Amendment_0003.pdf
PDF 565 KB Posted
- Attached to
- Boston Harbor Improvement Dredging Federal contract opportunity
- Solicitation number
- W912WJ18B0004
About this file
Amendment 0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BidAbstract.pdf | ||
| BidSnapSheet.pdf | ||
| Amendment_W912WJ18B0004-0007.pdf | ||
| Amendment_0006.pdf | ||
| Amendment0005.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0004_attach1.pdf | ||
| GPMA.PDF | ||
| SVNF.PDF | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| Specifications.pdf | ||
| Drawings.pdf | ||
| W912WJ18B0004_solicitation-final.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment to the solicitation is issued to respond to Request for Information and to provide guidance for performing test pits and permitting. This amendment also extends the bid opening date to Wednesday, January 3, 2018 at 2 pm.
Please note: Remaining Requests for Information w ill be responded to in future amendments
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ-18-B-0004
X 9B. DATED (SEE ITEM 11)
16-Nov-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0003
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Dec-2017
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ-18-B-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
Amendment 0003 RFI questions and responses.
1. After a review of the contract documents, we submit the following request:
1. Section 52.236-4 “Physical Data” on page 31 of the Solicitation states the following:
“The e4Sciences report, including xyz files of hard and fast materials, is located on the USACE-NAE public website: http://www.nae.usace.army.mil/Missions/Projectstopics/ Boston-Harbor/Boston-Harbor-Rock-Report-2014/.”
Please also make available to bidders the XYZ file of the top of Holocene material layer so that the Black Silt material may be quantified, as shown in Figure 21 of the e4 Sciences Comprehensive Report Sections 1-4, page 51.
Response:
The Hydrographic Survey X,Y, Z surface should be equivalent to the Top of Holocene X, Y, Z surface. Holocene age sediments are the most recent sediments. Therefore, the top surface of Holocene age sediments should correspond to the bathymetric survey.
2 The following information is presented to assist contractors who may want to utilize test pits.
Pre-bid use of test pits is not a contract requirement, and this information is presented for informational purposes only.
The test pits are self-verification under General Permit 19 Survey Activities on page 20 of the attached Massachusetts General Permit. Fill out the attached self-verification form and email it back to the Corps for our records. Also provide a plan of the approximate test pit locations as well as a pre and post survey of the test pits to make sure the work doesn't create a hazard to navigation. Coordinate with Norm Farris, Corps of Engineers Marine Analysis Section, for disposal of the material at MBDS. Test pits shall not be conducted within the FAA critical zones shown on bid documents. In addition contractors shall notify Mark Cutter prior to mobilization to Boston.
Please see and utilize the below two attachments.
(End of Summary of Changes)
File details come from the government source that posted it.