Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidAbstract-signed.pdf | ||
| BidSnapSheet.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0001.pdf | ||
| Drawings.pdf | ||
| W912WJ18B0003_Solicitation.pdf | ||
| Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to provide responses to Request For Information (RFI), provide a narrative change to Specifications and to extend the Bid Opening date from 03 April 2018 to 10 April 2018.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Mar-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912WJ18B0003
X 9B. DATED (SEE ITEM 11)
02-Mar-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Mar-2018
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912WJ18B0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
RFI
1. QUESTION: Can the temporary stone based protective material referenced in Specification Section 35 31 19, Paragraph 1.6.2.2 be delivered via land?
GOVERNMENT RESPONSE: No, all construction materials must be delivered to the site via waterborne methods per specification section 01 11 00 1.1.3.1(4)b.
2. QUESTION: Will the USACE be revising armor stone bid quantities and/or project scope to reflect additional damage to the breakwater sustained since the release of this solicitation? During a site inspection the amount of repair area appears to have increased significantly due to damage sustained during the winter 2017/2018 storms.
GOVERNMENT RESPONSE: Additional damages and potential repairs to the structure will be assessed when the awarded contractor completes and submits their pre-construction survey of the jetty to USACE-NAE.
3. QUESTION: On plan sheet RE-101 please clarify where the Government instructs the contractor to store materials, as typically this is the purpose of a staging area. Please also provide bathymetric soundings for the proposed access to staging area via beach, as it appears to be too shallow to safely unload materials via waterborne plant as proposed by the USACE.
GOVERNMENT RESPONSE: Construction materials may be stored anywhere within the construction limits of work shown on RE-101, with the exception of the parking lot and anything seaward of the MHW Line shown (Areas below MHW are for material and/or equipment delivery only). Surveyed elevations referencing MLLW are provided on Sheet C-101, bathymetric soundings will not be provided. USACE-NAE is confident that materials may be safely offloaded within the limits shown.
4. QUESTION: Please confirm that the USACE will require 1.5:1 slopes which are to be blended into existing slope outside of repair areas. As existing slope is much shallower, this will lead to awkward transitions from old to new work.
GOVERNMENT RESPONSE: Yes, 1.5H:1V side slopes are required for all major and minor repairs from Sta.
5+67 to the jetty's nose, as shown on the contract drawings. Contractors may use up to the allowable tolerances established in specification section 35 31 19 1.7 for transition work.
5. QUESTION: Onsite inspection notes the existing armor stone appears a “trap rock material because of the slab look (flat surface, smooth edges )”; and also looks to be a dark color (not attributed to wetness). Question: Must the new armor stone match the “trap rock (smooth edges)” and dark color (assuming all other specifications are met)?
Our quarry notes their product (meeting all other specification) is lighter in color and more angular in configuration.
GOVERNMENT RESPONSE: New quarry armor stones will be accepted or reject based on whether they meet the quality testing and physical characteristics established in specification section 35 31 19 subparts 1.6.3 and 2.1.
Stones will not be rejected based on coloration. Angular stones are preferred.
W912WJ18B0003
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 03-Apr-2018 02:00 PM to 10-Apr-2018 02:00 PM.
(End of Summary of Changes)