W22W9K30964031
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR23Q0069 for Caesar Creek Hydraulics is hereby amended as follow s:
a. The due dates for quotes has been changed to 10:00AM ET on 23 June 2023.
b. Questions received and answ ers are attached to this amendment.
c. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR23Q0069
X 9B. DATED (SEE ITEM 11)
11-May-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Jun-2023
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
QUESTIONS AND ANSWERS ADDRESSING CONCERNS AFTER SITE VISIT
Are you wanting the watertight seals to be replaced with new when lines are replaced?
Yes, the watertight seals should be replaced when new lines are replaced.
Do you want the 3/8" and 1/2" tubing under the valve stand replaced with new as well?
Yes, the 3/8” and ½” tubing under the valve stand shall be replaced.
Is the contractor responsible for dewatering the wet wells?
No, the site will dewater the wet wells.
Will the wet wells stay empty during the working process or will they need to be dewatered daily?
The wet wells will stay empty during the working process.
Is the tubing exposed in the wet wells?
Yes, there is tubing exposed in the wet wells.
Finally, with the site visit being added later, we respectfully ask, can the bid date be extended to reflect this? In the current supplier market, getting quotes for material alone is taking 3-5 days on average and while awaiting responses to RFIs, it is hard to fully plan with unknowns out there.
Q1: Could you please clarify exactly what tubing is to be replaced? Under SCOPE OF WORK the solicitation says “The contractor shall replace all control valves, check valves, flow control valves, and tube lines within the existing hydraulic system on elevation 854 of the control tower.” And farther down on the same page it says, 5. “Replace 24 tube lines with new tube lines rated for pressures equal to or greater than existing lines.” These statements imply that all of the tubing on level 854 is to be replaced all the way up to the level above. My question is, are we quoting to replace all of the tubing on the walls in the room on level 854 as well as the tubing going out to the inlet and bypass cylinders after the valve stand? Or are we only quoting replacement of the tubing going out to the cylinders AFTER the valve stand?
A1: The tubing replacement is only for the tubing going out to the cylinders after the valve stand.
Q2: Is the tubing poured in the concrete anywhere along its path?
A2: The tubing is not poured in concrete but is in a watertight sleeve assembly. See attached drawing LM12.2/125 for watertight sleeve assembly detail.
Q3: Is there access to the tubing running along the bottom side of the platform that the inlet and bypass cylinders are mounted on (underside is ceiling of the wet well)? Can this tubing be accessed from the wet well? If there is access to the tubing from the wet well can the wet well be dewatered to allow access to the tubing for replacement?
A3: Yes, it is running along the bottom side of the platform. Yes, it can be accessed. Yes, we can dewater to allow access for the replacement.
Q4: Would the Government allow core drilling of the right and left walls of the tower on level 854 to allow the tubing to be routed directly to the cylinders from the valve stand without running tubing through the gate chamber or wet well? What would be the requirements for core drilling?
A4: The tubing should be run through the existing sleeve assembly. The Government would have to assess through the submittal process any core drilling through the tower.
Q5: If the Government allows the tubing to be run directly to the cylinders, can the old tubing be abandoned in place or will it need to be removed? Please clarify what would need to be removed and what can be abandoned in place.
A5: A4 takes this question out since the requirement to run in the same areas and holes in the concrete, all will be removed since it is in the way.
Q6: Drawing sheet LM52-12.2/153 looks like it did not scan correctly. Can we get another copy of this drawing?
A6: Please see attached drawing LM52-12.2/153.
W912QR23Q0069
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)