This document is a Statement of Work (SOW) for the Provide and Install Precast Utility Building at Site Sandwich, U.S. Army Corps of Engineers Cape Cod Canal Project in Sandwich, MA. The SOW includes detailed information and photos of the existing site, as well as the requirements for the new 12'x14'x10' precast concrete utility building, including a frost wall footing foundation, site grading, underground conduits, relocation of the existing propane tank, generator, and transformer onto new precast pads, and installation of a 24,000 BTU mini-split heat pump, 200-amp main distribution panel, 100-amp electrical service panel, and other interior finishes.

The related federal contract opportunity, Solicitation Number W912WJ24Q0073, is for the Telecommunication Building Replacement at the Cape Cod Canal in Sandwich, MA. This is a small business set-aside procurement with a NAICS code of 236220 and a size standard of $45 million. The magnitude of construction is between $100,000 and $250,000. Vendors must have an active SAM.gov registration to be considered.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROVIDE and INSTALL

PRECAST UTILITY BUILDING AT SITE SANDWICH

U.S. ARMY CORPS OF ENGINEERS

CAPE COD CANAL PROJECT, SANDWICH, MA

STATEMENT OF WORK

Informational Figures

Figure 1

Figure 1 Aerial Satellite Map - Shows location of the Site Sandwich located at 12 Freezer

Road, Sandwich, MA

PROVIDE and INSTALL

PRECAST UTILITY BUILDING AT SITE SANDWICH

U.S. ARMY CORPS OF ENGINEERS

CAPE COD CANAL PROJECT, SANDWICH, MA

STATEMENT OF WORK

Informational Photos:

Photo 1

Photo 1 - Above Photo shows an aerial view of Site Sandwich with the telecommunications utility building located inside security fence enclosure. Contractor shall maintain at least (1) single lane access on Freezer Road at all times.

Photo 2

Photo 2 – Above Photo shows Telecommunications Building Site Sandwich looking West.

Contract shall relocate the Cummins Quiet Connect RS36 generator on to a new concrete equipment pad. Contract shall connect generator to restore full functionality.

Photo 3

Photo 3 – Above Photo shows Telecommunications Building Site Sandwich looking North. New smaller 12’x14’x10’ precast building to be placed on new frost wall footing foundation.

Photo 4

Photo 4 – Above Photo shows Telecommunications Building Site Sandwich looking East, showing the door access to the interior Onan 35EK generator set (nonfunctioning).

Photo 5

Photo 5 – Above Photo shows Telecommunications Building Site Sandwich looking South.

Photo 6

Photo 6 – Above Photo shows Telecommunications Building Site Sandwich building roof looking West. Government will remove all communications cables.

Photo 7

Photo 7 – Above photo shows the green Onan 35EK generator set (nonfunctioning) and associated exhaust muffler which shall be removed and disposed by contractor.

Photo 8

Photo 8 – Above Photo shows the existing disconnect switches/electrical service for the comfort station, parking lot lights, canal marine traffic range lights, and the utility building. Contractor shall identify, label, disconnect, safely pull conductors back to intersecting point (electrical vault, transformer, conduit, etc.), and reconnect all conductors to new building.

Photo 9

Photo 9 – Above Photo shows the existing RS36 generator Automatic Transfer Switch which the contractor shall remove, store, and reinstall inside the new precast building.

Photo 10

Photo 10 – Above photo shows the existing RS36 generator Automatic Transfer Switch (ATS) which the contractor shall remove, store, and reinstall inside the new precast building. The ATS will be fed from a 100 AMP breaker inside the 200 AMP MDP. Contractor shall provide all new conduits and conductors.

Photo 11

Photo 11 – Above photo shows the existing transformer. The contractor shall remove, store safely, and reinstall the existing transformer on a new Single Phase Vault that is 45”x45”x48”.

Contractor shall place vault on top of 6” crushed stone bed.

Photo 12

Photo 12 – Above photo shows the interior of the existing transformer. Contractor shall provide a new load break elbow, lugs, and miscellaneous items to reconnect transformer.

Photo 13

Photo 13 – Above photo shows the access and interior of the existing underground primary electrical manhole vault. This manhole fills with water; therefore, the contractor shall pump out the water to complete this work. The contractor shall penetrate the electrical manhole by core drilling to install new conduits.

Photo 14

Photo 14 – Above photo shows the existing conduits for the comfort station, parking lot lights, canal marine traffic range lights, and existing building. Government will remove and reinstall the fiber line. The government will refeed and install the new conductor for the comfort station.

Photo 15

Photo 15 – Above Photo shows the existing building foundation plan, which the contractor shall remove and dispose in its entirety.

Photo 16

Photo 16 – Above Photo shows the existing building foundation plan, which the contractor shall remove and dispose in its entirety.

Photo 17

Photo 17 – Above Photo shows Telecommunications Building Site Sandwich looking north. The government will remove the existing light pole. Contractor shall remove and dispose of the existing light pole foundation base. Contractor shall provide a conduit/pull string to this existing light pole location. Contractor shall remove and dispose of tree along fence line.

Photo 18

Photo 18 – Above Photo shows the new required layout of the building, propane tank, generator, electrical hand holes, and conduits.

Photo 19

Photo 19 – Contractor shall provide a new frost wall footing foundation for new 12’ x 14’ precast concrete utility building. Inside the wall, backfill with gravel borrow, compacted at 6” lifts and provide a top 6” thick layer of 3/8” minus aggregate crushed stone base compacted at 3” lifts. Clean crushed stone shall be 3/8" or smaller and must be screeded level within ¼" in both directions. Lifts shall be compacted to not less than 95% of the maximum dry density of the material.

Photo 20

Photo 20 – Shows typical underground conduit detail. Contractor shall provide conduits as stated in this statement of work.

Photo 21

Photo 21 – Shows the required Precast Concrete Equipment Pad which shall be installed under the existing propane tank and Cummins RS36 Emergency Generator. Place pad on top of 6” crushed stone bed at grade level to maximize height.

Photo 22

Photo 22 – Shows the required 1PH XFMR VAULT 45” x45” x48” which shall be installed under the existing transformer. Place vault on top of 6” crushed stone bed.

Photo 23

Photo 23 - Contractor shall provide new electrical HS-20 handhole. Above photo shows the typical precast concrete electrical handhole detail. Place handhole on top of 6” crushed stone bed.

Photo 24

Photo 24 - Contractor shall provide new electrical handhole frame. Above photo shows the typical electrical handhole frame detail.

Photo 25

Photo 25 - Contractor shall provide new electrical handhole cover. Above photo shows the typical electrical handhole cover detail.

Photo 26

Photo 26 - On two sides of the building, similar as shown above, the contractor shall provide

1x4, 4” aluminum entry port panels located approximately 8” down from the interior ceiling.

One (1) entry port shall be installed on the east and one (1) on the south side of the building.

Install entry port panels in a bed of waterproof sealant. These entry port panels will be solely utilized by the Government during re-installation of telecom equipment after acceptance of the buildings.

Photo 27

Photo 27 - Above photo shows the building penetration 1 X4, 4” aluminum entry port layouts for the side and back walls, including the weather tight kits. Provide exterior weather tight boot kits for all entry panel openings.

Photo 28

Photo 28 - Above photo shows the Stainless Steel Electrical Enclosure, 24”x48”, NEMA 4X and

Powder-Coated Steel White Steel Panel, 21”x45”. Enclosure shall be mounted on the exterior east of the building at 48” high.

Photo 29

Photo 29 - Above photo represents the intended layout of the 200 amp Main Distribution Panel

(MDP), Automatic Transfer Switch (ATS), and 100 amp Service Panel.

Photo 30

Photo 30 – Photo above represents the required layout of the precast concrete building. The

Contractor shall coordinate with the TPOC the size and locations of all penetrations needed to complete building installation to full functionality.