W912SV-18-B-6000

Repair Supply / Mobility Processing B155

SPBN 082031

11 July 2018 Pre-Bid Conference & Site Visit

Joint Base Cape Cod 102 Intelligence Wing Building 155 Otis ANG Base, MA 02542 Location of Project

Key Personnel Contracting Officer SMSgt Kyle Kiepke Contract Specialist Mrs. Kerry Wells MSgt Kirk Wetherbee Contracting Officer’s Representative Lt Robin Montgomery

Scope Project No: SPBN 082031 Repair Supply/Mobility Processing B-155.

Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary to repair and construct a 21,964 SF facility in accordance with specifications and drawings.

Invitation for Bid (IFB) 100% Total Small Business Set Aside

NAICS 236220

$36.5 Million Size Standard

Magnitude: $1,000,000 to $5,000,000

A single Firm-Fixed Price Contract will be awarded.

Bid Opening Public Bid Opening 25 July 2018 @ 1:00pm (EST) Building 330, Conference Room A

Arrive with enough time to get through Multiple Gates Late Bids will not be accepted The clock used for bid closing can be viewed at the following website using Eastern Daylight Time (EDT): https://tycho.usno.navy.mil/simpletime.html No Facsimile or Electronic Bids

Submission Requirements Offer, Standard Form 1442 front and back signed Section 00010 Line Items –all items must be priced Section 00600, Reps & Certs Must also have current & complete data on SAM.

All amendments to solicitation must be acknowledged Bid Envelope: BID No. W912SV-18-B-6000, and Name & Address of Bidder

Basis of Award As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.

Construction Period is 365 Calendar Days AFTER receiving the Notice To Proceed (NTP)

Period of Performance

Important Reminders IFB Award will be made without discussion

Read the entire solicitation requirements carefully

Read Section 010000 General Contract Conditions

All Amendments Will Be On The FBO Web Site (www.fbo.gov)

Check Site Regularly for Changes & Refresh the Page

Construction Wage Rates & Bid Bonds Most current DOL Construction Wage rates will apply.

Amendments will be issued for updated rates (within 10 days of bid opening)

Bid Bond Required SEE 52.228-1

Performance and Payment Bond Required SEE 52.228-15

Solicitation Questions Submit all questions in writing to the Contracting Office at the email addresses show below. Do NOT contact AE or 102 Civil Engineering personnel directly. Doing so will only delay your answer. All questions MUST come through the Contracting Office. (See Q&A template included in the solicitation for your convenience).

Subject Line: Reference No. SOLICITATION W912SV-18-B-6000 Email: kyle.d.kiepke.mil@mail.mil, kerry.a.wells2.civ@mail.mil, and kirk.b.wetherbee.mil@mail.mil.

Answers to Questions

08030803

All questions, on a non-attribution basis, and the answers will be posted to the FBO website

If necessary addendums, issued by an amendment, will also be posted

Check web site regularly and DON’T forget to refresh web page

RFIs must be sent to all e-mails previously provided. Use RFI template for all correspondences.

Helpful Websites https://www.fbo.gov https://www.sam.gov https://www.wdol.gov image1.jpeg image2.png