Amendment_W91WJ18Q0151-0004.pdf
PDF 751 KB Posted
- Attached to
- EBL Morse Road Bridge Repair
- Solicitation number
- W912WJ18Q0151
About this file
Amendment 0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_W91WJ18Q0151-0003.pdf | ||
| Amendment_W91WJ18Q0151-0002.pdf | ||
| Amendment_W91WJ18Q0151-0001.pdf | ||
| Solicitation_W912WJ18Q0151.pdf | ||
| Photos.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment is hereby necessary to provide revisions to the Statement of Work as w ell as to post additional RFIs and Government Responses.
The due date for the submission of quotes has been extended.
All other aspects remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 20-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ18Q0151
X 9B. DATED (SEE ITEM 11)
16-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
20-Sep-2018
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
Sheila.M.Winston@usace.army.milEMAIL:978-318-8159TEL:
SHEILA M WINSTONVINCUILLA / CONTRACT SPECIALIST
W912WJ18Q0151
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
RFIS
REQUEST FOR INFORMATION AND GOVERNMENT RESPONSES
1. In regards to Amendment 0002 Task 2-5 / Option 1-4 please confirm the max repair depth?
RESPONSE: Please see revised Statement of Work.
2. Amendment 0002 references CT DOT Standards, Amendment 0001 removed them from the specifications please confirm if the CT DOT standards are to be recognized for this project
RESPONSE: Amendment 0002 Erroniously included the requirement. The CT DOT standards requirement have been removed again. Please see revised Statement of Work.
3. Amendment 2 Execution Item “x” states the new guard rail will bolt into the bridge pleaseconfirm if you would like the guard rail and the bridge rail to be attached or left independent of each other, if attached please confirm a attachment detail for clarity.
RESPONSE: See revisions to the Statement of Work in Amendment 0004.
4. Regarding the Morse Rd Bridge project in Holland, MA photo #4 show additional spall along the south parapet and curb, is the concrete repair limited to the 9’-10” long x 2’ high x 2” deep area or are we to include the spall areas of picture 4?
RESPONSE: The spalling area in included in the Statement of Work. Please see Page 9 of the Solicitation , Section 3 Execution, iii,(1) of the Statement of Work.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 20-Sep-2018 05:00 PM to 24-Sep-2018 05:00 PM.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SOW
EAST BRIMFIELD DAM PROJECT
MORSE ROAD BRIDGE REHABILITATION
U.S. ARMY CORPS OF ENGINEERS
FISKDALE, MA
STATEMENT OF WORK
REVISED 17SEP2018
I. GENERAL
1. Scope
Furnish all equipment, materials and labor for access bridge concrete wearing surface removal and new bituminous hot mix asphalt wearing surface replacement (approximately 62’ x 20’) at East Brimfield Dam in Fiskdale, MA for the purpose of facility maintenance.
2. Location The required services shall be performed at the following project site location, the Morse Road Bridge, located in Holland, Massachusetts. This bridge is located within the East Brimfield Dam Flood Reduction Facility with the office at 24 Riverview Avenue, Fiskdale, Massachusetts.
3. Site Visits and Requests for Information Contact the Technical Point of Contact, Keith W. Beecher, 978-318-8405 or keith.w.beecher@usace.army.mil) to arrange a site visit.
4. Schedule The period of performance shall be 120 days from contract award. The project area will be open to the contractor Monday through Friday 7:00 AM to 3:30 PM and all work must be done during those hours unless additional hours are approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays.
5. Safety
The contractor will comply with all pertinent provisions of the latest edition of the U.S. Army Corps of Engineers Safety and Health Requirements COE EM 385-1-1. A copy of COE EM 385-1-1 is available for reference at the project office or the manual may be viewed at the following link http://www.usace.army.mil/SafetyandOccupationalHealth/EM38511,2008BeingRevised.asp x The contractor shall also comply with all OSHA work safety standards. The project staff can and will order the cessation of work at any time should the safety of employees and visitors become jeopardized.
6. Preconstruction Conference
Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Preconstruction Conference”. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Preconstruction conference the contractor shall provide to the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this Preconstruction Conference:
a. Authority of the Technical Point of Contact.
b.Contractor’s Safety Program (including sub-contractors).
c. Accident Prevention Plan and Activity Hazard Analysis (Submitted & accepted prior to start of work on site) d.Weekly Safety Meetings (Documented on NED Form 251)
e. Accident Reporting (ENG Form 3394)
f. Safety Data Sheet (SDS) requirements g.Correspondence, Communication and Administrative Procedures.
h.Invoice and payment.
7. Permits
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
8. Security The contractor will comply with all established security policies at East Brimfield Dam Project. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least 24 hour notice of any such closure.
9. Payment
Payment shall be made on a lump sum basis. After final inspection and acceptance by the Government, the Contractor must submit an invoice to the Technical Point of Contact. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, process, and total amount due. For jobs greater than 30 days the contractor may request progress payment.
This invoice may be mailed to:
US Army Corps of Engineers 24 Riverview Avenue Fiskdale, MA 01518 or emailed to keith.w.beecher@usace.army.mil
10. Damage to Government and Private Property The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of the firm’s operation. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the firm’s operations. The Contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the firms’ operation.
11. Point of Contact Requirements The Contractor shall provide to the Technical Point of Contact a telephone number and a point of contact for discussion of any contractual matters.
II. TECHNICAL
1. General:
Bridge History:
The Old Morse Road Bridge carries Old Morse Road over the Quinebaug River at the East Brimfield Lake Reservoir in Holland, Massachusetts. The structure is a three span, continuous, non-composite steel stringer bridge built in 1939.
Each span measures 20'-0" center to center of bent and the total length of the bridge is approximately 62'- 0". Old Morse Road ends 200' beyond the bridge. The bridge is closed to vehicular traffic and functions only as a pedestrian bridge and for USACE vehicles only. The roadway width across the bridge is 20'-0" between concrete curbs.
The superstructure consists of six wide flange rolled beams spaced at 4'-2" on center. The four interior stringers are 16WF40 sections and the fascia stringers are 16WF45 sections. The stringers support a 61/2" reinforced concrete deck, overlaid with 2" of bituminous concrete on a 1" gravel base. The substructure consists of two gravity type concrete abutments with “U” wing walls and two timber pile bents. The two bents consist of six timber piles each with cross bracing and timber caps.
Rating of the bridge is as follows:
Type: H 3 3S2 Inventory: 15 Ton 20 Ton 31 Ton Operating: 27 Ton 35 Ton 54 Ton
Bridge bituminous wearing surface, curbs and parapets, bridge rails, approach guardrails, pile cap hardware existing conditions:
The access bridge is inspected routinely. The last inspection was in 2014.The results of this inspection are as follows.
A. Approach Roadway and Guardrails
Both the east and west approach roadways remain in poor condition. Sections of bituminous pavement are missing at the east approach for the full width of the bridge (see Photo 1). The differential between the approach pavement and the bridge deck is at least 4" at the east approach on the south side. The concrete posts at the guardrails remain in poor condition. There are no cables.
B. Deck
The overall condition of the concrete bridge deck is fair. However, the bituminous wearing surface, curbs and parapets continue to deteriorate. Heavy vegetation is growing at both edges of the bridge deck (see Photo 2). Pavement on either side of the bridge deck is missing, measuring up to 4' wide. There is about 4” of fill/pavement on top of the deck. The underside of the deck is in good condition with only minor honeycombing along edges of top flanges of stringers. The bridge rails are in fair condition with moderate surface rusting and pitting. The condition of the spalling and efflorescence at the south parapet and curb is severe (see Photo 3). There is a large area of deteriorated concrete at the east end of the parapet/curb. This area is approximately 9'-10' long x 2' high x 2" deep and continues to worsen.
Please note that any repair that may need to be done to the bridge decking will be broken out into four options, as not all parts of the decking may need to be repaired. Repairs to the decking will not go any deeper than 1.5” into the deck:
Option 1: Repair/replace work to be done on the first 0’ – 15.5’ (linear feet) of the deck, going east to west.
Option 2: Repair/replace work to be done 15.5’ – 31’ (linear feet) of the deck, going east to west.
Option 3: Repair/replace work to be done 31’ – 46.5’ (linear feet) of the deck, going east to west.
Option 4: Repair/replace work to be done 46.5’ – 62’ (linear feet) of the deck, going east to west.
Options can be priced out in the bid schedule on page.
C. Substructure
Minor debris was noted on the bridge seats. There are some missing nuts and washers on the thru bolts at the pile caps.
Note contractor is responsible for final measurements for this contract.
Requests for Information:
Requests concerning the work of this project should be directed to the Technical Point of Contact at (978) 318-8405 or keith.w.beecher@usace.army.mil.
References:
Contractor’s work must meet or exceed industry standards and the following references for the removal and installation of new bridge bituminous hot mix asphalt wearing surface, guardrail, concrete repairs.
U.S. Government Unified Facilities guide specifications and criteria o Division 03, Concrete o Section 32, Asphalt o United facilities criteria, UFC 3-2500, Standard practice for concrete pavements o UFC 3-270-01 Asphalt Maintenance and Repair
Department of the Army and Air Force o Technical Manual, TM 5-600, Bridge Inspection, Maintenance and
Repair Department of the Army, Corps of Engineers o Transportation Systems Center TSC Report 13-1 State of Connecticut Department of Transportation o Construction Manual, Volume 2 ver. 2.2, Bituminous Pavements o CTDOT Standard Sheet for Metal Beam Rail Type R-B 350
Commonwealth of Massachusetts Department of Transportation o Design and construction guidelines and standards Division 32
Asphalt Paving
ASTM
o Guidelines and standards for hot dip galvanizing, preparation, treatment
Submittals:
Although the Government technically reviews submissions required by this scope of work, it is emphasized that the Contractor’s work must be prosecuted using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of Contact for review and accepted by the government prior to the commencement of any field activities.
Product specification sheets for:
1. Waterproofing bridge deck membrane system.
2. Asphalt bituminous material/mix overlay.
3. Concrete waterproof sealer.
4. Concrete mix for curbing, parapet repair.
Site Traffic Control plan.
Accident Prevention Plan (APP).
Activity Hazard Analysis (AHA).
Clean Up:
The Contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials. Upon completing work in an area the contractor shall remove any tools, equipment, and materials that are not the property of the government. Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the Government.
Government Resources:
The contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the Government will not provide any equipment, telephone services or other resources.
Omissions:
This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.
Quality Assurance:
The contractor is responsible for the quality control of the contract work. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.
Other Contracts:
The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor, or by Government employees.
Environmental Protection:
Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the contractor at the site, and the site will be inspected/ cleaned on a daily basis. No burning is permissible. Water, air and land resources shall not be adversely impacted during the course of the work. Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met.
Receiving and Storing Materials:
The contractor is responsible for protecting any stored material until it is placed in service. The contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive material or supplies for the contractor and will not be responsible for damage to contractor equipment or material.
2. Products:
Environmentally Preferred Products:
All products provided by the contractor must meet the recycled content requirements set forth by the EPA.
Products that fall under these requirements are things such as cement, concrete, non-pressure pipes, etc.
The list of approved products is periodically updated, please check the EPA website for the most current list: https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products.
Furthermore, the contractor should also meet the BioPreferred Program requirements set in place by the USDA. These will include products such as wood and concrete sealers, erosion controlled materials, sorbents, etc. For the most current list of products, please visit:
https://www.biopreferred.gov/BioPreferred/faces/catalog/Catalog.xhtml.
a. Guard Rail
i. Guardrail and associated posts, hardware will be galvanized; ends will have returns. Will be Steel Beam Highway Guard Rail Type SS, single faced, 6’ foot 3” post spacing, with rubber block spacer block for each post and rail attachment. Will be attached to bridge.
b. Curbing and parapet repair material.
i. Sika Crete 211 SCC Plus or similar meets these requirements.
c. Concrete sealant for curbing and parapet.
i. Sika Guard 705L or similar meets these requirements.
d. Bridge Deck waterproof membrane
i. Product will meet or exceed referenced specifications for concrete and bituminous hot mix asphalt bridge deck waterproof membrane.
ii. Bridge Preservation LCC, Bridge Deck Membrane meets these requirements.
iii. Membrane color to be approved by technical point of contact.
e. Bituminous hot mix asphalt material/mix.
i. Product will meet or exceed referenced specifications for bituminous hot mix asphalt for use as a bridge deck wearing surface.
ii. Superpave HMA S0.25 for leveling course on bridge
iii. Superpave HMA S0.5 bridge surface course, wearing course for approaches
iv. Superpave HMA S1 base course, approaches
3. Execution:
Traffic (primarily foot traffic, horse, staff service vehicles) will be signed and blocked by installing temporary fencing. It will be the responsibility of the contractor to block and maintain a safe working area, ensuring no one unauthorized enters the work site.
i) Removal and disposal of guard posts, any cable from both bridge approaches.
ii) Removal of bridge deck guardrail to galvanizing plant for removal of all paint and rust and then to be hot dip galvanized.
iii) Concrete repairs to:
(1) Spalling and efflorescence at the south parapet and curb (see Photos 3, 4).
(2) Deteriorated concrete at the east end of the parapet/curb. This area is approximately 9'-10' long x 2' high x 2" deep.
(3) Concrete curbing and parapet repairs will be formed to match the original lines of the bridge.
iv) Remove efflorescence, staining from bridge curbing and parapet surfaces.
(1) Power wash and brush effloresce from bridge curb, parapet.
v) Application of concrete sealant to curbing, parapet concrete surfaces.
vi) Reinstallation of bridge railings can be done at any time, after application of concrete sealant to curbing, and concrete repairs have cured.
vii) Removal and disposal of bridge wearing surface.
(1) Prepare area around bridge for demolition and removal of the asphalt wearing surface material.
(2) The contractor is responsible for the removal and disposal of all materials removed from the project site. Materials will be disposed offsite according to all local, state and federal regulations.
viii) Install waterproof membrane on bridge.
(1) Membrane shall be applied according to the manufacturer.
(2) Concrete surfaces will be cleaned, repaired and prepared in accordance with industry standards and membrane manufacturer for the proper bonding, adhesion and curing of the new waterproof membrane, membrane applied where appropriate.
(3) Seal top of bridge deck with waterproofing system primer and or bonding agent.
(4) Apply waterproof membrane on the deck and curbing, thickness shall be approved by membrane manufacture.
(5) Membrane will terminate on the curbing above the top of the final proposed asphalt overlay.
(6) Membrane termination line on the curb shall be straight and clean.
ix) Install new bituminous hot mix asphalt wearing surface on bridge.
(1) The installation shall be in accordance with industry standards and to all referenced specifications in this scope/contract for bridge wearing surface installations and curing.
(2) Bituminous hot mix asphalt will be installed with Superpave HMA S0.25 for leveling course of 1” followed by Superpave HMA S0.5 at 2” thickness maximum, and include a tack coat between each.
(3) Proper compaction by vibratory roller will be used between asphalt lifts.
(4) Proper grading of final compacted surface will allow for proper runoff of precipitation from the new bridge wearing surface.
(5) Final surface shall be a minimum of 3” thick at the centerline and 2.5” thick at the curbs.
x) Install new guard posts and rails.
(1) Will bolt into bridge and extend 36 feet off of each side for a total of 144 feet.
Each end will have returns for a total of four returns.
(2) The new guard rail will be independent of the bridge rail.
xi) Install new bituminous hot mix asphalt wearing surface on approach roadways.
(1) The installation shall be in accordance with industry standards and to all referenced specifications in this scope/contract for road base and asphalt installations.
(2) Removal and replacement of existing failed asphalt and sub base, and replacement with new road gravel base. Properly compacted. New approaches will extend 10 feet beyond bridge, at each end, and match existing road width.
(3) Bituminous hot mix asphalt will be installed with a Superpave HMA S1base course of 3” followed by a Superpave HMA S0.5 course of 2”, include a tack coat between.
(4) Proper compaction by vibratory roller will be used between asphalt lifts.
(5) Proper grading of final compacted surface will allow for proper drainage, with a
2” crown.
(6) Final surface shall be of 5.0” thick.
xii) Locate missing hardware on underside of bridge, e.g., missing nuts and washers on the thru bolts at the pile caps.
(1) Replace missing nuts and washers with new galvanized hardware.
i) Cleanup.
(1) Clean bridge deck and work area of construction debris.
(2) Remove traffic control barriers.
(End of Summary of Changes)