closing remains August 12, 2024 at 5:00 PM Eastern.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Jul-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ24Q0140

X 9B. DATED (SEE ITEM 11)

29-Jul-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

30-Jul-2024

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

jennifer.m.samela@usace.army.milEMAIL:978-318-8324TEL:

JENNIFER M SAMELA / ADDED BY UPASS

W912WJ24Q0140

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

REQUEST FOR INFORMATION

QUESTION 1: Is the 90-day completion date negotiable as I am concerned with the lead time on ordering a generator?

RESPONSE 1: The Period of Performance has been revised to 180 days from Notice to Proceed. Please refer to the revised Statement of Work, Delivery, and FAR clause 52.211-10 for further information.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK

WINGS NECK GENERATOR REPLACEMENT

U.S. ARMY CORPS OF ENGINEERS

CAPE COD CANAL PROJECT, POCASSET, MA

STATEMENT OF WORK

REVISED

I. General

1. Statement of Work

Contractor shall furnish all labor, equipment, tools, and materials for removal and proper disposal of an existing 35 KW propane standby generator, exhaust muffler, automatic transfer switch, and components. Contractor shall furnish equipment, materials, and labor for installation of a new 24 KW propane standby generator, automatic transfer switch, exhaust silencer/muffler, and components. Contractor shall connect and wire the existing louvers to function with the new generator. The new generator must be installed in the same place as current generator. (See Figure 1, Photos 1-7). All work shall be performed in accordance with the following Statement of Work.

The Government will disconnect power to the existing building. After installation of the new generator and automatic transfer switch, the Government will reconnect power to the building.

2. Locations

The Wings Neck work site is located on Federal property, adjacent to the Cape Cod Canal, at 10 Harbor Way, Pocasset, MA 02559.

3. Site Visits

A scheduled site visit for interested vendors will be listed in the Solicitation. Interested vendors should attend the site visit to confirm understanding of the scope, inspect field conditions, access, and existing utilities prior to submitting a quote. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements. After Contract award, the Technical Point of Contact (TPOC) for questions and site coordination is Travis Germano (978) 318-8550 or (Travis.J.Germano@usace.army.mil).

4. REVISED Schedule The work shall be completed within 90 180 days of Notice to Proceed. The hours available for work are Monday to Friday 0700 through 1700 hours.

All preconstruction submittals shall be submitted within 15 days of Notice to Proceed. The Government reserves up to 15 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 7 days of the Government’s response, unless additional time is granted by the Government in writing. No field work may proceed prior to the acceptance of preconstruction submittals.

5. Safety Requirements A. General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers

(USACE) Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), Federal, State, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:

https://www.publications.usace.army.mil/Portals/76/EM%20385-1- 1%20_EFFECTIVE%2015March2024.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

B. Accident Prevention Plan (APP):

The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.

The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_2023Aug31.pdf

A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Daily safety meetings shall be held and documented. Records shall be available to the

Technical Point of Contact upon request.

C. Activity Hazard Analysis (AHA):

An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard

Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_2023Aug24.pdf

D. Site Safety and Health Officer (SSHO) Requirements:

The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A

Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.b and 2-4.b.

Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.

The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor’s SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter):

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_2023Aug28.pdf

E. First-Aid and CPR Personnel Requirements:

For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency. Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.

F. Additional Personnel Requirements:

Other Competent Person (CP) or Qualified Persons (QP) may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the definable features of work for this project.

G. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor and reported to the

Technical Point of Contact in accordance with EM 385-1-1, Table 2-1.

The mandatory ENG Form 3394 shall be completed and submitted to the Technical Point of Contact within seven (7) days of an incident:

https://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms/Eng_Fo rm_3394_2021Aug.pdf

H. Employee Exposure Data:

The Contractor shall electronically report total employee work hours (including subcontractors) to the Technical Point of Contact by close of business on the 10th calendar day of the following month.

6. Preconstruction Conference

Prior to the start of any work, the Contractor and Technical Point of Contact will schedule and conduct a “Preconstruction Conference”. The Contractor’s Project Manager and Quality Control Personnel shall be physically present to attend this meeting. This conference will be scheduled for a time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the requirements in terms of safety, quality, submittals, communications, inspections, and payments.

7. Permits There are no permits required to complete this work. The Contractor shall comply with any applicable Federal, State, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

8. Security

The Contractor will comply with all established security policies at Cape Cod Canal Field Office. Potential periods of heightened security may affect access to work areas. During periods of heightened security, the Government reserves the right, at any time, to close any property and reschedule work. The Contractor shall be given at least 24-hour notice of any such closure.

9. Contractor Conduct

The work area is located on Federal property. Contractor and employees must act in a safe and professional manner at all times. Alcohol and firearms are prohibited on project grounds.

10. Payment

Payment shall be made after final inspection and acceptance by the Government, the Contractor must submit an invoice, utilizing Form ENG 93 to the Technical Point of Contact.

The invoice shall include the name of Contractor (as per SAM registration), invoice date, contract number, description of work completed, and total amount due. For jobs greater than 30 days the Contractor may request progress payments. Invoices shall be emailed to:

US Army Corps of Engineers Cape Cod Canal Field Office P.O. Box 1555 Buzzards Bay, MA 02532 Attn : Travis Germano travis.j.germano@usace.army.mil.

II. Technical Requirements:

Part 1 General:

Contractor’s work and responsibility includes all job scheduling, personnel, equipment, materials, supervision, and quality control necessary to perform the work. Contractor shall provide bathroom and sanitation facilities for workers.

1. Requests for Information:

After Notice to Proceed, questions concerning the work of this project should be directed to the Technical Point of Contact at the Cape Cod Canal Office at (978) 318-8550 or travis.j.germano@usace.army.mil.

2. Submittals:

Although the Government reviews submissions required by this Statement of Work Statement, it is emphasized that the Contractor’s work must be completed using proper internal controls and review procedures. The Government reserves up to 15 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in an acceptable form within 7 days of the Government’s response, unless additional time is granted by the Government in writing.

The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and must be accepted by the Government.

Preconstruction Submittals: Submitted within 15 days of Notice to Proceed. Submittals must be accepted prior to the commencement of any field work.

a. ENG Form 6293 (Accident Prevention Plan Worksheet)

b. Activity Hazard Analysis; non-mandatory template available: ENG Form 6206

(Activity Hazard Analysis)

c. ENG Form 6282 (Site Safety and Health Officer Designation Letter)

d. First-Aid and CPR Personnel requirements

e. Safety Data Sheets

f. Electrical and Plumbing State Licenses

g. For all materials to be used on the project, the Contractor shall provide the following information:

i. Manufacturer’s name

ii. Catalog number

iii. Specifications

iv. Any other information necessary to approve the materials.

v. Safety Data Sheets (SDS) shall be submitted along with the product data for any potentially hazardous materials such as adhesives and flux materials. Use Low Volatile Organic Compound (VOC) materials wherever possible.

h. Operation and Maintenance Manuals for all installed equipment – Provide (1) hard copy in a binder with all approved submittals, as-builts, manufacturer’s literature for equipment, and maintenance procedures.

i. Operational Test Results – At completion of field work and prior to final payment.

j. Manufacturer 5 Year Warranty and Contractor 1 Year Warranty

3. Government Resources:

The Contractor is responsible for providing all resources to complete the project. The Government will not provide any equipment or services except which are explicitly stated within this statement of work.

4. Omissions:

This Statement of Work may not cover all specified activities, steps, and procedures required to supply the contract product. In cases where work is not specifically shown or specified, contract shall include miscellaneous items, appurtenances, devices, and materials obviously necessary for a sound, secure and complete installation. In case of omission, the normal industry, State, or Federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

5. Quality Control and Quality Assurance:

The Contractor is responsible for the quality control of the contract work. The Government has the right to inspect and test all items called for by the contract for Quality Assurance, to the extent practicable at all times and at all places during the term of the contract.

6. Other Contracts:

The Government may undertake or award other contracts for additional work not related to this contract, the Contractor shall fully cooperate with other Contractors and Government employees. The Contractor shall not commit or permit any act, which will interfere with the performance of work by another Contractor, or by Government employees.

7. Receiving and Storing Materials:

Storage areas for materials, equipment and dumpsters will be coordinated with the Technical Point of Contact. The Contractor is responsible for protecting any stored material. The Contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive material or supplies for the Contractor and will not be responsible for damage or theft of Contractor equipment or material. All storage areas shall be restored to their pre-construction condition at the Contractor’s expense and verified as such by the Government Technical Point of Contact (TPOC).

8. Clean Up:

Contractor shall inspect all equipment and materials used to prevent the release of any contaminants to the environment. The Contractor shall practice good housekeeping to maintain a safe job site. Remove rubbish and debris from the site daily, do not allow it to accumulate inside or outside of the building. The Contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials. Upon completing work, the Contractor shall remove all tools, equipment, and materials that are not the property of the Government and shall clean up the job site to the satisfaction of the Government.

9. Sustainability:

EPA Designated: Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels.

Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.

Part 2 Materials:

All materials shall be approved by the Technical Point of Contact prior to installation.

The Contractor shall provide sufficient information on proposed materials and time to allow the Government to evaluate the products for adherence to specifications. Substitute materials will be evaluated in terms of quality, features, performance and expected service life. Substitute products must be accepted by the Government prior to installation.

Standby generator – Shall meet the following minimum requirements:

1) Generator:

a) Liquefied Petroleum Gas (LPG) generator shall be installed in the same interior area of the utility building as the existing LPG generator.

b) LPG Generator: 24 kW/kVA

c) Mounting: Skid Mounted / No Enclosure

d) Voltage: 120/240

e) Phase: 1

f) Frequency: 60 Hertz

g) Amps: 100

h) Rated RPM (not to exceed): 1800

i) Voltage regulator: Solid State, Volts/Hz

j) Silencer/Muffler Max Sound: 65 dBA

k) Frequency regulation, steady state: +/-1.0%

l) Frequency: Fixed

m) Standard 5-year warranty

n) Controller Features:

1) OFF, AUTO, and RUN push buttons

2) LCD screen (minimum 2 lines of display)

3) Built-in Battery Charger

4) Scrolling system status display

i. Generator set status

ii. Voltage and frequency

iii. Engine temperature

iv. Oil pressure

v. Battery voltage

vi. Engine runtime hours

o) Option Features:

1) Auto start, Cold Start capability

2) Block Heater, 120 V, 1 Ph

3) GFCI service outlet, 120/240 V for customer connection

4) Integral vibration isolation

5) Line circuit breaker

6) NEC prime mover shutdown switch

7) Oil drain extension

p) Full engine protection including warning and/or shutdown for overspeed, low coolant, high temperature, low battery voltage, over crank, low oil level and pressure, etc.

q) A radiator fan guard must be installed for personnel safety.

r) The exhaust system shall have a flexible section at the engine. Flexible sections and

Bellows type expansion joints shall have flanged connections.

s) Response time of no more than 10 seconds

t) Operation and Maintenance Literature

1) General Maintenance Manufacturer Literature

2) Overhaul Manufacturer Literature

3) Production Manufacturer Literature

2) Automatic Transfer Switch:

a) Automatic transfer switch shall be installed in the same interior location as the existing automatic transfer switch.

b) Voltage: 120/240

c) Frequency: 60 Hertz

d) Amps: 100 Amps

e) Enclosure: NEMA 3R

f) UL Listed

g) Indicator lights for power source and transfer switch status.

h) Integral engine exerciser

3) Interior Conduits – Provide ¾” Electric Metallic Tube (EMT)

4) Conductors – Provide per manufacture requirements.

5) Rod and Pipe Hanger (For new Exhaust Pipe)

6) Side Wall Hooded Vent Cover w/ Bird Screen (For new Exhaust Pipe)

7) ¾” Fire-Retardant Pressure-Treated Plywood (Backboard to mount new ATS and existing Disconnect Switch)

Part 3 Execution:

General:

1. All onsite work shall be coordinated with the Technical Point of Contact prior to start of mobilization. Work shall be performed in a safe manner that protects both workers and the public from hazards. The work area is located near a residential area on Federal property at the Cape Cod Canal Project.

2. Although work is not specifically shown or specified, contract shall include miscellaneous items, appurtenances, devices, and materials obviously necessary for a sound, secure and complete installation.

3. The Contractor shall employ ample personnel and sufficient equipment to accomplish the work of this contract in the least amount of time and be sequenced to minimize impacts on the residential area. Once power is shutoff by the Government, Contractor shall maintain an active daily presence onsite, prosecuting work continuously, without delay, and shall not demobilize nor vacate the work site until the project is complete. Contractor shall provide schedule which minimizes the duration of time from when the power is shutoff, the new generator is installed, and all services returned to full operation.

4. Existing Conditions: Contractor shall verify that actual site conditions are consistent with the existing conditions depicted within this statement of work. Discrepancies, omissions, and errors shall be reported to the Government prior to the start of construction. Contractor shall be responsible for the protection of all existing structures, equipment, and areas from damage during construction. Any items that are damaged or altered during construction shall be restored to their pre-construction condition at the Contractor’s expense and verified as such by the Government TPOC.

Dimensions of existing openings and equipment (Contractor is responsible to verify):

35 KW Generator Sled 69”L x 33”W x 47”H Door Opening 43”W x 83”H Louver Vent Opening Outside Frame 51”L x 51”W Raised Concrete Pad 76”L x 48”W x 17”H

5. There is an existing tower located next to the building work area. There are existing underground grounding rods, rings, and connections around the existing tower.

Demolition:

1. Contractor shall lock out and tag out the electrical system and propane line.

2. Disconnect and dispose of the existing generator, exhaust pipes, muffler, automatic transfer switch, conduits, and electrical wiring. Contractor may remove and reinstall existing louvers to facilitate removal and installation of generator.

3. Disconnect the existing propane line and reconnect to new generator.

4. Disconnect and dispose of all existing associated conductors and conduits and reconnect with new.

Installation:

1. Qualified Electrician: All work on the electric service, conduits, and wiring shall be performed by State licensed electricians.

2. Install the new 24kW LPG generator, new automatic transfer switch, new conduits, new conductors, and existing disconnect switch in the same location as the existing components.

3. The Contractor shall be responsible for all connections to the propane line, new exhaust line, electrical wiring, new conduits, and wiring to vent louver actuators to support a fully functioning system. Specifically, provide all new electrical wiring, conduits, and junction boxes to the existing actuators on the louver venting system. The Contractor shall confirm the layout of conduits prior to installation.

4. Configure new generator silencer/muffler and exhaust system to exit generator room through existing building penetration hole.

5. Install all electrical wiring and make all electrical connections in accordance with the manufacturer’s installation requirements and all National and State codes and regulations.

6. Secure Generator sled to existing raised concrete pad with concrete anchors.

7. In adherence to manufacturer instructions, the relocated generator and automatic transfer switch will be performance tested by Contractor and witnessed by the Government after installation. Advanced notification to the Government TPOC is mandatory for test witnessing. The system will be tested comprehensively in bypass, normal, and emergency modes. Government electricians will facilitate the re-energization of the main single-phase main feed conductor as required for testing.

Closeout:

1. Disposal: All demolished materials including existing miscellaneous construction debris generated from the project shall be removed and properly disposed or recycled by the Contractor. Contractor shall clean up and properly dispose of debris off-site in accordance with Federal, State and Local ordinances and regulations. Contractor shall leave the entire site of the work in a neat and orderly condition. Debris, rubbish, non-hazardous waste, and non-usable material resulting from the work under this contract shall be disposed of by the Contractor at his expense off Government property.

2. Closeout Procedures: Contractor shall coordinate with the TPOC for the following at the completion of the project:

a. A final inspection walkthrough of the project to ensure the work is completed in accordance with the Statement of Work.

b. Restore site area to pre-construction condition.

c. Waste Disposal Slips

d. Provide Operation and Maintenance Manuals, Extended Warranties, Testing

Records

e. Complete Final Payment Forms and Certifications.

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule item for CLIN 0001 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

90 dys. ANP 1 CAPE COD CANAL

TRAVIS GERMANO

40 ACADEMY DRIVE

BUZZARDS BAY MA 02532-1555

978-318-8550 FOB: Destination

961306

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

180 dys. ANP 1 CAPE COD CANAL

TRAVIS GERMANO

40 ACADEMY DRIVE

BUZZARDS BAY MA 02532-1555

978-318-8550 FOB: Destination

961306

SECTION I - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 180 calendar days after notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

(End of Summary of Changes)