W912QR21R0035_Plans-0000.pdf
PDF 5 MB Posted
- Attached to
- DTA Recirculating Air in Test Cells
- Solicitation number
- W912QR21R0035
About this file
This solicitation requests proposals for a design-build project at the Detroit Arsenal in Warren, Michigan. The project aims to realize energy savings by modifying ventilation systems in eight engine test cells and capturing regenerative power. The scope involves installing actuators on test cell exhaust dampers to reduce air flow by 50% and installing a steam meter. An energy storage solution will capture regenerative power. The contract is for a firm-fixed-price with a duration of 439 calendar days. The NAICS code is 237130 and there is no set-aside. Proposals will be evaluated on best value, and pro forma documentation is required. Discussions are not planned but are reserved if in the government's interest. The solicitation is available at SAM.gov and amendments will be posted there. Offerors must register in SAM. The point of contact is the listed contracting specialist.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR21R0035-0002.pdf | ||
| W912QR21R0035_Specs-0001.pdf | ||
| Pre-Proposal Site Visit Sign-In Sheet.pdf | ||
| Directions to Site Visit W912QR21R0035.pdf | ||
| W912QR21R0035_Specs-0000.pdf | ||
| W912QR21R0035_STA17_BaseAccessRequestInfo.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 13
G-001
B U
I L
D I N
G
C O
V E
R
P
A G
E
DESIGN BUILD RFP FOR BUILDING 212,
DTA RECIRCULATING AIR IN TEST CELLS
AND ENERGY STORAGE SYSTEM
Detroit Arsenal, Warren MI
81968, P2#: 457330
AREA OF WORK
SHEET INDEX
SHEET NO. SHEET TITLE
G - 001 BUILDING 212 COVER PAGE
M - 101 BUILDING 212 BASEMENT FLOOR
M - 601 TEST CELL GENERAL ARRANGEMENT
E - 001 ELECTRICAL LEGEND
E - 010 SITE PLAN OPTIONS
E - 101 BUILDING 212 BASEMENT FLOOR
E - 102 BUILDING 212 FIRST FLOOR
E - 103 BUILDING 212 SECOND FLOOR
E - 401 BUILDING 212 ELECTRICAL ROOM
E - 402 CONTROL ROOM PLAN VIEW
E - 403 MOTOR ROOM PLAN VIEW
E - 701 BUILDING 212 ONE-LINE
E - 702 BUILDING 212 ONE-LINE
PROJECT LOCATION
ANTICIPATED ENTRANCE AND HAUL ROUTE
S O
L I C
I T
A T
I O
N
N
O
F I L E
N
A M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
C T
O
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
L O
U I S
V I L
D
I S
T R
I C
T
K R
A O
A N
S I
D
M A
R C
H
G
D
W G
V M
E L
L I N
G
M G
R A
F
M S
U T
H E
R L
A N
D
D T
A
R
E C
I R
C U
L A
T I N
G
A
R
S
T
C
E L
L S
B U
I L
D I N
G
D E
T R
O
S
E N
A L
D
E T
R O
I T
M
I
W
Q R
R
P H
O N
E
A n n
A r b o r
M i c h i g a n
A v i s
D r
S u i t e w w w t e t r a t e c h c o m
SECURITY DISCLAIMER
A. Security Requirement: CONDITIONS FOR RELEASE of Plans to Contractor;
1. Released U.S. Government (USG) information is to be used for the purpose of this contract only, and will not be released to third parties without approval from US Army Garrison - Michigan.
Upon project completion, this information is to be destroyed or surrendered to the USG POC listed in Item 6 below.
2. No reproduction of released USG information is authorized for other than the contract's legitimate purpose.
3. Access to this information is to be controlled as UNCLASSIFIED / FOR OFFICIAL USE ONLY;
and shall not be available for distribution under the Freedom Of Information Act (FOIA).
4. Information that is provided to the Contractor from the USG will be returned to the USG when no longer needed, or at the end of the contract. Under special provisions the USG may authorize the contractor to destroy the information by shredding (paper) or degaussing (magnetic media) to make unreadable and unrecoverable. Confirmation of destruction will be provided to the USG.
5. All information and drawing provided shall not be posted on any internet web site.
6. The responsible USG POC for coordination of release and return of USG engineering drawings / information at the Detroit Arsenal, MI, is Michele Pointe @ (586) 282-0119.
B. Distribution authorized to US government agencies and contractors associated with TACOM Life Cycle
Management Command (LCMC) or the United States Army Garrison - Detroit Arsenal in accordance with Army Regulation AR 530-1. For Official Use Only (FOUO) caveat is assigned so as not to place
US personnel at risk, or compromise security procedures, or DOD information (Critical Infrastructure or
Technology).
This document is not releasable to the public or media. This document must be returned to the US
Government Contracting Officer or must be destroyed by shredding or tearing to make unreadable, when no longer needed. This document will not be sent over the INTERNET unencrypted, or posted to any public web sites. Other requests for this document shall be referred to Public Works, USAG-DTA, ATTN: IMMI-PWF, 6501 East 11 Mile Road, Warren, MI 48397-5000), Commercial Phone 586-282-6308.
PLAN
NORTH
PLAN
NORTH
25 MARCH 2021
W912QR21R0035
For Reference Only
W
2Q R
R
_P la ns -0
D N
UP
LP-1
LP-1
ELECTRICAL
SUBSTATION
ROOM#12
U
C H
L O
R I N
A T
E R
R O
M
OIL
SEPARATER
ROOM #16
j d e g ha h c
SCALE:
4' 8' 16'
SCALE: 1/8" = 1'-0"
SHEET NOTES:#
M-101
2 13
B U
I L
D I N
G
B A
S E
M E
O
O R
1. REFER TO SHEET E-101 FOR THE STEAM FLOW METERS POWER
AND SIGNAL CONNECTIONS.
GENERAL NOTES
1. LAYOUT BASED ON "REPAIR ELECTRICAL SUBSTATION BLDG. 212
BASEMENT AS BUILT DRAWINGS" DB CONTRACTOR SHALL
CONFIRM ACTUAL CONDITIONS.
PICTURE 1 (STEAM PIPE LOCATION)
SCALE: NTS
EXISTING ASBESTOS CONTAINING
INSULATION TO BE REMOVED BY THE
CONTRACTOR TO INSTALL NEW STEAM
METER
BUILDING 212 PARTIAL BASEMENT FLOOR PLAN
EXISTING STEAM PIPE
PROPOSED LOCATION FOR NEW STEAM
FLOW METER FOR 45 LB AND 18 LB
STEAM LINES TO TEST CELLS AND
CONTROL ROOMS
SCALE: 1/8" = 1'-0"
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
L O
U I S
V I L
S
T R
I C
T
K R
A O
A N
S I
D
M A
R C
H
M
D
W G
V M
E L
L I N
G
M G
R A
F
M S
U T
H E
R L
A N
D
D T
A
R
E C
I R
C U
L A
T I N
G
A
S
T
C
E L
L S
B U
I L
D I N
G
D E
T R
O
S
E N
A L
D
E T
R O
I T
M
I
W
Q R
R
P H
O N
E
A n n
A r b o r
M i c h i g
A v i s
D r
S u i w w w t e t r a t e c h c o m
SECURITY DISCLAIMER
A. Security Requirement: CONDITIONS FOR RELEASE of Plans to Contractor;
1. Released U.S. Government (USG) information is to be used for the purpose of this contract only, and will not be released to third parties without approval from US Army Garrison - Michigan.
Upon project completion, this information is to be destroyed or surrendered to the USG POC listed in Item 6 below.
2. No reproduction of released USG information is authorized for other than the contract's legitimate purpose.
3. Access to this information is to be controlled as UNCLASSIFIED / FOR OFFICIAL USE ONLY;
and shall not be available for distribution under the Freedom Of Information Act (FOIA).
4. Information that is provided to the Contractor from the USG will be returned to the USG when no longer needed, or at the end of the contract. Under special provisions the USG may authorize the contractor to destroy the information by shredding (paper) or degaussing (magnetic media) to make unreadable and unrecoverable. Confirmation of destruction will be provided to the USG.
5. All information and drawing provided shall not be posted on any internet web site.
6. The responsible USG POC for coordination of release and return of USG engineering drawings / information at the Detroit Arsenal, MI, is Michele Pointe @ (586) 282-0119.
B. Distribution authorized to US government agencies and contractors associated with TACOM Life Cycle
Management Command (LCMC) or the United States Army Garrison - Detroit Arsenal in accordance with Army Regulation AR 530-1. For Official Use Only (FOUO) caveat is assigned so as not to place
US personnel at risk, or compromise security procedures, or DOD information (Critical Infrastructure or
Technology).
This document is not releasable to the public or media. This document must be returned to the US
Government Contracting Officer or must be destroyed by shredding or tearing to make unreadable, when no longer needed. This document will not be sent over the INTERNET unencrypted, or posted to any public web sites. Other requests for this document shall be referred to Public Works, USAG-DTA, ATTN: IMMI-PWF, 6501 East 11 Mile Road, Warren, MI 48397-5000), Commercial Phone 586-282-6308.
C4
PLAN
NORTH
PLAN
NORTH
W
2Q R
R
_P la ns -0
TEST CELL (TYP.)
LOUVERS LOUVERS
CENTRIFUGAL
FAN
M
PNEUMATICALLY
ACTUATED DAMPER TO
BE REMOVED AND
REPLACED
M
DYNO
ENGINE
CORRIDOR
OUTSIDE
VENTILATION FAN MOTOR
MOTOR-
ACTUATED DAMPERS
STEAM
COILS
M
M
E N
G I N
E
E
X H
A U
S T
TO E/G EXHAUST FAN
50% - 100%
FAN AIR FLOW
50% - 100%
FAN AIR FLOW
EXISTING
DAMPER
S
EXISTING COPPER
INSTRUMENT PAIR
EXISTING FIRE
PROTECTION
INTERLOCK
NEW
REGULATOR
WITH GAUGE
NEW ELECTRO
PNEUMATIC
TRANSDUCER
NEW DIGITAL
CONTROLLER AND
POWER SUPPLY
EXISTING
COPPER
TUBING TO
DAMPER
NEW
REGULATOR
WITH GAUGE
NEW
POSITION
RELAY
NEW
ACTUATOR
NEW
LINKAGE
LOCATED IN THE
CONTROL ROOM
EXISTING
INSTRUMENT AIR
LOCATED IN FAN
ROOM (HIGH
TEMPERATURE AREA)
*ALL COMPONENTS
(DAMPER,
INSTRUMENTATION,
WIRING, CONTROLS)
SHALL BE RATED FOR
MINIMUM OPERATING
TEMPERATURES OF
250°F.
NEW LINEAR
TRANSDUCER
NEW SIGNAL
AMPLIFIER
*CONTRACTOR SHALL TEST
EXISTING FAN AND DEVELOP A FAN
CURVE TO DETERMINE THE SURGE
REGION OF THE FAN. THE DAMPER
CONTROLS SHALL HAVE A
MINIMUM SET POINT TO PREVENT
FAN OPERATION IN THE REGION.
M-601
3 13
T E
L
L
G
E N
E R
A L
A R
R A
N G
E M
E N
T
TEST CELL ROOM SIDE VIEW
A2
SCALE: NTS
INSTRUMENT AIR
ELECTRIC CONTROL
TIE IN POINT
LEGEND
ACTUATOR CONTROL DIAGRAM
B4
SCALE: NTS
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
L O
U I S
V I L
S
T R
I C
T
K R
A O
A N
S I
D
M A
R C
H
M
D
W G
V M
E L
L I N
G
M G
R A
F
M S
U T
H E
R L
A N
D
D T
A
R
E C
I R
C U
L A
T I N
G
A
S
T
C
E L
L S
B U
I L
D I N
G
D E
T R
O
S
E N
A L
D
E T
R O
I T
M
I
W
Q R
R
P H
O N
E
A n n
A r b o r
M i c h i g
A v i s
D r
S u i w w w t e t r a t e c h c o m
SECURITY DISCLAIMER
A. Security Requirement: CONDITIONS FOR RELEASE of Plans to Contractor;
1. Released U.S. Government (USG) information is to be used for the purpose of this contract only, and will not be released to third parties without approval from US Army Garrison - Michigan.
Upon project completion, this information is to be destroyed or surrendered to the USG POC listed in Item 6 below.
2. No reproduction of released USG information is authorized for other than the contract's legitimate purpose.
3. Access to this information is to be controlled as UNCLASSIFIED / FOR OFFICIAL USE ONLY;
and shall not be available for distribution under the Freedom Of Information Act (FOIA).
4. Information that is provided to the Contractor from the USG will be returned to the USG when no longer needed, or at the end of the contract. Under special provisions the USG may authorize the contractor to destroy the information by shredding (paper) or degaussing (magnetic media) to make unreadable and unrecoverable. Confirmation of destruction will be provided to the USG.
5. All information and drawing provided shall not be posted on any internet web site.
6. The responsible USG POC for coordination of release and return of USG engineering drawings / information at the Detroit Arsenal, MI, is Michele Pointe @ (586) 282-0119.
B. Distribution authorized to US government agencies and contractors associated with TACOM Life Cycle
Management Command (LCMC) or the United States Army Garrison - Detroit Arsenal in accordance with Army Regulation AR 530-1. For Official Use Only (FOUO) caveat is assigned so as not to place
US personnel at risk, or compromise security procedures, or DOD information (Critical Infrastructure or
Technology).
This document is not releasable to the public or media. This document must be returned to the US
Government Contracting Officer or must be destroyed by shredding or tearing to make unreadable, when no longer needed. This document will not be sent over the INTERNET unencrypted, or posted to any public web sites. Other requests for this document shall be referred to Public Works, USAG-DTA, ATTN: IMMI-PWF, 6501 East 11 Mile Road, Warren, MI 48397-5000), Commercial Phone 586-282-6308.
W
2Q R
R
_P la ns -0
BACKGROUND PLAN AND ONE LINE SYMBOLS
LOW VOLTAGE DISCONNECT SWITCH
DESCRIPTIONSYMBOL
DESCRIPTIONSYMBOL
EMERGENCY BATTERY PACK/EXIT
HIGH INTENSITY DISCHARGE FIXTURE
INCANDESCENT FIXTURE
FLUORESCENT FIXTURE
LC
F C
LIMIT - PRESSURE - VACUUM SWITCH
OVERLOAD SWITCH OR DEVICE
TERMINAL BOX
SOLENOID VALVE
PHOTOCELL LINE VOLTAGE
ITEM NO. INTERCOM EQUIPMENT
INTERCOMMUNICATION DESK SET
INTERCOM. SPEAKER (CEILING LAY-IN)
TELEPHONE OUTLET OR JUNCTION BOX
LOW VOLTAGE FUSE (BELOW 600V)
THREE PHASE LOAD WITH IDENTIFICATION
HIGH VOLTAGE FUSE (ABOVE 600 V)
TAG NO. (BALLOON) FOR DEVICE INDICATED
CAPACITOR, 3 PHASE, SIZE AS INDICATED
CONTROL PANEL
TEMPERATURE CONTROL PANEL
UNIT HEATER, 1/8 HORSEPOWER
LIGHTNING ARRESTOR
NEMA 4 WATERTIGHT
NEMA 4X WATERTIGHT AND CORROSION PROOF
NEMA 7
NEMA 9
JUNCTION BOX
HEATER
CABLE REEL
TRANSFORMER
CONDUIT WITH CONDUIT SEAL FITTING
CONDUIT EXPOSED
CONDUIT CONCEALED
DIRECT BURIED CONDUIT
INTERCOM VOLUME CONTROL
INTERCOM SPEAKER - SURFACE MOUNTED
EXIT LIGHT
KEYLOCK
DIRECT BURIED CABLE
OVERHEAD LINE
UNDERGROUND DUCT BANK
SMOKE DETECTOR
DESCRIPTIONSYMBOL
DESCRIPTIONSYMBOL
LATCHING CABLE SWITCH
X2X1
PRESS. ACTUATED SWITCH
FLOAT ACTUATED SWITCH
FLOW ACTUATED SWITCH
TEMP. ACTUATED SWITCH
TIME-DELAY FUSE
CONTROL RELAY COIL
TWO COIL LATCHING RELAY
TIMING RELAY COIL
120 VAC TRANSFORMER
FIELD LOCATED STOP BUTTON
SOLENOID OR CLUTCH
ELAPSED TIME INDICATOR
(F)
CONTROL CIRCUIT & PILOT DEVICE LEGEND
ALL STARTERS SHALL BE FULL VOLTAGE
NON-REVERSING UNLESS OTHERWISE
INDICATED (FVR) FULL VOLTAGE
REVERSING (RV) REDUCED VOLTAGE
(2S,2W) TWO SPEED, TWO WINDING
CONTROL SWITCH (SEL. OR P.B.)
SEE CIRCUITS FOR SPECIFIC TYPE
SEE CIRCUITS FOR SPECIFIC TYPE
FLOAT SWITCH - FLOW SWITCH
TEMPERATURE - HUMIDISTAT SWITCH
(SUBSCRIPT = NO. OF STAGES)
ELECTRICAL OR MECHANICAL ALTERNATOR
(SEE WIRING)
INTERCOMMUNICATION SYSTEM AMPLIFIER
- WALL STATION - LINE BALANCE
WELDING RECEPTACLE - NEMA L9-50R
600V, 2P, 3W, SIMPLEX
INTERCOM HANDSET - SURFACE MOUNTED
WITH REMOTE SPEAKER AMPLIFIER
INTERCOM HANDSET - FLUSH MOUNTED
WITH REMOTE SPEAKER AMPLIFIER
AS NOTED (LIGHTING PANEL, CONTROL PANEL,
DISTRIBUTION PANEL ETC.) WALL MOUNTED
CONCRETE ENCASED DUCT BANK, WITH
CABLE LOCATIONS AND SPARE DUCTS AS
INDICATED ON DRAWINGS
600V, 3 POLE MOLDED CASE CIRCUIT
BREAKER, FRAME & RATING AS SHOWN
SINGLE PHASE, FRACTIONAL HP MOTOR TO
LOCATION INDICATED (SEE GEN. NOTE 4)
FOR POWER (SEE GEN. NOTE 4)
3/4"C(2/C#18 SHLD.)CONDUIT AND WIRE
RUN FROM DEVICE INDICATED TO
LOCATION INDICATED
MAGNETIC STARTER (BACKGROUND
DRAWINGS ONLY)
COMBINATION MAGNETIC STARTER FUSED
UNLESS NOTED (CIRCUIT BREAKER)
COMBINATION LIGHTING CONTACTOR
WITH HAND-OFF-AUTO SWITCH
MANUAL STARTER (R) = REVERSING
LOW VOLTAGE HOME RUNS
120/208 V 120/240 V (SEE GEN. NOTE 4)
EXPLOSION PROOF - CLASS I, DIVISION I,
GROUP D
EXPLOSION PROOF - CLASS II, DIVISION 1
600 VOLT FEEDER BUS DUCT
(AMPERAGE AS INDICATED)
LIMIT SWITCH-
NORMALLY OPEN
LIMIT SWITCH-
NORMALLY CLOSED
LIMIT SWITCH-NORMALLY
CLOSED-HELD OPEN
LIMIT SWITCH-NORMALLY
OPEN-HELD CLOSED
CONTROL RELAY
CONTACT-NORMALLY OPEN
CONTROL RELAY
CONTACT-NORMALLY CLOSED
TIMED CLOSED CONTACT ON
ENERGIZATION
TIMED OPEN CONTACT ON
ENERGIZATION
TIMED OPEN CONTACT ON
DE-ENERGIZATION
TIMED CLOSED CONTACT ON
DE-ENERGIZATION
TIMING RELAY
INSTANTANEOUS
CONTACTS
LOCAL TERMINALS WITH
EXTERNAL WIRING
ZERO SPEED OR ANTI-
PLUGGING SWITCH
MAINTAINED STOP-
MOMENTARY START
PUSHBUTTON (JOG)
PUSH-TO-TEST INDICATING
LIGHT
SELECTOR SWITCH
OPERATOR WITH
FUNCTION SHOWN
MOMENTARY PUSHBUTTON
OPERATOR-NORMALLY OPEN
MOMENTARY PUSHBUTTON
OPERATOR-NORMALLY CLOSED
PUSHBUTTON OPERATOR
WITH MUSHROOM HEAD
MAINTAINED PUSH-PULL
OPERATOR
MAINTAINED STOP-START
PUSHBUTTON OPERATOR
COMMUNICATION HANDHOLE
ELECTRICAL HANDHOLE
1. THE FOLLOWING COMPONENT IDENTIFICATION SHALL BE USED AS
APPROPRIATE:
1.1. (F) FIELD MOUNTED NOT AT STARTER OR OTHER CONTROL PANELS.
1.2. (S) STARTER PANEL MOUNTED.
1.3. (TCP) AT TEMPERATURE CONTROL PANEL.
1.4. (MCP) AT MAIN CONTROL PANEL.
2. ELECTRICAL MATERIALS AND EQUIPMENT ITEMS SHOWN IN LIGHT LINE WEIGHTS ON THE DRAWINGS ARE
EXISTING ITEMS TO REMAIN. ELECTRICAL MATERIALS AND EQUIPMENT ITEMS SHOWN IN HEAVY LINE
WEIGHTS ARE NEW OR ARE TO BE REMOVED AND REPLACED AS NOTED.
3. FOR ITEMS INDICATED AS 'FIELD LOCATE' CHECK DRAWINGS OF OTHER TRADES (IN PARTICULAR PIPING
AND STRUCTURAL) FOR INTERFERENCES AND FOR LOCATIONS OF MOUNTING FLANGES, CONNECTION
POINTS, ETC.
4. INSTALL A SINGLE CONDUCTOR INSULATED (RHW, THHN OR XHHW) COPPER GROUND WIRE IN EACH
CONDUIT, SIZE PER THE NATIONAL ELECTRICAL CODE. THIS GROUND WIRE SHALL BE CONNECTED AT
EACH END TO THE EQUIPMENT GROUND. CONDUIT SHALL BE 3/4" MIN.
5. WIRE NUMBERS (1,3 & 5) ETC. SHALL BE PREFIXED WITH STARTER TAG NUMBERS. THE WIRE NUMBER
AFTER THE PREFIX, MAY BE THE MANUFACTURERS WIRE NUMBERING SYSTEM. WIRE MARKERS MAY BE
USED AT EACH WIRE TERMINATION POINT.
6. PROVIDE SIGNAGE/PLACARD/TAGS AS INDICATED ON THE DRAWINGS DETAILS.
7. OUTSIDE EQUIPMENT MUST BE RATED FOR -40 TO 150 DEG F.
8. CONDUIT FILL MUST MEET NFPA REQUIREMENTS. (WHERE NFPA IS SILENT CONDUIT FILL MUST NOT
EXCEED 40%)
8.1. INSTRUMENT SIGNAL CONDUIT: SHIELDED SIGNAL WIRES FOR 4-20 MA TYPE INSTRUMENTS OR
THERMOCOUPLE WIRES ASSIGNED TO THE SAME CONTROL PANEL MAY BE RUN IN THE SAME
CONDUIT. NO OTHER WIRES WILL BE PERMITTED IN AN INSTRUMENT SIGNAL/2-WIRE CONDUIT.
8.2. CONTROL CIRCUIT CONDUIT (120VAC). 120VAC CONTROL CIRCUIT WIRES USED FOR DISCRETE PLC
INPUT OR MCC CONTROL ASSIGNED TO THE SAME CONTROL PANEL/MCC MAY BE RUN IN THE SAME
CONDUIT. NO OTHER WIRES WILL BE PERMITTED IN THE CONTROL CIRCUIT CONDUIT.
8.3. CONTROL CIRCUIT CONDUIT (24VDC). 24VDC CONTROL CIRCUIT WIRES USED FOR DISCRETE PLC
INPUT OR MCC CONTROL ASSIGNED TO THE SAME CONTROL PANEL/MCC MAY BE RUN IN THE SAME
CONDUIT. NO OTHER WIRES WILL BE PERMITTED IN THE CONTROL CIRCUIT CONDUIT.
8.4. COMMUNICATION CONDUIT (ETHERNET). COMMUNICATION WIRE USED FOR ETHERNET, FIBER OPTIC, OR MODBUS MAY BE RUN IN THE SAME CONDUIT. NO OTHER WIRES WILL BE PERMITTED IN THE
COMMUNICATION CONDUIT (ETHERNET).
8.5. COMMUNICATION CONDUIT (FIELD BUS). FIELD BUS WIRE USED FOR CONTROLNET OR DEVICENET
MAY BE RUN IN THE SAME CONDUIT. NO OTHER WIRES WILL BE PERMITTED IN THE COMMUNICATION
CONDUIT (FIELD BUS).
9. EQUIPMENT SHALL BE NEMA 4 RATED FOR LOCATIONS INSIDE AND OUTSIDE THE TEST CELLS.
10. MINIMUM CONTROL WIRE SIZE SHALL BE EITHER #14 AWG OR 2/C#18SH AND MINIMUM POWER WIRE SIZE
SHALL BE #12 AWG.
11. MINIMUM CONDUIT SIZE SHALL BE 3/4".
12. CONTRACTOR TO PATCH/REPAIR/PAINT ALL ITEMS DISTURBED DURING INSTALLATION. FINISHED SHALL
MATCH EXISTING.
DATA JACK
GROUND FRAME TO REBAR
AIR TERMINAL / GROUND ROD
DUCT BANK CONDUIT WITH 2-4" 3-CELL MAXCELL
FABRIC INNERDUCT
DISCONNECT SWITCH (F) = FUSED (C) = CIRCUIT BREAKER,
POLE QUANTITY, RATING AND FUSING AS INDICATED
DEMOLISH
ABBREVIATIONS:
A AMPERE(S)
A/C AIR CONDITIONING
AI ANALOG INPUT
ALT ALTERNATE
AO ANALOG OUTPUT
ASB ALARM SILENCE BUTTON
AWG AMERICAN WIRE GAUGE
C CONDUIT
CAT CATEGORY
CB CIRCUIT BREAKER
CLAR CLARIFIER
CP CONTROL PANEL
CR CONTROL RELAY
CSF CARBON STORAGE & FEED
DB DUCTBANK
DI DISCRETE INPUT
DO DISSOLVED OXYGEN
EFF EFFLUENT
EM EMERGENCY
ENET ETHERNET
ETI ELAPSED TIME INDICATOR
FB FUSE BLOCK
FO FIBER OPTIC
FOC FIBER OPTIC CONVERTER
FOPP FIBER OPTIC PATCH PANEL
FVNR FULL VOLTAGE NON-REVERSING
G / GND GROUND
GA GAUGE
GAL GALLON(S)
GALV GALVANIZED
GEN GENERATOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
HOA HAND-OFF-AUTO
HORIZ HORIZONTAL
HP HORSEPOWER
HTR HEATER
HZ HERTZ
I/O INPUT/OUTPUT
M MOTOR
MA MILLIAMP
MB MAIN BREAKER
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MCP MAIN CONTROL PANEL
MIN MINIMUM
MLO MAIN LUG ONLY
MS MOTOR STARTER
MTR MASTER
N NEUTRAL
NO. NUMBER
O.C. ON CENTER
OL OVERLOAD
ORP OXIDATION REDUCTION
POTENTIAL
P POLE
PDB POWER DISTRIBUTION BLOCK
P.B. PUSHBUTTON
PLC PROGRAMMABLE LOGIC
CONTROLLER
PM PHASE MONITOR
PVC POLYVINYL CHLORIDE
RAD RADIANT
RL RUNNING LIGHT
RPM ROTATIONS PER MINUTE
SCHED SCHEDULE
SEL SELECTOR
SH SHIELDED
SKD SKID
SS STAINLESS STEEL
STA STATION
T THERMOSTAT
TNK TANK
TRN TRAIN
TVSS TRANSIENT VOLTAGE SURGE
SUPPRESSION
TYP. TYPICAL
UPS UNINTERRUPTIBLE POWER
SUPPLY
V VOLTAGE
VAC VOLTAGE ALTERNATING
CURRENT
VDC VOLTAGE DIRECT CURRENT
VERT VERTICLE
VFD VARIABLE FREQUENCY DRIVE
W WATT / WIRE
W/ WITH
XFMR TRANSFORMER
Ø PHASE
GENERAL NOTES:
ETHERNET (CAT6) CONNECTION BETWEEN UNITS
E-001
4 13
E L
E C
T R
I C
G
E N
D
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
U I S
V I L L E
K
E N
T U
C K
Y
L O
U I S
V I L
S
T R
I C
T
K R
A O
A N
S I
D
M A
R C
H
E
D
W G
V M
E L
L I N
G
W P
A I S
O N
R S
T R
A S
S B
U R
G
D T
A
R
E C
I R
C U
L A
T I N
G
A
S
T
C
E L
L S
B U
I L
D I N
G
D E
T R
O
S
E N
A L
D
E T
R O
I T
M
I
W
Q R
R
P H
O N
E
A n n
A r b o r
M i c h i g
A v i s
D r
S u i w w w t e t r a t e c h c o m
SECURITY DISCLAIMER
A. Security Requirement: CONDITIONS FOR RELEASE of Plans to Contractor;
1. Released U.S. Government (USG) information is to be used for the purpose of this contract only, and will not be released to third parties without approval from US Army Garrison - Michigan.
Upon project completion, this information is to be destroyed or surrendered to the USG POC listed in Item 6 below.
2. No reproduction of released USG information is authorized for other than the contract's legitimate purpose.
3. Access to this information is to be controlled as UNCLASSIFIED / FOR OFFICIAL USE ONLY;
and shall not be available for distribution under the Freedom Of Information Act (FOIA).
4. Information that is provided to the Contractor from the USG will be returned to the USG when no longer needed, or at the end of the contract. Under special provisions the USG may authorize the contractor to destroy the information by shredding (paper) or degaussing (magnetic media) to make unreadable and unrecoverable. Confirmation of destruction will be provided to the USG.
5. All information and drawing provided shall not be posted on any internet web site.
6. The responsible USG POC for coordination of release and return of USG engineering drawings / information at the Detroit Arsenal, MI, is Michele Pointe @ (586) 282-0119.
B. Distribution authorized to US government agencies and contractors associated with TACOM Life Cycle
Management Command (LCMC) or the United States Army Garrison - Detroit Arsenal in accordance with Army Regulation AR 530-1. For Official Use Only (FOUO) caveat is assigned so as not to place
US personnel at risk, or compromise security procedures, or DOD information (Critical Infrastructure or
Technology).
This document is not releasable to the public or media. This document must be returned to the US
Government Contracting Officer or must be destroyed by shredding or tearing to make unreadable, when no longer needed. This document will not be sent over the INTERNET unencrypted, or posted to any public web sites. Other requests for this document shall be referred to Public Works, USAG-DTA, ATTN: IMMI-PWF, 6501 East 11 Mile Road, Warren, MI 48397-5000), Commercial Phone 586-282-6308.
W
2Q R
R
_P la ns -0
NAT. GAS
W A
T E
R
BLDG
212B
D N
8 1
E-010
5 13
S I T
E
P
L A
N
BUILDING 212 ENERGY STORAGE
SYSTEM SITE PLAN
SCALE: 1/16" = 1'
O P
T I O
N S
SCALE:
8' 16' 32'
1/16" = 1'-0''
MAINTAIN 6' CLEARANCE BETWEEN SYSTEM AND BUILDING.
ROUTE 3" RMC ALONG OUTSIDE OF BUILDING.
250 KW ENERGY STORAGE SYSTEM.
CONDUIT SHALL PENETRATE THE PAD DOWN
INTO STAIRWELL, SEE E-101 FOR CONTINUATION.
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
L O
U I S
V I L
S
T R
I C
T
K R
A O
A N
S I
D
M A
R C
H
E
D
W G
V M
E L
L I N
G
W P
A I S
O N
R S
T R
A S
S B
U R
G
D T
A
R
E C
I R
C U
L A
T I N
G
A
S
T
C
E L
L S
B U
I L
D I N
G
D E
T R
O
S
E N
A L
D
E T
R O
I T
M
I
W
Q R
R
P H
O N
E
A n n
A r b o r
M i c h i g
A v i s
D r
S u i w w w t e t r a t e c h c o m
SECURITY DISCLAIMER
A. Security Requirement: CONDITIONS FOR RELEASE of Plans to Contractor;
1. Released U.S. Government (USG) information is to be used for the purpose of this contract only, and will not be released to third parties without approval from US Army Garrison - Michigan.
Upon project completion, this information is to be destroyed or surrendered to the USG POC listed in Item 6 below.
2. No reproduction of released USG information is authorized for other than the contract's legitimate purpose.
3. Access to this information is to be controlled as UNCLASSIFIED / FOR OFFICIAL USE ONLY;
and shall not be available for distribution under the Freedom Of Information Act (FOIA).
4. Information that is provided to the Contractor from the USG will be returned to the USG when no longer needed, or at the end of the contract. Under special provisions the USG may authorize the contractor to destroy the information by shredding (paper) or degaussing (magnetic media) to make unreadable and unrecoverable. Confirmation of destruction will be provided to the USG.
5. All information and drawing provided shall not be posted on any internet web site.
6. The responsible USG POC for coordination of release and return of USG engineering drawings / information at the Detroit Arsenal, MI, is Michele Pointe @ (586) 282-0119.
B. Distribution authorized to US government agencies and contractors associated with TACOM Life Cycle
Management Command (LCMC) or the United States Army Garrison - Detroit Arsenal in accordance with Army Regulation AR 530-1. For Official Use Only (FOUO) caveat is assigned so as not to place
US personnel at risk, or compromise security procedures, or DOD information (Critical Infrastructure or
Technology).
This document is not releasable to the public or media. This document must be returned to the US
Government Contracting Officer or must be destroyed by shredding or tearing to make unreadable, when no longer needed. This document will not be sent over the INTERNET unencrypted, or posted to any public web sites. Other requests for this document shall be referred to Public Works, USAG-DTA, ATTN: IMMI-PWF, 6501 East 11 Mile Road, Warren, MI 48397-5000), Commercial Phone 586-282-6308.
PROVIDE CONCRETE PAD LARGE
ENOUGH TO HOUSE EQUIPMENT
PLUS MAINTENANCE SPACE
SURROUNDING, ALONG WITH
REMOVABLE BOLLARDS AT THE
TWO WEST CORNERS OF PAD.
PLAN
NORTH
PLAN
NORTH
W
2Q R
R
_P la ns -0
OIL
SEPARATER
ROOM #13
SERVICE
CORR.
ROOM #2
UP
PP-3
PP-2
PP-1
CELL 2
400A SW
LP-2
LP-1
LP-1
ELECTRICAL
SUBSTATION
ROOM#12
OIL PUMP #1
EXISTING
CONDUIT UP
TO FIRST
FLOOR
CONDUIT
AND LEAD
SHIELDED
CABLE UP TO
TEST CELL 4
CONDUIT
AND LEAD
SHIELDED
CABLE UP TO
TEST CELL 5
1a
3a
5c
7a d e g ha h j v l m s o p u t ua sb sa cb ta
SERVICE
EQUIP.
ROOM #11
SERVICE
EQUIP.
ROOM #10
SERVICE
EQUIP.
ROOM #9
SERVICE
EQUIP.
ROOM #3
SERVICE
EQUIP.
ROOM #4
SERVICE
EQUIP.
ROOM #5
STORAGE
AREA
ROOM #1
nk r
MECHANICAL
EQUIP. ROOM
#17
C H
L O
R I N
A T
E R
R O
M
OIL
SEPARATER
ROOM #16
LP-14
LP-8
LP-X2
f ea
D N
SCALE:
8' 16' 32'
SCALE: 1/16" = 1'-0"
SHEET NOTES:
E-101
6 13
B U
I L
D I N
G
B A
S E
M E
O
O R
1. REMOVE AND REPLACE EXISTING CONDUIT AND WIRE TO TEST
CELL 4 AND TEST CELL 5 VENTILATION FAN MOTORS. REFER TO
SHEET E-702 FOR EXISTING CONDUIT AND WIRE SIZES.
2. REMOVE AND REPLACE EXISTING CONDUIT AND WIRE TO FIRST
FLOOR. REFER TO SHEET E-702 FOR EXISTING CONDUIT AND WIRE
SIZES.
3. CONNECT STEAM FLOW METERS TO THE NEAREST PP PANEL FOR
POWER. CONNECT SIGNAL WIRE FOR THE STEAM FLOW METERS
TO NEAREST JACE CONTROL PANEL.
BUILDING 212 PARTIAL BASEMENT FLOOR PLAN
GENERAL NOTES
1. LAYOUT BASED ON "REPAIR ELECTRICAL SUBSTATION BLDG. 212
BASEMENT AS BUILD DRAWINGS" DB CONTRACTOR SHALL
CONFIRM ACTUAL CONDITIONS.
2. EXISTING CONDUIT NOT CONNECTED TO TEST CELLS NOT
SHOWN FOR CLARITY.
PROPOSED LOCATION FOR
STEAM FLOW METERS
SCALE: 1/16" = 1'-0"
PROPOSED
CONTRACTOR LAY
DOWN AREA
PROPOSED ATS, REFER TO E-401
FOR FURTHER CLARIFICATION.
CORE THROUGH STAIRWELL CEILING TO BUILDING
EXTERIOR. REFER TO E-010 FOR CONTINUATION.
FIREWRAPPED TRIPLEX CABLE INSTALLED
ON UNISTRUT SUPPORTED FROM CEILING.
PROVIDE FIRE BARRIERS
AT WALL PENETRATIONS.
PROVIDE FIRE BARRIERS
AT WALL PENETRATIONS.
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
U I S
V I L L E
K
E N
T U
C K
Y
L O
U I S
V I L
S
T R
I C
T
K R
A O
A N
S I
D
M A
R C
H
E
D
W G
V M
E L
L I N
G
W P
A I S
O N
R S
T R
A S
S B
U R
G
D T
A
R
E C
I R
C U
L A
T I N
G
A
S
T
C
E L
L S
B U
I L
D I N
G
D E
T R
O
S
E N
A L
D
E T
R O
I T
M
I
W
Q R
R
P H
O N
E
A n n
A r b o r
M i c h i g
A v i s
D r
S u i w w w t e t r a t e c h c o m
SECURITY DISCLAIMER
A. Security Requirement: CONDITIONS FOR RELEASE of Plans to Contractor;
1. Released U.S. Government (USG) information is to be used for the purpose of this contract only, and will not be released to third parties without approval from US Army Garrison - Michigan.
Upon project completion, this information is to be destroyed or surrendered to the USG POC listed in Item 6 below.
2. No reproduction of released USG information is authorized for other than the contract's legitimate purpose.
3. Access to this information is to be controlled as UNCLASSIFIED / FOR OFFICIAL USE ONLY;
and shall not be available for distribution under the Freedom Of Information Act (FOIA).
4. Information that is provided to the Contractor from the USG will be returned to the USG when no longer needed, or at the end of the contract. Under special provisions the USG may authorize the contractor to destroy the information by shredding (paper) or degaussing (magnetic media) to make unreadable and unrecoverable. Confirmation of destruction will be provided to the USG.
5. All information and drawing provided shall not be posted on any internet web site.
6. The responsible USG POC for coordination of release and return of USG engineering drawings / information at the Detroit Arsenal, MI, is Michele Pointe @ (586) 282-0119.
B. Distribution authorized to US government agencies and contractors associated with TACOM Life Cycle
Management Command (LCMC) or the United States Army Garrison - Detroit Arsenal in accordance with Army Regulation AR 530-1. For Official Use Only (FOUO) caveat is assigned so as not to place
US personnel at risk, or compromise security procedures, or DOD information (Critical Infrastructure or
Technology).
This document is not releasable to the public or media. This document must be returned to the US
Government Contracting Officer or must be destroyed by shredding or tearing to make unreadable, when no longer needed. This document will not be sent over the INTERNET unencrypted, or posted to any public web sites. Other requests for this document shall be referred to Public Works, USAG-DTA, ATTN: IMMI-PWF, 6501 East 11 Mile Road, Warren, MI 48397-5000), Commercial Phone 586-282-6308.
PLAN
NORTH
PLAN
NORTH
W
2Q R
R
_P la ns -0
TEST CELL
#2
TEST CELL
#1
TEST CELL
#3
TEST CELL
#4
TEST CELL
#6
TEST CELL
#7
TEST CELL
#8
FUEL ROOM 4
ROOM 114
CELL 11 - EARL
ROOM 114
CHAMBER
DN
UP
DN
UP
CONTROL
ROOM # 8
CONTROL
ROOM # 7
CONTROL
ROOM # 6
FAN
ROOM
#153
TRANSMISSION
CELL #5
MACHINE
ROOM
M.G.
FUEL ROOM
TEST CELL
12/
BMS LAB
EQUIPMENT
AREA
MACHINE
ROOM
#2
FAN
ROOM
FUEL
ROOM
CONYTROL
ROOM #3
CORRIDOR
CONTROL
ROOM #2
CONTROL
ROOM #1
FUEL
ROOM
FUEL
ROOM
FUEL
ROOM
PP-4
EP-B
PP-A
PP-5
CELL 5 LIGHT BANK
CONTROLLER
(277V, LIGHTING
PANEL)
LP-6
LP-6B
LP-CR6
LP-CR7
LP-CR8
LP-X1
LP-CR3
LP-CR2
LP-P3
LP-CR1
LP-5
PP-6
EXISTING
CONDUIT TO
PULL BOX
BASEMENT
MPP-1
EXISTING
CONDUIT TO
TEST CELLS
1, 2, 3, 6, 7, AND 8
EXISTING CONDUIT
FROM BASEMENT
UP TO EF-1
UP TO EF-8
UP TO EF-7
UP TO EF-6
UP TO EF-3
UP TO EF-2
UP FROM
BASEMENT
EF-5
EF-4
UP FROM
BASEMENT
1a
3a
5c
7a
B3
E-402
D N
SCALE:
4' 8' 16'
SCALE: 1/8" = 1'-0"
SHEET NOTES:
1. REMOVE AND REPLACE EXISTING CONDUIT AND WIRE TO TEST
CELL 1, 2, 3, 6, 7, AND 8 VENTILATION FAN MOTORS. REFER TO
SHEET E-702 FOR EXISTING CONDUIT AND WIRE SIZES.
2. CONDUIT RUNS ABOVE DROP DOWN CEILING GRID. ACTUAL PATHS
TO BE CONFIRMED BY THE CONTRACTOR.
3. ELECTRICAL SIGNAL WIRE FROM NEW LINEAR TRANSDUCER TO
THE NEW DIGITAL CONTROLLER IN THE CONTROL ROOM.
E-102
7 13
B U
I L
D I N
G
F I R
O
O R
BUILDING 212 PARTIAL FIRST FLOOR PLAN
GENERAL NOTES
1. LAYOUT BASED ON "REPAIR ELECTRICAL SUBSTATION BLDG. 212
BASEMENT AS BUILD DRAWINGS" DB CONTRACTOR SHALL
CONFIRM ACTUAL CONDITIONS.
2. EXISTING CONDUIT NOT CONNECTED TO TEST CELLS NOT
SHOWN FOR CLARITY.
SCALE: 1/8" = 1'-0"
DEMOLISH CONDUIT, WIRE AND
TRANSFORMER BETWEEN XB AND MPP-1.
S
U
B
S
T
A
T
I
O
N
X
B
ROUTE CONDUIT AND
WIRE FROM MPP-1 DOWN
THROUGH FLOOR TO
ATS FLOOR BELOW.
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
L O
U I S
V I L
S
T R
I C
T
K R
A O
A N
S I
D
M A
R C
H
E
D
W G
V M
E L
L I N
G
W P
A I S
O N
R S
T R
A S
S B
U R
G
D T
A
R
E C
I R
C U
L A
T I N
G
A
S
T
C
E L
L S
B U
I L
D I N
G
D E
T R
O
S
E N
A L
D
E T
R O
I T
M
I
W
Q R
R
P H
O N
E
A n n
A r b o r
M i c h i g
A v i s
D r
S u i w w w t e t r a t e c h c o m
SECURITY DISCLAIMER
A. Security Requirement: CONDITIONS FOR RELEASE of Plans to Contractor;
1. Released U.S. Government (USG) information is to be used for the purpose of this contract only, and will not be released to third parties without approval from US Army Garrison - Michigan.
Upon project completion, this information is to be destroyed or surrendered to the USG POC listed in Item 6 below.
2. No reproduction of released USG information is authorized for other than the contract's legitimate purpose.
3. Access to this information is to be controlled as UNCLASSIFIED / FOR OFFICIAL USE ONLY;
and shall not be available for distribution under the Freedom Of Information Act (FOIA).
4. Information that is provided to the Contractor from the USG will be returned to the USG when no longer needed, or at the end of the contract. Under special provisions the USG may authorize the contractor to destroy the information by shredding (paper) or degaussing (magnetic media) to make unreadable and unrecoverable. Confirmation of destruction will be provided to the USG.
5. All information and drawing provided shall not be posted on any internet web site.
6. The responsible USG POC for coordination of release and return of USG engineering drawings / information at the Detroit Arsenal, MI, is Michele Pointe @ (586) 282-0119.
B. Distribution authorized to US government agencies and contractors associated with TACOM Life Cycle
Management Command (LCMC) or the United States Army Garrison - Detroit Arsenal in accordance with Army Regulation AR 530-1. For Official Use Only (FOUO) caveat is assigned so as not to place
US personnel at risk, or compromise security procedures, or DOD information (Critical Infrastructure or
Technology).
This document is not releasable to the public or media. This document must be returned to the US
Government Contracting Officer or must be destroyed by shredding or tearing to make unreadable, when no longer needed. This document will not be sent over the INTERNET unencrypted, or posted to any public web sites. Other requests for this document shall be referred to Public Works, USAG-DTA, ATTN: IMMI-PWF, 6501 East 11 Mile Road, Warren, MI 48397-5000), Commercial Phone 586-282-6308.
PLAN
NORTH
PLAN
NORTH
W
2Q R
R
_P la ns -0
DN
UPPER PART
OF TEST
CELL #1
UPPER PART
OF TEST
CELL #2
UPPER PART
OF TEST
CELL #3
UPPER PART
OF TEST
CELL #6
UPPER PART
OF TEST
CELL #7
UPPER PART
OF TEST
CELL #8
DN
LP-7
LP-CR5
LP-CR4
MCC-EFF
MCC-2
(DECOMMISSIONED)
SP2 (MOTOR
STARTER
PANELBOARD)
SP1 (MOTOR
STARTER
PANELBOARD)
LP-13
UP FROM
FIRST
FLOOR
UP FROM
FIRST
FLOOR
UP FROM
FIRST
FLOOR
UP
FROM
FIRST
FLOOR
UP
FROM
FIRST
FLOOR
UP
FROM
FIRST
FLOOR
EF-1
EF-8
EF-7
EF-6
EF-3
EF-2
1a
3a
5c g ha h j l m o p
B3
E-403
D N
8 1
E-103
8 13
B U
I L
D I N
G
S E
C O
O
O R
SCALE:
4' 8' 16'
SCALE: 1/8" = 1'-0"
SHEET NOTES:
1. REMOVE AND REPLACE CONDUIT AND WIRE TO THE EXISTING FAN
MOTORS. REFER TO SHEET E-702 FOR EXISTING CONDUIT AND
WIRES SIZES.
2. ELECTRICAL SIGNAL WIRE FROM NEW LINEAR TRANSDUCER TO
THE NEW DIGITAL CONTROLLER IN THE CONTROL ROOM.
BUILDING 212 PARTIAL SECOND FLOOR PLAN
GENERAL NOTES
1. LAYOUT BASED ON "REPAIR ELECTRICAL SUBSTATION BLDG. 212
BASEMENT AS BUILD DRAWINGS" DB CONTRACTOR SHALL
CONFIRM ACTUAL CONDITIONS.
2. EXISTING CONDUIT NOT CONNECTED TO TEST CELLS NOT
SHOWN FOR CLARITY.
SCALE: 1/8" = 1'-0"
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
L O
U I S
V I L
S
T R
I C
T
K R
A O
A N
S I
D
M A
R C
H
E
D
W G
V M
E L
L I N
G
W P
A I S
O N
R S
T R
A S
S B
U R
G
D T
A
R
E C
I R
C U
L A
T I N
G
A
S
T
C
E L
L S
B U
I L
D I N
G
D E
T R
O
S
E N
A L
D
E T
R O
I T
M
I
W
Q R
R
P H
O N
E
A n n
A r b o r
M i c h i g
A v i s
D r
S u i w w w t e t r a t e c h c o m
SECURITY DISCLAIMER
A. Security Requirement: CONDITIONS FOR RELEASE of Plans to Contractor;
1. Released U.S. Government (USG) information is to be used for the purpose of this contract only, and will not be released to third parties without approval from US Army Garrison - Michigan.
Upon project completion, this information is to be destroyed or surrendered to the USG POC listed in Item 6 below.
2. No reproduction of released USG information is authorized for other than the contract's legitimate purpose.
3. Access to this information is to be controlled as UNCLASSIFIED / FOR OFFICIAL USE ONLY;
and shall not be available for distribution under the Freedom Of Information Act (FOIA).
4. Information that is provided to the Contractor from the USG will be returned to the USG when no longer needed, or at the end of the contract. Under special provisions the USG may authorize the contractor to destroy the information by shredding (paper) or degaussing (magnetic media) to make unreadable and unrecoverable. Confirmation of destruction will be provided to the USG.
5. All information and drawing provided shall not be posted on any internet web site.
6. The responsible USG POC for coordination of release and return of USG engineering drawings / information at the Detroit Arsenal, MI, is Michele Pointe @ (586) 282-0119.
B. Distribution authorized to US government agencies and contractors associated with TACOM Life Cycle
Management Command (LCMC) or the United States Army Garrison - Detroit Arsenal in accordance with Army Regulation AR 530-1. For Official Use Only (FOUO) caveat is assigned so as not to place
US personnel at risk, or compromise security procedures, or DOD information (Critical Infrastructure or
Technology).
This document is not releasable to the public or media. This document must be returned to the US
Government Contracting Officer or must be destroyed by shredding or tearing to make unreadable, when no longer needed. This document will not be sent over the INTERNET unencrypted, or posted to any public web sites. Other requests for this document shall be referred to Public Works, USAG-DTA, ATTN: IMMI-PWF, 6501 East 11 Mile Road, Warren, MI 48397-5000), Commercial Phone 586-282-6308.
PLAN
NORTH
PLAN
NORTH
W
2Q R
R
_P la ns -0
D N
8 1
SUBSTATION XA
REMOVE AND REPLACE WIRE
AND CONDUIT TO TEST CELLS 4
AND 5
REMOVE AND
REPLACE WIRE AND
CONDUIT TO TEST
CELLS 1, 2, 3, 6, 7,
AND 8
REFER TO SHEET E-702 FOR
EXISTING CONDUIT AND WIRE
SIZES.
REFER TO SHEET E-702 FOR EXISTING CONDUIT
AND WIRE SIZES.
E-401
9 13
B U
I L
D I N
G
E L
E C
T R
I C
O
M
ENLARGED
BASEMENT ELECTRICAL SUBSTATION ROOM #12B1
E-101
SCALE: 1" = 1'
ha h g
7 8
SEE E-101 FOR CONT.
AUTOMATIC TRANSFER SWITCH
CONNECT WIRES TO SPARE BREAKERS IN GEAR. REFER TO ONE-LINE FOR CLARIFICATION.
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
U I S
V I L L E
K
E N
T U
C K
Y
L O
U I S
V I L
S
T R
I C
T
K R
A O
A N
S I
D
M A
R C
H
E
D
W G
V M
E L
L I N
G
W P
A I S
O N
R S
T R
A S
S B
U R
G
D T
A
R
E C
I R
C U
L A
T I N
G
A
S
T
C
E L
L S
B U
I L
D I N
G
D E
T R
O
S
E N
A L
D
E T
R O
I T
M
I
W
Q R
R
P H
O N
E
A n n
A r b o r
M i c h i g
A v i s
D r
S u i w w w t e t r a t e c h c o m
SECURITY DISCLAIMER
A. Security Requirement: CONDITIONS FOR RELEASE of Plans to Contractor;
1. Released U.S. Government (USG) information is to be used for the purpose of this contract only, and will not be released to third parties without approval from US Army Garrison - Michigan.
Upon project completion, this information is to be destroyed or surrendered to the USG POC listed in Item 6 below.
2. No reproduction of released USG information is authorized for other than the contract's legitimate purpose.
3. Access to this information is to be controlled as UNCLASSIFIED / FOR OFFICIAL USE ONLY;
and shall not be available for distribution under the Freedom Of Information Act (FOIA).
4. Information that is provided to the Contractor from the USG will be returned to the USG when no longer needed, or at the end of the contract. Under special provisions the USG may authorize the contractor to destroy the information by shredding (paper) or degaussing (magnetic media) to make unreadable and unrecoverable. Confirmation of destruction will be provided to the USG.
5. All information and drawing provided shall not be posted on any internet web site.
6. The responsible USG POC for coordination of release and return of USG engineering drawings / information at the Detroit Arsenal, MI, is Michele Pointe @ (586) 282-0119.
B. Distribution authorized to US government agencies and contractors associated with TACOM Life Cycle
Management Command (LCMC) or the United States Army Garrison - Detroit Arsenal in accordance with Army Regulation AR 530-1. For Official Use Only (FOUO) caveat is assigned so as not to place
US personnel at risk, or compromise security procedures, or DOD information (Critical Infrastructure or
Technology).
This document is not releasable to the public or media. This document must be returned to the US
Government Contracting Officer or must be destroyed by shredding or tearing to make unreadable, when no longer needed. This document will not be sent over the INTERNET unencrypted, or posted to any public web sites. Other requests for this document shall be referred to Public Works, USAG-DTA, ATTN: IMMI-PWF, 6501 East 11 Mile Road, Warren, MI 48397-5000), Commercial Phone 586-282-6308.
PLAN
NORTH
PLAN
NORTH
W
2Q R
R
_P la ns -0
TEST CELL
UP TO EF-2
D N
8 1
SCALE:
2' 4' 8'
SCALE: 1/4" = 1'-0"
E-402
10 13
C O
N T
R O
L
R
O O
M
P L
V
E
W
GENERAL NOTE:
1. REMOVE EXISTING MANUAL DAMPER ACTUATOR CONTROL AND REPLACE WITH NEW DIGITAL
INTERFACE WITH 4-20mA OUTPUT TO NEW E/P CONTROL. RECONNECT TO EXISTING PNEUMATIC
SUPPLY AND CONTROL TUBING. NEW INSTRUMENTATION TO BE POWERED LOCALLY FROM INSIDE
THE CONTROL PANEL.
PICTURE 1 (FRONT OF PANEL)
SCALE: NTS
B4
PICTURE 2 (BACK OF PANEL)
SCALE: NTS
LP-CR2
LP-5
ROOM 105
CONTROL ROOM #2
SHOWN. TYPICAL OF
ALL EIGHT TEST
CELLS.
ENLARGED
CONTROL ROOM PLAN (TYP. OF 6)B3
E-102
SCALE: 1/4" = 1'-0"
B4
B5 l m
REFER TO DRAWING M-601 FOR
ACTUATOR CONTROL DIAGRAM
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
L O
U I S
V I L
S
T R
I C
T
K R
A O
A N
S I
D
M A
R C
H
E
D
W G
V M
E L
L I N
G
W P
A I S
O N
R S
T R
A S
S B
U R
G
D T
A
R
E C
I R
C U
L A
T I N
G
A
S
T
C
E L
L S
B U
I L
D I N
G
D E
T R
O
S
E N
A L
D
E T
R O
I T
M
I
W
Q R
R
P H
O N
E
A n n
A r b o r
M i c h i g
A v i s
D r
S u i w w w t e t r a t e c h c o m
SECURITY DISCLAIMER
A. Security Requirement: CONDITIONS FOR RELEASE of Plans to Contractor;
1. Released U.S. Government (USG) information is to be used for the purpose of this contract only, and will not be released to third parties without approval from US Army Garrison - Michigan.
Upon project completion, this information is to be destroyed or surrendered to the USG POC listed in Item 6 below.
2. No reproduction of released USG information is authorized for other than the contract's legitimate purpose.
3. Access to this information is to be controlled as UNCLASSIFIED / FOR OFFICIAL USE ONLY;
and shall not be available for distribution under the Freedom Of Information Act (FOIA).
4. Information that is provided to the Contractor from the USG will be returned to the USG when no longer needed, or at the end of the contract. Under special provisions the USG may authorize the contractor to destroy the information by shredding (paper) or degaussing (magnetic media) to make unreadable and unrecoverable. Confirmation of destruction will be provided to the USG.
5. All information and drawing provided shall not be posted on any internet web site.
6. The responsible USG POC for coordination of release and return of USG engineering drawings / information at the Detroit Arsenal, MI, is Michele Pointe @ (586) 282-0119.
B. Distribution authorized to US government agencies and contractors associated with TACOM Life Cycle
Management Command (LCMC) or the United States Army Garrison - Detroit Arsenal in accordance with Army Regulation AR 530-1. For Official Use Only (FOUO) caveat is assigned so as not to place
US personnel at risk, or compromise security procedures, or DOD information (Critical Infrastructure or
Technology).
This document is not releasable to the public or media. This document must be returned to the US
Government Contracting Officer or must be destroyed by shredding or tearing to make unreadable, when no longer needed. This document will not be sent over the INTERNET unencrypted, or posted to any public web sites. Other requests for this document shall be referred to Public Works, USAG-DTA, ATTN: IMMI-PWF, 6501 East 11 Mile Road, Warren, MI 48397-5000), Commercial Phone 586-282-6308.
PLAN
NORTH
PLAN
NORTH
B5
W
2Q R
R
_P la ns -0
UP FROM
FIRST
FLOOR
SP2 (MOTOR
STARTER
PANELBOARD)
SP1 (MOTOR
STARTER
PANELBOARD)
UP FROM
FIRST
FLOOR
EF-7
D N
8 1
DN
DN
E-403
11 13
M O
T O
R
R
O O
M
P L
V
E
W
SCALE:
2' 4' 8'
SCALE: 1/4" = 1'-0"
PNEUMATIC ACTUATOR
ENCLOSURE
ENLARGED
MOTOR ROOM PLAN (TYP. OF 8)B3
E-103
SCALE: 1/4" = 1'-0"
EF-2
EF-2
MOTOR
ELECTRICAL
FEED CONDUIT
PICTURE 2
(DETAIL VIEW WITH ENCLOSURE OPENED)
SCALE: NTS
C5
SHEET NOTES:
1. REMOVE AND REPLACE CONDUIT AND WIRE TO THE EXISTING FAN MOTORS.
GENERAL NOTES
1. REPLACE PNEUMATIC ACTUATOR, INCLUDING THE FOLLOWING COMPONENTS: EXTENDED
SHAFT, INTEGRAL PIVOT WITH PIVOT POST, CLEVIS, AND MOUNTING PLATE.
2. REPLACE REGULATOR
3. REPLACE POSITIONING RELAY
4. REPLACE LINKAGE ARM
5. REPLACE INTERCONNECTION TUBING AND FITTINGS
6. MODIFY EXISTING ACTUATOR ENCLOSURE AS NEEDED TO ACCOMMODATE NEW ACTUATOR
AND ALL ANCILLARY COMPONENTS
7. INSPECT LINKAGES BUSHINGS AND BEARINGS OF EXISTING DAMPENERS MOUNTED TO THE
DISCHARGE OF THE VENTILATION FANS AND REPAIR ANY DAMAGED OR WORN BEARINGS,
BUSHINGS OR LINKAGES.
8. IF DAMAGED, REPAIR OR REPLACE LINKAGE BETWEEN THE DAMPENERS AND CONTROLLERS.
LINKAGE IN EACH TEST CELL IS A CUSTOM BUILD. CREATION OF NEW LINKAGES SHALL BE
INCLUDED IN COST.
9. CONTRACTOR TO DISCONNECT AND RECONNECT TO EXISTING COOLING DUCT.
EXISTING
COOLING
DUCT
EXISTING ASBESTOS
CONTAINING INSULATION
DB CONTRACTOR SHALL
AVOID DISTURBING.
m o
(TYP. OF 8)
PICTURE 3
SCALE: NTS
PNEUMATIC ACTUATOR
ENCLOSURE
REFER TO E-402 FOR NEW
PNEUMATIC ACTUATOR
AND RELATED CONTROLS.
PICTURE 1 (ISOMETRIC VIEW)
SCALE: NTS
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
U I S
V I L L E
K
E N
T U
C K
Y
L O
U I S
V I L
S
T R
I C
T
K R
A O
A N
S I
D
M A
R C
H
E
D
W G
V M
E L
L I N
G
W P
A I S
O N
R S
T R
A S
S B
U R
G
D T
A
R
E C
I R
C U
L A
T I N
G
A
S
T
C
E L
L S
B U
I L
D I N
G
D E
T R
O
S
E N
A L
D
E T
R O
I T
M
I
W
Q R
R
P H
O N
E
A n n
A r b o r
M i c h i g
A v i s
D r
S u i w w w t e t r a t e c h c o m
SECURITY DISCLAIMER
A. Security Requirement: CONDITIONS FOR RELEASE of Plans to Contractor;
1. Released U.S. Government (USG) information is to be used for the purpose of this contract only, and will not be released to third parties without approval from US Army Garrison - Michigan.
Upon project completion, this information is to be destroyed or surrendered to the USG POC listed in Item 6 below.
2. No reproduction of released USG information is authorized for other than the contract's legitimate purpose.
3. Access to this information is to be controlled as UNCLASSIFIED / FOR OFFICIAL USE ONLY;
and shall not be available for distribution under the Freedom Of Information Act (FOIA).
4. Information that is provided to the Contractor from the USG will be returned to the USG when no longer needed, or at the end of the contract. Under special provisions the USG may authorize the contractor to destroy the information by shredding (paper) or degaussing (magnetic media) to make unreadable and unrecoverable. Confirmation of destruction will be provided to the USG.
5. All information and drawing provided shall not be posted on any internet web site.
6. The responsible USG POC for coordination of release and return of USG engineering drawings / information at the Detroit Arsenal, MI, is Michele Pointe @ (586) 282-0119.
B. Distribution authorized to US government agencies and contractors associated with TACOM Life Cycle
Management Command (LCMC) or the United States Army Garrison - Detroit Arsenal in accordance with Army Regulation AR 530-1. For Official Use Only (FOUO) caveat is assigned so as not to place
US personnel at risk, or compromise security procedures, or DOD information (Critical Infrastructure or
Technology).
This document is not releasable to the public or media. This document must be returned to the US
Government Contracting Officer or must be destroyed by shredding or tearing to make unreadable, when no longer needed. This document will not be sent over the INTERNET unencrypted, or posted to any public web sites. Other requests for this document shall be referred to Public Works, USAG-DTA, ATTN: IMMI-PWF, 6501 East 11 Mile Road, Warren, MI 48397-5000), Commercial Phone 586-282-6308.
PLAN
NORTH
PLAN
NORTH
A1
C1
W
2Q R
R
_P la ns -0
E-701
12 13
B U
I L
D I N
G
O N
E L
I N
E
SUBSTATION XB-EXISTING
INVERTER
BATTERY
UNIT N
SYSTEM
CONTROLLER
E N
E T
BATTERY
UNIT 1
250 KW ENERGY
STORAGE SYSTEM
(INCLUDES 150KW
FOR THE BASE BID
AND 100KW FOR
THE OPTION)
3"C(3/C-500KCMIL, 1#3)
TO XA(6D)
TO XA(7D)
3"C(4/C-500KCMIL, 1#3)
ONE-LINE
PROVIDE 400A, 480V, 3PH, 4W
AUTOMATIC TRANSFER SWITCH
PURCHASE ATS WITH TERMINALS TO ACCEPT 2 SETS OF WIRE
NOTES:
1. AUTOMATIC TRANSFER SWITCH SHALL PROVIDE
RELAY CONTACT FOR LOSS OF NORMAL POWER.
CONTACT SHALL BE CONNECTED TO REMOTE TRIP
ON BREAKER XA(6D).
S O
L I C
I T
A T
I O
N
N
O
F I
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C O
N T
R A
SHEET
IDENTIFICATION
D A
T E
A P
P R
SHEET OF
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
L O
U I S
V I L
L E
K
E N
T U
C K
Y
L O
U I S
V I L
S
T R
I C
T
K R
A O
A N
S I
D
M A
R C
H
E
D
W G
V M
E L
L I N
G
W P
A I S
O N
R S
T R
A S
S B
U R
G
D T
A
R
E C
I R
C U
L A
T I N
G
A
S
T
C
E L
L S
B U
I L
D I N
G
D E
T R
O
S
E N
A L
D
E T
R O
I T
M
I
W
Q R
R
P H
O N
E
A n n
A r b o r
M i c h i g
A v i s
D r
S u i w w w t e t r a t e c h c o m
SECURITY DISCLAIMER
A. Security Requirement: CONDITIONS FOR RELEASE of Plans to Contractor;
1. Released U.S. Government (USG) information is to be used for the purpose of this contract only, and will not be released to third parties without approval from US Army Garrison - Michigan.
Upon project completion, this information is to be destroyed or surrendered to the USG POC listed in Item 6 below.
2. No reproduction of released USG information is authorized for other than the contract's legitimate purpose.
3. Access to this information is to be controlled as UNCLASSIFIED / FOR OFFICIAL USE ONLY;
and shall not be available for distribution under the Freedom Of Information Act (FOIA).
4. Information that is provided to the Contractor from the USG will be returned to the USG…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .