W912QR21Q0046_Plans-0000.pdf
PDF 6 MB Posted
- Attached to
- Indy North Passive Testing/ Stoplog Base Repair
- Solicitation number
- W912QR21Q0046
About this file
This solicitation is for a construction project to test a passive floodwall system, demolish an existing stoplog closure base, replace it with new reinforced concrete, and perform CCTV inspections of drainage pipes. The scope of work includes testing the passive floodwall manufactured by Floodbreak along Westfield Boulevard in Indianapolis, demolishing and replacing the stoplog closure base at 52nd Street, and inspecting pipes installed from 2018 to 2019 as part of Phase 3B-3 of the Indianapolis North Flood Risk Management Project. The Army Corps of Engineers Engineering District Louisville is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR21Q0046_AMDT0001.pdf | ||
| W912QR21Q0046_Solicitation.pdf | ||
| W912QR21Q0046_Specs-0000.pdf | ||
| W912QR21Q0046_Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
X01
VICINITY MAPS
I-64
I-64
I-64
I-70 I-70I-70
I-71 I-75
I-74
I-65
I-70
I-71
I-75
Cincinnati Ohio
Dayton Ohio
Columbus Ohio
Lexington Kentucky
Louisville Kentucky
LOCATION MAP
PROJECT AREA
62ND ST
A N
N E
T E S
T
A N
N E
T T
E S
T
A Y
R S
H
IR
E S
T
BERKLEY PL
BERKLEY RD
B E
T T
C H
E R S
T
BEVERLY DR
BLUE RIDGE RD
B O
N N
IE
B
R A
E D
R
B O
N N
IE
B
R A
E R
D
B O
N N
IE
B
R A
E S
T
B O
U L E
V A
R D P
L
B R
O A
D W
A Y
B R
O A
D W
A Y
B R
O A
D W
A Y T
E R
BUCKINGHAM DR
B U
E N
A V
IS
T A
B U
T T
O N
W O
O D C
R E
S
B Y
R A
M A
V E
C A N
A L B
L V D
C E
N T
R A
L A
V E
C
LAI
R
BO
R N E
W
AY
CLARENDON PL
C L
A R
E N
D O
N R
D
C O
B U
R N A
V E
C O
B U
R N S
T
C O
B U
R N S
T
C O
B U
R N S
T
COLD
SP
RI
NG
RD
COLLINGWOOD DR
COPENHAVER DR
C O
R N
E L
IU
S A
V E
C O
R N
E L
IU
S A
V E
C R
O O
K E
D C
R E
E K D
R
C R
O W
N S
T
C R
O W
N S
T
C R
O W
S N
E S
T D
R
D
IT
C H R
D
E 43RD ST
E 44TH ST
E 45TH ST
E 45TH ST
E 47TH ST
E 48TH ST
E 49TH ST
E 50TH ST
E 51ST ST
E 55TH ST
E 56TH ST
E 57TH ST
E 58TH ST
E 60TH STE 61ST ST
E 62ND ST
E HAMPTON DR
E L
A V E R
O C
K R
D
FLEETWOOD DR
F O
R E S T V
IE
W D
R
FOX HILL DR
F O
X W
O O
D L
A N
E
G A
R V
E R R
D
G
IF
F O
R D S
T
G L
A D
D E
N D
R
G R
A C
E L
A N
D A
V E
G R
A C
E L
A N
D A
V E
G R
A N
D
IO
S E D
R
G R
A N
D V
IE
W D
R
HAZELWOOD AVE
HIGHLAND MANOR CT
H
IN
E S
L E
Y A
V E
H
IN
E S
L E
Y A
V E
H O
O V
E R R
D
K A R S T A
D T D
R
K A
T H
R Y
N D
R
K E
S S
L E
R W
O O
D C
T
K N
O L L T
O N R
D
L E
S T
E R S
T
L
IE
B E
R R
D
LOUGHERY LANE
M E
R
ID
IA
N S
T R
E E
T W
E S
T D
R
MUNSEE CIR
M U
N S
E E L
A N
E
N C
A P
IT
O L A
V E
N D
E L
A W
A R
E S
T N D
E L
A W
A R
E S
T N D
E L
A W
A R
E S
T
N
IL
L
IN
O
IS
S
T
N K
E N
W O
O D A
V E
N MERIDIAN LANE
N MERIDIAN PL
N N
E W J
E R
S E
Y S
T
N N
E W J
E R
S E
Y S
T
N P
A R
K A
V E
N W
A S
H
IN
G T
O N B
L V
D
OLES DR O
L E
S D
R N
ORLANDO ST
P A
T T
E R
S O
N S
T
Q U
E S
T O
V E
R C
IR
RIP
PLE
RD
R
IV
E R
V
IE
W D
R
R
IV
E R
V
IE
W D
R
R O
O K
W O
O D A
V E
S A
D D
L E
B R
O O
K D
R E
SANWELA DR
S H
A R
O N R
D
S P A N
W O
O D R
D
STAFFORD RD
S T
A F F
O R
D R
D
STEVENSON ST
S T
O N
E H
IL
L D
R
S U
N N
Y M
E A
D E L
A N
E
S U
N S
E T A
V E
S U
N S
E T A
V E
SUNSET LANE
S U
N S
E T L
A N
E
S U
N S
E T L
A N
E
THOMAS W
OOD TRL
W 42ND ST
W 43RD ST
W 43RD ST
W 44TH ST
W 46TH ST
W 46TH ST
W 46TH ST
W 47TH ST
W 47TH ST
W 49TH ST
W 51ST ST W 51ST ST
W
N
D S
T
W 52ND ST
W
N
D S
T
W 53RD ST
W 53RD ST
W 54TH ST
W 54TH ST W 54TH ST
W 56TH ST
W 56TH ST
W 56TH ST
W 57TH ST
W 57TH ST
W 58TH ST
W 58TH ST
W 58TH ST
W 59TH ST W 59TH ST
W 59TH ST
W 59TH ST
W 61ST ST
W 61ST ST
W 61ST ST
W 62ND ST
W 62ND ST
W 63RD ST W 63RD ST
W BEVERLY DR
W HAMPTON DR
W LAVEROCK RD
W NORTHGATE ST W NORTHGATE ST
W A
L D
E N L
A N
E W E S T F
IE
L D B
L V
D
W O
O D K
N O
L L L
A N
E
W O
O D
S
ID
E D
R
W O
O D
S
ID
E D
R
W O
O D
S
ID
E D
R
W O
O D
S
ID
E D
R W
O O
D S
ID
E D
R
W H
IT
E R
IV
E
R
KESSLER BLVD
TESTING
PASSIVE FLOODWALL
BEGIN STA. 0+00
UNIV.
BUTLER
INDIANA
INDIANAPOLIS
VICINITY MAP
NOT TO SCALE
NOT TO SCALE
NONE
END STA. 79+23.69
LOCATION, AND
COVER SHEET, TOC,
O F W
A T
E R W
O R
K S
IN
D
IA
N A
P O
L
IS
D
E P
T
Reviewed by:
Approval Recommended: *
Project Engineer/Architect Date
Approved: *
Chief, Engineering Division Date
ARE REQUIRED BY ER 1110-1-8152.
OPERATING WITHIN THE SCOPE OF THIER EMPLOYMENT. SIGNATURES
REGISTRATION DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE
LOUISVILLE DISTRICT. INDIVIDUALS WHOSE SIGNATURES AND
* THIS PROJECT WAS DESIGNED BY THE U.S. ARMY CORPS OF ENGINEERS,
APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET.
SIGNATURES AFFIXED BELOW INDICATE OFFICAL RECOMMENDATION AND
STOPLOG BASE REPAIR P2 # 112589 - INC1
PASSIVE FLOODWALL TESTING AND
FLOOD DAMAGE REDUCTION PROJECT
INDIANAPOLIS, WHITE RIVER NORTH
CLOSURE
52ND ST. STOPLOG
RECONSTRUCT
W 52ND ST
W E S T F
IE
L D B
L V
D
D
C
B
A
5 4 3 2 1
A
B
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
U.S.ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
LOUISVILLE,KENTUCKY
Revisions
Symbol Descriptions Approved
Designed by:
Drawn by:
Checked by:
Scale:
Date:
Drawing Code:
Sheet reference number:
Sheet of
US Army Corps of Engineers
Project
Architect
Date
Engineer/
FILE:
DATE:
\\coe-lrldfe01lou\org\ED\Public\CAD\Civil\112589-INC0-3B part 3 I-wall\CADD\Design Master files\Repair Contract drawings\Plans\inc0xx01.dgn
09-DEC-2020
J. SINKHORN, P.E.
J. SINKHORN
J. SINKHORN
B. DORSCH P.E.
DEC 2020
C
D
IND-04/?
PASSIVE FLOODWALL TESTING AND STOPLOG BASE REPAIR
FLOOD DAMAGE REDUCTION PROJECT
INDIANAPOLIS, WHITE RIVER NORTH
C E
R T
IF
IE
D F
IN
A L D
O C
U M
E N
T S
Date
ATR CERTIFIED BY RACHAEL FELLMAN 12/20/20
PASSSIVE CLOSURE TEST BULKHEADSS-201
TRANSVERSE JOINT DETAILS-102
52ND STREET CLOSURE FOUNDATION REPAIRS-101
DESIGN LOADS, & ABBRIVIATIONS
GENERAL STRUCTURAL NOTES, S-001
SITE PLANC204
SITE PLANC203
SITE PLANC202
SITE PLANC201
OVERALL SITE PLAN C200
COVER SHEET, TOC, LOCATION, AND VICINITY MAPX-01
TABLE OF CONTENTS
W
2Q R
Q
-0
ARIMS: 1200 Disposition: Permanent
30 March 2021
W912QR21Q0046
H
IN
E S L E
Y A
V E
W E S T F
IE
L D B
L V
D
C O
R N
E L
IU
S A
V E
BO
U
LEVAR
D
PLAC
E
W E S T F
IE
L D B
L V
D
W E S T F
IE
L D B
L V
D
G R
AC
ELAN
D
AVE.
W E S T F
IE
LD
B
LV
D
W 59TH ST.
R
IV
E R
V
IE
W D
R
KESSLER BOULEVARD
S U
N S
E T A
V E
W E S T F
IE
L D B
L V
D
W . 6
.1
WL 694.2
W H
IT
E R
IV
E R
W 746.3
W H
IT
E R
IV
E R
PILES
PILES
PILES
PILES
W H
IT
E R
IV
E R
W 768.5
W 698.8
W 698.8
W 698.8
W 713.4
W 764.7
WHITE RIVER
W 718.1
W H
IT
E R
IV
E R
W 718.1
W.694.7
W.694.7
W.721.3
W.733.2
W 704.5
PILE
POOL
POOL
SUBSTATION
W 54TH ST.
W 52ND ST
FIBER OPTIC
FIBER OPTIC
FIBER OPTIC FIBER OPTIC
W H
IT
E R
IV
E R
W H
IT
E R
IV
E R
W H
IT
E R
IV
E R
LOVEROCK ROAD
IL
L
IN
O
IS
S
T
NORTHVIEW DRIVE
S T
O N
E H
IL
L D
R
IV
E
R
IV
IE
R A C
L U
B
IL
L
IN
O
IS
S
T
C A
N A L T
O W
P A T
H
FRIEDMAN PARK
IL
L
IN
O
IS
S
T
IL
L
IN
O
IS
S
T
IL
L
IN
O
IS
S
T
W E S T F
IE
LD
B
LV
D
53RD ST.
C A
N A L T
O E P
A T H
Parking Gravel
Inlet curb
ASPHALT PARKING AREA
R P
M
R P
M
INV. EL. 706.72
INV. EL. 706.09
VALVE
5+00
6+00
7+00
8+00
9+00
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
BUTLER UNIVERSITY TRACK
MAIN
TE
NANCE F
ACIL
ITY
BUTLE
R U
NIV
ERSIT
Y
H O
L C
O M
B G
A R
D E
N S
N . C
A P
IT
O L A
V E
N . K
E N
W O
O D A
V E
W 56TH ST.
W 58TH ST.
W 58TH ST.
C L
A R
E N
D O
N R
O A
D
RIP
PLE
RD.
N M
E R
ID
IA
N S
T
TRANSFORMER
100A 100C 100B
C O
M P
A N
Y C
A N
A L
IN
D
IA
N A P
O L
IS
W
A T E
R
W 58TH ST.
RIP
PLE
RD.
RIP
PLE
RD.
B Y
R A
M A
V E
L E
S T
E R S
T R
E E
T
LIFT STATION #507
CITY OF INDIANAPOLIS
well
Cinder Block
Asphalt
Tennis Courts Asphalt
Tennis Courts
Conc Curb
Conc Curb
W A T E R W
O R
K S C
A N
A L
IN
D
IA
N A P
O L
IS
D
E P T O F
W A T E R W
O R
K S C
A N
A L
IN
D
IA
N A P O
LI
S D
E P T . O
F
W A T E R W
O R
K S C
A N
A L
IN
D
IA
N A P O
LI
S D
E P T . O
F
W A T E
R W
O R
K S C
A N
A L
IN
D
IA
N A P
O L
IS
D
E P T O F
W A T E
R W
O R
K S C
A N
A L
IN
D
IA
N A P
O L
IS
D
E P T O
F
(PIPE J)
STORM SEWER
LOCATION OF
APPROXIMATE
10+00
13+00
14+00
1+00
2+00
8+00
9+00
0+00
3+00
4+00
5+00
6+00
7+00
11+00
12+00
(PIPE J)
STORM SEWER
LOCATION OF
APPROXIMATE
IL
L
IN
O
IS
S
T
.RIVIE
RA CLUB ENTRANCE
C O
R N
E L
IU
S A
V E
C B
C B
P
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P P
P
P
P PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
PP
P
P
P P
P
P P
P P
P
P
P
P
P
P
PP
CB CB CB
CB
CB
CB
CB
CB
CBCB
P
P
P
P
CB
CBCB
PPPPP
P
P
P
P
P
P
P
F L
O W
F L O
W
F L O
W
F L O
W
F L O
W
F L O
W
F L
O W
F L
O W
F L
O W
FLOW
F
LO
W
F L
O W
F L
O W
P
P
P
C200
1"=400'
SCALE: 1''= 400'
400 200 400 800FT
C204
C203
C202
C201
N
KEY MAP
SITE PLAN
WHITE RIVER
RIPPLE
ROCKY
FLOW
W 52ND ST
W 56TH ST.
W E S T F
IE
L D B
L V
D
KESSLER BOULEVARD
S T
O N
E H
IL
L D
R
IV
E
W 59TH ST.
W 58TH ST.
LOVEROCK RD
IL
L
IN
O
IS
S
T
IN
D
IA
N A
P O
L
IS
D
E P
T
O F W
A T
E R W
O R
K S
GENERAL NOTES:
STORM SEWER F,G, H, I, & J
BUTLER TOE DRAIN
WESTFIELD TOE DRAIN
CCTV INSPECT:3.
RECONSTRUCTING THE 52ND ST STOPLOG CLOSURE BASE2.
TESTING THE PASSIVE CLOSURE1.
THE SCOPE OF WORK INCLUDES THE FOLLOWING:
N . K
E N
W O
O D A
V E
C O
R N
E L
IU
S A
V E
H
IN
E S
L E
Y A
V E
B O
U L E
V A
R D P
L A
C E
W 54TH ST.
G R
AC
ELAN
D
AVE.
N . C
A P
IT
O L A
V E
W 52ND ST
W 53RD ST
IN
D
IA
N A
P O
L
IS
D
E P
T
O F W
A T
E R W
O R
K S
D
C
B
A
5 4 3 2 1
A
B
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
U.S.ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
LOUISVILLE,KENTUCKY
Revisions
Symbol Descriptions Approved
Designed by:
Drawn by:
Checked by:
Scale:
Date:
Drawing Code:
Sheet reference number:
Sheet of
US Army Corps of Engineers
Project
Architect
Date
Engineer/
FILE:
DATE:
\\coe-lrldfe01lou\org\ED\Public\CAD\Civil\112589-INC0-3B part 3 I-wall\CADD\Design Master files\Repair Contract drawings\Plans\inc0c200.dgn
09-DEC-2020
J. SINKHORN, P.E.
J. SINKHORN
J. SINKHORN
B. DORSCH P.E.
DEC 2020
C
D
IND-04/?
PASSIVE FLOODWALL TESTING AND STOPLOG BASE REPAIR
FLOOD DAMAGE REDUCTION PROJECT
INDIANAPOLIS, WHITE RIVER NORTH
C E
R T
IF
IE
D F
IN
A L D
O C
U M
E N
T S
Date
W
2Q R
Q
-0
ARIMS: 1200 Disposition: Permanent
W A T E R W
O R
K S C
A N
A L
IN
D
IA
N A P O
LI
S D
E P T . O
F
FIBER OPTIC
FIBER OPTIC FIBER OPTIC
ABANDONED 60" RCP
MH 100
EL. 710.00
N 1,677,615.23
E 188,685.83
EL. 711.40
N 1,677,381.31
E 188,415.32
MH B-2 101
MH B-3 102
R P
M
R P
M
ABAN
D
O N
ED
26" VC
P
W
W
TRANSFORMER
100A 100C 100B
CITY OF INDIANAPOLIS)
60" RCP (PLUGGED BY
EL. 710.00
RIM EL. = 713.24'
CB H1
ELEV 708.15
BOTTOM CENTER
PIPE INVERT
UNABLE TO OBTAIN
RIM EL. = 713.40'
CB I1
RIM EL. = 714.37'
CB D1
S L
IP
L
IN
E D T
O
IN
S
ID
E D
IA
M E
T E
R
" C
O N
C R
E T
E P
IP
E
" IN
S
ID
E D
IA
M E
T E
R B
R
IC
K L
IN
E D
EL. 713.55
N 1,677,042.15
E 188,484.81
MH / COMBO 410
W H
IT
E R
IV
E R
F L O
W
F L
O W
710.29'
P
P
CBCB
CB
SS
CB
SS
PP
BE RELEASED INTO THE STORM SEWER, NOT THE CANAL.
WATER RELEASED FROM THE BULKHEAD SHALL
STABILIZED BY RIPRAP.
CANAL SHALL OCCUR IN AREAS ALREADY
CANAL BANK IS ARMORED. PUMPING FROM THE
BE RELEASED INTO THE STORM SEWER, NOT THE CANAL.
WATER RELEASED FROM THE BULKHEAD SHALL
STABILIZED BY RIPRAP.
CANAL SHALL OCCUR IN AREAS ALREADY
CANAL BANK IS ARMORED. PUMPING FROM THE
INDICATED ON SHEET S201.
TEST THE PASSIVE SYSTEM AS
TO I-WALL STA. 44+20
FROM I-WALL STA. 43+70
CONSTRUCT CANAL SIDE TEMPORARY BULKHEAD
INDICATED ON SHEET S201.
TEST THE PASSIVE SYSTEM AS
TO I-WALL STA. 44+20
FROM I-WALL STA. 43+70
CONSTRUCT CANAL SIDE TEMPORARY BULKHEAD
INDICATED ON SHEET S201.
TEST THE PASSIVE SYSTEM AS
TO I-WALL STA. 43+06
FROM I-WALL STA. 37+02
CONSTRUCT CANAL SIDE TEMPORARY BULKHEAD
STA. 303+40
TOE DRAIN CLEAN OUT
STA. 300+00
TOE DRAIN CLEAN OUT
STA. 301+75
TOE DRAIN CLEAN OUT
INDICATED ON SHEET S201.
TEST THE PASSIVE SYSTEM AS
TO I-WALL STA. 43+06
FROM I-WALL STA. 37+02
CONSTRUCT CANAL SIDE TEMPORARY BULKHEAD
TO CONTRACT CLOSURE).
CONTRACT PERIOD (NOTICE TO PROCEED
DAMAGE RESTORED, DURING THE ENTIRE
GRADED TO DRAIN TO THE CANAL, ANY
MOWED, WOODY VEGETATION REMOVED,
AND THE CANAL SHALL BE MAINTAINED,
THE VEGETATED AREA BETWEEN THE PASSIVE WALL
FROM I-WALL STA. 37+00 - 45+00
TO CONTRACT CLOSURE).
CONTRACT PERIOD (NOTICE TO PROCEED
DAMAGE RESTORED, DURING THE ENTIRE
GRADED TO DRAIN TO THE CANAL, ANY
MOWED, WOODY VEGETATION REMOVED,
AND THE CANAL SHALL BE MAINTAINED,
THE VEGETATED AREA BETWEEN THE PASSIVE WALL
FROM I-WALL STA. 37+00 - 45+00
SHALL BE RELEASED INTO THE STORM SEWER, NOT THE CANAL.
EXISTING STORM SEWER CATCH BASIN, WATER FROM PASSIVE SYSTEM TEST
SHALL BE RELEASED INTO THE STORM SEWER, NOT THE CANAL.
EXISTING STORM SEWER GATEWELL, WATER FROM PASSIVE SYSTEM TEST
BEYOND THE WATERLINE OF THE CANAL IS NOT PERMITTED.
GENERAL CONTRACTOR WORK LIMITS. ACCESS
PROVIDE TRAFFIC MAINTENANCE OF TRAFFIC AND SIGNAGE.
COORDINATED WITH THE CITY AND COR. THE CONTRACTOR SHALL
DAY OF THE PASSIVE SYSTEM TEST. CLOSURE SHALL BE
CLOSURE OF WESTFIELD BLVD IS ONLY PERMITTED ON THE
PROVIDE TRAFFIC MAINTENANCE OF TRAFFIC AND SIGNAGE.
COORDINATED WITH THE CITY AND COR. THE CONTRACTOR SHALL
DAY OF THE PASSIVE SYSTEM TEST. CLOSURE SHALL BE
CLOSURE OF WESTFIELD BLVD IS ONLY PERMITTED ON THE
4 TON WEIGHT LIMIT
ASPHALT, 10' WIDE
MULTI-USE TRAIL
4 TON WEIGHT LIMIT
ASPHALT, 10' WIDE
MULTI-USE TRAIL
STA 43+51
GATEWELL #3
C201
1"=40'
N
MATCH LINE SHEET C202
SITE PLAN
TEXT=140 WT=3
SEWER SYSTEM AS IDENTIFIED ON THE PLANS.
WATER IS NOT PERMITED TO BE RELEASED INTO THE WATER CANAL. THE WATER MUST BE DISCHARGED INTO THE STORM
ALL FEES ASSOCIATED MUST BE PAID FOR BY THE CONCONTRACTOR.
TRAFFIC CLOSURE PLAN, DISCHARGE PUMPING PLAN, ESTIMATED WATER QUANTITY, AND PERFORMANCE DATE.
THE PERMIT REQUIRED FOR FIRE HYDRANT WATER SUPPLY SHALL INCLUDE:
THE MONTHS AFTER JUNE DUE TO HIGH DEMAND AT THE TREATMENT FACILITY.
WATER MAY BE PUMPED FROM THE CANAL IN THE MONTHS APRIL, AND MAY. PUMPING FROM THE CANAL IS PROHIBITED IN
EROSION CONTROL MEASURES AND GROUND COVER ESTABLISHMENT.
A SECOND INSPECTION MUST BE SCHEDLED 30 DAYS AFTER TO VERIFY THE REPAIR AND REMOVAL OF ANY TEMPORARY
INSPECTION BY BOTH THE COR AND CEG.
ANY REPAIRS TO THE CANAL SHALL BE COMPLETED WITHIN THREE DAYS OF THE DAMAGE AND DIRECTLY FOLLOWED BY AN
TO THE SATISFACTION OF CEG AND THE COR.
ACKNOWLEDGEMENT STATING CONTRACTOR SHALL RECTIFY ANY ISSUES CAUSED BY THE CANAL WATER REMOVAL PROJECT THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS TO ANY DAMAGE CAUSED TO THE CANAL THE PERMIT SHALL INCLUDE AN
RATES AND APPROXIMATE TOTAL QUANTITY.
AREA, SKETCHES OF THE PLANNED WATER REMOVAL SCHEME, DURATION OF WATER REMOVAL, PROPOSED PUMPING THE PERMIT SHALL INCLUDE LOCATION (PLAN VIEW), PHOTOS OF THE PRE-CONSTRUCTION WITHDRAWING/DISCHARGING
A MINIMUM OF THREE OPTIONS SHALL BE PROVIDED FOR COORDINATION IN THE PERMIT.
WITHIN THE 14 DAY REVIEW PERIOD AN ON-SITE MEETING WITH THE COR, CONTRACTOR, AND CEG SHALL BE SCHEDULED.
OF CONTRACTOR’S PROPOSAL.
REVIEW. CONTRACTOR SHALL ALLOW 14 CALENDAR DAYS FOR REVIEW, PRE-ACTIVITY WALK-THROUGH AND, APPROVAL CONTRACTOR SHALL SUBMIT CANAL WATER REMOVAL PLANS TO CITIZENS ENERGY GROUP EDWIN MORRIS, FOR
THE PERMIT REQUIRED FOR WATER REMOVED FROM THE CANAL REQUIRES THE FOLLOWING:
THE PRIMARY CEG CONTACT WILL BE EDWIN MORRIS. EMORRIS@CITIZENSENERGYGROUP.COM
BOTH WATER SOURCES REQUIRE PERMITING FROM CEG. PERMITS SHALL BE SUBMITTED TO THE COR AND CEG.
THE CONTRACTOR MAY DECIDE TO UTILIZED WATER FROM THE CANAL OR WATER FROM NEARBY FIRE HYDRANTS.
D
C
B
A
5 4 3 2 1
A
B
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
U.S.ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
LOUISVILLE,KENTUCKY
Revisions
Symbol Descriptions Approved
Designed by:
Drawn by:
Checked by:
Scale:
Date:
Drawing Code:
Sheet reference number:
Sheet of
US Army Corps of Engineers
Project Architect
Date
Engineer/
FILE:
DATE:
$$$pathname
$$$DATETIME
J. SINKHORN, P.E.
J. SINKHORN
J. SINKHORN
B. DORSCH P.E.
DEC 2020
C
D
IND-04/?
PASSIVE FLOODWALL TESTING AND STOPLOG BASE REPAIR
FLOOD DAMAGE REDUCTION PROJECT
INDIANAPOLIS, WHITE RIVER NORTH
C E
R T
IF
IE
D F
IN
A
L D
O C
U M
E N
T S
Date
GENERAL NOTES
TO
E STA. 301+00
TO
E STA. 302+00
TO
E STA. 303+00
TO
E STA. 304+00
TO
E STA. 305+00
TO
E STA. 306+00
TO
E STA. 307+00
TOE DRAIN IS HDPE, 12" DIAMETER
CCTV INSPECT THE ENTIRE PIPE APPROXIMATELY 1,000 LF
OF THE CANAL CLOSURE STRUCTURE STA 299+75
WESTFIELD TOE DRAIN BEGINS IN THE HEADWALL
TOE STA 307+30
TOE DRAIN CLEANOUT
I-WALL STA 37+00
I-W
ALL STA 39+00
I-W
ALL STA 40+00
I-W
ALL STA 41+00
I-W
ALL STA 42+00
I-W
ALL STA 43+00
I-W
ALL STA 44+00
I-W
ALL STA 45+00
38+00
I-W
ALL STA
TOE STA 306+24
TOE DRAIN CLEANOUT
TOE STA 306+63
TOE DRAIN CLEANOUT
- 100 LFPIPE J
- 25 LFPIPE I
- 15 LFPIPE H
- 10 LFPIPE G
- 250 LFPIPE F
- 700 LFBUTLER TOE DRAIN
- 1,000 LFWESTFIELD TOE DRAIN
WITH THE SOP LOCATED AT THE END OF THE SPECIFICATINS:
CCTV INSPECT ALL PIPES AS SHOWN, IN ACCORDANCE 3.
SEE SHEET S101 FOR DETAILS.
INSTALLED DURING FINAL INSPECTION.
SHALL FIT NEW STOPLOG BASE AND SHALL BE TRIAL
STOPLOG CLOSURE BASE. EXISTING STOPLOGS
REMOVE AND CONSTRUCT NEW 52ND ST. 2.
PASSIVE FLOODWALL DETAILS.
SECTIONS PER DETAIL 1 ON SHEET S201. SHEET S201 PROVIDES ADDITIONAL
INSTALL TEMPORARY BULKHEAD AND TEST BOTH PASSIVE FLOODWALL 1.
FOR GENERAL LOCATION OF WORK TO BE COMPLETED UNDER THIS CONTRACT.
OF THE FLOODWALL AND TOE DRAINS. THE STATIONING IS PROVIDED
ALIGNMENTS SHOWN REFERENCE THE ORIGINAL CONSTRUCTION
SCALE: 1''= 40'
40 20 40 80FT
TOE STA 306+93
TOE DRAIN CLEANOUT
W
2Q R
Q
-0
T E R W
O R
K S C
A N
A L
IN
D
IA
N A P O
LI
S D
E P T . O
F
C O
R N
E L
IU
S A
V E
BO
U
LEVAR
D
PLAC
E
W E S T F
IE
L D B
L V
D
G R
AC
ELAN
D
AVE.
W 54TH ST.
C A
N A L T
O E P
A T H
12"
12" T
ILE
RIP
PLE
RD.
711.04'
RIM EL. = 714.37'
CB D1
RIM EL. = 714.21'
CB E1
710.41'
RIM EL. = 714.58'
CB A1
711.85'
CURB INLET
RIM EL. = 715.15'
CB C1
712.55'
713.57'
CURB INLET
RIM EL. = 716.22'
CB B1
PIPE INVERT
UNABLE TO OBTAIN
RIM EL. = 714.18'
CB Y
BOTTOM CENTER
708.68'
RIM EL. = 714.46'
CB X
711.76'
RIM EL. = 714.61'
CB U
RIM EL. = 714.24'
CB V
W E S T F
IE
L D B
L V
D
F L O
W
P
PP
P
CB
CB
CB
CB
CB
S
CB
S
CB
CBCB
SS
CB
CB
THE TESTING OF THE FLOODWALL. THE MULTI-USE TRAIL HAS A 4 TON WEIGHT LIMIT.
AND TESTING OF THE PASSIVE FLOODWALL. 25' X 60' LAYDOWN AREA IS PROVIDED FOR
GENERAL CONTRACTOR WORKLIMITS FOR CCTV OF WESTFEILD TOE DRAIN
AND OTHER REQUIRED EQUIPMENT.
ACCESS IS PROVIDED FOR MOWING
SHALL BE RELEASED INTO THE STORM SEWER, NOT THE CANAL.
EXISTING STORM SEWER, WATER FROM PASSIVE SYSTEM TEST
MAINTENACE OF TRAFIC AND SIGNAGE.
THE CONTRACTOR SHALL PROVIDE TRAFFIC
COORDINATED WITH THE CITY AND COR.
SYSTEM TEST. CLOSURE SHALL BE
PERMITTED ON THE DAY OF THE PASSIVE
CLOSURE OF WESTFIELD BLVD IS ONLY
PROVIDE TRAFFIC MAINTENACE OF TRAFIC AND SIGNAGE.
COORDINATED WITH THE CITY AND COR. THE CONTRACTOR SHALL
DAY OF THE PASSIVE SYSTEM TEST. CLOSURE SHALL BE
CLOSURE OF WESTFIELD BLVD IS ONLY PERMITTED ON THE
N
MATCH LINE SHEET C201
MATCH LINE SHEET C203
C202
1"=40'
SITE PLAN
D
C
B
A
5 4 3 2 1
A
B
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
U.S.ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
LOUISVILLE,KENTUCKY
Revisions
Symbol Descriptions Approved
Designed by:
Drawn by:
Checked by:
Scale:
Date:
Drawing Code:
Sheet reference number:
Sheet of
US Army Corps of Engineers
Project
Architect
Date
Engineer/
FILE:
DATE:
\\coe-lrldfe01lou\org\ED\Public\CAD\Civil\112589-INC0-3B part 3 I-wall\CADD\Design Master files\Repair Contract drawings\Plans\inc0c202.dgn
09-DEC-2020
J. SINKHORN, P.E.
J. SINKHORN
J. SINKHORN
B. DORSCH P.E.
DEC 2020
C
D
IND-04/?
PASSIVE FLOODWALL TESTING AND STOPLOG BASE REPAIR
FLOOD DAMAGE REDUCTION PROJECT
INDIANAPOLIS, WHITE RIVER NORTH
C E
R T
IF
IE
D F
IN
A L D
O C
U M
E N
T S
Date
GENERAL NOTES
TO
E S
TA
. 308+00
TO
E S
TA
. 309+00
TO
E S
TA
. 309+82
TOE STA 309+51
TOE DRAIN CLEANOUT
END OF WESTFIELD TOE DRAIN
I-W
ALL STA 47+00
I-W
ALL STA 48+00
I-W
ALL STA 49+00
I-W
ALL STA 50+00
I-W
ALL STA 51+00
I-W
ALL STA 52+00
I-W A
LL S
T A 53+
I-W A
LL S
T A 54+
I-W A
LL S
T A 55+
I-W A
LL S
T A 56+
I-W A
LL S
T A 57+
I-W A
LL S
T A 58+
46+00
I-W A
LL S
T
SCALE: 1''= 40'
40 20 40 80FT
- 100 LFPIPE J
- 25 LFPIPE I
- 15 LFPIPE H
- 10 LFPIPE G
- 250 LFPIPE F
- 700 LFBUTLER TOE DRAIN
- 1,000 LFWESTFIELD TOE DRAIN
CCTV INSPECT ALL PIPES AS SHOWN:3.
SEE SHEET S101 FOR DETAILS.
INSTALLED DURING FINAL INSPECTION.
SHALL FIT NEW STOPLOG BASE AND SHALL BE TRIAL
STOPLOG CLOSURE BASE. EXISTING STOPLOGS
REMOVE AND CONSTRUCT NEW 52ND ST. 2.
PASSIVE FLOODWALL DETAILS.
SECTIONS PER DETAIL 1 ON SHEET S201. SHEET S201 PROVIDES ADDITIONAL
INSTALL TEMPORARY BULKHEAD AND TEST BOTH PASSIVE FLOODWALL 1.
FOR GENERAL LOCATION OF WORK TO BE COMPLETED UNDER THIS CONTRACT.
OF THE FLOODWALL AND TOE DRAINS. THE STATIONING IS PROVIDED
ALIGNMENTS SHOWN REFERENCE THE ORIGINAL CONSTRUCTION
AREA
LAYDOWN
25' X 60'
W
2Q R
Q
-0
T E
R W
O R
K S C
A N
A L
IN
D
IA
N A P
O L
IS
D
E P T O F
715 715
H
IN
E S L E
Y A
V E
S U
N S
E T A
V E
W E S T F
IE
L D B
L V
D
715 715
W 52ND ST
C A
N A L T
O W
P A T H
53RD ST.
9 7
W 52ND ST
APT.
TERRACE
UNIVERSITY
W 53rd ST
B Y
R A
M A
V E
B Y
R A
M A
V E
C O
R N
E L
IU
S A
V E
53RD ST.
F L O
W
S
P
P
P
P
CB
SC
E
CB
CB
S
G
CB
S
CB
W
G
DCB
S
CB
D
CB
CB
CB
CB
CB
CB
S
CB
CB
CB
D
D
C.L. I-WALL
CATCH BASIN IN THE ROAD.
(PIPE F) END CCTV INSPECTION AT THE
CONTINUE CCTV INSPECTION THROUGH INLET.
(PIPE F) TYPE R INDOT GRATE
STORM LINE F
PARTIALLY HDPE - 12" DIA
PARTIALLY CMP - 15" DIA
TOTAL LENGTH 250 LF
(PIPE F) BEGIN CCTV OF EXISTING STORM SEWER
SEE CLOSURE FOUNDATION REPAIR DETAILS ON SHEET S101
SEE GENERAL STRUCTURAL NOTES ON SHEET S001
STOPLOG CLOSURE FOUNDATION.
REPAIR THE 52ND STREET
SEE CLOSURE FOUNDATION REPAIR DETAILS ON SHEET S101
SEE GENERAL STRUCTURAL NOTES ON SHEET S001
STOPLOG CLOSURE FOUNDATION.
REPAIR THE 52ND STREET
CCTV INSPECT TOTAL LENGTH 10 LF
(PIPE G) 12" RCP STORM DRAIN WITH HEADWALL AND FLAPGATE
CONTRACTOR,
ANY DAMAGE TO THE ADJACENT AREAS MUST BE REPAIRED BY THE
VEHICLE, DETOUR SIGNAGE MUST BE PROVIDED BY THE CONTRACTOR.
EQUIPMENT, NOT TO EXCEED 4 TONS. IF ACCESSED BY
THE 10' MULTI USE TRAIL MAY BE ACCESSED BY CCTV
GENERAL CONTRACTOR WORKLIMITS ARE PROVIDED.
BE REPAIRED BY THE CONTRACTOR.
LIMITED TO 3 WEEKS. DAMAGE TO THE LAYDOWN AREAS SHALL
WATER FOUNTAIN. MATERIAL STOCK PILE DURATION SHOULD BE
STOCKPILED WITHIN 5' OF THE FLOODWALL, MULTI-USE TRAIL, OR
TWO LAYDOWN AREAS ARE PROVIDED, MATERIAL SHALL NOT BE
RAIL, OR THE BROADRIPPLE INTERCEPTOR.
CONTRACTOR SHOULD AVOID ANY IMPACT TO THE EXISTING GUARD
GENERAL CONTRACTOR WORKLIMITS FOR 52ND STREET REPAIR.
DO NOT BLOCK THE ENTIRE ROAD FOR THIS WORK.
REQUIRE WHILE OCCUPYING THE ROAD OR THE TRAIL.
LIMIT IS 4 TONS. MAINTENANCE OF TRAFFIC SIGNAGE IS
ON THE MULTI USE TRAIL. THE MULTI USE TRAIL WEIGHT
CCTV MAY TEMPORARILY BE PARKED IN THE STREET OR
GENERAL CONTRACTOR WORKLIMITS FOR CCTV OF PIPE F.
TRAFFIC SHALL BE DETOURED TO THE 53RD STREET BRIDGE.
SHALL PROVIDE MAINTENACE OF TRAFIC PLANS AND SIGNAGE.
SHALL BE COORDINATED WITH THE CITY AND COR. THE CONTRACTOR
CLOSURE OF 52ND STREET BRIDGE SHALL BE MINIMIZED. CLOSURE
N
MATCH LINE SHEET C207
MATCH LINE SHEET C202
C203
1"=40'
SITE PLAN
D
C
B
A
5 4 3 2 1
A
B
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
U.S.ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
LOUISVILLE,KENTUCKY
Revisions
Symbol Descriptions Approved
Designed by:
Drawn by:
Checked by:
Scale:
Date:
Drawing Code:
Sheet reference number:
Sheet of
US Army Corps of Engineers
Project
Architect
Date
Engineer/
FILE:
DATE:
\\coe-lrldfe01lou\org\ED\Public\CAD\Civil\112589-INC0-3B part 3 I-wall\CADD\Design Master files\Repair Contract drawings\Plans\inc0c203.dgn
09-DEC-2020
J. SINKHORN, P.E.
J. SINKHORN
J. SINKHORN
B. DORSCH P.E.
DEC 2020
C
D
IND-04/?
PASSIVE FLOODWALL TESTING AND STOPLOG BASE REPAIR
FLOOD DAMAGE REDUCTION PROJECT
INDIANAPOLIS, WHITE RIVER NORTH
C E
R T
IF
IE
D F
IN
A L D
O C
U M
E N
T S
Date
GENERAL NOTES
SCALE: 1''= 40'
40 20 40 80FT
I-W A
LL S
T A 58+
I-W A
LL S
T A 59+
I-W A
LL S
T A 60+
I-W A
LL S
T A 61+
I-W A
LL S
T A 62+
I-W
ALL STA 63+00
I-W
ALL STA 66+00
I-WALL STA 67+00
64+00
STA
I-W
ALL
STA 65+00
I-W
ALL
STA 68+00
I-WALL
STA 69+00
I-WALL
- 100 LFPIPE J
- 25 LFPIPE I
- 15 LFPIPE H
- 10 LFPIPE G
- 250 LFPIPE F
- 700 LFBUTLER TOE DRAIN
- 1,000 LFWESTFIELD TOE DRAIN
CCTV INSPECT ALL PIPES AS SHOWN:3.
SEE SHEET S101 FOR DETAILS.
INSTALLED DURING FINAL INSPECTION.
SHALL FIT NEW STOPLOG BASE AND SHALL BE TRIAL
STOPLOG CLOSURE BASE. EXISTING STOPLOGS
REMOVE AND CONSTRUCT NEW 52ND ST. 2.
PASSIVE FLOODWALL DETAILS.
SECTIONS PER DETAIL 1 ON SHEET S201. SHEET S201 PROVIDES ADDITIONAL
INSTALL TEMPORARY BULKHEAD AND TEST BOTH PASSIVE FLOODWALL 1.
FOR GENERAL LOCATION OF WORK TO BE COMPLETED UNDER THIS CONTRACT.
OF THE FLOODWALL AND TOE DRAINS. THE STATIONING IS PROVIDED
ALIGNMENTS SHOWN REFERENCE THE ORIGINAL CONSTRUCTION
30' X 50' 30' X 50'
W
2Q R
Q
-0
SHRUB
SHRUB
SHRUB
x x x x x
FIBER OPTIC
C A
N A L T
O W
P A T
H
SD
SD
SD
SD
SD
SD
S D
S D
S D
S D
S D
9 721
BUTLER UNIVERSITY TRACK
MAIN
TE
NANCE F
ACIL
ITY
BUTLE
R U
NIV
ERSIT
Y
H O
L C
O M
B G
A R
D E
N S
C L
A R
E N
D O
N R
O A
D
W A T E
R W
O R
K S C
A N
A L
IN
D
IA
N A P
O L
IS
D
E P T O
F
(PIPE J)
STORM SEWER
LOCATION OF
APPROXIMATE
(PIPE J)
STORM SEWER
LOCATION OF
APPROXIMATE
P
S
S
S
F L O
W
TOE DRAIN AT THE CLEAN OUT.
ACCESS PIPE J AT THE CONNECTION WITH BUTLER
IN BOTH DIRECTIONS. TOTAL 100 LF
CCTV INSPECT THE PIPE 50 FEET
(PIPE J) EXISTING 12" HDPE STORM SEWER.
FLAP GATE CCTV INSPECT TOTAL LENGTH 25 LF
(PIPE I)18" RCP STORM DRAIN WITH
FLAP GATE CCTV INSPECT TOTAL LENGTH 15 LF
(PIPE H) 18" RCP STORM DRAIN WITH
CCTV INSPECT
TOE DRAIN DAY LIGHTTOE DRAIN DAY LIGHT
CCTV INSPECT
TOE DRAIN DAY LIGHT
CCTV INSPECT
TOE DRAIN DAY LIGHT
CCTV INSPECT
TOE DRAIN DAY LIGHT
PIPE J CCTV INSPECTION
APPROXIMATE EXTENT OF
PIPE J CCTV INSPECTION
APPROXIMATE EXTENT OF
TO PULL THROUGH WITHOUT BACKING OUT.
ACCESS IS AVAILABLE TO ALLOW CCTV EQUIPMENT
N
MATCH LINE SHEET C203
C204
1"=40'
SITE PLAN
D
C
B
A
5 4 3 2 1
A
B
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
U.S.ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
LOUISVILLE,KENTUCKY
Revisions
Symbol Descriptions Approved
Designed by:
Drawn by:
Checked by:
Scale:
Date:
Drawing Code:
Sheet reference number:
Sheet of
US Army Corps of Engineers
Project
Architect
Date
Engineer/
FILE:
DATE:
\\coe-lrldfe01lou\org\ED\Public\CAD\Civil\112589-INC0-3B part 3 I-wall\CADD\Design Master files\Repair Contract drawings\Plans\inc0c204.dgn
09-DEC-2020
J. SINKHORN, P.E.
J. SINKHORN
J. SINKHORN
B. DORSCH P.E.
DEC 2020
C
D
IND-04/?
PASSIVE FLOODWALL TESTING AND STOPLOG BASE REPAIR
FLOOD DAMAGE REDUCTION PROJECT
INDIANAPOLIS, WHITE RIVER NORTH
C E
R T
IF
IE
D F
IN
A L D
O C
U M
E N
T S
Date
GENERAL NOTES
SCALE: 1''= 40'
40 20 40 80FT
TOE STA 400+00
TOE STA 401+00
TOE STA 402+00
TO
E STA 403+00
T O E S
T A 404+00
TOE STA 405+00
TOE STA 405+91
TOE STA 401+08
TOE DRAIN CLEAN OUT
TOE STA 401+29
TOE DRAIN CLEAN OUT
TOE STA 401+46
TOE DRAIN CLEAN OUT
TOE STA 402+43
TOE DRAIN CLEAN OUT
TOE STA 404+45
PT STA
TOE DRAIN IS HDPE, 12" DIAMETER
ALL DAYLIGHT PIPES. APPROXIMATELY 700 LF
CCTV INSPECT THE ENTIRE PIPE INCLUDING
BEGIN BUTLER TOE DRAIN TOE STA 400+00
TOE STA 405+91
END BUTLER TOE DRAIN
I-W
ALL
STA 7
0+
I-WALL STA 71+00
I-WALL STA 72+00
I-WALL STA 73+00
I-W A L L S
T A
I-WALL STA 75+00
I-WALL STA 76+00
I-WALL STA 77+
I-WALL STA 78+
I-WALL STA 78+
- 100 LFPIPE J
- 25 LFPIPE I
- 15 LFPIPE H
- 10 LFPIPE G
- 250 LFPIPE F
- 700 LFBUTLER TOE DRAIN
- 1,000 LFWESTFIELD TOE DRAIN
CCTV INSPECT ALL PIPES AS SHOWN:3.
SEE SHEET S101 FOR DETAILS.
INSTALLED DURING FINAL INSPECTION.
SHALL FIT NEW STOPLOG BASE AND SHALL BE TRIAL
STOPLOG CLOSURE BASE. EXISTING STOPLOGS
REMOVE AND CONSTRUCT NEW 52ND ST. 2.
PASSIVE FLOODWALL DETAILS.
SECTIONS PER DETAIL 1 ON SHEET S201. SHEET S201 PROVIDES ADDITIONAL
INSTALL TEMPORARY BULKHEAD AND TEST BOTH PASSIVE FLOODWALL 1.
FOR GENERAL LOCATION OF WORK TO BE COMPLETED UNDER THIS CONTRACT.
OF THE FLOODWALL AND TOE DRAINS. THE STATIONING IS PROVIDED
ALIGNMENTS SHOWN REFERENCE THE ORIGINAL CONSTRUCTION
W
2Q R
Q
-0
1/2" = 1'-0"1
52ND ST CLOSURE FLOOD LOAD
DIAGRAM- EXTREME
1/2" = 1'-0"2
52ND ST CLOSURE FLOOD LOAD
DIAGRAM- UNUSUAL
B. EVANS
B. EVANS
C. YOUNG
S-001
DESIGN LOADS, & ABBRIVIATIONS
GENERAL STRUCTURAL NOTES,
STRUCTURAL STEEL
1. STRUCTURAL STEEL DESIGN AND CONSTRUCTION SHALL CONFORM WITH THE
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) 2010 "SPECIFICATION FOR
STRUCTURAL STEEL BUILDINGS" (AISC 360), 2010 "CODE OF STANDARD PRACTICE
FOR STEEL BUILDINGS AND BRIDGES" (AISC 303) AND ETL 1110-2-584 "DESIGN OF HYDRAULIC
STEEL STRUCTURES" (USACE 2014).
2. MATERIALS AND SHAPES.
a. MISCELLANEOUS SHAPES, CHANNELS, ANGLES, AND PLATES SHALL BE ASTM A36.
b. WELDING ELECTRODES SHALL BE E70XX EXCEPT WHERE OTHER ELECTRODES
ARE REQUIRED FOR COMPATIBILITY WITH MATERIAL BEING WELDED.
c. ANCHOR RODS SHALL BE ASTM A1554 GR. 36.
d. HEADED STUD ANCHORS SHALL BE ASTM A108.
e. MULLION BASEPLATES SHALL BE ASTM A240 GR 316L.
3. STEEL CONNECTIONS SHALL BE BOLTED OR WELDED AS INDICATED.
a. BOLTED CONNECTIONS SHALL CONFORM WITH THE STRUCTURAL COUNCIL ON
STRUCTURAL CONNECTIONS (RCSC) "SPECIFICATION FOR STRUCTURAL JOINTS
USING HIGH-STRENGTH BOLTS."
b. USE FULLY PRE-TENSIONED ASTM F3125 A325-N BOLTED CONNECTIONS WITH HARDENED
WASHERS FOR CONNECTIONS.
c. USE HARDENED WASHERS FOR OVERSIZED AND SHORT-SLOTTED HOLES. USE
5/16" THICK A36 PLATE WASHERS FOR LONG-SLOTTED HOLES.
d. USE 3/4" DIAMETER (ø) BOLTS UNO.
e. USE STANDARD SIZE BOLT HOLES. SHORT SLOTS PERPENDICULAR TO LOAD
MAY BE USED FOR BEAM END SHEAR CONNECTIONS.
f. PROVIDE MINIMUM EDGE DISTANCE AND BOLT SPACING PER AISC 360.
g. STRUCTURAL STEEL WELDING SHALL CONFORM WITH THE AMERICAN WELDING
SOCIETY (AWS) 2015 STRUCTURAL WELDING CODE - STEEL (AWS D1.1) OR AWS 2016
STRUCTURAL WELDING CODE- STAINLESS STEEL (AWS D1.6).
h. WHERE WELD SIZE IS NOT SHOWN, USE MINIMUM WELD SIZE PER
AWS D1.1 OR AWS D1.6. WHERE WELD LENGTH IS NOT SHOWN, USE CONTINUOUS
WELDS.
i. WELDING SHALL BE PERFORMED BY OPERATORS CERTIFIED BY AWS IN
PERFORMING THE TYPE OF WORK INDICATED.
n. USE CONNECTIONS PER TYPICAL DETAILS WHERE APPLICABLE.
4. DO NOT FIELD CUT OR MODIFY STRUCTURAL STEEL FOR WORK OF OTHER TRADES
WITHOUT PRIOR WRITTEN APPROVAL OF THE DESIGNER OF RECORD.
6. GALVANIZING: HOT DIP GALVANIZE STEEL EXPOSED TO WEATHER. GALVANIZE PER
ASTM A-123 FOR ROLLED, PRESSED, OR FORGED SHAPES AND PLATES, ASTM A-153
FOR HARDWARE ITEMS, AND ASTM A-386 FOR ASSEMBLED STEEL PRODUCTS. RELIEF
ANGLES AND SHELF ANGLES FOR MASONRY SHALL BE GALVANIZED. BOLTS EXPOSED
TO WEATHER OR BOLTS FOR STEEL EXPOSED TO WEATHER SHALL BE HOT DIP
GALVANIZED. TOUCH UP SURFACES MISSING GALVANIZATION COATING WITH
APPROVED COLD GALVANIZING.
7. SILL ANGLE MUST BE HOT DIP GALVANIZED THEN EPOXY COATED WITH AN INDOT APPROVED
EPOXY COATING SYSTEM. APPLY EPOXY COATING IN ACCORDANCE WITH MANUFACTURERS
RECOMMENDATIONS.
STRUCTURAL CONCRETE
1. STRUCTURAL CONCRETE DESIGN AND CONSTRUCTION SHALL CONFORM WITH THE
AMERICAN CONCRETE INSTITUTE (ACI) 2014 "BUILDING CODE REQUIREMENTS FOR
STRUCTURAL CONCRETE" (ACI 318), 2014 "SPECIFICATIONS FOR STRUCTURAL
CONCRETE" (ACI 303), 2004 "ACI DETAILING MANUAL" (ACI SP-66), AND EM 1110-2-2104 "STRENGTH
DESIGN FOR REINFORCED CONCRETE HYDRAULIC STRUCTURES" (USACE 2016).
2. CAST-IN-PLACE CONCRETE SHALL ATTAIN A MINIMUM 28-DAY COMPRESSIVE
STRENGTH (f'c) OF 5000 PSI.
3. CONCRETE DENSITY SHALL BE NORMAL WEIGHT FOR FOUNDATIONS AND SLAB ON
GRADE.
4. CONCRETE REINFORCEMENT SHALL BE STEEL DEFORMED BARS CONFORMING TO
ASTM A615, GRADE 60.
5. DO NOT WELD CONCRETE REINFORCEMENT.
6. SHOP FABRICATE BENDS AND HOOKS. DO NOT FIELD BEND.
7. PROVIDE SUPPORTS FOR REINFORCEMENT AS NEEDED. WELDED WIRE
REINFORCEMENT SHALL BE SUPPORTED AT 2'-0" ON CENTER, EACH DIRECTION
MAXIMUM.
8. CONCRETE REINFORCEMENT SHALL BE CONTINUOUS. SPLICES SHALL BE MADE BY
LAPPING WITH CLASS B LAPS PER ACI 318.
9. MINIMUM CONCRETE COVER FOR REINFORCEMENT SHALL BE IN ACCORDANCE WITH
ACI 318 AND EM 1110-2-2104:
A. ROADWAY SURFACE (TOP FACE) AND BOTTOM FACE 4"
B. ALL OTHER FACES 4"
10. PROVIDE STANDARD HOOKS WITH 90 DEGREE BENDS AND EXTEND A MINIMUM OF 12
BAR DIAMETERS IN LENGTH. STIRRUPS, TIES, AND 180 & 135 DEGREE HOOKS SHALL
CONFORM TO ACI 318.
11.PROVIDE 1/2" THICK JOINT FILLER MATERIAL WHERE SLABS ON GRADE ABUT
CONCRETE, MASONRY, OR STEEL VERTICAL SURFACES, UNO.
12. EMBEDDED ITEMS SHALL BE PROPERLY PLACED, ACCURATELY POSITIONED AND
SECURELY MAINTAINED IN PLACE PRIOR TO AND DURING CONCRETE PLACEMENT.
13. SPREAD CONCRETE REINFORCEMENT AT SLEEVES, ANCHORS, RECESSES AND
OTHER EMBEDDED ITEMS WHERE BAR SPACING WILL NOT EXCEED 1.5 TIMES THE
NORMAL SPACING. DO NOT CUT REINFORCEMENT TO FACILITATE PLACEMENT
OF EMBEDDED ITEMS.
14.ALUMINUM SHALL NOT BE PLACED IN DIRECT CONTACT WITH CONCRETE. COAT
ALUMINUM WITH COATING CONFORMING TO ASTM D1187, ASPHALT-BASE EMULSION,
TO PREVENT ALUMINUM-CONCRETE REACTION AND ELECTROLYTIC ACTION BETWEEN
ALUMINUM AND STEEL.
15.PROVIDE FOUNDATION DOWELS FOR WALLS, PIERS, AND COLUMNS. MATCH SIZE AND
SPACING OF VERTICAL STEEL.
16. PRIOR TO PLACEMENT OF CONCRETE, SUBMIT JOINT LAYOUTS TO THE DESIGNER OF
RECORD FOR APPROVAL. CONSTRUCTION JOINTS SHALL BE POSITIONED TO
PREVENT CHANGE IN STRUCTURAL DESIGN REQUIREMENTS. CONTRACTION JOINTS MUST NOT
BE USED.
17.LAP SPLICES: LAP TENSION SPLICES PER THE FOLLOWING TABLE AND MODIFY LENGTHS AS
NOTED:
1. TOP BARS ARE DEFINED AS ANY HORIZONTAL BAR WITH MORE THAN 12" OF FRESH
CONCRETE CAST BELOW THE SPLICED BARS.
TENSION LAP SPLICES - CLASS
B FOR TOP & BOTTOM BARS
BAR
SIZE
#4
#5
#6
#7
#8
#9
#10
TOP BOT.
f'c= 5000 psi
2'-5" 1'-10"
3'-0" 2'-4"
3'-7" 2'-9"
5'-3" 4'-0"
6'-0"4'-7"
6'-9" 5'-2"
7'-7" 5'-10"
GENERAL NOTES
1. GENERAL NOTES SHALL APPLY UNLESS NOTED OTHERWISE IN THE CONTRACT
DOCUMENTS, INCLUDING PLANS, DETAILS, OR SPECIFICATIONS. USE TYPICAL
DETAILS WHERE APPLICABLE. SEE SPECIFICATIONS FOR ADDITIONAL
REQUIREMENTS.
2. USE THE STRUCTURAL DRAWINGS IN CONJUNCTION WITH ALL OTHER DRAWINGS.
COORDINATE THE WORK OF OTHER TRADES INCLUDING, BUT NOT LIMITED, WITH THE
REQUIREMENTS FOR SLEEVES, INSERTS, HOLES, HANGERS, AND ANCHORS.
3. DO NOT SCALE THE DRAWINGS.
4. VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO CONSTRUCTION. REPORT
DISCREPANCIES IN DIMENSIONS BETWEEN DIFFERENT DRAWINGS TO THE
CONTRACTING OFFICER PRIOR TO BEGINNING WORK IN AREAS THAT WILL BE
AFFECTED.
5. DURING THE BIDDING PHASE, THE CONTRACTOR SHALL SUBMIT A REQUEST FOR
INTERPRETATIONS OF CONFLICTS OR DISCREPANCIES. IF NO REQUEST IS MADE,
ALL PROVISIONS WILL BE ASSUMED TO BE INCLUDED IN THE BID. THE CONTRACTING
OFFICER SHALL DETERMINE WHICH PROVISION GOVERNS AND THE CONTRACTOR
SHALL PERFORM THE WORK AT NO ADDITIONAL COST TO THE GOVERNMENT.
6. NOTIFY THE CONTRACTING OFFICER OF ANY DISCREPANCIES ON THE STRUCTURAL
DRAWINGS OR BETWEEN THE STRUCTURAL DRAWINGS AND OTHER DRAWINGS PRIOR TO
PROCEEDING WITH CONSTRUCTION.
7. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE SAFETY OF PERSONS
AND PROPERTY DURING CONSTRUCTION.
8. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR MEANS AND METHODS TO
CONSTRUCT THE STRUCTURE, INCLUDING, BUT NOT LIMITED TO, VERIFICATION OF
LOAD CAPACITY OF THE STRUCTURE, NEW OR EXISTING, TO SUPPORT CONSTRUCTION
ACTIVITIES, EQUIPMENT, ETC. AND LIMITING THE AMOUNT OF CONSTRUCTION LOAD.
DAMAGE TO ADJACENT AREAS CAUSED BY CONSTRUCTION ACTIVITIES SHALL BE
CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
TEMPORARY CONSTRUCTION MATERIAL SHALL REMAIN THE PROPERTY OF THE
CONTRACTOR AFTER COMPLETION OF THE PROJECT.
9. REPRODUCTION OF CONTRACT DRAWINGS SHALL NOT BE USED AS SHOP DRAWINGS.
SHOP DRAWINGS SHALL BE CHECKED, APPROVED, AND STAMPED BY THE
CONTRACTOR PRIOR TO SUBMISSION.
10.EXISTING CONSTRUCTION SHOWN IS BASED ON EXISTING CONSTRUCTION DOCUMENTS
AND GENERAL CONSTRUCTION PRACTICE AND IS NOT GUARANTEED TO BE TRUE OR
EXACT. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS RELEVANT
PRIOR TO CONSTRUCTION.
11.USE MOST RECENT VERSION OF REFERENCED AMERICAN SOCIETY FOR TESTING AND
MATERIALS (ASTM) STANDARD UNLESS SPECIFIED OTHERWISE IN THE REFERENCED
UFC, IBC, OR OTHER REFERENCED REQUIREMENT/SPECIFICATIONS.
DESIGN CRITERIA
1. IN ACCORDANCE WITH EM 1110-2-2104, ETL 1110-2-584, AND ASCE 7-16.
2. DEAD LOADS
ASSUMED CONCRETE UNIT WEIGHT: γc= 150 pcf
ASSUMED WATER UNIT WEIGHT: γw= 62.4 pcf
3. LIVE LOADS
TRUCK LOAD: HL-93
4. WIND LOADS
BASIC WIND SPEED V=86 MPH
RISK CATEGORY CATEGORY = III
WIND EXPOSURE CATEGORY CATEGORY = B
GUST EFFECT FACTOR FACTOR = 0.85
FORCE COEFFICIENT Cf= 1.4
5. FLOOD LOADS
ELEVATION
EXTREME 718.67 FT
UNUSUAL 715.39 FT
FOUNDATION NOTES
1. CLOSURE FOUNDATIONS ARE DESIGNED FOR AN ALLOWABLE BEARING PRESSURE OF
3 KSF.
2. THE CONTRACTOR SHALL RETAIN A LICENSED GEOTECHNICAL
ENGINEER LICENSED IN THE STATE OF INDIANA TO
PROVIDE OBSERVATION AND TESTING SERVICES DURING THE GRADING AND
FOUNDATION PHASE OF CONSTRUCTION PER THE EARTHWORK SPECIFICATIONS.
INSPECTING AND TESTING REPORTS SHALL BE SUBMITTED TO THE GOVERNMENT FOR
REVIEW.
3. ALL FOOTINGS SHALL BE SUPPORTED ON UNDISTURBED SOIL CAPABLE OF
SUPPORTING THE DESIGN LOADS WITHOUT APPRECIABLE SETTLEMENT AS INDICATED
IN THE EARTHWORK SPECIFICATIONS. SEE THE EARTHWORK SPECIFICATIONS FOR
ADDITIONAL SUBGRADE PREPARATION REQUIREMENTS.
4. SURFACE RUNOFF SHALL BE DIRECTED AWAY FROM FOUNDATION EXCAVATIONS AND
IS NOT PERMITTED TO POND WITHIN THE EXCAVATION.
5. LOWER THE PERCHED GROUNDWATER BY AN ACCEPTABLE DEWATERING SYSTEM. THE
GROUNDWATER LEVEL SHALL BE MAINTAINED CONTINUOUSLY A MINIMUM OF 1'-6"
BELOW THE EXCAVATION WHEN EXCAVATIONS APPROACH THE GROUND WATER
LEVEL.
6. PREPARE SUBGRADE FOR FOUNDATIONS AND PAVEMENT PER THE EARTHWORK
SPECIFICATIONS.
7. COORDINATE UNDERGROUND UTILITIES PRIOR TO THE START OF FOUNDATION
EXCAVATIONS. COORDINATE WITH UTILITY COMPANIES FOR ANY SHUT-OFF
REQUIREMENTS OF ACTIVE LINES.
8. PROTECT EXISTING FOUNDATIONS AND PAVEMENT. THE CONTRACTOR SHALL PROVIDE REQUIRED
SHORING, BRACING, OR UNDERPINNING REQUIRED. DO NOT UNDERCUT EXISTING
FOUNDATIONS OR PAVEMENT. EXISTING FOUNDATIONS AND PAVEMENT SHOWN ARE APPROXIMATE
AND FOR REFERENCE ONLY. THE CONTRACTOR SHALL VERIFY EXACT CONDITIONS PRIOR TO
CONSTRUCTION.
9. OPEN FOUNDATION EXCAVATIONS SHALL BE INSPECTED AND APPROVED BY THE
LICENSED GEOTECHNICAL ENGINEER RETAINED BY THE CONTRACTOR PRIOR TO
PLACING CONCRETE.
10. DO NOT PLACE FOUNDATION CONCRETE ON FROZEN OR SATURATED SUBGRADE.
11. ANY FILL PLACED WHICH WILL SUPPORT PAVEMENT, CONCRETE, FOUNDATIONS, OR SERVE AS
LATERAL SUPPORT TO EXISTING STRUCTURES SHALL BE COMPACTED TO 98% MAXIMUM DENSITY
AND WITHIN ±2% OPTIMUM MOISTURE CONTENT IN ACCORDANCE WITH ASTM D698.
12. ANY FILL SHALL COME FROM PROJECT EXCAVATION AND BE CLASSIFIED BY ASTM D2487 AS CL, ML, SC, SM, GW, GC, OR GM. IF ADDITIONAL FILL IS REQUIRED IT SHALL BE INDOT NO. 53 AGGREGATE
UNLESS NOTED OTHERWISE.
AFF = ABOVE FINISHED FLOOR
ARCH = ARCHITECTURAL/ARCHITECT
B/ = BOTTOM OF
BFF = BELOW FINISHED FLOOR
BM = BEAM
BOT = BOTTOM
BP = BASE PLATE
CFS = COLD-FORMED STEEL
CFMF = COLD-FORMED METAL FRAMING
CJ = CONSTRUCTION JOINT
CMU = CONCRETE MASONRY UNIT
COL = COLUMN
CONC = CONCRETE
CY = CUBIC YARD
DBA = DEFORMED BAR ANCHOR
DIA = DIAMETER
DIM = DIMENSION
DWGS = DRAWINGS
EF = EACH FACE
EJ = EXPANSION JOINT
EL = ELEVATION
EMBED = EFFECTIVE EMBEDMENT
EOD = EDGE OF DECK
EQ = EQUAL
EW = EACH WAY
EX = EXISTING
EXT = EXTERIOR
FD = FLOOR DRAIN
FF = FINISHED FLOOR
FLR = FLOOR
FND = FOUNDATION
GA = GAUGE
GALV = GALVANIZED
GB = GRADE BEAM
HORZ = HORIZONTAL
HP = HIGH POINT
HSA = HEADED STUD ANCHOR
HSS = HOLLOW STRUCTURAL STEEL
IAW = IN ACCORDANCE WITH
ID = INSIDE DIAMETER
IF = INSIDE FACE
INT = INTERIOR
LF = LINEAR FEET
LLBB = LONG LEG BACK TO BACK
LDH = LONG DIMENSION HORIZONTAL
LDV = LONG DIMENSION VERTICAL
LLH = LONG LEG HORIZONTAL
LLV = LONG LEG VERTICAL
ABBREVIATIONS
LP = LOW POINT
MAX = MAXIMUM
MECH = MECHANICAL
MFR = MANUFACTURER
MIN = MINIMUM
MISC = MISCELLANEOUS
NTS = NOT TO SCALE
OC = ON CENTER
OD = OUTSIDE DIAMETER
OF = OUTSIDE FACE
OPH = OPPOSITE HAND
OPNG = OPENING
OPP = OPPOSITE
P = PILE
PC = PILE CAP
PCF = POUNDS PER CUBIC FOOT
PL = PLATE
PLF = POUNDS PER LINEAR FOOT
PSF = POUNDS PER SQUARE FOOT
PSI = POUNDS PER SQUARE INCH
PT = POST TENSION
PVC = POLYVINYL CHLORIDE
R = RADIUS
RD = ROOF DRAIN
REF = REFERENCE
REINF = REINFORCED, REINFORCING
REQ = REQUIRED
SCHD = SCHEDULE
SDI = STEEL DECK INSTITUTE
SF = SQUARE FOOT
SJ = SAWN CONTRACTION JOINT
SIM = SIMILAR
SQ = SQUARE
SS = STAINLESS STEEL
STL = STEEL
SYM = SYMETRICAL
T&B = TOP AND BOTTOM
T/ = TOP OF
TP = TYPE
TYP = TYPICAL
UNO = UNLESS NOTED OTHERWISE
VERT = VERTICAL
VIF = VERIFY IN FIELD
W/ = WITH
W/O = WITHOUT
WP = WORK POINT
WWR = WELDED WIRE REINFORCEMENT
DELEGATED DESIGN
1. THE DESIGN OF THE FOLLOWING STRUCTURAL ELEMENTS AND SYSTEMS AND THEIR
CONNECTIONS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ADDITIONAL
DELEGATED ELEMENTS AND SYSTEMS MAY BE INDICATED IN THE DRAWINGS AND
SPECIFICATIONS.
a. TEMPORARY BRACING AND SHORING OF PAVEMENT
b. MULLION BASE PLATES W/ ANCHORS
1.
WOOD CONSTRUCTION
WOOD STRESS GRADE FOR ALL STRUCTURAL FRAMING MEMBERS:
4x4 = SPRUCE PINE FIR, NO. 2
SHEATHING= APA SPAN RATED 48/24 EXP CAT 1
2. CONSTRUCTION SHALL CONFORM TO THE NATIONAL DESIGN SPECIFICATIONS
FOR WOOD CONSTRUCTION.
3. BOLT HOLES IN WOOD SHALL BE 1/16" OVERSIZE. WASHERS SHALL BE USED
ON ALL BEARINGS OF HEADS AND NUTS AGAINST WOOD. WASHERS SHALL
BE STANDARD PLAIN WASHERS EXCEPT AS OTHERWISE NOTED. BOLTS SHALL
CONFORM TO ASTM F3125 A325. BOLTS, NUTS, AND WASHERS SHALL BE GALVANIZED.
1.
2.
3.
4.
5.
6.
ADHESIVE ANCHOR NOTES
NORMAL WEIGHT CONCRETE BASIS OF DESIGN
HILTI HIT-HY 200 ADHESIVE ANCHOR
ICC-ES EVALUATION REPORT NO. ESR-3187
TEL. # 1-800-423-6587
HILTI HIS-N B7
ICC-ES EVALUATION REPORT NO. ESR-3187
TEL. # 1-800-423-6587
CONTRACTOR SHALL SUBMIT THE PROPOSED EPOXY ADHESIVE PRODUCT DATA,
ICC REPORT, AND TESTING REQUIREMENTS.
ADHESIVE ANCHORS SHALL BE OF DIAMETER, EMBEDMENT, AND FINISH AS
INDICATED. LOAD VALUES PROVIDED BY HILTI "HIS" GALVANIZED STEEL
ANCHORS WITH HY200 ADHESIVE ARE THE BASIS FOR DESIGN. PROVIDE
APPROPRIATE ANCHOR WITH ADHESIVE WITH EQUIVALENT TENSILE AND SHEAR
CAPACITIES AFTER MODIFICATION DUE TO EMBEDMENT, SPACING, EDGE
DISTANCES, AND SEISMIC LOADING IN CRACKED CONCRETE AND MASONRY.
LOAD CAPACITIES SHALL BE BASED ON THE APPLICABLE ICC EVALUATION
REPORT.
PROVIDE DRILLED HOLES OF DIAMETER AND DEPTH RECOMMENDED BY THE
PRODUCT MANUFACTURER FOR DOWEL SIZE SPECIFIED OR OF DIAMETER AND
DEPTH SPECIFIED IN THE CONTRACT DOCUMENTS, WHICHEVER IS GREATER.
THOROUGHLY CLEAN HOLE OF CONCRETE DUST WITH BRUSH AND OIL-FREE
COMPRESSED AIR. INJECT ADHESIVE PER THE MANUFACTURER'S
RECOMMENDATIONS. INSTALL ANCHORS IN CONCRETE HAVING A MINIMUM AGE
OF 21 DAYS.
DO NOT DRILL THROUGH CONCRETE REINFORCEMENT.
SUBMIT TRAINING LOGS FROM ANCHOR MANUFACTURER-SPONSORED TRAINING
FOR EACH TYPE OF ANCHOR USED.
INTERNALLY THREADED ANCHORS SHALL BE USED AND MUST BE ASTM A193 GR
B7 WITH A MINIMUM YIELD STRENGTH OF 55 KSI.
380 PSF
255 PSF
RIVER SIDE LAND SIDE
718.67' ±
714.59' ±
190 PSF
185 PSF
60 PSF
RIVER SIDE LAND SIDE
714.59' ±
715.39' ±
92.5 PSF
D
C
B
A
5 4 3 2 1
A
B
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
U.S.ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
LOUISVILLE,KENTUCKY
Revisions
Symbol Descriptions Approved
Designed by:
Drawn by:
Checked by:
Scale:
Date:
Drawing Code:
Sheet reference number:
Sheet of
US Army Corps of Engineers
Project
Architect
Date
Engineer/
FILE:
DATE:
\\coe-lrldfe01lou\org\ED\Public\CAD\Civil\112589-INC0-3B part 3 I-wall\CADD\Design Master files\Repair Contract drawings\Plans\S-001 - GENERAL STRUCTURAL NOTES, DESIGN LOADS & ABBREVIATIONS.dgn
09-DEC-2020
J. SINKHORN, P.E.
DEC 2020
C
D
IND-04/?
PASSIVE FLOODWALL TESTING AND STOPLOG BASE REPAIR
FLOOD DAMAGE REDUCTION PROJECT
INDIANAPOLIS, WHITE RIVER NORTH
C E
R T
IF
IE
D F
IN
A L D
O C
U M
E N
T S
Date
W
2Q R
Q
-0
1" = 1'-0"S-101
2 52ND ST CLOSURE SECTION
1" = 1'-0"S-101
4 52ND STREET CLOSURE ELEVATION
NOTES:
1. FOUNDATION SHALL MATCH EXISTING PAVEMENT SLOPE AND SILL ELEVATION OF 714.59' ±.
2. SLOPE SO WATER DOES NOT POOL ON CLOSURE FOUNDATION.
3. LOCATE CONSTRUCTION JOINT AT CENTER OF SHEET PILE FLANGE PER DETAIL 8/S-101.
4. COORDINATE LOCATION OF EMBEDDED MOUNTING PLATES AND SILL ANGLE WITH GOVERNMENT
FURNISHED STOP LOG CLOSURE SYSTEM TO ALLOW FOR COMPLETE INSTALLATION. EMBED PLATES
MUST BE RIGIDLY CONNECTED TO REBAR TO PREVENT SHIFTING DURING CONCRETE PLACEMENT. PRIOR
TO POURING CONCRETE, LOCATIONS MUST BE FIELD VERIFIED WITH GOVERNMENT STOP LOG CLOSURE
SYSTEM.
5. REPLACE I-WALL END POST JAMB ANCHORS WITH GALVANIZED INTERNALLY THREADED ADHESIVE
ANCHORS OF SIMILAR CAPACITY AS EXISTING. SEE PS DOORS TRANSMITTAL #05 50 14-2.1 DATED 6/12/2018.
6. REFER TO PS DOORS SHOP DRAWINGS TRANSMITTAL #05 50 14-2.1 DATED 06/12/2018 FOR ADDITIONAL
INFORMATION.
1/4" = 1'-0"1
52ND STREET CLOSURE FOUNDATION
PLAN VIEW
1" = 1'-0"S-101
3 SHEET PILE ELEVATION AND PLAN
3" = 1'-0"S-101
7 WATERSTOP AT EXPANSION JOINT
3/4" = 1'-0"S-101
WATERSTOP SECTION AT CONSTRUCTION
JOINT
3" = 1'-0"S-101
8 WATERSTOP AT CONSTRUCTION JOINT
3/4" = 1'-0"S-101
5 WATERSTOP SECTION AT EXPANSION JOINT
C. YOUNG
B. EVANS
B. EVANS
FOUNDATION REPAIR
52ND STREET CLOSURE
S-101
6' - 6"
RIVER SIDE LAND SIDE
SAW CUT AND REMOVE EXISTING PAVEMENT
TO NEW FOUNDATION LIMITS
SHEET PILE MUST REMAIN INTACT AND
UNDAMAGED
#7 @ 8" OC EW T&B
4" CLR COVER, TYP
GOVERNMENT FURNISHED MULLION
REMOVE AND REPLACE STOP LOG EMBEDDED
MOUNTING PLATE AND ANCHOR ASSEMBLY AND
EMBEDDED SILL ANGLE. SEE EMBEDDED STOP
LOG MOUNTING PLATE NOTE 1
EXISTING SHEET PILE
BURN OR DRILL 1 1/4" ø
HOLES TO PASS
REINFORCING
(2) #4 EPOXY COATED STIRRUPS AT
EVERY EMBEDDED STOP LOG
MOUNTING PLATE
S-101
TYPICAL EXISTING PAVEMENT
S-102
S-102
NEW 2' THICK FOUNDATION
4' - 4" 2' - 2"
/2
EMBEDDED STOP LOG MOUNTING PLATE NOTE:
1. BASIS OF DESIGN FOR EMBEDDED STOP LOG
MOUNTING PLATE AND ANCHORS IS PS DOORS. SEE
REFERENCE DRAWINGS. MOUNTING PLATE ASSEMBLY
MUST HAVE CAPACITY TO RESIST HYDROSTATIC LOADS
FROM STOP LOG POSTS WHEN WATER IS AT TOP OF
CLOSURE. MOUNTING PLATE GEOMETRY MUST ALLOW
INSTALLATION OF GOVERNMENT FURNISHED STOP LOG
POSTS. FIELD VERIFY DIMENSIONS.
4"
4"
714.43'±
EMBEDDED SILL ANGLE
L4X3X3/8 W/ 5/8"øX3 1/2"
HEADED STUDS @ 12" OC
S-101
7/8"øX12" THREADED ROD W/ HEAVY
HEX NUTS AND PL3/8X3X3 WASHERS
S-101
NOTE: HORIZONTAL PLANKS NOT SHOWN FOR CLARITY.
REMOVE AND REPLACE STOP LOG EMBEDDED
MOUNTING PLATE AND ANCHOR ASSEMBLY AND
EMBEDDED SILL ANGLE. SEE 2/S-101
GOVERNMENT FURNISHED MULLION
#4 EPOXY COATED STIRRUPS
SEE DET 2/S-101
#7 @ 8" EW T&B
EXISTING SHEET PILE
EXISTING FOUNDATION
S-101
3 1 1/2"X18" SMOOTH
EPOXY COATED DOWELS
C J
S-101
1/4" HAND TOOLED JOINT W/
ELASTOMERIC JOINT SEALANT
DO NOT SAW CUT
L3/8X4X3 EMBEDDED SILL ANGLE W/
5/8"øX3 1/2" HEADED STUDS
3/16"
TYP
CONNECT EMBEDDED SILL TO EMBEDDED
MOUNTING PLATE WITH PL 1/4" W/ 1/2" BOLT, NUT
AND WASHER, TYP
ISOLATE DISSIMILAR METALS WITH PHENOLIC
ISOLATION BUSHING, WASHER AND NEOPRENE PAD
C J
EMBEDDED STOP LOG
MOUNTING PLATE, TYP
SEE NOTE 4
(2) #4 X 5' IN THE TOP LAYER
OF THE FOUNDATION, TYP
S-101
S-101
20' - 10" ± 1'-0"
SEE NOTE 3
29' - 2" ± 1'-0"
SEE NOTE 3
S-101
EXISTING I-WALL
END POST,
SEE NOTE 5
50' - 0" ±
1/2" EXPANSION JOINT W/
ELASTOMERIC SEALANT,
SEE DET 1/S-104 AND 2/S-104
1/2" EXPANSION JOINT W/
ELASTOMERIC SEALANT
LAND SIDE
RIVER SIDE
8' - 4" ± 8' - 4" ± 8' - 4" ± 8' - 4" ± 8' - 4" ± 8' - 4" ±
CONSTRUCTION JOINT W/ 1 1/2"ø X 24"
SMOOTH EPOXY COATED DOWELS
SEE NOTE 3
PLAN NORTH5
S-101
6"
TYP
1' - 0"
TYP
EXISTING CONCRETE
PAVEMENT
EXISTING CONCRETE
SIDEWALK
EXISTING CONCRETE
SIDEWALK
EXISTING CONCRETE
SIDEWALK
EXISTING CONCRETE
SIDEWALK
6"
TYP
EXISTING CONCRETE
PAVEMENT
S-102
S-102
EXISTING I-WALL
END POST,
SEE NOTE 5
SILL ANGLE, TYP
SEE NOTE 4
EXISTING SHEET PILE
BURN OR DRILL 1"ø HOLES, INSTALL 7/8"øX12"
THREADED ROD WITH HEAVY HEX NUTS AND
PL3/8X3X3 WASHERS AT EVERY FLUTE
SHEET PILE PLAN
SHEET PILE ELEVATION
/2
BOT/FOUNDATION
" 1
' - 0
NEW CONCRETE
EXISTING CONCRETE
9" T TYPE PVC WATERSTOP
ATTACH PER MANF RECOMMENDATIONRIVER SIDE LAND SIDE
EXISTING SHEET PILE
9" DUMBBELL TYPE PVC
WATERSTOP
ELECTROMETRIC JOINT SEALANT
1 1/2"ø X 24" SMOOTH EPOXY COATED DOWELS
S-101
6"
TYP
1' - 0"
TYP
/2
/2
HYDROPHILLIC WATERSTOP
HYDROPHILLIC WATERSTOP
1/2"ø BOLTS AND NUTS
W/ HARDENED WASHERS
PACK VOID WITH
HYDROPHILIC WATER STOP
MATERIAL, TYP
NEOPRENE PAD TYP
EXISTING SHEET PILE
9" DUMBBELL TYPE PVC WATERSTOP
RIVER SIDE
LAND SIDE
EXISTING SHEET PILE
1/2" EXPANSION MATERIAL
ELECTROMETRIC JOINT SEALANT
S-101
HYDROPHILLIC WATERSTOP
9" T TYPE WATERSTOP
EXISTING I-WALL END
POST
/2
/2
D
C
B
A
5 4 3 2 1
A
B
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
U.S.ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
LOUISVILLE,KENTUCKY
Revisions
Symbol Descriptions Approved
Designed by:
Drawn by:
Checked by:
Scale:
Date:
Drawing Code:
Sheet reference number:
Sheet of
US Army Corps of Engineers
Project
Architect
Date
Engineer/
FILE:
DATE:
\\coe-lrldfe01lou\org\ED\Public\CAD\Civil\112589-INC0-3B part 3 I-wall\CADD\Design Master files\Repair Contract drawings\Plans\S-101 - 52ND STREET CLOSURE FOUNDATION REPAIR.dgn
09-DEC-2020
J. SINKHORN, P.E.
DEC 2020
C
D
IND-04/?
PASSIVE FLOODWALL TESTING AND STOPLOG BASE REPAIR
FLOOD DAMAGE REDUCTION PROJECT
INDIANAPOLIS, WHITE RIVER NORTH
C E
R T
IF
IE
D F
IN
A L D
O C
U M
E N
T S
Date
W
2Q R
Q
-0
NTSS-101
1 TRANSVERSE JOINT DETAILS
B. EVANS
B. EVANS
C. YOUNG
J. SINKHORN, P.E.
TRANSVERSE JOINT DETAIL
S-102
D
C
B
A
5 4 3 2 1
A
B
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
U.S.ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
LOUISVILLE,KENTUCKY
Revisions
Symbol Descriptions Approved
Designed by:
Drawn by:
Checked by:
Scale:
Date:
Drawing Code:
Sheet reference number:
Sheet of
US Army Corps of Engineers
Project
Architect
Date
Engineer/
FILE:
DATE:
\\coe-lrldfe01lou\org\ED\Public\CAD\Civil\112589-INC0-3B part 3 I-wall\CADD\Design Master files\Repair Contract drawings\Plans\S-102 - TRANSVERSE JOINT DETAILS.dgn
09-DEC-2020
J. SINKHORN, P.E.
DEC 2020
C
D
IND-04/?
PASSIVE FLOODWALL TESTING AND STOPLOG BASE REPAIR
FLOOD DAMAGE REDUCTION PROJECT
INDIANAPOLIS, WHITE RIVER NORTH
C E
R T
IF
IE
D F
IN
A L D
O C
U M
E N
T S
Date
W
2Q R
Q
-0
5" MIN
V A
R
IE
S G
R A
D E
12" TYP "
EXISTING PASSIVE ENCLOSURE SECTION
SCALE: NTS
EXISTING PASSIVE ENCLOSURE AREA 2
SCALE: NTS
EXISTING PASSIVE ENCLOSURE AREA 1
SCALE: NTS
PASSIVE ENCLOSURE BULKHEAD ELEVATION
SCALE: 1" = 1'-0"
PASSIVE ENCLOSURE BULKHEADSECTION
SCALE: 1" = 1'-0"
B. EVANS
B. EVANS
C. MANLEY
S-201
PASSIVE CLOSURE TEST BULKHEAD
CHAMFER PLYWOOD
JOINT MUST BE WATER TIGHT
3X8X3/4 PLYWOOD SHEATHING
APA 48/24 SPAN RATING
EXP CAT 1
4X4 SPRUCE-PINE-FIR NO. 2 @ 12" OC
DRIVE POSTS TO INSTALL
TAPER BOTTOM OF POST AS SHOWN
3 MIL PLASTIC SHEETING STAPLE TO PLYWOOD AND
SEAL SEAMS AND EDGES WITH WATERPROOF TAPE
AT PASSIVE CLOSURE INLET GRATES:
REMOVE PLASTIC AND SEAL TO GRATE PERIMETER
WITH WATERPROOF TAPE
INLET GRATES MUST REMAIN OPEN TO ALLOW WATER
PASSAGE INTO THE PASSIVE CLOSURE STRUCTURE
GALVANIZED 1/2" FLUSH INTERNALLY THREADED
ADHESIVE ANCHOR WITH 1/2" BOLTS AND PL2X2X1/4
WASHERS @ 12" OC
INSTALL PER MANF RECOMMENDATIONS
FACTORED ANCHOR ULTIMATE TENSION LOAD: 2000 LB
FACTORED ANCHOR SHEAR LOAD: 50 LB
REMOVE SOIL AS NECESSARY TO INSTALL ANCHORS
AFTER BULKHEAD REMOVAL BACKFILL POST
LOCATIONS WITH 4" LOOSE LIFTS OF SUITABLE
LEVEE MATERIAL AND TAMP TO COMPACT
RESEED WHEN BACKFILL HAS BEEN COMPLETED
RIVER SIDE LAND SIDE
EXISTING PASSIVE CLOSURE FOUNDATION AND CURB
S-201
INSTALL SECOND ANCHOR IN AREAS
WHERE GRADE IS MORE THAN 12" BELOW
TOP OF FOUNDATION CURB
TOP OF FOUNDATION CURB
PASSIVE CLOSURE TEST NOTES:
NOTIFICATION OF TESTING MUST BE PROVIDED TO THE GOVERNMENT A MINIMUM OF 14
DAYS IN ADVANCE.
1. AT NO TIME SHALL PERSONNEL ENTER THE CHAMBER PRIOR TO DOGGING OF THE
ENTIRE SECTION.
2. CLOSE ROAD AND PEDESTRIAN TRAFFIC PRIOR TO FILLING PASSIVE CLOSURE CHAMBER.
3. FILL CHAMBER WITH CONTRACTOR PROVIDED PUMPS AND HOSES. WATER MUST BE
PUMPED THROUGH INLET GRATES, NOT DIRECTLY ONTO GATE TOPS. GATES CANNOT BE
MANUALLY RAISED TO "GET IT STARTED". COORDINATE RATE OF FILL WITH MANUFACTURER.
4. LOCK THE GATES IN THE UPRIGHT POSITION IN ACCORDANCE WITH MANUFACTURER'S
WRITTEN INSTRUCTIONS. AT NO TIME SHALL PERSONNEL ENTER THE CHAMBER PRIOR TO
DOGGING OF THE ENTIRE SECTION.
5. ALLOW FOR INSPECTION WHILE THE CHAMBER IS FULL.
6. DEWATER THE CHAMBER AFTER DOGGING DEVICES ARE INSTALLED AND PROVIDE
INGRESS AND EGRESS INTO THE CHAMBER FOR INSPECTION. COORDINATE RATE OF
DEWATER WITH MANUFACTURER.
7. REFILL CHAMBER, REMOVE DOGGING DEVICES, AND DEWATER SO CLOSURE IS ABLE TO
SHUT SAFELY IN A CONTROLLED MANOR THAT DOES NOT DAMAGE THE CLOSURE.
COORDINATE RATE OF DEWATER WITH MANUFACTURER.
8. FILL, DOGGING, INSPECTION AND DEWATER SHALL ALL OCCUR IN A SINGLE WORK DAY (8
TO 12 HOURS).
9. PROVIDE A MINIMUM OF 3 PERSONNEL TO MONITOR FILL AND DEWATER OPERATIONS AND
MINIMUM OF 1 OPERATOR PER PUMP OPERATOR.
ASSUMED WATER ELEVATION FOR FULL GATE
OPERATION, WATER LEVEL MAY BE INCREASED TO
FULL HEIGHT OF BULKHEAD IF GATE DOES NOT
RAISE FULLY
NOTE:
1. DET 3/S-201, 4/S-201, AND 5/S-201 ARE FOR REFERENCE ONLY.
2. REFER TO FLOODBREAK SHOP DRAWINGS TRANSMITTAL #05 50 14-1.1
DATED 05/17/2018 FOR ADDITIONAL INFORMATION.
3. FIELD VERIFY ALL DIMENSIONS.
4. AFTER BULKHEAD REMOVAL INSTALL SHORT 1/2" GALVANIZED BOLTS WITH
NEOPRENE WASHERS TO REDUCE WATER INTRUSION INTO ANCHORS.
5. SPAN PLYWOOD IN THE STRONG DIRECTION HORIZONTALLY.
6. CONTRACTOR MUST PROVIDE WATER TIGHT JOINTS BETWEEN PANELS, AT
PANEL BOTTOM, AND AT THE ENDS OF THE BULKHEAD (PANEL TO WIPER
WALL JOINT).
EXISTING PASSIVE CLOSURE FOUNDATION
3X8X3/4 PLYWOOD SHEATHING
APA 48/24 SPAN RATING
EXP CAT 1
PANEL JOINT BEYOND
FASTEN WITH 8d COMMON NAILS
PANEL EDGE: 6" OC
PANEL FIELD: 9" OC
4X4 SPRUCE PINE FIR
NO. 2, TYP
GALVANIZED 1/2" FLUSH INTERNALLY THREADED
ADHESIVE ANCHOR WITH 1/2" BOLTS AND PL2X2X1/4
WASHERS @ 12" OC
INSTALL PER MANF RECOMMENDATIONS
FACTORED ANCHOR TENSION LOAD: 2100 LB
S-201
INSTALL SECOND ANCHOR IN AREAS
WHERE GRADE IS MORE THAN 12" BELOW
TOP OF FOUNDATION CURB
D
C
B
A
5 4 3 2 1
A
B
*** SAFETY PAYS ***
*** SUPPORT VALUE ENGINEERING - IT PAYS ***
U.S.ARMY ENGINEER DISTRICT
CORPS OF ENGINEERS
LOUISVILLE,KENTUCKY
Revisions
Symbol Descriptions Approved
Designed by:
Drawn by:
Checked by:
Scale:
Date:
Drawing Code:
Sheet reference number:
Sheet of
US Army Corps of Engineers
Project
Architect
Date
Engineer/
FILE:
DATE:
$$$pathname
$$$DATETIME
J. SINKHORN, P.E.
B. DORSCH P.E.
DEC 2020
C
D
IND-04/?
PASSIVE FLOODWALL TESTING AND STOPLOG BASE REPAIR
FLOOD DAMAGE REDUCTION PROJECT
INDIANAPOL…