- Replace Subsurface Utility Conduits
- Solicitation number
- W912wJ-16-Q-0138
About this file
Amendment to respond to RFI and correct Figure 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment2.pdf | ||
| Solicitation_W912WJ-16-Q-0138.pdf | ||
| Solicitation_W912WJ-16-Q-0138.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W13G86609024320001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment is necessary to answ er questions posed by interested vendors.
1. Are electrical conductors part of the Scope of Work? A: NO
2. Is a licensed electrician required to install conduits? A: NO
3. Is manhole racking required as part of the Scope of Work? A: NO
4. Is there any grounding or grounding w ire required as part of the Scope of Work? A: NO
Additionally, a revised Figure 2 w ith the correct footage (8200 linear feet) of 4" conduit is attached.
There is no time extension as part of this amendment and all aspects of the solicitation remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 29-Apr-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912WJ-16-Q-0138
X 9B. DATED (SEE ITEM 11)
26-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Apr-2016
CODE
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
W912WJ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
Sheila.M.Winston@usace.army.milEMAIL:978-318-8159TEL:
SHEILA M WINSTONVINCUILLA / CONTRACT SPECIALIST
W912WJ-16-Q-0138
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
REPLACE SUBSURFACE UTILITY CONDUITS
Figure 2
Figure 2 – Shows Line Diagram of required new conduits, manholes, pull boxes.
NOTES
LEGEND
= 4" pvc conduit
= 2" pvc conduit
= wood utility pole
= manhole
= pull box
Excavate to expose two existing 2" conduits and rerout into new Manhole 4 located near Pole 12
Manhole 4 installed near Pole 12
For Pole 12 only, two 4" Sch 80 PVC conduits installed from Manhole 4 onto Pole 12
For Pole 11 only, two 4" Sch 80 PVC conduits installed from pull box onto Pole 11
For Poles 2 thru 10, one 2" Sch 80 PVC conduit installed from pull box onto wood poles. Extend conduit 10' up
Four new manholes (4'x4'x4' concrete base with iron frame and cover)
Ten new pullboxes (Polymer concrete 13"x 24"x18" )
Approx 8,200 feet of 4‐inch pvc conduit and 220 feet of 2‐inch pvc conduit. All
Sch 80, with large radius sweeps at changes in direction. Conduits encased in flowable fill where under road.
For Pole 1 only, four 4" Sch 80 PVC conduits installed onto pole 1, 10' up pole.
This Line Diagram is not draw to scale.