This document provides an amendment to a solicitation for piston ring replacement services at the Blackwater Dam in Webster, New Hampshire. The scope of work includes removing and replacing the middle piston rings on each of the six gates that control water flow through the dam's three conduits. Access to the gates is through a stairway and gallery. An onsite hoist and anchor points will be available for contractor use. The gate chamber is considered a non-permit confined space. The magnitude of construction is estimated between $100,000 to $250,000. The solicitation is set aside for small businesses with a NAICS code of 237990 and size standard of $45 million. The response due date is extended to June 7, 2023 at 5:00 PM Eastern time. Davis-Bacon wage determinations are provided. Technical questions and answers are included regarding hydraulic oil specifications, operating pressures, load testing, and seal material alternatives.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is necessary to provide responses to questions from industry.

Closing w ill be extended until June 7, 2023 at 5:00 PM Eastern.

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-May-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ23Q0005

X 9B. DATED (SEE ITEM 11)

07-Mar-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-May-2023

CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

W912WJ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

jennifer.m.samela@usace.army.milEMAIL:978-318-8324TEL:

JENNIFER M SAMELA / ADDED BY UPASS

W912WJ23Q0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

REQUEST FOR INFORMATION

1. What type and viscosity of hydraulic oil is used ? Are we supplying the “top off” oil – Response: There have been two types of hydraulic fluid added to this system. One fluid is a Duralene ZD AW 32 hydraulic oil and the other is a Travellers AS Hyd ISO46 hydraulic oil. The contractor will be responsible for topping off the system after it is re-assembled.

2. Does the filtered oil have to be sent off to prove it is 10 microns or less? Or will filtering with 10 micron filters suffice.

Response: Contractor shall top off the hydraulic tank with hydraulic fluid as specified and actuate the oil filtration system with a 10 µm element in the filter. Circulate the fluid and change filters as they become clogged.

3. What is the operating pressure of the HPU?

Response: The maximum operating pressure of the system is 500 psi.

4. Has the lifting beam in the gate house been load tested?

Response: Yes, the lifting beam was load tested when the new the trolley and hoist were installed.

5. Please provide a photo of the counterbalance valve on each slide gate. – Response: No longer included in scope. Revisions to scope will be issued in subsequent amendment.

6. Please provide technical description and mfg. part # and drawing for the counterbalance valve. – Response: No longer included in scope. Revisions to scope will be issued in subsequent amendment.

7. Millwrights will perform this work. Can you provide Davis Bacon Rates?

Response: Wage Determinations are included in the solicitation that cover the majority of work. Millwrights would be covered under Service Contract Act Wage Determination #2015-4023 for Merrimack County, New Hampshire.

8. We can machine the polyurethane part of the seal out of a 55D material, but the spec for the rubber energizer is saying 85D, which is harder than the sealing element. We would only be able to machine the energizer from 85A NBR. Is this just a 2pc seal? The description b. on drawing m-301 references cap seal and often times that is a 4pc piston seal.

Response: The proposed design shall utilize a 2pc seal. Contractor may submit alternative materials for review after contract award.

W912WJ23Q0005

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 26-May-2023 05:00 PM to 07-Jun-2023 05:00 PM.