W912WJ18Q0013_Solicitation.pdf
PDF 315 KB Posted
- Attached to
- WOONSOCKET FLOOD REDUCTION
- Solicitation number
- W912WJ18Q0013
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Scope_of_Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOONSOCKET FLOOD CONTROL PROJECT
JOSEPH ZANCA
121 SOUTH MAIN STREET
WOONSOCKET RI 02895
TEL: 978-318-8419 FAX: 508-347-8732
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
W912WJ18Q0013 11-Dec-2017 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPO RTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. % NO TE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and
ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) ( Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA
FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
21-Dec-2017(Date) PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
9783188478SARA J TORRES
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
W912WJ18Q0013
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
WOONSOCKET FLOOD REDUCTION
FFP
Contractor shall furnish all equipment, materials and labor for Trunnion Bearing Access System at Woonsocket Falls Dam in Woonsocket, RI, in accordance with the attached Scope of Work.
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Destination
NET AMT
Section C - Descriptions and Specifications
NOTICE TO OFFERORS
-PLEASE DIRECT QUESTIONS TO SARA J. TORRES AT (978) 318‐8478 OR
Sara.J.Torres@usace.army.mil . THE SOLICITATION AND RESULTING CONTRACT SHALL BE
THE GOVERNING DOCUMENT IN ALL CASES.
-QUOTES CAN BE FAXED OR E‐MAILED TO SARA J. TORRES AT (978) 318‐8478 or EMAILED AT Sara.J.Torres@usace@army.mil . E‐MAIL IS THE PREFERRED METHOD OF
SUBMISSION.
Contractors MUST be registered in the System for Awards Management at www.SAM.gov (formerly the Central Contractor Registration (CCR) database and the On‐Line Representations and Certifications (ORCA) (see DFARS clause 252.204‐7004 Alt A). Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla Firefox, Safari, and Internet Explorer are supported browsers.
NOTE: SAM registration may take up to 3 weeks to process.
Provide DUNS number: ___________________________ (telephone 866‐705‐5711 for DUNS)
Provide CAGE code: ____________________________
Provide TAX ID: __________________________
Per FAR Clause 52.212‐3 Alt I, the Contractor is required to complete the On‐line Representations and Certifications Application (www.SAM.gov) and paragraph (b) if applicable, or to complete paragraphs (c) thru (m) of this clause and return with quote.
NOTE 1: In accordance with FAR Part 28.102-1(b)(1), the Contractor will be required to provide one of the following payment protections for all construction contracts greater than $35,000.00 but not greater than $150,000.00.
(i) Payment bond
(ii) Irrevocable letter of credit
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.
SCOPE OF WORK
WOONSOCKET FLOOD REDUCTION
TRUNNION BEARING ACCESS SYSTEM
U.S. ARMY CORPS OF ENGINEERS
WOONSOCKET FALLS DAM
WOONSOCKET, RI
SCOPE OF WORK
mailto:Sara.J.Torres@usace.army.mil mailto:Sara.J.Torres@usace@army.mil http://www.sam.gov/
October 2017
I. GENERAL
1. Scope Furnish all equipment, materials and labor for Trunnion Bearing Access System at Woonsocket Falls Dam in Woonsocket, RI, for the purpose of facility maintenance.
2. Location The required services shall be performed at the following project site location, Woonsocket Falls Dam, 121 South Main Street, Woonsocket, RI.
3. Site Visits and Requests for Information Contact the Technical Point of Contact, Joe Zanca 978-318-8419 or joseph.l.zanca@usace.army.mil to arrange a site visit.
4. Schedule The period of performance shall be 120 days from Notice to Proceed. The project area will be open to the contractor Monday through Friday 7:00 AM to 3:30 PM and all work must be done during those hours unless additional hours are approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays.
5. Safety The contractor will comply with all pertinent provisions of the latest edition of the U.S. Army Corps of Engineers Safety and Health Requirements COE EM 385-1-1.
A copy of COE EM 385-1-1 is available for reference at the project office or the manual may be viewed at the following link http://www.usace.army.mil/SafetyandOccupationalHealth/EM38511,2008BeingR evised.aspx The contractor shall also comply with all OSHA work safety standards. The project staff can and will order the cessation of work at any time should the safety of employees and visitors become jeopardized.
mailto:joseph.l.zanca@usace.army.mil http://www.usace.army.mil/SafetyandOccupationalHealth/EM38511,2008BeingRevised.aspx http://www.usace.army.mil/SafetyandOccupationalHealth/EM38511,2008BeingRevised.aspx
6. Preconstruction Conference Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Preconstruction Conference”. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Preconstruction conference the contractor shall provide to the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this Preconstruction Conference:
• Authority of the Technical Point of Contact.
• Contractor’s Safety Program (including sub-contractors).
• Accident Prevention Plan and Activity Hazard Analysis
(Submitted & accepted prior to start of work on site)
• Weekly Safety Meetings (Documented on NED Form 251)
• Accident Reporting (ENG Form 3394)
• Safety Data Sheet (SDS) requirements
• Correspondence, Communication and Administrative Procedures.
• Invoice and payment.
7. Permits
The contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
8. Security The contractor will comply with all established security policies at Woonsocket Flood Reduction Project. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The contractor shall be given at least 24 hour notice of any such closure.
9. Payment Payment shall be made on a per job basis. After final inspection and acceptance by the Government, the contractor must submit an invoice to the Technical Point of Contact.
The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, process, and total amount due per line item. For jobs greater than 30 days the contractor may request progress payment.
This invoice may be mailed to:
US Army Corps of Engineers 518 East Hartford Ave., Uxbridge, MA 01569-1209 or emailed to joseph.l.zanca@usace.army.mil or faxed to the office at (508) 278-4234.
10. Damage to Government and Private Property The contractor shall be responsible for restoring any Government facilities or structures damaged as a result of the firm’s operation. The contractor shall also be responsible for any damage to private property or injury to any person as a result of the firm’s operations. The contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the firms’ operation.
11. Point of Contact Requirements The contractor shall provide to the Technical Point of Contact a telephone number and a point of contact for discussion of any contractual matters.
II. TECHNICAL
Part 1 General:
Existing Conditions:
Woonsocket Falls Dam was completed in 1959. Eight Trunnion Bearings assist four Tainter gates used to operate for flood reduction management. Due to the location of the Trunnion Bearings, routine inspection and maintenance cannot be performed without special fall protection planning and equipment. Installation of five access systems to trunnion bearings and one ladder to reach the river channel below the Dam will allow for routine inspections and maintenance to occur without increased risk to personnel.
Elevations are as follows:
-Service Bridge Deck Elevation=170.00ft.
-Pier/Abutment Concrete Elevation= 145.00ft -River Channel Bottom=130.00ft.
Note: contractor is responsible for final measurements.
Requests for Information:
Requests concerning the work of this project should be directed to the Technical Point of Contact at (978) 318-8419 or joseph.l.zanca@usace.army.mil Submittals:
Although the Government technically reviews submissions required by this scope of work, it is emphasized that the Contractor’s work must be prosecuted using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted to the mailto:joseph.l.zanca@usace.army.mil mailto:joseph.l.zanca@usace.army.mil
Technical Point of Contact for review and accepted by the government prior to the commencement of any field activities.
• Product specification sheets for ladders, platforms, railings, anchors and associated materials/hardware.
• Installation plan.
• Provide fabricator certification for ladder assembly stating that the ladder and associated components have been fabricated according to the requirements of 29 CFR 1910.27.
• Certificates of qualified welders in accordance with AWS D1.1/D1.1M.
Use procedures, materials, and equipment of the type required for the work.
• Manufacturer Warranty for all equipment and hardware
• Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA)
(Prior to start of field work)
Clean Up:
The contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials. Upon completing work in an area the contractor shall remove any tools, equipment, and materials that are not the property of the government. Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the Government.
Government Resources:
The contractor is responsible for providing all materials to complete the project.
Unless specified in the contract, the Government will not provide any equipment, telephone services or other resources.
Omissions:
This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.
Quality Assurance:
The contractor is responsible for the quality control of the contract work. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.
Other Contracts:
The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor, or by Government employees.
Environmental Protection:
Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the contractor at the site, and the site will be inspected/ cleaned on a daily basis.
No burning is permissible. Water, air and land resources shall not be adversely impacted during the course of the work. Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met.
Receiving and Storing Materials:
The contractor is responsible for protecting any stored material until it is placed in service. The contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive material or supplies for the contractor and will not be responsible for damage to contractor equipment or material.
Part 2 Schedule:
1. Pier No. 1 (Access entrance from land surface): Safety railing on top of pier.
2. Pier No. 2 (Access entrance from Service Bridge): Ladder, fall protection rail system, platforms, safety railing on top of pier. Access entrance from Service Bridge. Ladder from top of pier to river channel, to be installed out of river flow.
3. Pier No. 3 (Access entrance from Service Bridge): Ladder, fall protection rail system, platforms, safety railing on top of pier.
4. Pier No. 4 (Access entrance from Service Bridge): Ladder, fall protection rail system, platforms, safety railing on top of pier.
5. East Abutment (Access entrance from walkway): New fence with gate (replace existing). Ladder down to pier, safety railing on top of pier.
Part 3 Products:
Trunnion Bearing Access system will meet or exceed specifications as listed specifications and the following:
1. Pier/Abutment Post, Railing and kickplates (Five units): Provide stainless steel handrails, including inserts or fittings, in concrete, steel pipe conforming to ASTM A53/A53M standards. Provide 316 stainless steel railings and fittings of 2-inches nominal size, schedule 40, conforming to ASTM standards.
a. Exterior railings, including pipe, fittings, brackets, fasteners, and other metal components shall be 316 stainless steel.
b. Provide 316 stainless steel kickplates between railing posts where indicated, and consist 1/8-inch steel flat bars 6-inches high.
2. Fixed Ladders, Platforms and Supports (Three units):
a. Shall be 316 stainless steel conforming to ASTM standards.
b. Provide fabricator certification for ladder assembly stating that the ladder and associated components have been fabricated according to the requirements of 29 CFR 1910.27.
c. Platforms will have two safety chains per access opening.
3. Fixed Ladder, Platform, support and hardware for section descending to river channel (One unit):
a. Shall be 316 stainless steel.
b. Provide fabricator certification for ladder assembly stating that the ladder and associated components have been fabricated according to the requirements of 29 CFR 1910.27.
4. Fence with gate (One unit):
a. Existing thirty (30) feet of aluminum fence will be replaced, on east abutment, with 2 in chain link fence, height matched to fence adjoining the Dam, with a pedestrian gate with heavy duty locking mechanism. Fence will be vinyl coated black in color with three inch posts. System will meet or exceed US Army Corps of Engineers, Omaha District, FE5 chain link fence diagram (Sketch No. 1 and No. 2)
5. Safety Chains for Platform/Ladder Openings (Multiple units):
a. Shall be 316 stainless steel, straight link type, 3/16-inch diameter, with at least twelve links per foot, and with snap hooks on each end.
b. Provide 3/16” stainless steel snap hooks of boat type.
c. Provide 316 stainless steel 3/8-inch bolt with 3/4-inch eye diameter for attachment of chain, anchored as indicated.
d. Mount the top chain 6 inches above the deck/platform and mount the lower chain 2 feet above the deck/platform.
6. Concrete Anchors (Multiple units):
a. Shall be 316 stainless steel conforming to ASTM standards.
b. Shall be sized accordingly for installation.
7. Fall protection ladder system (Four units):
a. Shall provide continuous fall protection for climbing fixed ladders.
b. Shall be installed on all ladders in this contract.
c. Shall provide 100% tie-off during transition.
d. Shall be constructed of stainless steel.
e. Shall be a rail type system that meets or exceeds the Sperian
Miller GlideLoc vertical height access ladder system.
f. Shall include four (4) fall arrester units for use with rail system.
g. System, arrester and harness shall meet or exceed ANSI Z359 Standards.
Part 4 Execution:
General:
A. Trunnion Bearing Access system:
Trunnion Bearing Access system installation shall reduce safety hazards to employees and contractors on-site.
1. Work area will be restricted to contractors and USACE Employees.
2. Remove eight existing stainless steel trunnion bearing lubrication lines from east abutment and four piers.
3. Install five Trunnion Access Systems, according to Part 2 Schedule, at each of the four piers and one on the East Dam abutment.
4. Install safety railings on pier number one with safety chain closure on entrance access.
5. Three systems, on piers number two, three and four, will begin from the
Service Bridge deck of Woonsocket Falls Dam. A portion of the Service Bridge deck railing will be cut, removed and made safe for access. Chains will be installed to prevent fall hazards when not in use.
6. East abutment fence will be removed and replaced with new fence and gate. Ladder and railings will be installed on abutment.
7. Provide break in the rail, with two safety chains to open access on land side of Pier No. one and same for Pier No. two for ladder to access to bottom of river channel.
8. Service Bridge thermal expansion shall be built into the system and anticipated with the access anchoring system.
9. System shall not impede the operation of full opening of the tainter gates.
10. Platforms with railings and kickplates may be installed as needed, at the
Service Bridge deck level or at the pier surfaces for access to new ladders.
11. Ladders will extend from the new platforms to the Piers and Dam
Abutments concrete surface.
12. Railings with kickplates will be installed on the concrete platform along the outer edge of all four piers and east abutment.
13. Pier No. 2 will also include access thru the railing for an additional platform with ladder on the pier nose descending to the downstream river channel.
14. Clean up site.
IMPORTANT NOTE: Informational Pictures Attached Separately.
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 days.
(End of clause)
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 120 dys. ANP 1 WOONSOCKET FLOOD CONTROL
PROJECT
JOSEPH ZANCA
121 SOUTH MAIN STREET
WOONSOCKET RI 02895
978-318-8419 FOB: Destination
961314
Section H - Special Contract Requirements
SECURITY REQUIREMENTS
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Technical Point of Contact not later than 5 calendar days after the completion of the training.
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/everify ) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the Technical Point of Contact no later than 3 business days after the initial award.
WAGE DETERMINATION
General Decision Number: RI170001 12/08/2017 RI1 Superseded General Decision Number: RI20160001 State: Rhode Island
Construction Types: Building, Heavy (Heavy and Marine) and Highway
Counties: Rhode Island Statewide.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) HEAVY, HIGHWAY AND MARINE
CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 01/13/2017 2 01/27/2017 3 02/03/2017 4 02/17/2017 5 03/03/2017 6 03/10/2017 7 03/17/2017 8 04/07/2017 9 04/21/2017 10 05/05/2017 11 05/12/2017 12 06/02/2017 http://www.uscis.gov/everify
13 06/16/2017 14 06/30/2017 15 07/07/2017 16 07/28/2017 17 08/04/2017 18 08/25/2017 19 09/01/2017 20 09/22/2017 21 10/13/2017 22 11/10/2017 23 11/17/2017 24 12/01/2017 25 12/08/2017
ASBE0006-006 06/01/2015
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 31.63 18.30
ASBE0006-008 09/01/2017
Rates Fringes
Asbestos Worker/Insulator Includes application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems.$ 41.48 27.35
BOIL0029-001 01/01/2017
Rates Fringes
BOILERMAKER......................$ 42.42 24.92
BRRI0003-001 12/01/2017
Rates Fringes
Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 37.38 26.59
BRRI0003-002 09/01/2017
Rates Fringes
Marble Setter, Terrazzo Worker & Tile Setter.............$ 37.16 27.09
BRRI0003-003 09/01/2017
Rates Fringes
Marble, Tile & Terrazzo Finisher.........................$ 31.32 25.80
CARP0094-001 06/05/2017
Rates Fringes
CARPENTER (Includes Soft Floor Layer).....................$ 35.28 27.15 Diver Tender.....................$ 36.28 27.15
DIVER............................$ 47.08 27.15
Piledriver.......................$ 35.28 27.15
WELDER...........................$ 36.28 27.15
FOOTNOTES:
When not diving or tending the diver, the diver and diver tender shall receive the piledriver rate. Diver tenders shall receive $1.00 per hour above the pile driver rate when tending the diver.
Work on free-standing stacks, concrete silos & public utility electrical power houses, which are over 35 ft. in height when constructed: $.50 per hour additional.
Work on exterior concrete shear wall gang forms, 45 ft. or more above ground elevation or on setback: $.50 per hour additional.
The designated piledriver, known as the "monkey": $1.00 per hour additional.
CARP1121-002 10/01/2017
Rates Fringes
MILLWRIGHT.......................$ 36.85 27.50
ELEC0099-002 06/01/2017
Rates Fringes
ELECTRICIAN......................$ 38.08 57.24%
Teledata System Installer........$ 28.56 13.1%+13.76
FOOTNOTES:
Work of a hazardous nature, or where the work height is 30
ft. or more from the floor, except when working OSHA-approved lifts: 20% per hour additional.
Work in tunnels below ground level in combined sewer outfall:
20% per hour additional.
ELEV0039-001 01/01/2017
ELEVATOR MECHANIC................$ 48.45 31.585+A+B
FOOTNOTES:
A. PAID HOLIDAYS: New Years Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
B. Employer contributes 8% basic hourly rate for 5 years or more of service of 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit.
* ENGI0057-001 12/03/2017
Rates Fringes
Operating Engineer: (power plants, sewer treatment plants, pumping stations, tunnels, caissons, piers, docks, bridges, wind turbines, subterranean & other marine and heavy construction work) GROUP 1.....................$ 37.90 25.10+a GROUP 2.....................$ 33.52 25.10+a GROUP 3.....................$ 30.67 25.10+a GROUP 4.....................$ 36.95 25.10+a GROUP 5.....................$ 27.75 25.10+a GROUP 6.....................$ 21.75 25.10+a GROUP 7.....................$ 33.60 25.10+a GROUP 8.....................$ 37.52 25.10+a
a. BOOM LENGTHS, INCLUDING JIBS:
150 feet and over + $ 2.00 180 feet and over + $ 3.00 210 feet and over + $ 4.00 240 feet and over + $ 5.00 270 feet and over + $ 7.00 300 feet and over + $ 8.00 350 feet and over + $ 9.00 400 feet and over + $10.00
a. PAID HOLIDAYS:
New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.
a. FOOTNOTES:
Hazmat work: $2.00 per hour additional.
Tunnel/Shaft work: $5.00 per hour additional.
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Digging machine, Ross Carrier, crane, lighter, locomotive, derrick, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, graders, front end loader (3 yds. and over), vibratory hammer & vacuum truck, roadheaders, forklifts, economobile type equipment, tunnel boring machines, concrete pump and on site concrete plants.
GROUP 2: Oilers on cranes.
GROUP 3: Oiler on crawler backhoe.
GROUP 4: Bulldozer, bobcats, skid steer loader, tractor, scraper, combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile-powered sweeper (3-yd. capacity), 8-ft. sweeper minimum 65 HP).
GROUP 5: Well-point installation crew.
GROUP 6: Utility Engineers and Signal Persons
GROUP 7: Heater, concrete mixer, stone crusher, welding machine, generator and light plant, gas and electric driven pump and air compressor.
GROUP 8: Boat & tug operator.
ENGI0057-002 11/06/2017
Rates Fringes
Power Equipment Operator (highway construction projects; water and sewerline projects which are incidental to highway construction projects; and bridge projects that do not span water) GROUP 1....................$ 33.05 25.10+a GROUP 2....................$ 27.75 25.10+a GROUP 3....................$ 21.75 25.10+a GROUP 4....................$ 28.33 25.10+a GROUP 5....................$ 32.03 25.10+a GROUP 6....................$ 31.65 25.10+a GROUP 7....................$ 27.30 25.10+a GROUP 8....................$ 28.68 25.10+a GROUP 9....................$ 30.63 25.10+a
a. FOOTNOTE: a. Any employee who works three days in the week in which a holiday falls shall be paid for the holiday.
a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Digging machine, crane, piledriver, lighter, locomotive, derrick, hoist, boom truck, John Henry's, directional drilling machine, cold planer, reclaimer, paver, spreader, grader, front end loader (3 yds. and over), vacuum truck, test boring machine operator, veemere saw, water blaster, hydro-demolition robot, forklift, economobile, Ross Carrier, concrete pump operator and boats
GROUP 2: Well point installation crew
GROUP 3: Utlity engineers and signal persons
GROUP 4: Oiler on cranes
GROUP 5: Combination loader backhoe, front end loader (less than 3 yds.), forklift, bulldozers & scrapers and boats
GROUP 6: Roller,skid steer loaders, street sweeper
GROUP 7: Gas and electric drive heater, concrete mixer, light plant, welding machine, pump & compressor
GROUP 8: Stone crusher
GROUP 9: Mechanic & welder
* ENGI0057-003 12/03/2017
BUILDING CONSTRUCTION
Rates Fringes
Power Equipment Operator GROUP 1....................$ 37.17 25.10+a GROUP 2....................$ 36.95 25.10+a GROUP 3....................$ 32.95 25.10+a GROUP 4....................$ 30.10 25.10+a GROUP 5....................$ 36.25 25.10+a GROUP 6....................$ 35.82 25.10+a GROUP 7....................$ 33.14 25.10+a a.BOOM LENTHS, INCLUDING JIBS:
150 ft. and over: + $ 2.00 180 ft. and over: + $ 3.00 210 ft. and over: + $ 4.00 240 ft. and over: + $ 5.00 270 ft. and over: + $ 7.00 300 ft. and over: + $ 8.00 350 ft. and over: + $ 9.00 400 ft. and over: + $10.00
a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.
a. FOOTNOTE: Hazmat work: $2.00 per hour additional.
Tunnel/Shaft work: $5.00 per hour additional.
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Digging machine, Ross carrier, crane, boomtrucks, lighter, locomotive, derrick, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, front end loader (3 yds. and over), vibratory hammer and vacuum truck
GROUP 2: Telehandler equipment, forklift, concrete pump & on-site concrete plant
GROUP 3: Fireman & oiler
GROUP 4: Oiler on crawler backhoe
GROUP 5: Bulldozer,skid steer loaders,bobcats, tractor, grader, scraper,combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile powered sweeper (3 yds. capacity), 8-ft. sweeper (minimum 65 hp)
GROUP 6: Well point installation crew
GROUP 7: Heater, concrete mixer, stone crusher, welding machine, generator for light plant, gas and electric driven pump & air compressor
IRON0037-001 09/16/2017
Rates Fringes
IRONWORKER.......................$ 34.89 26.87
LABO0271-001 06/05/2016
BUILDING CONSTRUCTION
Rates Fringes
LABORER
GROUP 1.....................$ 29.20 23.80
GROUP 2.....................$ 29.45 23.80
GROUP 3.....................$ 29.95 23.80
GROUP 4.....................$ 30.20 23.80
GROUP 5.....................$ 31.20 23.80
LABORERS CLASSIFICATIONS
GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems]
GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder Operator
GROUP 3: Pre-Cast Floor & Roof Plank Erectors
GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster
GROUP 5: Toxic Waste Remover
LABO0271-002 06/05/2016
HEAVY AND HIGHWAY CONSTRUCTION
LABORER
COMPRESSED AIR
Group 1....................$ 46.63 21.80 Group 2....................$ 36.15 21.80 Group 3....................$ 48.63 21.80
FREE AIR
Group 1....................$ 38.70 21.80 Group 2....................$ 36.15 21.80 Group 3....................$ 40.70 21.80
LABORER
Group 1....................$ 29.20 21.80 Group 2....................$ 29.45 21.80 Group 3....................$ 30.20 21.80 Group 4....................$ 22.70 21.80 Group 5....................$ 31.20 21.80
OPEN AIR CAISSON,
UNDERPINNING WORK AND
BORING CREW
Bottom Man.................$ 35.20 21.80 Top Man & Laborer..........$ 34.25 21.80
TEST BORING
Driller....................$ 35.65 21.80 Laborer....................$ 34.25 21.80
LABORER CLASSIFICATIONS
GROUP 1: Laborer; Carpenter tender; Cement finisher tender;
Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries
GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder; Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator;
Pipelayer; Pipe trench bracer
GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster
GROUP 4: Flagger & signaler
GROUP 5: Toxic waste remover
LABORER - COMPRESSED AIR CLASSIFICATIONS
GROUP 1: Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner: motor person & all others in compressed air
GROUP 2: Change house attendant, powder watchperson, top person on iron
GROUP 3: Hazardous waste work within the "HOT" zone
LABORER - FREE AIR CLASSIFICATIONS
GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator
GROUP 2: Change house attendant, powder watchperson
GROUP 3: Hazardous waste work within the "HOT" zone
PAIN0011-005 06/01/2017
Rates Fringes
PAINTER
Brush and Roller............$ 32.72 20.45 Epoxy, Tanks, Towers, Swing Stage & Structural Steel.......................$ 34.72 20.45 Spray, Sand & Water Blasting....................$ 35.72 20.45 Taper.......................$ 33.47 20.45 Wall Coverer................$ 33.22 20.45
PAIN0011-006 06/01/2017
Rates Fringes
GLAZIER..........................$ 36.28 20.45
FOOTNOTES:
SWING STAGE: $1.00 per hour additional.
PAID HOLIDAYS: Labor Day & Christmas Day.
PAIN0011-011 06/01/2017
Rates Fringes
Painter (Bridge Work)...........$ 48.55 20.45
PAIN0035-008 06/01/2011
Rates Fringes
Sign Painter.....................$ 24.79 13.72
PLAS0040-001 06/06/2017
BUILDING CONSTRUCTION
CEMENT MASON/CONCRETE FINISHER...$ 33.55 26.80
FOOTNOTE: Cement Mason: Work on free swinging scaffolds under 3 planks width and which is 20 or more feet above ground and any offset structure: $.30 per hour additional.
PLAS0040-002 07/23/2017
HEAVY AND HIGHWAY CONSTRUCTION
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 30.40 21.75
PLAS0040-003 07/03/2017
Rates Fringes
PLASTERER........................$ 34.15 27.05
PLUM0051-002 09/01/2017
Rates Fringes
Plumbers and Pipefitters.........$ 40.69 28.80
ROOF0033-004 06/01/2017
Rates Fringes
ROOFER...........................$ 34.85 23.52
SFRI0669-001 04/01/2017
Rates Fringes
SPRINKLER FITTER.................$ 43.92 21.49
SHEE0017-002 12/01/2017
Rates Fringes
Sheet Metal Worker...............$ 35.42 34.34
TEAM0251-001 05/01/2017
HEAVY AND HIGHWAY CONSTRUCTION
Rates Fringes
TRUCK DRIVER
GROUP 1....................$ 26.96 23.6325+A+B+C
GROUP 2....................$ 27.11 23.6325+A+B+C
GROUP 3....................$ 27.16 23.6325+A+B+C
GROUP 4....................$ 27.21 23.6325+A+B+C
GROUP 5....................$ 27.31 23.6325+A+B+C
GROUP 6....................$ 27.71 23.6325+A+B+C
GROUP 7....................$ 27.91 23.6325+A+B+C
GROUP 8....................$ 27.41 23.6325+A+B+C
GROUP 9....................$ 27.66 23.6325+A+B+C
GROUP 10....................$ 27.46 23.6325+A+B+C
FOOTNOTES:
A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, plus Presidents' Day, Columbus Day, Veteran's Day & V-J Day, providing the employee has worked at least one day in the calendar week in which the holiday falls.
B. Employee who has been on the payroll for 1 year or more but less than 5 years and has worked 150 Days during the last year of employment shall receive 1 week's paid vacation; 5 to 10 years - 2 weeks' paid vacation; 10 or more years - 3 week's paid vacation.
C. Employees on the seniority list shall be paid a one hundred dollar ($100.00) bonus for every four hundred (400) hours worked, up to a maximum of five hundred dollars ($500.00)
All drivers working on a defined hazard material job site shall be paid a premium of $2.00 per hour over applicable rate.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Pick-up trucks, station wagons, & panel trucks
GROUP 2: Two-axle on low beds
GROUP 3: Two-axle dump truck
GROUP 4: Three-axle dump truck
GROUP 5: Four- and five-axle equipment
GROUP 6: Low-bed or boom trailer.
GROUP 7: Trailers when used on a double hook up (pulling 2 trailers)
GROUP 8: Special earth-moving equipment, under 35 tons
GROUP 9: Special earth-moving equipment, 35 tons or over
GROUP 10: Tractor trailer
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-14 Limitations On Subcontracting JAN 2017 52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment
Exceeding $15,000
MAY 2014
52.222-27 Affirmative Action Compliance Requirements for Construction
APR 2015
52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.228-2 Additional Bond Security OCT 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-14 Irrevocable Letter of Credit NOV 2014 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.236-26 Preconstruction Conference FEB 1995 52.242-14 Suspension of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994
52.249-1 Termination For Convenience Of The Government (Fixed Price) (Short Form)
APR 1984
52.249-10 Default (Fixed-Price Construction) APR 1984 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
OCT 2016
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.211-7003 Item Unique Identification and Valuation MAR 2016 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.227-7033 Rights in Shop Drawings APR 1966 252.232-7004 DOD Progress Payment Rates OCT 2014 252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991
52.213-4 TERMS AND CONDITIONS--SIMPLIFIED ACQUISITIONS (OTHER THAN COMMERCIAL
ITEMS) (NOV 2017).
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(ii) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
(iii) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(iv) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).
(v) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.s, proclamations, and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.