W912WJ-16-Q-0028.pdf
PDF 2 MB Posted
- Attached to
- Limitorque Gate Hoist Assembly Service
- Solicitation number
- W912WJ-16-Q-0028
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912WJ-16-Q-0028-0002.pdf | ||
| W912WJ-16-Q-0028-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HOPKINTON-EVERETT PROJ
STEPHEN DERMODY
2097 MAPLE STREET
CONTOOCOOK NH 03229-3370
TEL: 978-318-8325 FAX:
W13G86531483840001
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
W912WJ-16-Q-0028 16-Dec-2015 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NOTE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
19-Jan-2016(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
978-318-8324JENNIFER M SAMELA
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
W912WJ-16-Q-0028
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job HKL Limitorque Service
FFP
Contractor shall furnish all labor, materials, and equipment necessary to service two (2) Limitorque Gate Hoist Operator Assemblies (Assembly numbers 2 and 3), in accordance with the attached Performance Work Statement. Quotes shall be accompanied by the attached bid schedule.
FOB: Destination
MILSTRIP: W13G8653148384
PURCHASE REQUEST NUMBER: W13G86531483840001
NET AMT
0002 1 Job OPTION HKL Limitorque Service
FFP
Contractor shall furnish all labor, materials, and equipment necessary to service one (1) additional Limitorque Gate Hoist Operator Assembly (Assembly number 1), in accordance with the attached Performance Work Statement. Quotes shall be accompanied by the attached bid schedule.
FOB: Destination
0003 1 Job OPTION HKL Limitorque Service
FFP
Contractor shall furnish all labor, materials, and equipment necessary to service one (1) additional Limitorque Gate Hoist Operator Assembly (Assembly number 4), in accordance with the attached Performance Work Statement. Quotes shall be accompanied by the attached bid schedule.
BID SCHEDULE
LIMITORQUE GATE HOIST OPERATOR ASSEMBLY SERVICE
U.S. ARMY CORPS OF ENGINEERS
HOPKINTON DAM
HOPKINTON, NEW HAMPSHIRE
Performance Work Statement
Bid Schedule - Base
ITEM NUMBER UNIT QTY
UNIT
PRICE
TOTAL
1. Hopkinton Dam Service, Repair & Rehabilitate Limitorque Gate Hoist Operator Assembly Number 2
Job
2. Hopkinton Dam
Limitorque Gate Hoist Operator Assembly Number 3
3. Hopkinton
Limitorque Gate Hoist Operator Replacement Parts
$10,000
Total
U.S. ARMY CORPS OF ENGINEERS
HOPKINTON DAM
Bid Schedule - Option
ITEM NUMBER UNIT QTY
UNIT
PRICE
TOTAL
4. Hopkinton Dam
Limitorque Gate Hoist Operator Assembly Number 1
5. Hopkinton
Service, Repair & Rehabilitate Limitorque Gate Hoist Operator Assembly Number 1 Replacement Parts
$5,000
6. Hopkinton Dam
Limitorque Gate Hoist Operator Assembly Number 4
7. Hopkinton
Service, Repair & Rehabilitate Limitorque Gate Hoist Operator Assembly Number 4 Replacement Parts
$5,000
Total
ADDITIONAL INFORMATION
PLEASE DIRECT QUESTIONS TO JENNIFER M. SAMELA AT (978) 318‐8324 OR
jennifer.m.samela@usace.army.mil. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE
GOVERNING DOCUMENT IN ALL CASES.
QUOTES CAN BE FAXED OR E‐MAILED TO JENNIFER M. SAMELA AT (603) 746‐2593 or jennifer.m.samela@usace.army.mil. E‐MAIL IS THE PREFERRED METHOD OF SUBMISSION.
Contractors must be registered in the System for Awards Management at www.SAM.gov (formerly the Central Contractor Registration (CCR) database and the On‐Line Representations and Certifications (ORCA) (see DFARS clause 252.204‐7004 Alt A). Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.
Provide DUNS number: ___________________________ (telephone 866‐705‐5711 for DUNS) Provide CAGE code: ____________________________ Provide TAX ID: __________________________ Per FAR Clause 52.212‐3 Alt I, the Contractor is required to complete the On‐line Representations and Certifications Application (www.SAM.gov) and paragraph (b) if applicable, OR to complete paragraphs (c) thru (m) of this clause and return with quote.
POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS
PRICE ALONE.
ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST
BE CONSIDERED BY THE AGENCY.
INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
LIMITORQUE GATE HOIST OPERATOR ASSEMBLY SERVICE
U.S. ARMY CORPS OF ENGINEERS
HOPKINTON DAM
A. General
1. Scope – Furnish all labor, materials and equipment necessary to refurbish (2) two Limitorque
Gate Hoist Operator Assemblies with the option to refurbish (2) two additional Limitorque Gate Hoist Operator Assemblies located at the Hopkinton Dam, Gatehouse Building.
2. Location – Hopkinton Dam is located at 2097 Maple Street in Hopkinton, New Hampshire.
3. Site Visit – Contact the Technical Point of Contact to arrange a site visit. The Technical Point of Contact for the project is Project Manager, Stephen Dermody (978-318-8325, 603- 746-3601 or stephen.p.dermody@usace.army.mil).
4. Schedule – The work shall be completed no later than 120 days from the contract award date. Work shall be performed Monday through Friday 7:30 AM to 4:00 PM unless otherwise approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays.
5. Exercise of Options – Should the Government exercise the options associated with the contract, the Contractor will be notified of the intent to exercise one or more of the options no later than 60 days from the end of the period of performance.
6. Safety – The contractor will comply with all pertinent provisions of the latest edition of the U.S. Army Corps of Engineers Safety and Health Requirements COE EM 385-1-1. A copy of COE EM 385-1-1 is available for reference at the project office or may be viewed at the following link:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1.pdf.
The contractor shall also comply with all OSHA work safety standards. The project staff can and will order the cessation of work at any time should the safety of employees and visitors become jeopardized.
7. Pre-Work Conference – Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Pre-Work Conference”. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Work conference the contractor shall provide the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this Pre-Work Conference:
i. Authority of the Technical Point of Contact and Quality Assurance Inspectors.
ii. Contractor’s Safety Program (including sub-contractors).
iii. Abbreviated Accident Prevention Plan and Activity Hazard Analysis
(Submitted & accepted prior to start of work on site)
iv. Accident Reporting (ENG Form 3394)
v. Safety Data Sheet (SDS) requirements
vi. Contractor’s Equipment
vii. Correspondence, Communication, Security and Administrative
Procedures.
viii. Invoice and payment.
8. Permits – The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
9. Security – The contractor will comply with all established security policies at Hopkinton Dam. Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent service. The Contractor shall be given at least 24 hour notice of any such closure.
10. Contractor Conduct – Alcohol and firearms are prohibited on project grounds. Contractor and employees must comply with CFR 36 Rules and Regulations.
11. Payment – After final inspection and acceptance by the Government, the Contractor must submit an invoice to the Technical Point of Contact. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, and total amount due per line item.
All invoices may be mailed to U.S. Army Corps of Engineers Hopkinton Everett Lakes
2097 Maple Street Hopkinton, New Hampshire 03229
Or Emailed to stephen.p.dermody@usace.army.mil
B. Technical Requirements:
General Requirement:
1. Summary – Furnish all labor, materials, supplies and equipment necessary to refurbish two Limitorque Gate Hoist Operator Assemblies with the option to refurbish
(2) two additional Limitorque Gate Hoist Operator Assemblies including electrical components, gearing, and all external surfaces (to include floor mount pedestal; see Exhibit A-5).
2. Existing Conditions - The existing Limitorque Gate Hoist Operator Assemblies has the following characteristics: See exhibits A-1& A-2.
a. Each electric power actuated mechanism controls 1 (one) Rodney Hunt Sluice type flood gate 6’ x 12’, with push button operation, and a backup manual hand wheel control for lowering or raising the flood gates. Manufactured by Limitorque Corporation, Lynchburg, VA. See exhibit A-3.
b. Limitorque Size: Model L120-800/B320-90, W.P., 3/60/460, 3165 RPM, Class F, H.P. 37.4, electric geared operator mounted on a cast iron pedestal.
c. While lowering and raising the flood gates, the motor drives the worm shaft through helical gears. The sluice gates are approximately 56’ down from the Gatehouse Operating level, connected by the gate shaft.
d. The operators are provided with upper and lower limit switches and torque switches.
e. There is a 25 ton capacity overhead crane for lifting in accordance with EM385- 1-1 to include required operator certifications. It is recommended that if a crane is needed the contractor should set up a temporary unit to meet lifting requirement. If the contractor utilizes a temporary unit for lifting that requires the insulating panel of the gatehouse doors to be removed to allow both external doors to be opened to admit the lifting mechanism, then the contractor shall coordinate with project personnel who will be responsible for the removal of the insulating panel.
f. There are oil leaks around many of the seals. See exhibit A-5.
NOTE: See Informational Photo Exhibits A-1 through A-11
3. Clean Up and Waste Disposal – The contractor shall keep the work area free from accumulation of waste materials. Any and all disturbed areas resulting from contractor activities shall be restored by the contractor to the satisfaction of the Technical Point of Contact. All waste material will be disposed off site in accordance with all Federal, State, and local regulations.
4. Environmental Protection – Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the contractor at the site, and the site will be inspected/ cleaned on a daily basis. Water, air and land resources shall not be adversely impacted during the course of the work. Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met.
5. Government Resources – The contractor may use the existing restroom facilities at
Hopkinton Dam. If project personnel aren’t available, the contractor should use the Merrimack River Basin office facilities. The government will supply any electricity and water necessary for the project work from points of existing outlets. The contractor shall carefully conserve the use of electricity and water provided. The contractor shall supply his own means of communication (telephone).
6. Omissions – This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.
7. Quality Assurance – The contractor is responsible for the quality control of the contract work. The contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.
8. Receiving and Storing Materials – The Government will provide a storage area and parking for contractor personnel. The contractor is responsible for protecting any stored material until it is placed in service. The contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive material for supplies for the contractor and will not be responsible for damage to the contractor’s equipment or materials.
9. Requests for information – Requests concerning the work of this project should be directed to the Technical Point of Contact, Stephen Dermody at 978-318-8325 or stephen.p.dermody@usace.army.mil.
10. Submittals – Although the Government technically reviews submissions required by this scope of work, it is emphasized that the Contractor’s work must be prosecuted using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted for review and accepted by the Government prior to the commencement of any field activities.
Abbreviated Accident Prevention Plan (APP) – Prior to the start of field work.
Activity Hazard Analysis – Prior to the start of field work.
Manufacturer’s product data sheets – Prior to ordering.
Manufacturer’s cut sheets for all new and replaced materials.
Warranty information.
Contractor Qualification Documentation Lift Plan Electrician License Documentation
Operational Test Results – Completion of field work and prior to final payment.
Motor Testing Documentation for before and after motor refurbishment.
Replacement Parts List – Prior to ordering Oil/ Grease and Paint Specifications and Color Sample – Prior to application
11. References – All work shall be in conformance with :
a. American Society of Mechanical Engineers (ASME)
i. ANSI/ASME B30.2 Overhead and Gantry Cranes
b. Institute Of Electrical And Electronics Engineers (IEEE)
i. IEEE 100 (2000; Archived) The Authoritative Dictionary of IEEE Standards Terms
ii. IEEE C2 (2012; Errata 2012; INT 1-4 2012; INT 5-7 2013) National Electrical Safety Code
c. National Fire Protection Association (NFPA)
i. NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2
2013) National Electrical Code
ii. NFPA 70E (2012; Errata 2012)
Standard for Electrical Safety in the Workplace
Service Requirements
1. Safety Equipment: It is the contractor’s responsibility to furnish and supply personnel with the proper personal protective equipment and/or fall protection when and where necessary.
2. Contractor Qualifications:
a. ALL Electrical work shall be performed by Qualified Personnel with verifiable credentials who are familiar with applicable code requirements.
Verifiable credentials consist of State, National and/or Local Certifications or Licenses that a Master or Journeyman Electrician may hold, depending on work being performed
b. The Contractor shall have a minimum of five (5) years of experience with Limitorque Operator repair/service. Alternatively, the Contractor shall have a minimum of five (5) years experience with Electrical Valve Actuator repair/service.
3. Refurbishment of Limitorque Operator Assemblies Refurbishing the operator assemblies shall include, but not be limited to, complete disassembly, thorough cleaning, detailed inspection of all components, replacement of all gaskets, seals, and bearings, replacement of lubricant with manufacturer’s recommendations, testing, preparation and painting, and documentation.
a. Refurbishment of the (3) three-phase electric motor to meet motor nameplate specifications.
i. The Contractor shall perform bench testing of the electric motor prior to any refurbishment work.
ii. The Contractor shall perform bench testing of the electric motor at the completion of the refurbishment work.
iii. The Contractor shall prepare and provide a report for the motor to confirm the motor meets all of its nameplate specifications.
iv. Any defective electrical wiring, switches, and limit switches shall be replaced.
v. The cold weather heating element will also need to be tested, repaired or replaced.
vi. Replacement Parts - Any broken, missing or damaged parts shall be identified at disassembly and inspection. The Contractor shall prepare a parts list (including pricing) and provide the list to the Technical Point of Contact for evaluation and approval prior to ordering. Parts shall meet or exceed original manufacturer specifications. The Technical Point of Contact shall confirm the parts meet or exceed original manufactures requirement and confirm the pricing is fair and reasonable. The Contractor shall assume that the cost of the “Replacement Parts” will not exceed $10,000 for the base contract and $10,000 for the option.
b. All external surfaces of the operator (including the cast iron pedestal that mounts to the floor) shall be media blasted if removed from the site for service, prepared in accordance with paint manufacture recommendation and painted. The paint system shall be epoxy based paint and color must be approved by the Technical Point of Contact before applying. Any portions of the operator that remain on site will not be media blasted or painted due to safety regulations.
c. Before reassembling the operator, the threaded portions of the gate stems shall be greased using a NGLI No.2 lithium grease for extreme pressure.
The grease must be approved by the Technical Point of Contact before applying.
d. Only one Limitorque operator assembly may be out of service at a time.
The second Limitorque operator assembly shall not be removed until first Limitorque operator assembly is fully installed, tested, and fully operational.
e. The sluice gate associated with the Limitorque operator that is out of service shall be in the closed position. Operation of sluice gate will be completed by the Technical Point of Contact.
4. Operational Test:
The Contractor shall perform an Operation Test of the system at the completion the refurbishment of each Limitorque Operator Assembly.
a. All testing shall be coordinated with the Technical Point of Contact.
b. The Contractor shall set and properly adjust the torque and limit switches to ensure proper opening and closing at the completion of the refurbishment.
c. The Contractor shall provide written documentation of the results of the performance test.
d. The refurbished unit shall be operated through two full cycles in the presence of the Technical Point of Contact.
e. Operational test shall demonstrate the proper operation of both limit and torque switches.
HOPKINTON DAM
Informational Photos
Informational Photo Number 1: Gate Hoist Motor 1 is on the left & 2 is on the right. (Exhibit
A-1)
HOPKINTON DAM
Informational Photo Number 2: Gate Hoist Motor 4 is in the immediate foreground & 3 is the second unit in. (Exhibit A-2)
HOPKINTON DAM
Informational Photo Number 3: Gate Hoist Motor Control Panel 3 button controllers, stop, up
& down with main power disconnect. (Exhibit A-3)
HOPKINTON DAM
Informational Photo Number 4: Gate Hoist Motor Nameplate. (Exhibit A-4)
HOPKINTON DAM
Informational Photo Number 5: Gate Hoist Motor 3. Note oil leaks. (Exhibit A-5)
Floor mount pedestal
HOPKINTON DAM
Informational Photo Number 6: Access Bridge to Gate House. Looking East
The bridge is a single span, rolled beam structure built in 1959. The roadway width across the bridge is 12'-0" between curbs. (Exhibit A-6)
The Bridge Rating information is as follows:
Type: H-20; Inventory: 47 ton; Operating: 79 ton
HOPKINTON DAM
HOPKINTON, NEW HAMPSHIRE
Informational Photos Number 7: Main Electrical Control Panel (Exhibit A-7)
HOPKINTON DAM
HOPKINTON, NEW HAMPSHIRE
Informational Plans
Informational Plan Number 1: Sketch of Gate Tower Operating Floor [Not to Scale] (Exhibit
A-8)
HOPKINTON DAM
Informational Plan Number 2: As Built Drawing [Not to Scale] (Exhibit A-9)
HOPKINTON DAM
HOPKINTON, NEW HAMPSHIRE
Informational Plan Number 3: Wiring diagram. [Not to Scale] (Exhibit A-10)
HOPKINTON DAM
HOPKINTON, NEW HAMPSHIRE
Informational Plan Number 4: As Built Drawing [Not to Scale]. (Exhibit A-11)
HOPKINTON DAM
Informational Plan Number 5: Sectional Elevation of Gate Tower [Not to Scale]. (Exhibit A-
12)
Section E - Inspection and Acceptance
CLAUSES INCORPORATED BY REFERENCE
52.246-1 Contractor Inspection Requirements APR 1984 52.246-4 Inspection Of Services--Fixed Price AUG 1996
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 120 dys. ADC 1 HOPKINTON-EVERETT PROJ
STEPHEN DERMODY
2097 MAPLE STREET
CONTOOCOOK NH 03229-3370
978-318-8325
961404
0002 120 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0003 120 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984
Section H - Special Contract Requirements
SECURITY INFORMATION
The contractor and all associated sub‐contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Technical Point of Contact NLT 5 calendar days after the completion of the training.
The Contractor must pre‐screen Candidates using the E‐verify Program (http://www.uscis.gov/e‐verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the Technical Point of Contact no later than 3 business days after the initial contract award.
WAGE DETERMINATION
WD 05‐2339 (Rev.‐18) was first posted on www.wdol.gov on 07/14/2015
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2005‐2339 Daniel W. Simms Division of | Revision No.: 18 Director Wage Determinations| Date Of Revision: 07/08/2015 Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Service Contract Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
This wage determination applies to the entire state of NEW HAMPSHIRE Excluding the cities and towns in ROCKINGHAM county listed below:
ROCKINGHAM County: Atkinson, Brentwood, Danville, Derry, East Kingston, Hampstead, Kingston, Newton, Plaistow, Salem, Sandown, Seabrook, and Windham
See WD 2005‐2257 for other cities and towns that are included.
**Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE ‐ TITLE FOOTNOTE RATE
01000 ‐ Administrative Support And Clerical Occupations 01011 ‐ Accounting Clerk I 13.21 01012 ‐ Accounting Clerk II 14.82 01013 ‐ Accounting Clerk III 16.58 01020 ‐ Administrative Assistant 19.72 01040 ‐ Court Reporter 16.02 01051 ‐ Data Entry Operator I 12.04 01052 ‐ Data Entry Operator II 13.14 01060 ‐ Dispatcher, Motor Vehicle 18.10 01070 ‐ Document Preparation Clerk 14.12 01090 ‐ Duplicating Machine Operator 14.12 01111 ‐ General Clerk I 11.84 01112 ‐ General Clerk II 12.92 01113 ‐ General Clerk III 14.50 01120 ‐ Housing Referral Assistant 17.87 01141 ‐ Messenger Courier 11.87 01191 ‐ Order Clerk I 12.93 01192 ‐ Order Clerk II 14.11 01261 ‐ Personnel Assistant (Employment) I 13.89 01262 ‐ Personnel Assistant (Employment) II 15.54 01263 ‐ Personnel Assistant (Employment) III 17.33 01270 ‐ Production Control Clerk 20.97 01280 ‐ Receptionist 12.46 01290 ‐ Rental Clerk 12.86 01300 ‐ Scheduler, Maintenance 14.32 01311 ‐ Secretary I 14.32 01312 ‐ Secretary II 16.02 01313 ‐ Secretary III 17.87 01320 ‐ Service Order Dispatcher 18.47 01410 ‐ Supply Technician 19.87 01420 ‐ Survey Worker 13.97 01531 ‐ Travel Clerk I 13.79 01532 ‐ Travel Clerk II 14.92 01533 ‐ Travel Clerk III 16.08 01611 ‐ Word Processor I 12.80 01612 ‐ Word Processor II 14.37 01613 ‐ Word Processor III 16.07 05000 ‐ Automotive Service Occupations 05005 ‐ Automobile Body Repairer, Fiberglass 19.30 05010 ‐ Automotive Electrician 18.69 05040 ‐ Automotive Glass Installer 17.79 05070 ‐ Automotive Worker 17.72 05110 ‐ Mobile Equipment Servicer 15.80 05130 ‐ Motor Equipment Metal Mechanic 19.63 05160 ‐ Motor Equipment Metal Worker 17.72 05190 ‐ Motor Vehicle Mechanic 19.30 05220 ‐ Motor Vehicle Mechanic Helper 14.90 05250 ‐ Motor Vehicle Upholstery Worker 16.77 05280 ‐ Motor Vehicle Wrecker 17.72
05310 ‐ Painter, Automotive 20.31 05340 ‐ Radiator Repair Specialist 17.72 05370 ‐ Tire Repairer 12.26 05400 ‐ Transmission Repair Specialist 19.63 07000 ‐ Food Preparation And Service Occupations 07010 ‐ Baker 13.19 07041 ‐ Cook I 12.31 07042 ‐ Cook II 14.29 07070 ‐ Dishwasher 9.00 07130 ‐ Food Service Worker 9.42 07210 ‐ Meat Cutter 16.52 07260 ‐ Waiter/Waitress 9.53 09000 ‐ Furniture Maintenance And Repair Occupations 09010 ‐ Electrostatic Spray Painter 15.62 09040 ‐ Furniture Handler 11.63 09080 ‐ Furniture Refinisher 16.50 09090 ‐ Furniture Refinisher Helper 13.15 09110 ‐ Furniture Repairer, Minor 14.81 09130 ‐ Upholsterer 16.50 11000 ‐ General Services And Support Occupations 11030 ‐ Cleaner, Vehicles 11.70 11060 ‐ Elevator Operator 11.70 11090 ‐ Gardener 15.64 11122 ‐ Housekeeping Aide 12.07 11150 ‐ Janitor 12.07 11210 ‐ Laborer, Grounds Maintenance 13.10 11240 ‐ Maid or Houseman 10.21 11260 ‐ Pruner 12.25 11270 ‐ Tractor Operator 14.78 11330 ‐ Trail Maintenance Worker 13.10 11360 ‐ Window Cleaner 12.91 12000 ‐ Health Occupations 12010 ‐ Ambulance Driver 16.19 12011 ‐ Breath Alcohol Technician 18.20 12012 ‐ Certified Occupational Therapist Assistant 20.82 12015 ‐ Certified Physical Therapist Assistant 20.93 12020 ‐ Dental Assistant 19.41 12025 ‐ Dental Hygienist 34.59 12030 ‐ EKG Technician 25.01 12035 ‐ Electroneurodiagnostic Technologist 25.01 12040 ‐ Emergency Medical Technician 16.80 12071 ‐ Licensed Practical Nurse I 16.84 12072 ‐ Licensed Practical Nurse II 18.84 12073 ‐ Licensed Practical Nurse III 21.01 12100 ‐ Medical Assistant 14.60 12130 ‐ Medical Laboratory Technician 19.22 12160 ‐ Medical Record Clerk 13.47 12190 ‐ Medical Record Technician 15.07 12195 ‐ Medical Transcriptionist 16.30 12210 ‐ Nuclear Medicine Technologist 33.89 12221 ‐ Nursing Assistant I 10.91 12222 ‐ Nursing Assistant II 12.27
12223 ‐ Nursing Assistant III 13.39 12224 ‐ Nursing Assistant IV 15.03 12235 ‐ Optical Dispenser 17.60 12236 ‐ Optical Technician 15.46 12250 ‐ Pharmacy Technician 13.84 12280 ‐ Phlebotomist 15.03 12305 ‐ Radiologic Technologist 26.78 12311 ‐ Registered Nurse I 23.67 12312 ‐ Registered Nurse II 28.95 12313 ‐ Registered Nurse II, Specialist 28.95 12314 ‐ Registered Nurse III 35.02 12315 ‐ Registered Nurse III, Anesthetist 35.02 12316 ‐ Registered Nurse IV 41.97 12317 ‐ Scheduler (Drug and Alcohol Testing) 22.55 13000 ‐ Information And Arts Occupations 13011 ‐ Exhibits Specialist I 16.49 13012 ‐ Exhibits Specialist II 20.40 13013 ‐ Exhibits Specialist III 24.95 13041 ‐ Illustrator I 16.46 13042 ‐ Illustrator II 20.40 13043 ‐ Illustrator III 24.95 13047 ‐ Librarian 22.58 13050 ‐ Library Aide/Clerk 11.01 13054 ‐ Library Information Technology Systems 20.40 Administrator 13058 ‐ Library Technician 14.22 13061 ‐ Media Specialist I 14.71 13062 ‐ Media Specialist II 16.46 13063 ‐ Media Specialist III 18.36 13071 ‐ Photographer I 14.38 13072 ‐ Photographer II 16.08 13073 ‐ Photographer III 19.92 13074 ‐ Photographer IV 24.37 13075 ‐ Photographer V 29.49 13110 ‐ Video Teleconference Technician 18.04 14000 ‐ Information Technology Occupations 14041 ‐ Computer Operator I 16.60 14042 ‐ Computer Operator II 18.57 14043 ‐ Computer Operator III 20.71 14044 ‐ Computer Operator IV 23.00 14045 ‐ Computer Operator V 25.48 14071 ‐ Computer Programmer I (see 1) 20.16 14072 ‐ Computer Programmer II (see 1) 24.47 14073 ‐ Computer Programmer III (see 1) 14074 ‐ Computer Programmer IV (see 1) 14101 ‐ Computer Systems Analyst I (see 1) 14102 ‐ Computer Systems Analyst II (see 1) 14103 ‐ Computer Systems Analyst III (see 1) 14150 ‐ Peripheral Equipment Operator 16.60 14160 ‐ Personal Computer Support Technician 23.03 15000 ‐ Instructional Occupations 15010 ‐ Aircrew Training Devices Instructor (Non‐Rated) 31.98
15020 ‐ Aircrew Training Devices Instructor (Rated) 38.33 15030 ‐ Air Crew Training Devices Instructor (Pilot) 45.94 15050 ‐ Computer Based Training Specialist / Instructor 31.98 15060 ‐ Educational Technologist 28.31 15070 ‐ Flight Instructor (Pilot) 45.94 15080 ‐ Graphic Artist 21.11 15090 ‐ Technical Instructor 20.43 15095 ‐ Technical Instructor/Course Developer 24.99 15110 ‐ Test Proctor 16.48 15120 ‐ Tutor 16.48 16000 ‐ Laundry, Dry‐Cleaning, Pressing And Related Occupations 16010 ‐ Assembler 10.71 16030 ‐ Counter Attendant 10.71 16040 ‐ Dry Cleaner 14.24 16070 ‐ Finisher, Flatwork, Machine 10.71 16090 ‐ Presser, Hand 10.71 16110 ‐ Presser, Machine, Drycleaning 10.71 16130 ‐ Presser, Machine, Shirts 10.71 16160 ‐ Presser, Machine, Wearing Apparel, Laundry 10.71 16190 ‐ Sewing Machine Operator 15.10 16220 ‐ Tailor 15.78 16250 ‐ Washer, Machine 11.92 19000 ‐ Machine Tool Operation And Repair Occupations 19010 ‐ Machine‐Tool Operator (Tool Room) 18.20 19040 ‐ Tool And Die Maker 21.75 21000 ‐ Materials Handling And Packing Occupations 21020 ‐ Forklift Operator 14.68 21030 ‐ Material Coordinator 20.97 21040 ‐ Material Expediter 20.97 21050 ‐ Material Handling Laborer 12.62 21071 ‐ Order Filler 12.73 21080 ‐ Production Line Worker (Food Processing) 14.68 21110 ‐ Shipping Packer 14.26 21130 ‐ Shipping/Receiving Clerk 14.26 21140 ‐ Store Worker I 13.78 21150 ‐ Stock Clerk 16.77 21210 ‐ Tools And Parts Attendant 14.68 21410 ‐ Warehouse Specialist 14.68 23000 ‐ Mechanics And Maintenance And Repair Occupations 23010 ‐ Aerospace Structural Welder 24.94 23021 ‐ Aircraft Mechanic I 23.78 23022 ‐ Aircraft Mechanic II 24.94 23023 ‐ Aircraft Mechanic III 26.06 23040 ‐ Aircraft Mechanic Helper 17.05 23050 ‐ Aircraft, Painter 20.77 23060 ‐ Aircraft Servicer 19.21 23080 ‐ Aircraft Worker 20.31 23110 ‐ Appliance Mechanic 20.23 23120 ‐ Bicycle Repairer 12.26 23125 ‐ Cable Splicer 28.05 23130 ‐ Carpenter, Maintenance 19.95 23140 ‐ Carpet Layer 18.11
23160 ‐ Electrician, Maintenance 22.43 23181 ‐ Electronics Technician Maintenance I 21.55 23182 ‐ Electronics Technician Maintenance II 23.50 23183 ‐ Electronics Technician Maintenance III 24.70 23260 ‐ Fabric Worker 18.48 23290 ‐ Fire Alarm System Mechanic 21.13 23310 ‐ Fire Extinguisher Repairer 17.45 23311 ‐ Fuel Distribution System Mechanic 19.10 23312 ‐ Fuel Distribution System Operator 17.00 23370 ‐ General Maintenance Worker 17.53 23380 ‐ Ground Support Equipment Mechanic 23.78 23381 ‐ Ground Support Equipment Servicer 19.21 23382 ‐ Ground Support Equipment Worker 20.31 23391 ‐ Gunsmith I 17.45 23392 ‐ Gunsmith II 19.54 23393 ‐ Gunsmith III 21.71 23410 ‐ Heating, Ventilation And Air‐Conditioning 21.15 Mechanic 23411 ‐ Heating, Ventilation And Air Contditioning 22.18 Mechanic (Research Facility) 23430 ‐ Heavy Equipment Mechanic 20.41 23440 ‐ Heavy Equipment Operator 19.48 23460 ‐ Instrument Mechanic 22.13 23465 ‐ Laboratory/Shelter Mechanic 20.65 23470 ‐ Laborer 12.62 23510 ‐ Locksmith 17.69 23530 ‐ Machinery Maintenance Mechanic 21.67 23550 ‐ Machinist, Maintenance 18.83 23580 ‐ Maintenance Trades Helper 13.16 23591 ‐ Metrology Technician I 22.13 23592 ‐ Metrology Technician II 23.21 23593 ‐ Metrology Technician III 24.25 23640 ‐ Millwright 27.57 23710 ‐ Office Appliance Repairer 19.25 23760 ‐ Painter, Maintenance 16.50 23790 ‐ Pipefitter, Maintenance 24.35 23810 ‐ Plumber, Maintenance 22.30 23820 ‐ Pneudraulic Systems Mechanic 21.71 23850 ‐ Rigger 21.71 23870 ‐ Scale Mechanic 19.54 23890 ‐ Sheet‐Metal Worker, Maintenance 19.35 23910 ‐ Small Engine Mechanic 14.88 23931 ‐ Telecommunications Mechanic I 24.67 23932 ‐ Telecommunications Mechanic II 27.10 23950 ‐ Telephone Lineman 25.74 23960 ‐ Welder, Combination, Maintenance 19.03 23965 ‐ Well Driller 21.29 23970 ‐ Woodcraft Worker 21.71 23980 ‐ Woodworker 14.36 24000 ‐ Personal Needs Occupations 24570 ‐ Child Care Attendant 9.67 24580 ‐ Child Care Center Clerk 12.06
24610 ‐ Chore Aide 10.68 24620 ‐ Family Readiness And Support Services 12.30 Coordinator 24630 ‐ Homemaker 13.55 25000 ‐ Plant And System Operations Occupations 25010 ‐ Boiler Tender 21.18 25040 ‐ Sewage Plant Operator 19.75 25070 ‐ Stationary Engineer 21.18 25190 ‐ Ventilation Equipment Tender 16.01 25210 ‐ Water Treatment Plant Operator 19.75 27000 ‐ Protective Service Occupations 27004 ‐ Alarm Monitor 16.77 27007 ‐ Baggage Inspector 13.37 27008 ‐ Corrections Officer 19.46 27010 ‐ Court Security Officer 19.73 27030 ‐ Detection Dog Handler 16.60 27040 ‐ Detention Officer 19.46 27070 ‐ Firefighter 19.14 27101 ‐ Guard I 13.37 27102 ‐ Guard II 16.60 27131 ‐ Police Officer I 21.92 27132 ‐ Police Officer II 24.36 28000 ‐ Recreation Occupations 28041 ‐ Carnival Equipment Operator 11.41 28042 ‐ Carnival Equipment Repairer 12.06 28043 ‐ Carnival Equpment Worker 9.45 28210 ‐ Gate Attendant/Gate Tender 14.77 28310 ‐ Lifeguard 11.34 28350 ‐ Park Attendant (Aide) 16.52 28510 ‐ Recreation Aide/Health Facility Attendant 12.06 28515 ‐ Recreation Specialist 14.66 28630 ‐ Sports Official 13.16 28690 ‐ Swimming Pool Operator 17.64 29000 ‐ Stevedoring/Longshoremen Occupational Services 29010 ‐ Blocker And Bracer 20.74 29020 ‐ Hatch Tender 20.74 29030 ‐ Line Handler 20.74 29041 ‐ Stevedore I 20.29 29042 ‐ Stevedore II 22.63 30000 ‐ Technical Occupations 30010 ‐ Air Traffic Control Specialist, Center (HFO) (see 2) 35.77 30011 ‐ Air Traffic Control Specialist, Station (HFO) (see 2) 24.66 30012 ‐ Air Traffic Control Specialist, Terminal (HFO) (see 2) 27.16 30021 ‐ Archeological Technician I 17.71 30022 ‐ Archeological Technician II 19.81 30023 ‐ Archeological Technician III 24.55 30030 ‐ Cartographic Technician 24.55 30040 ‐ Civil Engineering Technician 25.22 30061 ‐ Drafter/CAD Operator I 17.71 30062 ‐ Drafter/CAD Operator II 19.81 30063 ‐ Drafter/CAD Operator III 22.09 30064 ‐ Drafter/CAD Operator IV 27.17
30081 ‐ Engineering Technician I 15.12 30082 ‐ Engineering Technician II 16.97 30083 ‐ Engineering Technician III 21.45 30084 ‐ Engineering Technician IV 23.52 30085 ‐ Engineering Technician V 28.77 30086 ‐ Engineering Technician VI 34.81 30090 ‐ Environmental Technician 18.38 30210 ‐ Laboratory Technician 20.17 30240 ‐ Mathematical Technician 24.55 30361 ‐ Paralegal/Legal Assistant I 17.37 30362 ‐ Paralegal/Legal Assistant II 21.53 30363 ‐ Paralegal/Legal Assistant III 26.34 30364 ‐ Paralegal/Legal Assistant IV 31.86 30390 ‐ Photo‐Optics Technician 24.55 30461 ‐ Technical Writer I 23.62 30462 ‐ Technical Writer II 28.90 30463 ‐ Technical Writer III 34.96 30491 ‐ Unexploded Ordnance (UXO) Technician I 22.74 30492 ‐ Unexploded Ordnance (UXO) Technician II 27.51 30493 ‐ Unexploded Ordnance (UXO) Technician III 32.97 30494 ‐ Unexploded (UXO) Safety Escort 22.74 30495 ‐ Unexploded (UXO) Sweep Personnel 22.74 30620 ‐ Weather Observer, Combined Upper Air Or (see 2) 22.09 Surface Programs 30621 ‐ Weather Observer, Senior (see 2) 24.55 31000 ‐ Transportation/Mobile Equipment Operation Occupations 31020 ‐ Bus Aide 11.57 31030 ‐ Bus Driver 15.29 31043 ‐ Driver Courier 14.03 31260 ‐ Parking and Lot Attendant 10.25 31290 ‐ Shuttle Bus Driver 14.57 31310 ‐ Taxi Driver 11.16 31361 ‐ Truckdriver, Light 14.57 31362 ‐ Truckdriver, Medium 15.55 31363 ‐ Truckdriver, Heavy 18.76 31364 ‐ Truckdriver, Tractor‐Trailer 18.76 99000 ‐ Miscellaneous Occupations 99030 ‐ Cashier 9.22 99050 ‐ Desk Clerk 10.61 99095 ‐ Embalmer 28.59 99251 ‐ Laboratory Animal Caretaker I 10.17 99252 ‐ Laboratory Animal Caretaker II 10.81 99310 ‐ Mortician 28.59 99410 ‐ Pest Controller 17.70 99510 ‐ Photofinishing Worker 15.03 99710 ‐ Recycling Laborer 14.64 99711 ‐ Recycling Specialist 16.68 99730 ‐ Refuse Collector 13.69 99810 ‐ Sales Clerk 12.38 99820 ‐ School Crossing Guard 11.44 99830 ‐ Survey Party Chief 17.19 99831 ‐ Surveying Aide 10.46
99832 ‐ Surveying Technician 15.64 99840 ‐ Vending Machine Attendant 13.85 99841 ‐ Vending Machine Repairer 16.49 99842 ‐ Vending Machine Repairer Helper 13.85
ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:
HEALTH & WELFARE: $4.27 per hour or $170.80 per week or $740.13 per month
VACATION: 1 week paid vacation after 1 year of service with a contractor or successor; 2 weeks after 2 years; and 3 weeks after 10 years. Length of service includes the whole span of continuous service with the present contractor or successor, wherever employed, and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)
HOLIDAYS: A minimum of ten paid holidays per year, New Year's Day, Martin Luther King Jr's Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans' Day, Thanksgiving Day, and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4174)
THE OCCUPATIONS WHICH HAVE NUMBERED FOOTNOTES IN PARENTHESES RECEIVE THE FOLLOWING:
1) COMPUTER EMPLOYEES: Under the SCA at section 8(b), this wage determination does not apply to any employee who individually qualifies as a bona fide executive, administrative, or professional employee as defined in 29 C.F.R. Part 541. Because most Computer System Analysts and Computer Programmers who are compensated at a rate not less than $27.63 (or on a salary or fee basis at a rate not less than $455 per week) an hour would likely qualify as exempt computer professionals, (29 C.F.R. 541.
400) wage rates may not be listed on this wage determination for all occupations within those job families. In addition, because this wage determination may not list a wage rate for some or all occupations within those job families if the survey data indicates that the prevailing wage rate for the occupation equals or exceeds $27.63 per hour conformances may be necessary for certain nonexempt employees. For example, if an individual employee is nonexempt but nevertheless performs duties within the scope of one of the Computer Systems Analyst or Computer Programmer occupations for which this wage determination does not specify an SCA wage rate, then the wage rate for that employee must be conformed in accordance with the conformance procedures described in the conformance note included on this wage determination.
Additionally, because job titles vary widely and change quickly in the computer industry, job titles are not determinative of the application of the computer professional exemption. Therefore, the exemption applies only to computer employees who satisfy the compensation requirements and whose primary duty consists of:
(1) The application of systems analysis techniques and procedures, including consulting with users, to determine hardware, software or system functional specifications;
(2) The design, development, documentation, analysis, creation, testing or modification of computer systems or programs, including prototypes, based on and related to user or system design specifications;
(3) The design, documentation, testing, creation or modification of computer programs related to machine operating systems; or
(4) A combination of the aforementioned duties, the performance of which requires the same level of skills. (29 C.F.R. 541.400).
2) AIR TRAFFIC CONTROLLERS AND WEATHER OBSERVERS ‐ NIGHT PAY & SUNDAY PAY: If you work at night as part of a regular tour of duty, you will earn a night differential and receive an additional 10% of basic pay for any hours worked between 6pm and 6am.
If you are a full‐time employed (40 hours a week) and Sunday is part of your regularly scheduled workweek, you are paid at your rate of basic pay plus a Sunday premium of 25% of your basic rate for each hour of Sunday work which is not overtime (i.e. occasional work on Sunday outside the normal tour of duty is considered overtime work).
HAZARDOUS PAY DIFFERENTIAL: An 8 percent differential is applicable to employees employed in a position that represents a high degree of hazard when working with or in close proximity to ordinance, explosives, and incendiary materials. This includes work such as screening, blending, dying, mixing, and pressing of sensitive ordance, explosives, and pyrotechnic compositions such as lead azide, black powder and photoflash powder. All dry‐house activities involving propellants or explosives.
Demilitarization, modification, renovation, demolition, and maintenance operations on sensitive ordnance, explosives and incendiary materials. All operations involving regrading and cleaning of artillery ranges.
A 4 percent differential is applicable to employees employed in a position that represents a low degree of hazard when working with, or in close proximity to ordance, (or employees possibly adjacent to) explosives and incendiary materials which involves potential injury such as laceration of hands, face, or arms of the employee engaged in the operation, irritation of the skin, minor burns and the like; minimal damage to immediate or adjacent work area or equipment being used.
All operations involving, unloading, storage, and hauling of ordance, explosive, and incendiary ordnance material other than small arms ammunition. These differentials are only applicable to work that has been specifically designated by the agency for ordance, explosives, and incendiary material differential pay.
** UNIFORM ALLOWANCE **
If employees are required to wear uniforms in the performance of this contract (either by the terms of the Government contract, by the employer, by the state or local law, etc.), the cost of furnishing such uniforms and maintaining (by laundering or dry cleaning) such uniforms is an expense that may not be borne by an employee where such cost reduces the hourly rate below that required by the wage determination. The Department of Labor will accept payment in accordance with the following standards as compliance:
The contractor or subcontractor is required to furnish all employees with an adequate number of uniforms without cost or to reimburse employees for the actual cost of the uniforms. In addition, where uniform cleaning and maintenance is made the responsibility of the employee, all contractors and subcontractors subject to this wage determination shall (in the absence of a bona fide collective bargaining agreement providing for a different amount, or the furnishing of contrary affirmative proof as to the actual cost), reimburse all employees for such cleaning and maintenance at a rate of $3.35 per week (or $.67 cents per day). However, in those instances where the uniforms furnished are made of "wash and wear" materials, may be routinely washed and dried with other personal garments, and do not require any special treatment such as dry cleaning, daily washing, or commercial laundering in order to meet the cleanliness or appearance standards set by the terms of the Government contract, by the contractor, by law, or by the nature of the work, there is no requirement that employees be reimbursed for uniform maintenance costs.
The duties of employees under job titles listed are those described in the "Service Contract Act Directory of Occupations", Fifth Edition, April 2006, unless otherwise indicated. Copies of the Directory are available on the Internet. A links to the Directory may be found on the WHD home page at http://www.dol.
gov/esa/whd/ or through the Wage Determinations On‐Line (WDOL) Web site at http://wdol.gov/.
REQUEST FOR AUTHORIZATION OF ADDITIONAL CLASSIFICATION AND WAGE RATE {Standard Form
1444 (SF 1444)}
Conformance Process:
The contracting officer shall require that any class of service employee which is not listed herein and which is to be employed under the contract (i.e., the work to be performed is not performed by any classification listed in the wage determination), be classified by the contractor so as to provide a reasonable relationship (i.e., appropriate level of skill comparison) between such unlisted classifications and the classifications listed in the wage determination. Such conformed classes of employees shall be paid the monetary wages and furnished the fringe benefits as are determined. Such conforming process shall be initiated by the contractor prior to the performance of contract work by such unlisted class(es) of employees. The conformed classification, wage rate, and/or fringe benefits shall be retroactive to the commencement date of the contract. {See Section 4.6 (C)(vi)} When multiple wage determinations are included in a contract, a separate SF 1444 should be prepared for each wage determination to which a class(es) is to be conformed.
The process for preparing a conformance request is as follows:
1) When preparing the bid, the contractor identifies the need for a conformed occupation(s) and computes a proposed rate(s).
2) After contract award, the contractor prepares a written report listing in order proposed classification title(s), a Federal grade equivalency (FGE) for each proposed classification(s), job description(s), and rationale for proposed wage rate(s), including information regarding the agreement or disagreement of the authorized representative of the employees involved, or where there is no authorized representative, the employees themselves. This report should be submitted to the contracting officer no later than 30 days after such unlisted class(es) of employees performs any contract work.
3) The contracting officer reviews the proposed action and promptly submits a report of the action, together with the agency's recommendations and pertinent information including the position of the contractor and the employees, to the Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, for review. (See section 4.6(b)(2) of Regulations 29 CFR Part 4).
4) Within 30 days of receipt, the Wage and Hour Division approves, modifies, or disapproves the action via transmittal to the agency contracting officer, or notifies the contracting officer that additional time will be required to process the request.
5) The contracting officer transmits the Wage and Hour decision to the contractor.
6) The contractor informs the affected employees.
Information required by the Regulations must be submitted on SF 1444 or bond paper.
When preparing a conformance request, the "Service Contract Act Directory of Occupations" (the Directory) should be used to compare job definitions to insure that duties requested are not performed by a classification already listed in the wage determination. Remember, it is not the job title, but the required tasks that determine whether a class is included in an established wage determination.
Conformances may not be used to artificially split, combine, or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .