Amendment W912WJ23Q0005-0006.pdf
PDF 827 KB Posted
- Solicitation number
- W912WJ23Q0005
About this file
This document contains an amendment to a solicitation for a federal contract opportunity as well as the related solicitation. The amendment provides responses to vendor questions regarding a project to replace piston rings on hydraulic gates at the Blackwater Dam in Webster, New Hampshire. The scope of work involves removing and replacing the middle piston ring on each of the six gates with a new hydrolysis-resistant polyurethane seal. The contractor must note that only one gate may be worked on at a time until repairs are complete. The applicable NAICS code is 237990 for specialty trade contractors and the procurement is set aside for small businesses with less than $45 million in annual revenue. The response deadline remains June 14, 2023 at 5:00 PM Eastern Time. Wage determinations and additional details are provided in the original solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment is necessary to provide responses to questions from industry. Questions/responses #9-#13 are applicable to this amendment.
A revised sheet MER-BW-106_M-301_REVISED w ill be posted as an attachment.
Closing remains June 14, 2023 at 5:00 PM Eastern.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Jun-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ23Q0005
X 9B. DATED (SEE ITEM 11)
07-Mar-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Jun-2023
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
jennifer.m.samela@usace.army.milEMAIL:978-318-8324TEL:
JENNIFER M SAMELA / ADDED BY UPASS
W912WJ23Q0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
REQUEST FOR INFORMATION
1. What type and viscosity of hydraulic oil is used ? Are we supplying the “top off” oil – Response: There have been two types of hydraulic fluid added to this system. One fluid is a Duralene ZD AW 32 hydraulic oil and the other is a Travellers AS Hyd ISO46 hydraulic oil. The contractor will be responsible for topping off the system after it is re-assembled.
2. Does the filtered oil have to be sent off to prove it is 10 microns or less? Or will filtering with 10 micron filters suffice.
Response: Contractor shall top off the hydraulic tank with hydraulic fluid as specified and actuate the oil filtration system with a 10 µm element in the filter. Circulate the fluid and change filters as they become clogged.
3. What is the operating pressure of the HPU?
Response: The maximum operating pressure of the system is 500 psi.
4. Has the lifting beam in the gate house been load tested?
Response: Yes, the lifting beam was load tested when the new the trolley and hoist were installed.
5. Please provide a photo of the counterbalance valve on each slide gate. – Response: No longer included in scope. Revisions to scope will be issued in subsequent amendment.
6. Please provide technical description and mfg. part # and drawing for the counterbalance valve. – Response: No longer included in scope. Revisions to scope will be issued in subsequent amendment.
7. Millwrights will perform this work. Can you provide Davis Bacon Rates?
Response: Wage Determinations are included in the solicitation that cover the majority of work. Millwrights would be covered under Service Contract Act Wage Determination #2015-4023 for Merrimack County, New Hampshire.
8. We can machine the polyurethane part of the seal out of a 55D material, but the spec for the rubber energizer is saying 85D, which is harder than the sealing element. We would only be able to machine the energizer from 85A NBR. Is this just a 2pc seal? The description b. on drawing m-301 references cap seal and often times that is a 4pc piston seal.
Response: The proposed design shall utilize a 2pc seal. Contractor may submit alternative materials for review after contract award.
9. Has the lifting beam in the gate house been load tested?
Yes, the lifting beam was load tested when the new the trolley and hoist were installed. The government does not have the documentation for this test.
10. Is the contractor required to load test the lifting beam?
No. Please note that the monorail beam is load rated at 2 tons (4,000lbs).
W912WJ23Q0005
11. Is the contractor required to load test the lifting points above each of the slide gate cylinders before using them?
No. Please note that the lifting points are load rated for 2 tons (4,000lbs).
12. Please confirm that the bonnet seals do not need replaced contrary to drawing M-301.
Confirmed, they do not need to be replaced. If the bonnet cover is removed as part of the work, the Contractor shall provide a watertight seal between the bonnet cover and the bonnet during reassembly.
13. In the table 1.1 at the top left of drawing M-301, please notice the 5th item in the list marked below….In drawing M13-56/1 the item number 4-8 (listed in the “Mark” column on table 1.1) is referred to as a “Bonnet Seal” and is shown as a bronze seal that is installed on the side of the gate itself. Could you please clarify if the Government wants these seals replaced (requiring the removal of the gates) or if the “Bonnet Seal” referred to on table 1.1 is instead the “Bonnet Cover Plate” referred to in table 1.2 Technical Requirements 4.f.
This work is no longer included in the contract. Please refer to the revised drawing that will be posted with the amendment.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .