This solicitation is for the design and construction of a Radiation Test Facility at the Naval Surface Warfare Center in Crane, Indiana. The estimated construction cost is between $5-10 million. The contractor will be responsible for all aspects of design and construction to deliver a fully functional 20,000 square foot facility, including administrative space, test cells, control rooms, and support areas. The facility must be ready to accept radiation testing equipment by November 2021. The contractor must obtain all required permits and approvals and is responsible for site work, utilities, building systems, and ensuring the project meets antiterrorism standards. The solicitation closes on August 27, 2020. Offerors must comply with System for Award Management registration requirements.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: MARCEL D HULL
600 DR M L KING JR PL RM 821
LOUISVILL KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR20R0016 for the Crane Radiation Test Facility project at NSWC Crane, IN. is hereby amended as follow s:
PLEASE SEE THE ATTACHED AMDT. 0002 SUMMARY OF CHANGES.
1. CONTRACT ID CODE PAGE OF PAGES
1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0016
X 9B. DATED (SEE ITEM 11)
24-Apr-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Aug-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE 964860
FACILITY CODECODE
EMAIL:TEL:
W912QR20R0016Specs-0002
W912QR20R0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF CHANGES AMDT 0002
Solicitation: W912QR20R0016 Project: Design/Build of a Radiation Test Facility Location: NSWC Crane, IN.
Amendment 0002 Summary of Changes
General Information:
A. The pre-proposal site visit attendee roster has been attached.
B. The following SHEETS have been revised and replaced in their entirety:
G-002 G-003
C. The following SPECIFICATION SECTIONS have been revised and replaced in their entirety:
Spec Section 01 02 00.02 48 – Statement of Work
D. The following ATTACHMENTS have been revised and replaced in their entirety:
Attachment O: Minimum Construction Standards for Open Storage Attachment U: Strategic Radiation Testing CATEX Attachment V: PWD Crane Architectural and Engineering Preferences Supplement
E. The Record of Categorical Exclusion, Strategic Radiation Testing Modernization Facility attachment has been attached herein.
F. FAR Clauses 52.204-24 and 52.204-25 have been revised and replaced in their entirety.
G. The Proposal due date has been extended to 27 August 2020 at 2:00 PM Eastern Time (ET).
Section 00 73 00 – Supplementary Conditions:
H. Wage Determination IN20200008 (Building), Modification 05, Dated 03 July 2020, has been replaced in its entirety by Wage Determination IN20200008 (Building), Modification 06, Dated 24 July 2020, and must be adhered to.
All Other Terms and Conditions Remain Unchanged.
END OF SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 19-Aug-2020 02:00 PM to 27-Aug-2020 02:00 PM.
DEPARTMENT OF THE NAVY
NAVALSURFACE'WARFARE CENTER
CRANE DIVISION
300 HIGH'WAY 361
CRANE INDIANA 47522·5001
IN REPLY REFER TO:
Ser 1023/089
JUN 1 0 2019
From: Commanding Officer, Naval Surface Warfare Center, Crane Division To: Commanding Officer, Naval Support Activity Crane
Subj: NATIONAL ENVIRONMENTAL POLICY ACT DOCUMENTATION
Ref: (a) OPNAVINST M-5090.1, Environmental Readiness
Encl:
Program Manual of 10 JAN 2014
(b) Guidance For Implementing Categorical Exclusions
Under The National Environmental Policy Act, Commander Navy Region Mid-Atlantic, 5090 Ser OOC, 27 AUG 2012
(1) Record of Categorical Exclusion, Strategic Radiation Testing Modernization Facility
1. Enclosure (1) has been prepared by Naval Surface Warfare Center, Crane Division Environmental Protection, and is submitted for your review and approval in accordance with references (a) and (b) .
2. Request your signature on enclosure (1) if you concur.
3. Naval Facilities Engineering Command Mid-Atlantic, Public Works Department Crane point of contact is Ben Embry, telephone 812-854-6162, DSN 482-6162 or email benjamin.embry@navy.mil.
Copy to:
1023 (D.
1024 (D.
1024 (M.
APWO (LT
PRXl (C.
PRX2 (K .
PRX42 (B .
(Electronic) Johnson) Barela) Shedd) Williams) Dages) Bradway) Embry)
By direction
COMNAVREG MIDLANT (EV21, OGC)
CJSeto (K. Wagler)
RECORD OF CATEGORICAL EXCLUSION
Strategic Radiation Testing Modernization Facility
Code PRX4
JUN l 8 2019
DEPARTMENT OF THE NA VY
NAVAL SUPPORT ACTIVITY CRANE, CRANE INDIANA
NATIONAL ENVIRONMENTAL POLICY ACT OF 1969
ENVIRONMENT AL IMPACT ASSESSMENT
RECORD OF CATEGORICAL EXCLUSION
Ref: (a) Final Programmatic Agreement Between the Naval Support Activity Crane of the Department of the Navy and the Indiana State Historic Preservation Officer for the Operation, Rehabilitation, Repair, Maintenance, and Development of the Naval Support Activity Crane at Crane, Indiana, l 0 DEC 2008
Att: (a) Project Location Map
(b) Environmental Program Managers - Point of Contact List
(c) Wetlands Determination
(d) Environmental Resource Program Areas Project Checklist
This document memorializes the determination of the below-named action proponent, as per OPNA V M-5090.1, Environmental Readiness Program Manual, January 2014, and Commander Navy Region Mid-Atlantic Guidance for Implementing Categorical Exclusions (CA TEX) Under the National Environmental Policy Act (NEPA), 27 August 2012, that neither an Environmental Assessment nor Environmental Impact Statement needs to be prepared for the following proposed action:
Strategic Radiation Testing Modernization Facility at Naval Support Activity (NSA) Crane, Crane, Indiana during fiscal year 2020.
Action Proponent: The action proponent is Naval Surface Warfare Center, Crane Division (NSWC Crane). The NSWC Crane NEPA Program Manager is Doug Johnson, (812) 854-6426, DSN 482-6426.
Description of Proposed Action: Strategic test time is significant in support of the Navy Strategic System Program, Missile Defense Agency, United States Air Force (USAF), Airborne Launch Control System, USAF Ground-Based Strategic Deterrent, and the Department of Defense (DoD) space community. NSWC Crane currently has a Linear Accelerator (LIN AC) Facility that meets some of the program requirements. For these programs to perform their critical mission, NSWC Crane must expand strategic radiation-hardened microelectronics Research, Development, Test, and Evaluation capabilities. Without these additional radiation testing capabilities, the fielding plan for multiple next-generation strategic systems is at risk of being delayed and/or severely degraded, negatively impacting DoD' s strategic missions.
Enclosure ( 1)
Therefore, the construction of a stand-alone structure to house the new radiation testing equipment and associated support activities is the proposed action. The new structure will be located immediately south of and adjacent to Building 3059. Please see attachment (a) for the project location map.
Implementation of the proposed action will require the construction of a stand-alone infrastructure that will provide space for:
• Two operational radiation systems: a flash x-ray system, and pulsed, high dose-rate gamma irradiation system;
• A radiation-hardened microelectronics laboratory; and
• Office space.
This scope will help enable nuclear environment simulation and testing necessary to perform component testing in direct support of the National Defense Strategy.
To provide adequate human health and environmental safety and ensure radiation is not released from the building, the facility will meet Nuclear Regulatory Commission and Navy Radiological Affairs Support Office (RASO) radiation shielding requirements. The facility will not be constructed until RASO documents that the shielding design is sufficient to provide required protection. In addition, safety devices (e.g. , door interlocks, radiation sit,rnage, warning lights, etc.) will be required in conjunction with both systems to prevent personnel from entering the shielded area while radiation operations are being conducted.
Applicable CA TEX: The action proponent has determined that the following CA TEX is applicable to the proposed action: CA TEX# 34 ·'New construction that is similar to existing land use, and when completed, the use or operation of which complies with existing regulatory requirements (e.g., a building within a cantonment area with associated discharge/runoff within existing handling capacities)" .
This CA TEX covers the proposed action as presented in this documentation only. If the proposed action changes in scope, or if significant environmental effects are realized as a result of implementation, a new assessment shall be required.
Facts Supporting CA TEX: The proposed action will require tree clearing and will need to be evaluated for possible impacts to a federally listed endangered species, the Indiana Bat, or a federally listed threatened species, the Northern Long-Eared Bat. Contact the NSA Crane Natural Resources Manager listed in attachment (b) at least 60 days in advance of any tree clea1ing to determine if a consultation with the United States Fish and Wildlife Service is required. Thus, the proposed action is not precluded from being categorically excluded due to adverse effects on federally listed endangered and threatened species or marine mammals.
The proposed action will include ground disturbing activities. The site is located outside of the historic districts and cannot be seen from any historic building, district, site, or structure. Areas where ground disturbance will occur are considered previously disturbed. Therefore, no
RECORD OF CA TEGORJCAL EXCLUSION
consultation with the lndiana State Historic Preservation Officer is required, and the following exemption applies:
a. "Ground disturbing activities on sites previously disturbed by construction and/or maintenance activities of the Navy base", reference (a), stipulation 2(m).
In accordance with Indiana State Law IAC 14-21-1-27 and 29, and Federal Law 36 CFR 800.13, if archaeological artifacts or human remains are uncovered during earthmoving activities, stop work immediately, and contact the Cultural Resources Manager listed in attachment (b) for guidance. Thus, the proposed action is not precluded from being categorically excluded due to the threat of violation of federal , state, or local environmental laws applicable to Department of the Navy (DON); specifically those regulations pertaining to Cultural resources.
Appropriate construction permits must be obtained, and the Storm Water (Construction) Manager listed in attachment (b) should be contacted prior to implementation of the proposed action. Appropriate erosion control measures must be implemented during construction. All bare earth resulting from the project shall be smoothed and vegetation established as part of the project. Thus, the proposed action is not precluded from being categorically excluded due to the threat of violation of federal, state, or local environmental laws applicable to DON; specifically those regulations pertaining to stonn water and/or erosion control.
Any new or relocated air emission sources must be evaluated for significance under the NSWC Crane Title V Air Permit. Types of air emission sources that must be considered include, but are not limited to; boiler installation, relocation, or modifications, new laboratory exhaust systems, installation of paint booths, abrasive blasting units, and generators. The project manager is required to coordinate all actions pertaining to air emission sources through NSWC Crane's Air Program Manager listed in attachment (b). Thus, the proposed action is not precluded from being categorically excluded due to the threat of violation of federal , state, or local environmental laws applicable to the DON; specifically those regulations pertaining to air.
Radon testing will be performed after new construction, or after every renovation (e.g. , weatherization, whole building replacement, and additions), heating, ventilation, air conditioning modifications or replacement, or damage by any events such as earthquakes and stonns that would alter the building envelope. High levels of radon have been detected in the adjacent building, Building 3059. Therefore, the project design should consider installation of a radon mitigation system as part of the facility construction. The project manager is required to coordinate all actions associated with radon testing with the NSWC Crane Radon Program Manager listed in attachment (b). Thus, the proposed action is not precluded from being categorically excluded due to the threat of violation of federal, state, or local environmental laws applicable to the DON; specifically those regulations pertaining to Radon.
The Flash X-ray system will require a 3,300-gallon oil tank to support the x-ray tube cooling system. This mineral oil tank will require containment to prevent a release to the environment in the case of a spill. Contact Jared Cornelius, Spill Prevention Control and Countenneasures Program Manager at (812) 854-2876 for requirements regarding storage and secondary containment.
A wetlands and waterways determination was completed for the proposed project location at NSA Crane. The purpose of the field work was to identify wetlands and potential Waters of the United States present within the proposed project area. No wetland resources were identified during the site visit. Selected pages of the wetlands report are provided in attachment (c). If the construction location changes the project manager must contact the Natural Resources Program Manager listed in attachment (b) for an updated wetlands impact assessment.
Review attachment (d), for environmental programs and contact the individual listed in attachment (b) as indicated.
The proposed action may be categorically excluded because it is not of a kind likely to significantly affect the quality of the human environment, does not result in any significant change from conditions existing at the site of the proposed action, and will result in effects that are primarily economic or social.
Consideration of Circumstances Precluding CA TEX: A proposed action shall not be categorically excluded if it:
a. Would adversely affect public health or safety;
b. Involves effects on the human environment that are highly uncertain, involve unique or unknown risks, or which are scientifically controversial ;
c. Establishes precedents or makes decisions in principle for future actions that have the potential for significant impacts;
d. Threatens a violation of federal , state, or local environmental laws applicable to DON;
or
e. Involves an action that, as determined in coordination with the appropriate resource agency, may:
(I) Have an adverse effect on federally listed endangered and threatened species or marine mammals;
(2) Have an adverse effect on coral reefs or on federally designated wilderness areas, wildlife refuges, marine sanctuaries, or park lands;
(3) Have an adverse effect on the size, function, or biological value of wetlands and is not covered by a nationwide or regional pennit;
(4) Have an adverse effect on archaeological resources or resources (including but not limited to ships, aircraft, vessels and equipment) listed or determined eligible for li sting on the National Register of Historic Places; or
(5) Result in an uncontrolled or unpermitted release of hazardous substances or require a conformity determination under the standards of the Clean Air Act General Conformity Rule.
None of the foregoing conditions are present in this case.
Retention: This document shall be retained for ape 'od of not less than six years.
By direction
Attachment A - Project Location Map
Attachment (a)
N
(J1
)> co
'.-4-.r,~··"'·~·IAttachment A Project Location Map Strategic Radiation Testing Modernization Facility
Attachment 8 - Environmental Program Managers - Point of Contact List
Attachment (b)
Environmental Program Managers - Point of Contact List:
ASBESTOS - LEAD - Jonathan Mozingo, (812) 854-3353 DRINKfNG WATER-Kim Hughes, (812) 854-6158 CULTURAL RESOURCES - Ben Embry, (812) 854-6162 EXPLOSIVES HAZ WASTE - Patrick Overton, (812) 854-3233 EXPLOSIVES-CONTAMfNATED MATERIALS - CAAA Safety (812) 854-3404 HAZ WASTE - Dennis Lankford, (812) 854-6153 HAZ MAT - Sarah Sexton, (812) 854-4258 INSTALLATION RESTORATION - Thomas Brent, (812) 854-6160 NATURAL RESOURCES - Brady Miller, (812) 854-6656 NEPA - Ben Embry, (812) 854-6162 NEPA (CAAA) - Sam Wright, (812) 854-1481 NEPA (NSWC Crane) - Doug Johnson, (812) 854-6426 PCB - Thomas Brent, (812) 854-6160 RADON - Ruth Ann Flynn, (812) 854-2097 STORAGE TANKS - Jared Cornelius, (812) 854-2876 STORM WATER (Construction) - Jared Cornelius, (812) 854-2876 STORM WATER (Process) - Brandy Ranard, (812) 854-3382 TITLE V A IR PERMIT - Quentin Gilbert, (812) 854-4 785 WASTEWATER - Brandy Ranard, (812) 854-3382
NA VF AC MIDLANT CRANE - ENV DIVISION DIRECTOR - Trent Osmon, (812) 854-3257 NSWC CRANE - ENV PROTECTION MANAGER - Heather Baladi, (812) 854-6156
Attachment C- Wetlands Report
Attachment (c)
Waters and Wetlands Delineation Report Radiation Facility
Crane, Indiana
Support Services, LLC PROFESSIONAi. TFA:HNICAL SUPPORT SERVICES
Prepared for:
Naval Surface Warfare Center Crane
Prepared by:
CJSeto Support Services, LLC 13980 E Capt WJ Nelson Dr. Suite A
Odon, Indiana 47562
June 10, 2019
Wetland Delineation Report, Radiation Facility
Field Investigation
CJSeto performed the required field investigation for the Site on June 11 , 2019. On the time of the investigation, the temperature was 68°F, and the weather was mostly sunny with scattered clouds. Climatic conditions varied for the previous months of March, April, and May. Climate averages in March were observed to be 39°F (below 45°F average), and 4.51 " of precipitation (above 4.09" average); April averages were observed to be 55°F (mean), and 6.15" of precipitation (above 4.84" average); May averages were observed to be 66°F (above 64.5°F average), and 4.07" of precipitation (below 5.55" average). While climatic conditions varied through the previous months before and during the field investigation, vegetation was clearly evident. Field investigation findings and pictures location is presented in Appendix A, Figure 4.
Wetlands
No areas within the Site project boundary were suspected to be wetland during the field investigation; therefore, no wetlands were observed in the project boundary.
Streams
Few areas resembled valleys that would contain water conveyance features within the project boundary. Those areas that were investigated were observed to not contain stream features of bed, bank, and ordinary high-water marks; those areas were also observed to not be capable of directing water that would be identified as upland drainage features. Therefore, no streams were observed in the project boundary.
CONCLUSIONS
CJSeto performed a wetlands determination and delineation at the project areas located within the Scotland, Indiana, USGS 7.5-Minute Quadrangle Map in Section 5, Township 5 North, and Range 4 West in Martin County, Indiana. The Site was observed to be comprised of mostly mesic upland deciduous forest at the time of the determination and delineation. Plant species observed within the forest include Tulip Poplar (Liriodendron tulipifera, FACU), Black Walnut (Jug/ans nigra, FACU), Jack Pine (Pinus banksiana, FACU), Sassafras (Sassafras albidum, FACU), White Oak (Quercus alba, FACU), Spicebush (Lindera benzoin, FAC), Multiflora Rose (Rosa multi.flora, FACU), Silvery Spleenwort (Deparia acrostichoides, FAC), and Christmas Fern (Polystichum acrostichoides, FACU). The test facility was active and gravel and paved roadways were present during the field investigation. No water or topographic features that fulfill the criteria of federal or state jurisdictional streams or wetlands were observed within the project boundary.
If proposed development activities will disturb one (1) or more acres of land, then a Rule 5 Stormwater Run-off Permit may be required.
June 11, 2019
WETLAND DELINEATION REPORT
FIGURE 4 - Field Investigation Radiation Facility, NSA Crane, Martin County, Indiana
0 90 180 360
Feet
Note: Map Updated 11JUN 19
N
• Pictures Location
--- NHD Flowlines
D Survey Boundary
D Tree Clearing
Attachment D - Program Area Checklist
Attachment (d)
Environmental Resource Program Areas Project Checklist If resource is marked "Yes" below, please review associated section in CATEX document and coordinate with the appropriate Environmental Program Managers
Environmental Resource· Program Area: Project Involvement?
ASBESTOS. LEAD PAINT, or PCBs No: IZJ I Yes: D Comments:
WETLANDS/WATERWAYS No: IZJ I Yes: D Comments:
Current construction location will not impact wetlands. If the facility location changes, contact the Natural Resources Manager for an updated wetlands impact assessment.
CULTURAL RESOURCES No: IZJ I Yes: D Comme11ts:
EXPLOSIVES No: IZJ I Yes: D Co111111e11ts:
HAZARDOUS WASTE No: IZJ I Yes: D Commems:
HAZARDOUS MATERIALS No: IZJ I Yes: D Commel11s:
INSTALLATION RESTORATION/SWMU No: [{] I Yes: D Comme11ts:
ENDANGERED OR THREATENED SPECIES/WILDLIFE No: IZJ I Yes: D Com111e11ts:
STORM WATER (CONSTRUCTION) No: D I Yes: [{]
Commenrs: Appropriate construction permits must be obtained.
STORM WATER (INDUSTRIAL) No: IZJ I Yes: D Comments:
WASTEWATER No: IZJ I Yes: D Commems:
AIR QUALITY No: D I Yes: [{]
Comments: Notify program manager of any new or modified air pollution sources.
RADON No: D I Yes: [{] Comments:
Radon testing will be required after construction. Recommend installation of a radon mitigation system.
STORAGE TANKS No: [{] I Yes: D Comments:
OTHER (POL. DRINKING WATER, AIRSPACE, etc.) No: D I Yes: [{]
Comments: Spill Prevention Control and Countermeasures required for storage of large oil volume
SECTION 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS
The following have been added by reference:
52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment.
AUG 2020
The following have been deleted:
52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment.
DEC 2019
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been added by reference:
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2020
The following have been deleted:
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2019
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE DETERMINATION IN20200008
General Decision Number: IN20200008 07/24/2020
Superseded General Decision Number: IN20190008
State: Indiana
Construction Type: Building
Counties: Daviess and Martin Counties in Indiana.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/24/2020 2 04/03/2020 3 05/01/2020 4 06/26/2020 5 07/03/2020 6 07/24/2020
BRIN0005-002 06/01/2019
Rates Fringes
BRICKLAYER
BRICKLAYER; STONE MASON &
POINTER, CAULKER, CLEANER...$ 32.16 14.27
MARBLE and TILE SETTER......$ 31.61 13.92
TERRAZZO FINISHER..........$ 19.07 7.05
TILE and MARBLE FINISHER....$ 19.03 4.35
CARP0224-008 04/01/2020
Rates Fringes
CARPENTER (Including Drywall)....$ 27.71 22.45
ELEC0016-001 04/01/2019
Rates Fringes
ELECTRICIAN (Including Alarm Installation and HVAC Control Wiring)..........................$ 38.02 17.61
ENGI0181-025 04/01/2019
MARTIN COUNTY
Rates Fringes
Power equipment operators:
Backhoe.....................$ 34.98 16.50
LABO0561-004 04/01/2020
DAVIESS COUNTY
Rates Fringes
LABORER (Unskilled)..............$ 25.12 16.50
LABO0741-005 06/01/2020
MARTIN COUNTY
Rates Fringes
LABORER (Unskilled)..............$ 23.13 16.00
* PAIN0156-005 04/01/2020
DAVIESS COUNTY
Rates Fringes
PAINTER..........................$ 26.45 17.53
FOOTNOTE A:
All Structures over 40? $0.75/ hour above base wage All Structures over 75? $1.50/ hour above base wage All Structures over 100? $2.50/ hour above base wage
PLAS0692-026 04/01/2020
DAVIESS & MARTIN COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.30 18.31
PLUM0136-005 07/01/2020
Rates Fringes
PLUMBER (Including HVAC Work)....$ 37.72 19.76
PIPEFITTERS.................$ 37.72 19.76
ROOF0106-003 04/01/2019
Rates Fringes
ROOFER...........................$ 30.30 16.52
SHEE0020-021 07/01/2020
Rates Fringes
Sheet metal worker (Including HVAC Duct Work)..................$ 30.92 24.73
SUIN1996-003 04/22/1996
Rates Fringes
Elevator Constructor.............$ 19.90 5.57
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
*** SAFETY PAYS ***
Design Build Radiation Test Facility NSWC Crane, IN W912QR20R0016
01 02 00.00 48 - 1
SECTION 01 02 00.00 48 – STATEMENT OF WORK
TABLE OF CONTENTS
Page
PART 1 DESIGN OBJECTIVES, AND FUNCTIONAL AND AREA REQUIREMENTS 5
1.1 SCOPE OF WORK. 5
1.2 DESIGN OBJECTIVES. 5
1.3 CONTRACTOR RESPONSIBILITY. 7
1.4 SURVEY AND GEOTECHNICAL INFORMATION. 8
1.5 RFP DRAWINGS. 8
1.6 SPECIFICATIONS. 8
1.7 SITE. 8
1.8 FUNCTIONAL AND AREA REQUIREMENTS. 10
1.9 OPTIONS 10
PART 2 APPLICABLE CRITERIA AND COORDINATION WITH LOCAL AUTHORITIES 11
2.1 APPLICABLE CRITERIA. 11
2.2 LOCAL AND STATE CODES OR STANDARDS. 12
2.3 MILITARY CRITERIA. 12
2.4 OTHER APPLICABLE CRITERIA. 14
2.5 SOURCES FOR GOVERNMENT PUBLICATIONS. 18
2.6 PERMITS AND COORDINATION WITH LOCAL AUTHORITIES. 19
PART 3 SITE CIVIL ENGINEERING 21
3.1 GRADING. 21
3.2 GEOTECHNICAL STUDIES 21
3.3 UTILITIES. 22
3.4 CIRCULATION AND PARKING. 23
3.5 DEMOLITION. 23
3.6 CLEARING AND GRUBBING. 23
3.7 BORROW MATERIAL. 24
3.8 OFF-SITE WORK. 24
3.9 ANTI-TERRORISM STANDARDS 24
3.10 RECORD OF ENVIRONMENTAL CONSIDERATION (REC) 24
3.11 CONTRACTOR LAYDOWN AREA 24
3.12 SITE IMPROVEMENTS 24
PART 4 SITE ELECTRICAL / COMMUNICATIONS ENGINEERING 26
4.1 UTILITY POWER. 26
4.2 TELECOMMUNICATIONS SERVICE. 26
4.3 CABLE TELEVISION (CATV) SERVICE 27
4.4 CATHODIC PROTECTION 27
PART 5 LANDSCAPE ARCHITECTURE 29
5.1 QUALITY ASSURANCE. 29
Amendment 002 W912QR20R0016Specs-0002
NSWC Crane, IN W912QR20R0016
01 02 00.00 48 - 2
5.2 SOIL TESTING. 29
5.3 INSTALLATION. 29
5.4 ESTABLISHMENT PERIOD. 29
5.5 WARRANTY. 29
5.6 LANDSCAPE IRRIGATION. 29
5.7 TURF AND MEADOW GRASSES. 29
5.8 MISCELLANEOUS. 29
PART 6 ARCHITECTURAL AND INTERIOR DESIGN 31
6.1 DESIGN GOAL. 31
6.2 GENERAL CONSTRUCTION REQUIREMENTS. 32
6.3 OCCUPANCY AND BUILDING TYPE CLASSIFICATIONS. 33
6.4 EXTERIOR DESIGN. 34
6.5 INTERIOR DESIGN. 37
6.6 FURNITURE AND EQUIPMENT. 41
PART 7 STRUCTURAL DESIGN 43
7.1 GENERAL REQUIREMENTS. 43
7.2 STRUCTURAL WORK. 43
7.3 STRUCTURAL DESIGN CRITERIA. 44
PART 8 THERMAL DESIGN 47
8.1 THERMAL CHARACTERISTICS. 47
8.2 HUMID AREA DESIGN. 47
PART 9 PLUMBING DESIGN 48
9.1 DESIGN CRITERIA. 48
9.2 DESIGN NARRATIVE AND CALCULATIONS. 48
9.3 PLUMBING FIXTURES AND EQUIPMENT. 49
9.4 PIPING SYSTEMS. 50
9.5 NATURAL GAS PIPING SYSTEMS. 51
AMENDMENT 002 51
PART 10 ELECTRICAL DESIGN 53
10.1 DESIGN CRITERIA 53
10.2 DESIGN CALCULATIONS 53
10.4 LIGHTNING PROTECTION AND GROUNDING SYSTEMS 55
10.5 INTERIOR LIGHTING 55
10.6 INTERIOR ELECTRICAL DISTRIBUTION 57
10.7 SPECIAL POWER REQUIREMENTS 59
10.8 INTERIOR GROUNDING SYSTEMS 60
10.9 INTERIOR TELECOMMUNICATIONS 61
10.10 SPECIAL COMMUNICATIONS SYSTEMS 63
10.11 ELECTRONIC SECURITY SYSTEMS 63
PART 11 HVAC DESIGN 65
NSWC Crane, IN W912QR20R0016
01 02 00.00 48 - 3
11.1 DESIGN CRITERIA. 65
11.2 DESIGN CALCULATIONS. 66
11.3 HVAC SYSTEMS 68
11.4 DUCTWORK, PIPING AND ACCESSORIES 69
11.5 TESTING, ADJUSTING, AND BALANCING. 70
11.6 COMMISSIONING 70
11.7 BUILDING OCCUPANCY FOR ENERGY CALCULATIONS 70
PART 12 ENERGY CONSERVATION 72
12.1 ENERGY CONSERVATION STRATEGIES. 72
PART 13 FIRE PROTECTION DESIGN 74
13.1 DESIGN CRITERIA. 74
13.2 WATER SUPPLY FOR FIRE PROTECTION 74
13.3 FIRE PROTECTION EQUIPMENT 75
13.4 FIRE ALARM (FA) AND MASS NOTIFICATION SYSTEM (MNS) 75
PART 14 SUSTAINABLE DESIGN 79
14.1 SUSTAINABLE DESIGN GOALS. 79
14.2 SUSTAINABLE DESIGN MEASURES. 79
PART 15 ADDITIONAL REQUIREMENTS 80
15.1 WARRANTIES. 80
15.2 CYBERSECURITY 80
15.3 OIL SUMP PUMP 80
15.4 RADON 80
15.5 SOLE SOURCE ITEMS 80
NSWC Crane, IN W912QR20R0016
01 02 00.00 48 - 4
ATTACHMENTS TO THE STATEMENT OF WORK
Attachment A – Room Requirement Sheets Attachment B – Geotechnical Report Attachment C- L3 Reference Documents Attachment D – RF Shield Room Requirements Attachment E – Low Threshold Example Attachment F – Ethernet Interface Example Attachment G – FXR Overhead Crane Concept Attachment H – FXR Rail Wheel Block Concept Attachment I – NSA Crane Oil Storage ank Requirements Attachment J – HPSB Checklist Attachment K – Project Information Form Attachment L – Flow Test Attachment M – Energy Analysis Report Attachment N – Water Harvesting Analysis Attachment O – Minimum Construction Standards for Open Storage Attachment P – Form DD1354 Attachment Q – eOMSI Form Attachment R – Indiana Dept of Revenue General Sales Tax Exemption Certificate Attachment S – Indiana Dept of Revenue Chapter 5 Exempt Transactions of Retail Merchants Attachment T – Facility Responsibility Matrix
Amendment 002 Attachment U – Strategic Radiation Testing CATEX Attachment V – PWD Crane Architecture and Engineering Preferences Supplemental
Amendment 002
REFERENCE DRAWINGS UNDER SEPARATE COVER
NSWC Crane, IN W912QR20R0016
01 02 00.00 48 - 5
PART 1
DESIGN OBJECTIVES, AND FUNCTIONAL AND AREA REQUIREMENTS
1.1 SCOPE OF WORK.
The objective of this solicitation is to construct a Radiation Test Facility that will operate efficiently and function as a testing and associated administrative building at Naval Surface Warfare Center (NSWC), Crane, Indiana. This new facility shall consist of approximately 20,000 square feet and will be constructed adjacent to existing Building 3059. This project shall include the design and construction of the facility along with associated site improvements. It is critical that the high bay area be constructed and ready to accept installation of L3 provided FXR machine by November 1, 2021. This is to include but not be limited to building structure, foundations, floors, shield walls, lighting, electrical, oil storage tank and associated piping and pumps and doors. Contractor at this point will provide partial occupancy to the Government for installation and testing of the radi-ation test equipment.
1.1.1 Requirements stated in this RFP are minimums; design and construction shall meet or exceed the requirements. The design and technical criteria contained and cited in this RFP es-tablish minimum standards for design and construction quality. Innovative, creative, and life cy-cle cost effective solutions which meet or exceed these requirements are encouraged.
1.1.2 This project shall consist of the design and construction of a Radiation Test Facility com-plete with required utilities, communications, electric, HVAC, plumbing, fire protection/alarm sys-tems, EMCS, force protection measures, exterior lighting, site improvements, grading, paving, and fencing on Government-owned land at NSWC, Crane, Indiana.
1.1.3 The Contractor shall provide design and design documents (Comprehensive Interior De-sign or CID) for the furniture and some equipment that is to be purchased and installed by the Government (Government-furnished, Government-installed or GFGI).
Amendment 002
1.1.4 Radiation shielding design is the sole responsibility of the testing equipment pro-vider, L3. Contractor will be required to coordinate and construct the radiation shielding per the design provided by L3. The testing process does not produce any waste materi-als nor is it anticipated to produce any ground or ground water contamination.
Amendment 002
1.2 DESIGN OBJECTIVES.
1.2.1 Applicable Criteria. Applicable design and construction criteria references are listed in this Statement of Work. Criteria shall be taken from the most current references as of the date of issue of the RFP unless stated otherwise. Referenced codes and standards are minimum ac-ceptable criteria.
1.2.1.1 This RFP and its referenced documents define the necessary criteria to plan and de-sign the Radiation Test Facility. Functional space requirements, including general lighting, com-munications, power, tempered air requirements, finishes, test equipment, etc. are contained within
NSWC Crane, IN W912QR20R0016
01 02 00.00 48 - 6 the RFP and its referenced documents and design guides. Typical functional space furniture layouts and inventories are provided in the RFP drawings (these drawings are preliminary only.
It is up to the Contractor’s Designer of Record (DOR) to design to the RFP’s requirements); Con-tractor’s designers shall adapt these to the final floor plans.
1.2.1.2 The project shall be designed and constructed using English (inch-pound) units of measurement.
1.2.2 Primary Consideration. The primary consideration of this solicitation is to obtain a fully functional Radiation Test Facility within funds available, and to maximize design quality. Offe-rors are encouraged to review the RFP to familiarize themselves with all RFP requirements.
1.2.3 Design Quality. Design quality is achieved through the optimization of interior planning, integration of the building with the site, sustainability, selection of building materials and sys-tems for low-cost maintenance and operation, and an overall balance of aesthetics and function-ality. The Army Reserve encourages a project design of award-winning caliber.
1.2.4 Design Freedom. Requirements stated in this RFP are minimums. Innovative, crea-tive, or cost-saving proposals, which meet or exceed these requirements are encouraged, and will be considered more favorably.
1.2.4.1 The project conceptual design was developed by the NSWC Crane, the Radiation Test Equipment designers, the Corps of Engineers, and an A/E design team; this conceptual design is accepted by the Government.
1.2.4.2 The conceptual design Drawings, this Statement of Work along with the other infor-mation and requirements in this RFP, serve as requirements for Contractor building design and construction completion, along with other code, regulatory and professional practice require-ments. The extent of development of these RFP documents in no way relieves the successful offeror from responsibility for completing the design, construction documentation, and construc-tion of the facility in conformance with Applicable Criteria and codes.
1.2.4.3 The conceptual design illustrates desired general arrangements, orientation, and ad-jacencies, it is not intended to dictate the final layout and image for the project. The Contrac-tor’s designers shall develop and refine the conceptual site and building design in their comple-tion of the design and construction documents. Such development shall be consistent with the criteria and acceptable to the Government.
1.2.4.4 The Contractor shall accommodate minor site and building plan changes by the Gov-ernment in the early stages of the design process, as a normal part of the design development process. The Contractor may adjust spaces, within the overall and specific functional area guidelines, as required to accommodate structural layout, and as necessary to provide ade-quate space for mechanical, electrical and communication spaces. The mechanical and electri-cal spaces must provide adequate space to safely and efficiently accommodate equipment op-eration and maintenance. The spatial relationships and adjacencies in the RFP drawings, how-ever, must be maintained, unless the Contractor recommends changes to the Government, and the Government accepts such changes.
1.2.4.5 The Contractor shall develop and refine the exterior image and aesthetics of the building as part of the design development process. The Contractor shall utilize materials, de-tailing, fenestration, lighting and ornamentation to develop a high-quality exterior image for the
NSWC Crane, IN W912QR20R0016
01 02 00.00 48 - 7 facility.
1.2.4.6 The Contractor’s architect or interior designer shall select the final palette of colors and materials for building interior and exterior to produce a pleasing appearance, coordinated throughout. The final palette of colors and materials selection is required to be accepted by the Government.
1.2.5 Installation Design Guidance.
1.2.5.1 The contractor is to follow the most up to date Naval Surface Warfare Center (NSWC), Crane, Indiana Installation Design Guide for the requirements for the exterior renova-tion.
1.2.6 Energy and Resources Conserving Features. Public Laws 102-486 and 109-58, Ex-ecutive Order 13423, and Federal Regulations 10 CFR 435, require federal buildings to be de-signed and constructed to reduce energy consumption in a life-cycle, cost-effective manner us-ing renewable energy sources when economical. Products designed to conserve energy and resources by controlling the amounts of consumed energy or by operating at increased efficien-cies should be considered. Minimum requirements for this project are listed in this Statement of Work.
1.2.6.1 Energy conservation techniques shall be considered as they relate to site design, site engineering, building design, and building engineering. Techniques which conserve energy, improve functionality, and can be justified by life cycle cost analysis as cost-effective are en-couraged. Integration of energy conservation systems with the building design (lighting, struc-ture, mechanical systems, and aesthetics) is essential to facilitate functionality and maximum energy savings. If an alternative energy generation method is proposed for use as the project's primary energy source, documentation shall be submitted to the Contracting Officer, verifying the system’s reliability, life-cycle cost effectiveness, and ability to meet the project’s peak de-mand.
1.2.7 Sustainable Design. Project shall be designed and constructed in accordance with High Performance and Sustainable Buildings (HPSB) Guiding Principles as required by UFC-1- 200-02. In addition, third-party certification is required and shall be certified through USGBC/GBCI Guiding Principles Assessment, GBI Guiding Principles Compliance programs or
LEED.
1.2.8 Antiterrorism and Force Protection Considerations. This Project’s design and con-struction shall comply with the Department of Defense Antiterrorism (AT) Standards for Build-ings, UFC 4-010-01, 12 Dec 2018. The Project shall meet the requirements for an “Inhabited” facility located within an Installation Perimeter. Note that existing buildings located within an in-stallation perimeter are exempt from the requirements of Standard 1, Standoff Distance.
1.3 CONTRACTOR RESPONSIBILITY.
1.3.1 The Contractor shall provide all labor, materials, equipment, supplies, permits, fees, and consultant services to design and construct this Radiation Test Facility. The complex shall be a complete and usable facility, meeting the requirements of this RFP. The Contractor shall develop a complete site, and building package.
1.3.2 Throughout the RFP, references are made to MCAR and OMAR funds. For clarification, NSWC Crane, IN W912QR20R0016
01 02 00.00 48 - 8 this refers to the funding source – either Construction funds or Operations and Maintenance funds – for the Project. The funding source has no bearing on the Scope of the Work.
1.3.3 For purposes of clarification, this RFP identifies parts of the Project for which some re-sponsibility is borne by the Government. If not identified as Government-furnished, all work re-quired by the RFP is the responsibility of the Contractor.
1.3.3.1 Not Used
1.4 SURVEY AND GEOTECHNICAL INFORMATION.
Provided as an appendix.
1.5 RFP DRAWINGS.
The conceptual drawings are included as a part of this RFP to provide preliminary information and criteria for the Contractor’s completion of the design.
1.6 SPECIFICATIONS.
1.6.1 Final specifications shall include as a minimum, a description of the technical require-ments, criteria for determining whether the criteria are met, and quality control requirements and procedures.
1.6.2 Not Used.
1.6.3 Contractor’s final specifications shall be developed from the UFGS. The use of industry prototype specifications (such as MasterSpec), is not allowed.
1.6.3.1 The following order of priority applies:
1.6.3.1.1 First select Sections specifically developed for Military facilities.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .