REQUEST FOR INFORMATION
Solicitation Number: W912SV-18-B-6001
PROJECT TITLE: Convert B165 to Cyber ISRG
Date: 12 July 2018
RFI
NO.
DATE OF
SUBMISSION
DATE TO
REQUESTOR/TECH
POC
DATE
RESPONSE
RETURNED
RESPONSE TO RFI DATE
RETURNED
TO KTR
12 Jul 2018 12 Jul 2018 12 Jul 2018 See Answer Below 12 Jul 2018
My company rep was unable to make it to the scheduled site visit on 11 July 2108. Will we be able to get access to the base and building later in the week?
No, only one site visit is scheduled for this project which was held on 11 July. No further access to the site will be authorized.
12 Jul 2018 12 Jul 2018 12 Jul 2018 See Answer Below 12 Jul 2018
Will the Site Visit Sign-in list be uploaded to FBO?
Yes, the Pre-Bid & Site Visit Slides and Sign-In will be uploaded to FBO.
12 Jul 2018 12 Jul 2018 12 Jul 2018 See Answer Below 12 Jul 2018
I am unable to access the drawings and specs and getting access will take several days. Is there any other way to get the drawings and specs?
If obtaining access is going to take longer than 48hrs to rectify, please submit your company name and email address of individual to receive email to kirk.b.wetherbee.mil@mail.mil, kerry.a.wells2.civ@mail.mil, and kyle.d.kiepke.mil@mail.mil so plans and specifications can be provided via secure email.
Continued
DATE OF
SUBMISSION
DATE TO
REQUESTOR/TECH
POC
DATE
RESPONSE
RETURNED
RESPONSE TO RFI DATE
RETURNED
TO KTR
12 Jul 2018 12 Jul 2018 12 Jul 2018 See Answer Below 12 Jul 2018
Please advise if there is an alternative source for acquisition / access to the solicitation bidding documents other than the submission and approval of a DD Form 2345. The processing of our DD Form 2345 has been delayed and we are apprehensive that we may not be able to access the bidding documents in time to prepare and submit a proposal.
We have performed contract for the US Air Force and Mass ANG in the past, as well as other DOD agencies. Please advise.
See #3 above
12 Jul 2018 12 Jul 2018 XX Jul 2018 See Answer Below 13 Jul 2018
Will the government take possession of the outdoor 500 KVA transformer? It most likely is oil filled and if old enough maybe PCB filled.
Yes, Government will take possession of the transformer
What is the Manufacturer or monitoring company for the existing fire alarm/mass notification system?
The proprietary supervising station (PSS) receiving equipment is Monaco. The PSS is located in Building 40.
Please provide specifications or scope in regards to the security system.
Or is this work by others and we just install raceways and boxes?
Refer to general note 4 on sheets E-131A and E-131B.
Continued
DATE OF
SUBMISSION
DATE TO
REQUESTOR/TECH
POC
DATE
RESPONSE
RETURNED
RESPONSE TO RFI DATE
RETURNED
TO KTR
12 Jul 2018 12 Jul 2018 XX Jul 2018 See Answer Below 13 Jul 2018
Please see the two attached drawings that I clouded.
a. Drawing ED‐111B directs us to relocate existing panel PP3, One Existing 50a/3P C/B, and Existing Transformer T7.
b. The shading of the panel, the Transformer Description, and the C/B on “One‐Line” drawing E‐601 leads me to believe this is new equipment.
c. Which is correct?
Panel PP3, transformer T7, and the 50A CB are all existing to be relocated. Items are shown bold due to new work (relocation) being performed.
There is a panel “PH” indicated on drawing E‐601 as a 400A MLO panel. Panel “PH” is not indicated on the panel schedules.
See revised drawings for clarification.
There is a panel “PH‐1” indicated on the panel schedule as a 200A MLO panel.
Are panel “PH” and panel “PH‐1” one in the same?
a. If so, which amperage is correct?