W912QR92907255-0002.pdf
PDF 1 MB Posted
- Attached to
- Nolin Lake Office Addition
- Solicitation number
- W912QR-92907255
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR92907255-0005.pdf | ||
| W912QR92907255-0004.pdf | ||
| W912QR92907255-0003.pdf | ||
| AMDT 0001 - RFP W912QR-92907255 (Nolin Office Addition).pdf | ||
| W912QR92907255-0000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
LOUISVILLE DISTRICT, CORPS OF ENGINEERS
P.O. BOX 59
LOUISVILLE,KENTUCKY 40201-0059
REPLY TO
ATTENTION OF
Contracting Division 12 December 2019
ENVIRONET, INC.
T&T CONSTRUCTION ENTERPRISES LLC
Q.B.S., INC.
SAF, INC.
FORTIS NETWORKS, INC.
Dear MATOC Contractors:
Reference is made to your Indefinite Delivery Indefinite Quantity Contracts, Numbers W912QR- 15-D-0019 through W912QR-15-D-0023, Multiple Award Task Order Contracts to Perform Design/Build, Operations & Maintenance, and Construction Activities for Civil and Military Projects within the Great Lakes and Ohio River Division Mission Boundaries.
In accordance with Amendment 0002 for Solicitation No. W912QR-92907255 for the Nolin Lake Office Addition Project, the following changes have been made:
- The proposal due date has been revised from 30 December 2019 to 16 January 2020.
- The Period of performance has been changed from 480 calendar days from Notice to
Proceed, back to 365 calendar days from Notice to Proceed, as detailed in 52.211-10.
- Price Breakout Schedule – Note 4.
- Section 01 20 , Paragraph 1.4
- Section 01 20 00, Paragraph 1.5, Bid Option 4
The basis for award of this task order is lowest total price of the base proposal and all options.
Please complete the price breakout schedule, and include a labor category table demonstrating the use of the binding rates included in your MATOC contract. The submitted price breakdown should include sufficient detail to allow the Government to verify that your proposed price incorporates the binding rates from your base contract. Any level of effort shown in the submitted information will not be used for evaluation purposes and will be used only to ensure that the proposal is in compliance with the binding rates from the base contract.
Offerors shall allow for Government acceptance of proposals for 60 calendar days from the date proposals are due. Any proposal that does not allow acceptance for 60 days will not be considered and will be rejected.
Proposals are due no later than 1:00 PM Eastern Time on 16 January 2020. Submit your proposal by email to Samantha (Dani) Harrison at Samantha.D.Harrison@usace.army.mil.
Proposals not received by the stated date/time will not be considered. Please acknowledge receipt
W912QR92907255-0002
-2-of this RFP by signing below in the space provided and returning to Samantha D. Harrison via email.
Payment and Performance Bonds will be required for this project. The Notice to Proceed will be issued after receipt and approval of the bonds.
All questions regarding this Request for Proposal (RFP) must be submitted via ProjNet. The website to access this system is www.projnet.org and the bidder inquiry key for this specific project is: (JKB6JN-34ZX37). Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation;
or (c) Notice that a response is not necessary. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled five (5) calendar days prior to the proposal due date. No Government responses will be entered into the ProjNet system within two (2) calendar days prior to the proposal due date stated in this letter.
If you have contractual questions, please contact Samantha D. Harrison at the email address provided above. If an Offeror believes that the requirements in the RFP contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contract Specialist in writing with supporting rationale. The Offeror is reminded that the Government reserves the right to award this RFP based on the initial proposals, as received, without discussion.
Sincerely, Travis Dunn Contracting Officer
(Signature) (Date)
(Printed Name)
(Firm Name)
DUNN.TRAVIS.IS
AAC.108274867
Digitally signed by
DUNN.TRAVIS.ISAAC.10827
48675 Date: 2019.12.12 11:37:04 -05'00'
-3-
00750
52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)
The Contractor shall be required to
(a) commence work under this contract within 10 calendar days from the issuance of Notice to Proceed
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than 365 calendar days FROM the issuance of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
-4-
00 10 00
PRICE BREAKOUT SCHEDULE
OFFEROR'S NAME: ___________________________________________
CONTRACT LINE ITEM SCHEDULE
Line Item No. Description Unit Amount
BASE PROPOSAL
0001. Design: All design and consulting services required to prepare construction documents for the construction of the Nolin Lake Office Building addition to the Green River Building.
0002. Construct: All work, materials, labor and consulting services required to demolish, dispose, repair, and construct the 3,600 SF area Nolin Lake Office Building addition to the existing Green River Building.
Total Base Proposal $ ________________
OPTIONS
0003. Option 1: Includes design and construction of parking lot and access drive for employees and visitors utilizing an asphalt pavement surface, including all required markings, in addition to Base Bid aggregate base. Includes paving of handicap parking space.
Job $ ________________
0004. Option 2: Includes all work, materials, and labor required to install a flagpole.
Job $ ________________
0005. Option 3: Includes all work, materials, labor and consulting services required to provide full landscaping of grounds surrounding the existing and new construction.
Job $ ________________
0006. Option 4: Includes all design, work, materials, labor and consulting services required to provide total interior reconstruction of existing Green River Building to create three offices and a conference room with seating for 20-25 people. Demolition of all plumbing fixtures in existing Building with no replacement. Cap sewer lines in existing building. HVAC system shall be salvaged and reused as much as possible. NFPA requirements for new construction will apply.
0007. Option 5: Includes all work, materials, labor and consulting services required to provide high efficiency vinyl windows in lieu of base bid aluminum windows.
Job $ ________________
0008. Option 6: Includes all work, materials, labor and consulting services required to provide a covered back entrance.
0009. Option 7: Includes all work, materials, labor and consulting services required to provide tile floor and tile wainscoting to 5’-0” on wet walls in all three restrooms.
Total Options $ ________________
-5-
TOTAL PROPOSAL (Base + All Options) $ ________________
NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Price Breakout Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items, including options of the Price Breakout Schedule. Failure to do so may result in the offer being unacceptable.
NOTE NO. 3. The Offerors Base proposals and all Options will be evaluated on price only. The basis for award is the lowest total proposed price of the base quote and all options in accordance with 52.217-5, Evaluation of Options.
NOTE NO. 4. The Contracting Officer may exercise Option 1-3 (CLINs 0003, 0004, 0005) by written notice to the Contractor within 180 calendar days from Notice to Proceed. The Contracting Officer may exercise Options 4-7 (CLINs 0006, 0007, 0008, and 0009) by written notice to the Contractor within 60 calendar days from Notice to Proceed.
--END OF PRICE BREAKOUT SCHEDULE--
Nolin Lake Office Addition 128623 Bee Springs, KY 11/2019
**SAFETY PAYS**
SECTION 01 20 00
STATEMENT OF WORK GENERAL
11/19 Amendment 0002
1 PROJECT INFORMATION 1
1.1 GENERAL 1
1.2 SCOPE OF WORK 3
1.3 SITE LOCATION 4
1.4 EXISTING SITE UTILITIES 4
1.5 BID OPTIONS 4
1.6 ATTACHMENTS 5
1.7 PERMITS 6
1.8 ENVIRONMENTAL REQUIREMENTS 6
1.9 PERSONNEL REQUIREMENTS AND QUALIFICATIONS 8
2 DESIGN REQUIREMENTS 8
2.1 GENERAL 8
2.2 DESIGN 9
2.3 REQUEST FOR PROPOSAL (RFP) INTENT 9
2.4 COORDINATION BETWEEN THE VARIOUS DISCIPLINES 9
2.5 QUALITY OF WORK 9
2.6 RFP DESIGN AND TECHNICAL CRITERIA 10
2.7 TECHNICAL SPECIFICATIONS 11
2.8 APPLICABLE BUILDING CODES AND STANDARDS 11
2.9 UNITS OF MEASUREMENT 12
2.10 REQUIRED DESIGN PROFESSIONALS 12
2.11 DESIGN SUBMITTAL DISTRIBUTION MATRIX 13
3 GENERAL CONSTRUCTION REQUIREMENTS 14
3.1 SUMMARY 14
3.2 GENERAL INFORMATION 15
3.3 DOCUMENTATION 16
3.4 USE OF THE PREMISES 16
3.5 PROJECT SITE 17
1 PROJECT INFORMATION
1.1 GENERAL
The Contractor shall provide all labor, equipment, supplies, and consultant services and all site investigations, surveys, analysis, sampling, testing and verification of existing field conditions as required for design and construction of the Nolin Lake Office Addition to the Green River Building to result in a complete and useable Facility. Contractor shall provide complete design analysis incorporating all engineering computations, analysis/ test and survey results, building code (including fire protection, life safety, environmental and accessibility) review as it pertains/affects/relates to this project, equipment and material data and documentation of existing conditions.
SECTION 01 20 00
Amendment 0002
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
EXISTING CONDITIONS
The addition to the Green River Area Office Building will be the new Nolin Lake Project Office. The existing Nolin Lake Building will be abandoned and demolished under a separate contract at a later date. A gravel road connects the Green River Area Office Building to the Nolin Lake Project Office approximately 1000’ away.
The Green River Building was originally constructed in 1962. Refer to Attachment 11 for As Built Record Drawings. There were originally two building one a mirror of the other. A major renovation was performed in 1993 and at that time one of the two buildings was demolished.
The as built drawings included are of the mirror of the current remaining building. The Contractor shall finalize all elements of the design, including exact dimensions.
The existing one-story Green River Building is constructed of wood framing. The exterior walls consist of 8” red brick veneer. With green standing seam metal roof. The interior construction is Gypsum Wall Board (GWB) walls with GWB ceilings. The floor is a mix of vinyl composition tile flooring and carpet.
ANTITERRORISM FORCE PROTECTION UFC 4-010-01
It has been determined No ATFP measures are required based on Low occupancy, stated in UFC 4-010-01, 12 December 2018, section 1-7. Nolin Lake and Green River Building together only have 7 regular in office employees with predictable regular schedules. The Rangers and Maintenance set their own schedules and are not in the office on a regular consistent basis. There is no routine peak in occupancy. The Nolin Lake Green-River Building Office facility is classified as a low occupancy, inhabited building. This building will be occupied by less than 11 DOD employees, therefore DOD Minimum Antiterrorism Standards for Buildings are not required for this project.
LIFE SAFETY
This facility shall be designed to meet or exceed the minimum construction and life safety standards as required by UFC 3-600-01 Fire Protection for Facilities. Fire Department access shall be provided as required by UFC 3-600-01. If the square footage of the existing building plus the addition exceeds 5,000 SF, then sprinkler protection shall be provided. A mezzanine with a permanent stair can be constructed without triggering the ‘multi story’ building sprinkler requirement in UFC 3-600-01, as long as the total square footage of the building including the mezzanine does not exceed 5,000 SF.
ACCESSIBILITY REQUIREMENTS
All building improvements and new work shall be accessible and shall comply with the Architectural Barriers Act (ABA) Accessible Guidelines for Buildings and Facilities as currently amended.
**SAFETY PAYS**
ENERGY STANDARD COMPLIANCE
The building shall comply with the provisions of the ASHRAE 90.1-2016. As a separate part or section of the Design Analysis, demonstrate compliance with ASHRAE 90.1 using calculations, vendor literature, equipment catalog sheets, compliance forms, worksheets, and narrative descriptions of the building envelope, HVAC systems, service water heating, electrical power, lighting, and other equipment and systems.
ENVIRONMENTAL SEVERITY CLASSIFICATION
Project site has an Environmental Severity Category of C3 in accordance with UFC 1-200-
01. Provide design detailing, and use materials, systems, components and coatings that are durable and minimize the need for preventative and corrective maintenance over the life-cycle of the facility.
1.2 SCOPE OF WORK
Unless specifically noted otherwise in this Specification Section or in the base MATOC contract Volume 1 of 2 itself, all requirements of the base MATOC contract Volume 1 of 2 shall apply to this Task Order. Operations HubZone MATOC W912QR15-D-0019, 0020, 0021, 0022, 0023 is to be used.
The work indicated as a base proposal includes the 3,600 SF ‘Nolin River Project Office Addition’ to the existing ‘Green River Area Office’. In addition Bid Option 4 include the complete interior renovation of the existing ‘Green River Area Office Building’.
Design and construction shall comply with the requirements contained in this Task Order Request for Proposal (RFP). The design and technical criteria contained and cited in this RFP and the Unified Facilities Guide Specifications (UFGS) establish minimum standards for design and construction quality. The Designers of Record shall use the Unified Facilities Guide Specifications (UFGS) and the requirements contained in this RFP to fully develop the technical specifications and construction drawings. The objective of this solicitation is to obtain an energy efficient, durable, maintainable and sustainable space.
The illustrations and exhibits included in this RFP illustrate the conceptual design of the project and are provided to define the scope of work and budget. The concepts provided shall be further developed by the Design/Build Contractor to comply with the customer’s functional needs.
All demolition required to construct the 3600 SF Nolin Lake addition to the Green River Area Office Building is included as part of the work of this Contract. Demolition of carport roof and carport slab.
During initial hazardous material investigation asbestos was found in the existing Green River Area Office Building. The asbestos remediation will be completed under separate contract, prior to the starting point of this contract, including a portion of the exterior wall.
Based on the capacity of the municipal water system, type V construction is not permitted.
SECTION 01 20 00
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
1.3 SITE LOCATION
This project is located at the Green River Area Office’ off Nolin Dam Road (State Route 728) in Bee Spring, KY.
Amendment 0002**************************************************************
1.4 EXISTING SITE UTILITIES
Electrical utility service to the office addition will be a new service independent of the existing service to the Green River Area Office. The office addition will also be separately metered.
New radio lines (TEXT DELETED) will be connected with the existing system at the Green River Area Office.
The (TEXT DELETED) construction contractor will make connections from the outlets to the panel (TEXT DELETED). At the time of Substantial Completion ACEIT will come in and make final connections for the internet and telephone.
See 012010 Electrical 1.6.7 for a general note. Additional paragraphs 1.6.10-14 have further detail.
Water mains at the site appear to be of adequate size to satisfy the domestic water flow requirement. An existing 1-1/4 inch waterline provides service to the existing buildings on the project site. The 1-1/4 inch line reduces to a 1 inch service for the Green River Area Office Building. See Attachment 1, plan sheet CU101 for additional details.
An existing sanitary lift station serves the existing Green River Area Office Building. The existing lift station will be relocated by others prior to start of this project. See Attachment 1, plan sheet CU101 for the anticipated new location of the existing lift station. The existing lift station appears to be of adequate size for the new office addition.
Amendment 0002***************************************************************
1.5 BID OPTIONS
BID OPTION 1: ASPHALT PAVING OF PARKING LOT
Asphalt Paving of Parking Lot. Design and construction of parking lot and access drive for employees and visitors utilizing an asphalt pavement surface, including all required markings, in addition to Base Bid aggregate base. Includes paving of handicap parking space.
BID OPTION 2: FLAGPOLE
Provide and install flagpole. See Section 01 02 10.00 06, para 3.3. For flagpole requirements.
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
BID OPTION 3: LANDSCAPING.
Provide full landscaping package. Includes all work, materials, labor and consulting services required to provide full landscaping of grounds surrounding the existing and new construction.
Amendment 0002***************************************************************
BID OPTION 4: RECONSTRUCTION OF EXISTING GREEN RIVER BUILDING
Complete interior reconstruction of existing building. The NFPA building rehabilitation classification of reconstruction, triggers the requirements for the entire building to meet new construction, per UFC 3-600-01. Reconstruction of existing Building to create three offices, and a conference with seating room for 20-25. Provide new HVAC system or may be served from the base bid HVAC system. The existing HVAC system may be reused if heating and cooling load calculations indicate capacity is sufficient to meet the new loads. Removal of all existing finishes including flooring, wall coverings, (TEXT DELETED) and cabinets. New finishes will match the materials and requirements of the Nolin lake addition. Construction of interior partitions will be required to provide new floor plan with desired new functional spaces. No additional square footage is permitted. No new plumbing fixtures will be included in the renovation of the Green River Building. All demolition (TEXT DELETED) of the plumbing fixtures in existing building and capping of sewer lines will be completed prior to this construction under separate contract.
Amendment 0002***************************************************************
BID OPTION 5: VINYL WINDOWS
Provide Vinyl windows in lieu of aluminum.
BID OPTION 6: COVERED BACK ENTRANCE.
Provide a Covered back entrance with an overhang, awning or portico.
BID OPTION 7: TILE FINISH
Provide tile floor and tile wainscoting to 5’-0” on wet walls in restrooms.
1.6 ATTACHMENTS
Information provided in the Attachments is intended to guide the completion of the design by establishing existing conditions, and the desired character, appearance, and function of the new construction. The following Attachments are included and shall be used and strictly adhered-to in completing the design and construction of the project.
ATTACHMENT 1: G001 - Location/ Vicinity Map ATTACHMENT 2: V101 - Existing Site ATTACHMENT 3: VA101 - Aerial ATTACHMENT 4 CS101 - Site Plan ATTACHMENT 5: CD101 - Demolition Plan
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
ATTACHMENT 6: CU101 - Utility Plan ATTACHMENT 7: Conceptual Floor Plan ATTACHMENT 8: LRL Life Safety Review Form ATTACHMENT 9: Preliminary Site Characterization Report ATTACHMENT 10: Hazardous Material Testing ATTACHMENT 11: As Built Drawings 1964
1.7 PERMITS
The Contractor shall investigate and submit any permits necessary for the construction of this project. All permit applications shall be completed by the Contractor and provided to the Contracting Officer for submittal to the appropriate agency. Contractor shall pay all permit fees.
Copies of all permits shall be provided to the USACE.
1.8 ENVIRONMENTAL REQUIREMENTS
ENVIRONMENTAL COMPLIANCE
The contractor shall comply with the National Environmental Protection Act and all other Environmental regulations.
DUST CONTROL
Contractor shall maintain all work areas free from excess dust to such reasonable degree as to avoid causing a hazard to base personnel or surrounding facilities. Dust control shall be performed as the work proceeds and whenever a dust nuisance or hazard occurs.
ASBESTOS
No asbestos containing material shall be used. During the process of demolition and construction, if the Contractor encounters any suspected asbestos containing materials (ACM), stop work immediately and notify the COR.
SDS SHEETS
Safety Data Sheet (SDS) is required for all building materials except for wood, glass, or steel.
The MSDS will be submitted to the Contracting Officer within seven (7) calendar days after the NOTICE TO PROCEED.
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
HAZARDOUS MATERIALS MANAGEMENT
Contractor will provide the Contracting Officer (KO) the Material Safety Data Sheets (MSDS) for chemical materials to be used during the project prior to the contract award in accordance with FAR Clause 52.223-3. The Contractor will provide MSDSs’ to the Contracting Officer for review prior to the contractor bringing products on the property. The contractor must inventory all chemical materials, including but not limited to: solvents, paints, degreasers, greases, Ozone Depleting Substances, and oils, brought on base. A chemical material inventory must be maintained when used containing the nomenclature, manufacturer, part number, quantity, storage location, and the process in which the material is used. All chemical materials will be managed in accordance with federal, state, and local regulations.
PAINT
All paints must meet Green Seal Certification and be low VOC. See the table below for additional guidance. Paint containing lead will not be used during any painting process. An MSDS will be submitted for all paint products used.
For this kind of product: VOCs (in g/L) shall not exceed:
Flat Topcoat 50
Non-Flat Topcoat 100
Primer or Undercoat 100
Floor Paint 100
Anti-Corrosive Coating 250
Reflective Wall Coating 50
Reflective Roof Coating 100
PLUMBING FIXTURES TRIM
No plumbing fixture trim will be installed unless they conform to the voluntary standard NSF/ANSI Standards 24 and 61 . Products certified under these standards are tested to ensure no leaching from the fixtures exceeds 11 parts per billion of lead.
POTABLE WATER
If construction or modification of a potable water system is included as a part of the task order scope of work, the contractor is responsible to insure that all potable water connections are protected adequately with anti-siphon devices in accordance with the plumbing code. An ASSE approved anti-siphon device shall be attached to the hose bib prior to mixing chemicals, etc. A backflow prevention device must be installed at each location potable water enters a facility.
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
WASTE WATER
Absolutely no chemical products will be allowed to be dumped in any drainage system, storm drain, wash rack, septic system or sanitary sewer. All remaining and residual chemicals will be taken away by the contractor.
EPA PERMIT
EPA application will be needed.
EROSION PREVENTION AND SEDIMENT CONTROL
Soil disturbance during this project, including equipment staging areas, will require erosion control measures. For projects that disturb more than an acre, a Notice of Intent (NOI) must be approved by the applicable State EPA, DOW or DEQ prior to any soil being disturbed as well as a storm water pollution prevention plan (SWPPP) reviewed and accepted by the government. For projects that disturb less than an acre of soil, an erosion control plan is required prior to soil disturbance.
1.9 PERSONNEL REQUIREMENTS AND QUALIFICATIONS
Site Safety and Health Officer (SSHO) The SSHO shall be assigned as SSHO, but may have duties as the CQC System Manager and Superintendent.
CQC
The following CQC Personnel shall be provided for this contract: Design Quality Control Manager (DQCM)/Architectural, Civil/Geotechnical, Structural and Electrical/Mechanical. The CQC Personnel may perform other duties, but must be allowed sufficient time to perform their assigned quality control duties as described in the Quality Control Plan. In addition to the requirements of Section 01 45 04.10 06 CONTRACTOR QUALITY CONTROL, CQC personnel resumes and site visit frequency shall be identified in the Design Quality Control Plan (DQCP) and accepted by the government.
2 DESIGN REQUIREMENTS
2.1 GENERAL
The Contractor shall prepare complete construction documents for all work designed as required by the RFP. The construction documents to be prepared shall include, but are not limited to, construction drawings, specifications, submittals, and design analysis as required in Section 01 21 00.00 06 DESIGN SUBMISSION REQUIREMENTS AFTER TASK ORDER AWARD FOR CIVIL AND MILITARY CONSTRUCTION. Materials and equipment shall be limited to those specified except that where no specific material and equipment is specified or no basis of design is identified, the Contractor shall use materials and equipment accepted within the construction industry and in compliance with Design Criteria.
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
2.2 DESIGN
The Contractor shall prepare “Final/100%” and “Corrected Final/100%, and Certified Final “Ready for Construction” milestone submittals in accordance with the RFP using industry standard materials and efficient practices. The design of the materials selected shall be high quality, durable and easily maintained. The Contractor shall be responsible for the professional quality, code compliance, technical accuracy, and coordination of all designs, drawings, specifications, and other documents or publications upon which the design and construction are based. It shall be the responsibility of the Design/ Build Contractor to verify the accuracy of the documents provided.
2.3 REQUEST FOR PROPOSAL (RFP) INTENT
The intent of this RFP section is to describe the requirements for appearance, function, materials, and types of construction in sufficient detail to enable engineering and design to be completed by the Contractor.
2.4 COORDINATION BETWEEN THE VARIOUS DISCIPLINES
The Contractor shall be responsible for the coordination between all disciplines in order to fulfill the requirements of this contract and to provide for a complete, integrated, and functional design.
2.5 QUALITY OF WORK
CONSTRUCTION DOCUMENTS
Construction documents shall be of sufficient detail to afford a clear understanding of the construction work required. The work shall be organized in a manner that will assure thorough coordination between the various details on the drawings and the specifications.
The Contractor shall crosscheck all work until all conflicts have been reconciled.
WORKMANSHIP
Where not more specifically described in any of the various Sections of this RFP, workmanship shall conform to all of the methods and operations of best standards and accepted practices of the trade or trades involved, and shall include all items of fabrication, construction, or installation regularly furnished or required for completion (including any finish), and for successful operation as intended.
**SAFETY PAYS**
2.5.1.1 All work shall be executed by personnel or workers skilled in their respective lines of work.
2.5.1.2 When completed, all parts shall have been durably and substantially built and shall present a neat, workmanlike appearance.
2.5.1.3 Acceptance of completed work will be based on its conformance to this request for proposal (RFP), all RFP references and the contractor’s accepted Technical Proposal. Nonconforming work will be rejected. The Government is not obligated to accept nonconforming work at a reduced price. The contractor shall start replacement or correction of rejected work within 10 calendar days after receipt of the rejection notice.
2.6 RFP DESIGN AND TECHNICAL CRITERIA
PARAMETERS
All designs and construction document drawings and specifications shall be prepared to comply with the RFP. The RFP documents set forth the parameters for the development of a full and complete design.
COMPLETE DESIGN
RFP documents are provided as a performance standard. The Contractor is required to independently prepare and submit for approval a complete design. The Contractor’s Design Professionals shall independently confirm and be responsible for the technical accuracy and adequacy of all aspects of the design.
FULL AND COMPLETE
All remaining design work necessary for a “full and complete” design shall be performed by the Contractor based on the design criteria as required by the RFP. No deviations from the criteria will be allowed unless prior approval is obtained from the Contracting Officer. All questions or problems encountered by the Contractor in following criteria shall be promptly submitted with recommendations to the Contracting Officer for approval.
TASK ORDER SCOPE OF WORK
Task Order Scope of Work defines the design and performance criteria. The applicable building codes and standards shall be used as the minimum criteria to develop the construction documents for areas of work not specifically defined.
DESIGN SUBMISSION REQUIREMENTS
SECTION 01 21 00.00 06 DESIGN SUBMISSION REQUIREMENTS AFTER TASK ORDER
AWARD FOR CIVIL AND MILITARY CONSTRUCTION defines the format and submittal requirements in which the design and the construction documents shall be prepared by the Contractor.
SECTION 01 20 00
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
2.7 TECHNICAL SPECIFICATION
SPECIFICATIONS
The Contractor's Designers of Record shall develop all necessary construction document technical specifications for all areas of the work, from the latest 48 division UFGS Guide specifications. The technical specifications shall be developed from the 48 division Unified Facilities Guide Specifications (UFGS). The Louisville District (LRL) versions of the UFGS shall be used in all cases where applicable. All other specifications shall be the UFGS guide specifications unless otherwise indicated or not available.
GUIDE SPECIFICATIONS
The guide specifications shall be considered the minimum for quality and requirements unless otherwise indicated in this Task Order. Testing requirements in the guide specifications shall remain as part of the project, unless otherwise indicated in this Task Order.
SUBMITTALS INDICATED AS “G”
Submittals indicated as “G” for government approval in the guides specs, shall be submitted to the Contracting Officer for approval prior to purchase or installation. The specifications shall be edited to include installation specific requirements. If a specification section is not available in UFGS, the Designer of Record shall develop one using a SpecsIntact template.
See the base contract, Volume 1, MATOC Section 01 21 00.00 06 for further technical specification preparation requirements.
2.8 APPLICABLE BUILDING CODES AND STANDARDS
Unless a specific document version or date is indicated, use criteria from the most current references including any applicable addenda, unless otherwise stated in the contract or task order, as the date of the Contractor’s latest accepted proposal or date of issue of the contract or task order solicitation, whichever is later. In the event of conflict between References and/or Applicable Military Criteria, apply the most stringent requirement, unless otherwise specifically noted in the contract or task order.
This list is not intended to be a complete list. All work shall be designed and constructed to meet all state and federal codes, standards and laws. Refer to the technical specifications for other standards and references not listed below.
Uniform Facilities Criteria (UFC) Louisville District Military Design Guide (LDMDG) https://www.lrl.usace.army.mil/Missions/Engineering/Design-Guide/ Installation Design Guides/Technical Design Guides US Army Corps of Engineers Safety and Health Requirements Manual EM 385-1-1 IBC - International Building Code, 2018 IMC - International Mechanical Code, current edition IPC - International Plumbing Code, current edition
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
NEC - National Electrical Code, current edition NFPA - National Fire Protection Association Codes and Standards, current edition ANSI - American National Standards Institute Standards IES - Illuminating Engineering Society Lighting Handbook NEMA - National Electrical Manufacturer's Association NESC - National Electrical Safety Code UL - Underwriters Laboratories ASHRAE - American Society of Heating, Refrigeration and Air Conditioning Engineers OSHA, Occupational Safety and Health Act Requirements.
ABA Accessibility Standard for Department of Defense Facilities (October 2008) UFC 3-600-01 Design: Fire Protection Engineering for Facilities 8 August 2016 Change 3, 10 May 2019 Energy and Policy Act of 2005 (EPACT 2005) Federal Property Management Regulations 41 C.F.R. Chapter 101 EM 385-1-1 Safety and Health Requirements Manual, 2014
2.9 UNITS OF MEASUREMENT
The design shall be developed using the English system of units.
2.10 REQUIRED DESIGN PROFESSIONALS
The contractor shall provide the following design professionals for the design of this project with the experience indicated below:
1. Mechanical Engineer (Designer of Record) with at least 5 years of experience in HVAC design, plumbing design and prior experience on government projects.
2. Civil Engineer (Designer of Record) with at least 5 years of experience in site design, waterline design, utility design, storm water design, sanitary sewer design, and prior experience on government projects.
3. Structural Engineer (Designer of Record) with at least 5 years of experience in structural design and prior experience on government projects.
4. Architect (Designer of Record) with at least 5 years of experience in building design, building renovation design, and prior experience on government projects.
5. Electrical Engineer (Designer of Record) with at least 5 years of experience in electrical design and prior experience on government projects.
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
REGISTERED PROFESSIONALS
All designers of record shall be registered professionals (professional engineer, registered architect or certified by NCIDQ) in a state within the United States of America. A post-award construction submittal with resumes detailing the experience and credentials of the designers shall be included in the DQCP.
DESIGN FIRM
The contractor shall utilize the Design Firm included in the Contractor’s accepted proposal for the base contract. If the contractor chooses to use a design firm that is not included in the contractor’s accepted proposal for the base MATOC, the contractor shall submit a substitution request to the Contracting Officer listed on the Federal Business Opportunities Website for this task order 10 days prior to the bid due.
2.11 DESIGN SUBMITTAL DISTRIBUTION MATRIX
Submittal Reviewers & Mailing Addressee Copies Required
U.S. Army Corps of Engineers 1 CD or digital transfer ATTN: Laura Grant, ED-D-A 600 Dr. Martin Luther King Jr. Place Suite 968 Louisville, KY 40202-2239 Laura.J.Grant@usace.army.mil
U.S. Army Corps of Engineers 1 CD or digital transfer ATTN: Todd Crutchfield, OP-TM 600 Dr. Martin Luther King Jr. Place Louisville, KY 40202-2239 Todd.T.Crutchfield@usace.army.mil
U.S. Army Corps of Engineers 1 CD or digital transfer ATTN: David Wethington, OP-TM 600 Dr. Martin Luther King Jr. Place Louisville, KY 40202-2239 David.A.Wethington@usace.army.mil
U.S. Army Corps of Engineers 1 CD or digital transfer Nolin Project Office 1 hard copy ATTN: Deryck Rodgers 2150 Nolin Dam Road P.O. Box 339 Bee Springs, KY 42207-0339 Deryck.V.Rodgers@usace.army.mil
U.S. Army Corps of Engineers 1 CD or digital transfer Green River Area Office 1 hard copy
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
ATTN: Chris Boggs 2150 Nolin Dam Road P.O. Box 339 Bee Springs, KY 42207-0339 Chris.Boggs@usace.army.mil
U.S. Army Corps of Engineers 1 CD or digital transfer Fort Knox 125 6th Ave, STE 116 Bldg 1110 - B wing Fort Knox, KY 40121 ATTN: Scott Hearne Scott.Hearne@usace.army.mil
Submittals shall include both electronic and hard copies. All hard copies shall include half-size drawings, unless otherwise indicated to include full-size drawings.
3 GENERAL CONSTRUCTION REQUIREMENTS
3.1 SUMMARY
The requirements include:
Construction considerations and use of the premises.
Protection of personnel and Government property.
Construction facilities and job site standards.
The requirements of this section apply to the entire project including all amendments or modifications that may be issued to modify the contract documents.
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
3.2 GENERAL INFORMATION
COORDINATION PRIOR TO CONSTRUCTION
3.2.1.1 Contractor shall coordinate with the Contracting Officer for execution of the construction work as defined in the requirements of this RFP, as the existing building is currently occupied. Entrance into and interface with the surrounding facilities shall be coordinated in advance with the Contracting Officer.
3.2.1.2 Coordinate all construction activities with the Contracting Officer’s Representative and building occupants.
3.2.1.3 Coordinate all Construction and Use of Premises Activities with the Contracting Officer’s Representative.
3.2.1.4 Coordinate with Contracting Officer’s Representative the scheduling and routing of work, personnel access and material deliveries for the work.
3.2.1.5 The superintendent in charge of this work shall personally contact the Contracting Officer’s Representative a minimum of 72 hours before starting work on the contract, before restarting work after a lengthy delay, and prior to moving workers and equipment from one site of work to another.
3.2.1.6 Prior to the start of any construction operations whatsoever, a schedule of work or operations in proper sequence shall be submitted by the contractor for approval by the Contracting Officer’s Representative so as to cause a minimum amount of disruption to the normal flow of traffic on streets, pedestrian travel, installation security, and facility operations.
3.2.1.7 The Contractor shall coordinate with the Contracting Officer’s Representative regarding worker and vehicle identification, badging, and permits. See paragraph entitled IDENTIFICATION OF EMPLOYEES in Section 00 80 00.00 06 SPECIAL CLAUSES in MATOC, Volume I.
CONSTRUCTION CHANGES
High-ranking officers, USACE employees, or DOD employees may request construction changes; however, only the Contracting Officer can make changes to the contract, therefore, refer such requests to the Contracting Officer.
BULLETIN BOARD
Bulletin Board. See MATOC, Volume I, 01 50 00, Paragraph 2.1.1, . 00 80 00.00 06, para.
1.34e
PROJECT AND SAFETY SIGNS
Project and Safety Signs. See MATOC, Volume I, 01 50 00, Paragraph 2.1.2.
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
3.3 DOCUMENTATION
CONSTRUCTION PLAN
Prior to the start of any onsite construction activities, the Contractor shall submit a detailed construction plan. The plan shall include a detailed schedule of the major construction activities. Prior to the start of work, submit a site plan showing the locations and dimensions of temporary facilities (including layouts and details, equipment and material storage area (onsite and offsite), and access and haul routes, avenues of ingress/egress to the fenced area and details of the fence installation. Identify any areas which may have to be graveled to prevent the tracking of mud. Indicate if the use of a supplemental or other staging area is desired. Show locations of safety and construction fences, site trailers, construction entrances, trash dumpsters, temporary sanitary facilities, and worker parking areas.
Once the schedule is approved, do not deviate from the sequence, without prior written approval.
WASTE DISPOSAL
Prior to the start of any onsite construction activities, the Contractor shall submit a written plan for disposing of waste materials resulting from work under this contract as described in this specification section and MATOC, Volume I, Section 01 74 19 CONSTRUCTION AND
DEMOLITION WASTE MANAGEMENT.
3.4 USE OF THE PREMISES
The Contractor’s use of the site, utility availability, and temporary facilities are described below.
WORK SCHEDULE
The Contractor shall schedule the work between the hours of 7:00 a.m. and 4:30 p.m.
Central Daylight Time, Monday through Friday except Federal Holidays.
1. Permission to perform any work outside of these hours must be in writing and submitted five (5) calendar days in advance for approval by the Contracting Officer.
2. The Government may or may not grant such permission at its discretion.
OCCUPIED AREAS
The Green River Building will not be occupied during construction.
USE OF FACILITIES
The Contractor will not be permitted to use existing toilet and wash facilities. The contractor shall provide his own toilet and wash facilities if desired.
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
UTILITIES
The Government will not furnish any utilities to the Contractor for their use even if available at the work site. The Contractor is responsible for procuring and/or providing these items themselves or obtaining them from a private entity (utility company). The Contractor shall furnish at no additional cost all utilities, including HVAC, lighting and electrical power, during furniture and IT/Telecom equipment installation and until the facility is turned over to the Government.
UTILITY OUTAGES
3.4.1.1 Once an outage is approved, and prior to beginning of work on the utility system requiring shutdown, the contractor shall attend a pre-outage meeting with the Contracting officer Public Utilities representative.
3.4.1.2 Any utility outages (gas, steam, electricity, and water) requested by the Contractor shall be submitted in writing no less than fourteen (14) calendar days prior to proposed outage.
3.4.1.3 The Government reserves the right to reschedule the Contractor’s proposed outage if deemed necessary.
3.4.1.4 In the event utility outages cannot be performed on any facility due to critical operation impact, the utility outages and any related work shall be performed on non-duty hours.
3.4.1.5 Contractor Personal Vehicle Parking: The contractor may use a limited number of parking spaces in the existing lots for the contractor’s employee parking of personal vehicles. The Contractor shall coordinate with the Government on the exact number of available spaces, and shall make provisions to transport employees to the site should inadequate parking spaces be available on site.
Parking in these areas is available on a first-come first served basis.
3.5 PROJECT SITE
Contractor shall maintain a neat and orderly workplace with clear paths of emergency egress within the construction area.
PROTECTION AND MAINTENANCE OF TRAFFIC
Prior to commencement of demolition and construction, the Contractor shall coordinate daily access and egress from the area of construction with the Contracting Officer, both vehicle and pedestrian. The Contractor shall confine construction personnel and equipment travel and operations to the area of work. The Contractor shall request approval for the limits of construction from the Government and show on the construction plans. The contractor shall coordinate access ways for personnel and equipment with the contracting officer.
The Contractor shall maintain and protect traffic on all affected roads during the construction period except as otherwise specifically directed by the Contracting Officer. The Contractor shall prepare a traffic plan (vehicle and pedestrian) for the project area and submit it to the Contracting Officer for review and approval.
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
The Contractor shall maintain and protect pedestrian traffic inside and outside of project area. The Contractor shall not cause traffic interference on any interior corridors without approval from the Contracting Officer.
The traveling public shall be protected from damage to person and property.
DUST CONTROL
For interior work, the Contractor shall construct a dust partition wall around the interior perimeter of the space as necessary to prevent dust from travelling into the corridor space.
For exterior work the contractor shall control all fugitive dust.
STORAGE OF MATERIALS
The Contractor shall be responsible for the storage and safekeeping of all material to be incorporated into the work. The Contractor shall be responsible for all aspects of safety and security within the storage area.
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
3.5.1.1 Outside space is limited on the property for the storage of materials, the Contractor shall limit storage of materials to areas within project area. The Contractor shall indicate if the use of a supplemental or other staging area is desired.
3.5.1.2 Upon the Contractor’s request, the Contracting Officer will consider another or supplemental area for the Contractor’s use and storage of equipment, trailers, and materials; however, this will be solely at the discretion of the Nolin Lake Project manager and may not be approved. This area may not be in close proximity of the construction site but will be within the property boundaries.
3.5.1.3 Fencing of materials or equipment will be required at storage locations; plastic strip inserts, colored green, must be used on the fence to screen the storage compound; fence posts must be embedded into grade as recommended by the manufacturer. Alternately 4ft tall safety fencing is also acceptable, as long as it keeps people out, however security of the site and materials is the responsibility of the contractor. The Contractor shall be responsible for cleanliness and orderliness of the area used and shall restore the area to its original condition upon completion of the project.
3.5.1.4 The Government will not provide utilities to the storage area.
3.5.1.5 Provide adequate storage facilitates for protection of materials and equipment.
Materials and equipment shall be stored so as to ensure preservation of their quality of fitness for Work. Perishable items and items adversely affected by weather, rain, wind, dust, heat, or cold shall be stored within the designated area of construction, temporary waterproof sheds, or mobile facilities with raised floors, and heated if necessary. Other materials and equipment shall be stored on wooden platforms and not on the ground.
3.5.1.6 Storage facilities shall be clean, in good condition, undamaged and free of rust or surface deterioration. Rental trailers shall be of a neutral color. Unsightly material storage or office trailers will not be permitted.
3.5.1.7 The Contractor shall be responsible to maintain the condition of storage facilities, as defined above, and the entire construction site in a neat, orderly, professional and uncluttered manner at all times throughout the length of the contract.
SECURITY
3.5.1.8 Security requirements shall be observed at all times. The Contractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, appearance, and integrity. Personnel working on or involved with security alarms, secure areas or security infrastructure shall be US Citizens.
3.5.1.9 Construction operations shall be strictly confined to the designated area of Work.
3.5.1.10 The Contractor shall be responsible for the security of his own equipment.
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
PROTECTION OF PERSONNEL AND GOVERNMENT PROPERTY
3.5.1.11 Contractor shall comply with all applicable Federal, State, and Local safety codes, regulations, and requirements.
3.5.1.12 The Safety Officer or his representative will attend preconstruction conferences to brief contractors on pertinent safety regulations and to provide guidance for safe operations during contract performance. Local safety guidance will be furnished to the Contractor for briefing his personnel.
3.5.1.13 The Contractor shall provide, no later than ten days after receiving Notice of Award, four (4) copies of their written safety program to the Contracting Officer for review. No construction shall commence until the Contractor’s Safety Program has been reviewed and accepted by the Contracting Officer.
3.5.1.14 It is the Contractor’s responsibility to maintain a secure construction site to prevent access to the work area by unauthorized personnel.
3.5.1.15 Safety posters, “hard hat area” posters, “authorized personnel only” posters, and any other notifications required by law shall be posted and maintained in sufficient quantity to be conspicuous on the job site.
3.5.1.16 The contractor shall protect all government property in adjacent areas from damages during the construction project; especially furniture and finishes. In the event of damages of any nature caused by this work due to improper protection, precaution, or safety measures, such damages shall be repaired by the Contractor at no cost to the Government. In the event the Contractor does not satisfactorily repair or replace such damage caused by the work of this contract, the Government will make the necessary corrections and the Contractor shall reimburse the Government for inconveniences, labor, and materials, involved.
3.5.1.17 The Contractor shall erect and maintain temporary barricades to limit public access to hazardous areas.
1. Such barricades shall be required whenever safe public access is prevented by construction activities or as otherwise necessary to ensure safety of both pedestrian and vehicular traffic.
2. Barricades shall be securely placed, clearly visible with adequate illumination to provide sufficient visual warning of the hazard during both day and night.
**SAFETY PAYS**
SECTION 01 20 00
Amendment 0002
SITE FIRE PROTECTION
3.5.1.18 Site fire protection shall conform to NFPA 241 and EM 385-1-1.
3.5.1.19 Fire extinguisher equipment shall be provided in storage areas according to…