EASTOVER ARMY AVIATION SUPPORT FACILITY ADD/ALT, Project # 450252 at McEntire Joint National Guard Base, Eastover, South Carolina.
Construction Contract for Project # 450252 for AASF Hangar Addition 2 at McEntire Joint National Guard Base, Eastover, SC. Work w ill be performed in accordance w ith plans and specif ications attached to and made a part of this solicitation. This project is being solicited as an
8(a) set-aside. The North American Industry Classif ication (NAICS) Code is 236220 and the Size Standard for Small Business is $33.5 M of average annual receipts for the past 3 years. Project magnitude is betw een $10,000,000 and $25,000,000. Funds are not currently available. Persons intending on offering a proposal should attend the Pre-Proposal Conference Site Visit. See Section 00100 for specif ic registration information and details. Solicitation, Specif ications, and Draw ings posted at https://fbo.gov.
Contracting Officer: Sharon L. Zimmerman
Email: shari.zimmerman@sc.ngb.army.mil
SHARON L. ZIMMERMAN 803-806-1538
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
13-Apr-2010
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________500 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________13 May 2010 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USPFO FOR SOUTH CAROLINA
9 NATIONAL GUARD ROAD
COLUMBIA SC 29201-4763
W912QG
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
10:00 AM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
8038061540FAX:TEL: 8038061450 TEL: FAX:
W912QG-10-R-0001 61
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912QG-10-R-0001
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lump Sum
AASF HANGAR ADDITION #2
FFP
Non personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary, as per specifications and drawings to construct a 75,000 square foot addition of a rotor wing aircraft hanger and associated shops, to the existing AASF. The building addition will be structural steel frame, membrane roof, metal siding and masonry exterior walls with concrete block partitions, finishes, HVAC system, plumbing rough in, fixtures and trim, lighting and electrical power, data wiring, fire suppression system, along with exterior grading, storm drainage system, land side and air side paving, and utilities extensions to tie into existing services.
FOB: Destination
NET AMT
0002 1 Lump Sum
OPTION OPTION 0001
FFP
METAL SOFFIT PANELS
OPTION 0001 IS DESIGNATED AS ALTERNATE 0001 ON
SPECIFICATIONS.
In lieu of galvanized steel soffit panels as indicated in base proposal, provide satin finished stainless soffit panels as per specifications and drawings.
0003 1 Lump Sum
OPTION OPTION 0002
FFP
FASCIAS, TRIM AND EXPOSED METAL TRIM, GUTTER COVERS AND
LINERS
OPTION 0002 IS DESIGNATED AS ALTERNATE 0002 ON
SPECIFICATIONS.
In lieu of galvanized steel fascias, trim and exposed flashings, gutter covers and liners as indicated in base proposal, provide satin finished stainless steel fascias, trim and exposed flashings as per specifications and drawings.
0004 1 Lump Sum
OPTION OPTION 0003
FFP
INSULATED CORE METAL WALL PANELS
OPTION 0003 IS DESIGNATED AS ALTERNATE 0003 ON
SPECIFICATIONS.
In lieu of galvanized steel insulated core panels as indicated in base proposal, provide satin finished stainless steel sheet insulated core wall panels, all surfaces as per specifications and drawings.
0005 1 Lump Sum
OPTION OPTION 0004
FFP
METAL ROOF PANELS
OPTION 0004 IS DESIGNATED AS ALTERNATE 0004 ON
SPECIFICATIONS.
In lieu of galvanized steel standing seam metal roof panels with aluminum color paint finish as indicated in base proposal, provide satin finished stainless steel sheet insulated core wall panels, all surfaces as per specifications and drawings.
0006 1 Lump Sum
OPTION OPTION 0005
FFP
METAL COLUMN COVERS
OPTION 0005 IS DESIGNATED AS ALTERNATE 0005 ON
SPECIFICATIONS.
In lieu of aluminum column covers as indicated in base proposal, provide satin finished stainless steel column covers as per specifications and drawings.
0007 1 Lump Sum
OPTION OPTION 0006
FFP
ADDITIONAL CONCRETE APRON PAVING
OPTION 0006 IS DESIGNATED AS ALTERNATE 0006 ON DRAWINGS.
Demo, remove existing concrete paving, and provide new paving in delineated area as per specifications and drawings.
SECTION 00010 - NOTES
TABLE OF CONTENTS
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00010 – PRICING SCHEDULE, NOTES
SECTION 00100 – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS
SECTION 00700 – CONTRACT CLAUSES
SECTION 00800 – SPECIAL CONTRACT REQUIREMENTS
ATTACHMENT 1 – PLANS AND SPECIFICATIONS Project # 450252 Dated 13 APRIL 2010
WAGE DETERMINATION(S)- to be inserted at award.
EXHIBIT A – Performance Relevancy Questionnaire
EXHIBIT B – Subcontractor Information and Consent Form
EXHIBIT C – Reference Questionnaire Package
EXHIBIT D – Option information form
EXHIBIT E – Proposal Contents Aid
EXHIBIT F – Proposal Inquiry Format
SECTION 00010 NOTES
1. Instructions for the preparation of proposals are located in Sections 00100, 00110 and 00120.
2. Offeror’s attention is invited to the insurance requirement contained in this solicitation (FAR Clause 52.228-5
Insurance – Work on a Government Installation). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.
3. Reference DFARS Provision 252.236-7008, Contract Prices – Bidding Schedules. The term ―Bidding Schedule‖ shall also be construed to mean ―Offer Schedule‖ or ―Schedule‖. The terms ―bid‖ and ―offer‖, and ―bidder‖ and
―offeror‖ shall be construed as having the same meaning in this solicitation and resulting contract.
4. Funds IAW FAR Provision 52.232-18, Availability of Funds. Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.
5. CLINS 0002 through 0007 are Option Line Items. See FAR Provision 52.217-5 Evaluation of Options, Section
00100. The Government anticipates awarding options at time of award, however, reserves the right to award unexercised options after award within the time period provided in the awardee’s accepted proposal. (Reference
Exhibit D)
6. Liquidated Damages (see FAR Clause 52.211-12, Liquidated Damages - Construction) apply for exceeding 500 calendar days.
7. All references in specifications and drawings to Alternate is intended to mean Option.
8. All references in specifications and drawings to a specific brand or supplier is intended to mean ―or approved equal‖.
End of Section 00010
Section 00100 - Bidding Schedule/Instructions to Bidders
SECTION 00100 - NOTICES
Section 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. SCOPE
1.1. You are invited to submit a proposal in response to our Request for Proposal (RFP) W912QG-10-R-
0001entitled Eastover Army Aviation Support Facility Add/Alt, Project Number 450252, at McEntire Joint National
Guard Base, Eastover, South Carolina. As a result of this solicitation, the Government intends to award a single
Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
1.2. This solicitation is set-aside 100% for a competitive 8(a) SBA approved program serviced by the South
Carolina, North Carolina, or Georgia District Office and who submit evidence of bonding in a minimum amount of
$30,000,000. It is the intention of the Government to allow 8(a) firms who are not serviced by these District Offices but have a verifiable ―bona fide‖ office and employees located within the geographic area served by the South
Carolina, North Carolina, or Georgia District Office at time of solicitation issuance be deemed eligible to submit offers. All other firms are deemed ineligible to submit offers.
2. NOTICE OF PRE-PROPOSAL CONFERENCE
2.1.1. A pre-proposal conference will be conducted 22 April 2010 at 9:30 AM EST for the purposes of briefing on the proposal requirements and answering questions regarding this solicitation. This conference will be held at McEntire Joint National Guard Base (JNGB), Aerospace Dining Hall, Building 984, 1325 South Carolina
Road, Eastover, South Carolina. Interested Contractors are highly encouraged to attend the pre-proposal conference.
The site visit will be held following the conference.
2.1.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to Sharon L. Zimmerman at the following addresses:
shari.zimmerman@sc.ngb.army.mil or shari.zimmerman@us.army.mil
Firm Name and Telephone Number
Visitor’s Name and Social Security No.
Drivers License and Citizenship
Designate if Visitor is Prime Contractor or Sub-Contractor/Supplier
2.1.3. This information must be provided in advance, not later than 2 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
2.1.4. Visitors may be required to present the following information upon arrival: (1) Vehicle
Registration, (2) Valid Drivers License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
2.1.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
mailto:shari.zimmerman@sc.ngb.army.mil mailto:shari.zimmerman@us.army.mil
2.1.6. A record of the conference shall be made and furnished to all prospective offerors via posting to our web site at https://www.fbo.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS
3.1. Submit all questions on the Exhibit F, Proposal Inquiry Format by email to the contracting office at the address show below.
Subject Line: Reference No. W912QG-10-R-0001
Email: shari.zimmerman@sc.ngb.army.mil or shari.zimmerman@us.army.mil
3.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.
3.3. The Contracting Officer reserves the right to address questions received after the fifth day prior to solicitation closing with those offers deemed responsive and/or in the competitive range after closing. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to closing and will be posted not later than two working days prior to closing. OFFERORS ARE STRONGLY ENCOURAGED
TO SUBMIT QUESTIONS EARLY IN THIS PROCESS.
3.4. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to our web site at:
https://www.fbo.gov.
3.4.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site.
3.4.2. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (FedBizOpps.gov or fbo.gov) system. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system. FedBizOpps registration requires the following information:
3.4.2.1. 1) Central Contractor Registration (CCR) Marketing Partner Identification Number
(MPIN), 2) DUNS Number and CAGE Code, 3) Telephone Number, 4) E-Mail Address. Registration instructions can be found on the FedBizOpps website at https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf. Reference paragraph 4.4 of the Vendor Guide for instructions to retrieve the specification and drawing documents for this project. Bidders/offerors who have registered with FedBizOpps must access the data for this solicitation by way of the link below. Bidders/Offerors cannot log into the FedBizOpps home page and search for data.
4. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF PROPOSALS
4.1. The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Request for Proposal. All information relating to this RFP, including pertinent changes/amendments and information prior to the date set for receipt of proposals will be posted on the following website: https://www.fbo.gov.
https://www.fbo.gov/ mailto:shari.zimmerman@us.army.mil https://www.fbo.gov/ https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf https://www.fbo.gov/
4.2. Offerors are strongly cautioned to check this site frequently and to ―refresh‖ their web page to ensure they have the lasted information.
5. HAND CARRIED PROPOSALS/INVITATIONS
5.1. A bid repository is provided for hand carried proposals and is located at the USPFO for South
Carolina, 9 National Guard Road, Columbia, SC 29201-4763. Hand carried proposals must be deposited in the repository prior to the time established for receipt of proposals.
5.2. Late receipt of proposals due to base entry delays may not be deemed excusable and the Contracting
Officer may declare the proposal late and remove it from consideration.
6. WAGE DETERMINATION
6.1. Davis Bacon Wage Rates are applicable to this project. Current prevailing wage determination(s) at time of issuance of solicitation are General Decision Number SC20100037 dated 03/12/2010.
In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of this solicitation, it is the offeror’s responsibility to insure the most recent determination is used in preparing the proposal. An Amendment will not be issued prior to closing to change Wage Determination dates and/or numbers. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. If the wage determination modification does not change any affected wage rates, then the provisions of FAR 22.404-5(c)(4) will apply.
6.2. Applicable wage rates can be found at http://www.gpo.gov/davisbacon/sc.html
7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This RFP does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.
8. REMOVAL OF SECTIONS AT TIME OF AWARD
Sections 00100, 00110, 00120, 00600 and all exhibits will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.
9. DISPOSITION OF UNSUCCESSFUL PROPOSALS
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful proposals. The
Government will destroy extra copies of unsuccessful proposals. No destruction certificate will be provided.
10. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES
10.1. It has been determined that all reasonable amounts of electricity and water, where/if physically available, used in connection with this project will be furnished to contractor without cost. The offerors will take this into consideration when computing its offer. (FAR Clause 52.236-14, Availability and Use of Utility Services)
11. EXCEPTIONS
11.1. If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00010 through 00800) http://www.gpo.gov/davisbacon/sc.html and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an offeror's proposal unacceptable and ineligible for award.
12. CLAUSES
12.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
12.2. Clauses and provisions in this document may not appear in consecutive order.
End of Section 00100
CLAUSES INCORPORATED BY REFERENCE
52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004
52.215-16 Facilities Capital Cost of Money JUN 2003
52.217-5 Evaluation Of Options JUL 1990
52.217-7 Option For Increased Quantity-Separately Priced Line Item MAR 1989
52.222-5 Davis-Bacon Act--Secondary Site of the Work JUL 2005
52.225-10 Notice of Buy American Act Requirement--Construction
Materials
FEB 2009
52.236-28 Preparation of Proposals--Construction OCT 1997
252.236-7008 Contract Prices-Bidding Schedules DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.215-20 REQUIREMENTS FOR COST OR PRICING DATA OR INFORMATION OTHER THAN COST
OR PRICING DATA (OCT 1997)
(a) Exceptions from cost or pricing data. (1) In lieu of submitting cost or pricing data, offerors may submit a written request for exception by submitting the information described in the following subparagraphs. The Contracting
Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.
(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Commercial item exception. For a commercial item exception, the offeror shall submit, at a minimum, information on prices at which the same item or similar items have previously been sold in the commercial market that is adequate for evaluating the reasonableness of the price for this acquisition. Such information may include--
(A) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities;
(B) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market;
(C) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.
(2) The offeror grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this provision, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation
, access does not extend to cost or profit information or other data relevant solely to the offeror's determination of the prices to be offered in the catalog or marketplace.
(b) Requirements for cost or pricing data. If the offeror is not granted an exception from the requirement to submit cost or pricing data, the following applies:
(1) The offeror shall prepare and submit cost or pricing data and supporting attachments in accordance with Table
15-2 of FAR 15.408.
As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firmed Fixed Price contract resulting from this solicitation.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance
Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
23.4 6.9
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract
Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to
Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract
Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is South Carolina, Richland County.
52.225-12 NOTICE OF BUY AMERICAN ACT REQUIREMENT-- CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (FEB 2009)
(a) Definitions. ―Commercially available off-the-shelf (COTS) item,‖ ―construction material,‖ ―designated country construction material,‖ ―domestic construction material,‖ and ―foreign construction material,‖ as used in this provision, are defined in the clause of this solicitation entitled ―Buy American Act-- Construction Materials Under
Trade Agreements‖ (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the
Buy American Act, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause
52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.225-12 NOTICE OF BUY AMERICAN ACT REQUIREMENT-- CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (FEB 2009)
(a) Definitions. ―Commercially available off-the-shelf (COTS) item,‖ ―construction material,‖ ―designated country construction material,‖ ―domestic construction material,‖ and ―foreign construction material,‖ as used in this provision, are defined in the clause of this solicitation entitled ―Buy American Act-- Construction Materials Under
Trade Agreements‖ (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the
Buy American Act, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause
52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
(1) Protest to the independent review authority shall be filed at:
Office of Chief Counsel
ATTN: NGB Protest Decision Authority
1411 Jefferson Davis Highway
Jefferson Plaza 1; Suite 11300
Arlington, VA 22202-3231
FAX (703) 607-3684 or 3682
OR
(2) Protest to the Contracting Officer shall be filed at:
USPFO for South Carolina
ATTN: Sharon L. Zimmerman
9 National Guard Road
Columbia, SC 29201-4763
FAX (803) 806-1540
ONLY WRITTEN PROTESTS WILL BE CONSIDERED. NO PROTESTS MAY BE FILED BY ELECTRONIC
MAIL.
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the
GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
22 April 2010 @ 9:30 AM EST
(c) Participants will meet at--
McEntire Joint National Guard Base (JNGB)
Aerospace Dining Hall
Building 984
1325 South Carolina Road
Eastover, South Carolina
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
www.arnet.gov/far http://farsite.hill.af.mil http://www.acq.osd.mil/dpap/dars/dfars/index.htm
(End of provision
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
NONE
SECTION 00110 - SUBMISSION REQ
SECTION 00110 SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1. PROPOSAL PREPARATION INSTRUCTIONS
1.1. These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposal data. They are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals. Carefully review this section prior to commencing proposal preparation. All solicitation amendments must be acknowledged in accordance with Section
00100, FAR Provision 52.215-1, Instruction to Offerors – Competitive Acquisition and Instructions to Offerors.
1.2. Offerors are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete proposal. Failure to furnish a complete proposal, at the time of proposal submission, may result in the proposal being unacceptable to the Government and eliminated from consideration for award.
2. Reserved.
3. PROPOSAL CONTENT
3.1. Prospective offerors shall submit the following volumes in two separate packages:
3.1.1. Submit Volume 1, Price proposal, pro forma documents, in original and (3) three hard copies, except as noted, in accordance with instructions contained herein and;
3.1.2. Volume 2, Past/present performance information in original and three (3) hard copies.
3.1.3. Submit Volume 1 and Volume 2 in its entirety on Compact Disk (CD).
http://www.arnet.gov/far http://farsite.hill.af.mil/ http://www.acq.osd.mil/dpap/dars/dfars/index.htm
3.1.4. Offerors are cautioned to carefully review the proposal requirements for these Volumes and ensure a complete proposal is submitted.
3.2. PROPOSAL DUE DATE SCHEDULE
3.2.1. The entire proposal (Volumes 1 and 2 and the CD copy) are due by the date and time set for the receipt of proposals shown in Block 13 of the SF 1442. Past performance references should provide questionnaire responses to the Contracting Officer not later than the closing date.
3.2.2. After compiling all required information, submit original and specified number of copies to the issuing office listed in Block 7 of the SF 1442. Mark the front of the envelope/box with the following:
―PROPOSAL No. W912QG-10-R-0001, DO NOT OPEN --- Competitive Acquisition‖.
3.3. PROPOSAL FORMAT
3.3.1. Purpose: These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposed data. The proposal shall include all of the information requested in the specific instructions. Failure to include all information requested may adversely affect the evaluation.
3.3.2. A proposal that merely reiterates or promises to accomplish the requirements of the RFP will be considered unacceptable. A proposal that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough and fair evaluation.
3.3.3. Offerors are cautioned to submit enough information to enable the evaluation committee to fully ascertain each offeror’s capability to perform all of the requirements contemplated by this solicitation. All commitments made in the proposal may become a part of the resultant contract. The data submitted with each proposal should be complete and concise, but not overly elaborate. Excessive reliance on promotional brochures is discouraged.
3.3.4. Written proposals shall be prepared on standard 8.5 x 11 inch paper (charts may be landscaped but must be on 8.5 x 11 inch paper) and shall be in a legible font size (10). All pages of each proposal shall be appropriately numbered, and identified with the RFP number. For ease of reference, consecutive page numbering with tabs is required. Type size for graphics, charts, diagrams and tables shall be of an appropriate font and size for the application, and must be clearly readable without magnification assistance to the normal eye. Text lines will be no less than single-space. To the maximum extent practicable, proposal submission shall be double sided.
3.3.5. Binding: Elaborate format and binding are neither necessary nor desirable. All binders will be capable of lying flat when opened. Three ring binders are preferred. The cover and spine of each binder will clearly identify the offeror’s name, Part number, RFP number, RFP title and copy number, (e.g. copy 2 of 3). The original for each volume will be clearly identified on the cover and the spine. All binders will allow for easy removal and replacement of pages.
3.3.6. Indexing: Each binder will contain a ―Table of Contents‖ for that volume. The ―Table of
Contents‖ will identify major areas, paragraphs and subparagraphs by number and title, as well as by page number and volume locations. Tab indexing will be used to identify Sections as appropriate.
3.3.7. Electronic Copy: Provide one (1) electronic copy of all of the proposal information for Volumes 2 and Volume 1. Electronic copies shall be submitted on CD-ROM saved in Microsoft Word format or Adobe
Acrobat. (―Read Only‖ files are acceptable). All disks shall be virus checked prior to submission.
3.3.8. If revised proposals are requested, all proposal revisions shall be submitted on colored paper as page changes with each page identified by date and page number. Revised pages shall be printed on one side and punched with a 3-hole punch along the left margin. The number of revised copies to be submitted is the same as the initial proposal.
3.3.9. Offeror may, at the discretion of the Government, be asked to provide clarifications regarding their proposals in accordance with FAR 15.306 (a). Requests for such information do not constitute discussions.
3.3.10. The offeror shall be held responsible for the validity of all information supplied in his/her proposal, including that provided by potential subcontractors. Should subsequent investigation disclose that the facts and conditions were not as stated, the proposal may be rejected.
3.4. PROPOSAL VOLUME CONTENTS: Each offeror’s proposal shall be submitted as set forth below and all information shall be confined to the appropriate part to facilitate independent evaluation. Proposals, which do not include the requested minimum information, may be eliminated from further consideration for award.
3.4.1. VOLUME 1, PRICE/COST INFORMATION AND PRO FORMA DOCUMENTS
3.4.1.1. Offerors shall provide all price/cost information necessary to provide a meaningful basis for Government's analysis and evaluation of price/cost for the project set forth in Section 00120 of this solicitation.
The Government is not, and does not intend on, requesting certified cost or pricing data. Offerors may be required during the evaluation process to provided sufficient price/cost information that will enable the Government to perform a meaningful evaluation. If an offeror proposes an unusually low price, the offeror should also provide rationale to justify the price. Detailed requirements follow:
3.4.1.2. Provide an introductory page to include Cage Code, DUNS Number, Tax Identification
Number (TIN), points of contact, authorized negotiators, contact phone, facsimile numbers, and email addresses.
Also, include you business socioeconomic status, e.g. small business, woman-owned small business, HUBZone small business, etc.
3.4.1.3. Offer and Section 00010 – Complete in its entirety the ―Offeror‖ portion of the Standard
Form (SF) 1442. An official having the authority to contractually bind your company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF 1442 is required to have an original signature.
3.4.1.4. Section 00010 – Insert the price/cost associated with the project in the line items.
3.4.1.5. Representations and Certifications- Section 00600- insert the required certifications and representations and return only those shown in section 00600. All other required representations and certifications are to be completed on line in ―ORCA‖.
3.4.1.6. All potential offerors are required to register in the Central Contractor Registration
(CCR), http://www.ccr.gov, in order to complete the annual Representations and Certifications found at the ORCA website. The ORCA site contains an ORCA Application Handbook and an ORCA Quick Reference Guide. To access them, simply click on the "Help" link at the top of the ORCA homepage. Ensure your Central Contractor
Registration (CCR) information is up-to-date. Complete annual Representations and Certifications on line at http://orca.bpn.gov if you have not already done so. You are not required to provide a copy of the Representations and Certifications completed in ORCA with your written proposal. DO include any Representations and
Certifications and other statements of offerors contained in Section 00600 of this solicitation, which are in addition to the annual certifications on ORCA. Information provided on your introductory page will assist us in locating and verifying your data in (CCR) and ORCA.
3.4.1.7. Provide on Exhibit D the number of days after the Notice to Proceed (NTP) is issued that
Options 0001 through 0006 can be exercised and not affect contract price or performance period given a notice to proceed (NTP) on or about 10 June 2010. The information provided will be incorporated in unexercised options at time of contract award and will be used as a basis for exercising of options after award. (Exhibit D information is provided for informational purposes only and not for evaluation).
3.4.1.8. Reserved.
http://www.ccr.gov/ http://orca.bpn.gov/
3.4.1.9. Reserved.
3.4.1.10. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the
Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the Central Contractor Registration (CCR) database.
HUBZone Joint Ventures must meet the requirements in FAR 19.1303(c) and will be referred to the Small Business
Administration to determine eligibility.
3.4.2. VOLUME 2, OFFEROR PAST PERFORMANCE INFORMATION
3.4.2.1. VOLUME 2 is obtained for the purpose of evaluating Past Performance. Past
Performance includes current/on-going performance that is complete to 70% or greater. Volume 2 includes the offeror’s Performance Relevancy Questionnaire, Exhibits A Parts 1 and 2; and any discussion and or additional information, awards, letters, etc. concerning past performance the offeror includes. Offerors are cautioned to complete all the questions on the Exhibits A Part 1 and Part 2. Detailed instructions are included in Exhibit A.
3.4.2.2. Offerors shall use the Reference Package, Exhibit C, to obtain references from past and present clients.
3.4.2.3. Past Performance, which includes current on-going (present) performance that is complete to 70% or greater will be evaluated using the evaluation criteria set forth in Section 00120 of the solicitation. If the offeror represents the combining of two or more companies, joint venture or formal teaming agreement, for the purpose of this RFP, each company shall complete Exhibit As and obtain Exhibit C references.