Text version
EASTOVER ARMY AVIATION
SUPPORT FACILITY (AASF)
ADD/ALT
PROJECT # 450252
CONSTRUCT THIS PROJECT AT
MCENTIRE JNGB, EASTOVER
SHARON L. ZIMMERMAN
Contracting Office
LTC ANDREW W. BATTEN
Facilities Management Office
UNCLASSIFIED
Construct a 75,000 SF addition of rotor wing aircraft hanger/associated shops to existing AASF.
Magnitude between $10M & $25M
100% Competitive 8(a) Set-Aside
SBA approved program serviced by
SC, NC or GA District Office
A Firm-fixed Price Contract Will Be
Awarded.
Contract Will Be Awarded to the responsible offeror whose proposal represents the best value to Govt.
Evaluation Factors - Price & Past
Performance
On The Web - https://www.fbo.gov
Solicitation
Exhibits
Questions & Answers Document
Amendments
○Check Regularly & Refresh Web Page
○ Plans & Specifications- must be registered and have password on FBO
Construction Period Is 500 Calendar
Days After Receiving The Notice To
Proceed
The following is a brief overview of the proposal requirements
Offerors Are Strongly Cautioned To
Carefully Read The Requirements
Of The Solicitation And Comply
Accordingly
The Government Intends To Award
Without Discussion, Therefore, There May Not Be A Chance For
Discussions, Corrections, Or
Revised Proposals
Section 00110 Of The RFP Details The
Required Information And Format For The
Proposal
2 Volumes Are Required
VOL 1 – Price/Cost
○ Pro forma documents
VOL 2 - Past Performance
Offeror portion of SF1442
Section 00010 – Pricing Info CLINS
Section 00600 – Representations and Certifications (R&C) Complete R&Cs in ORCA on the Web
Complete and Return DoD R&Cs in Section
Complete & Include Supplemental Info as Required – Bonding Evidence of $30M, JV Agreement
Exhibit A- Part 1- Performance Relevancy
Questionnaires – Use Exhibit Format!
Complete not more than 5 forms for Relevant
Contracts Completed Or Substantially Completed
(70%) In The Last Five Years
Exhibit A-Part 2 – Complete One (1)
Send Questionnaires For The Exhibit A
Projects to references NOW
Do This Early – Must Be to KO NLT Closing Date
If You Do Not Have Relevant Past
Performance And Are Using Experience
Of Key Personnel, Predecessor
Companies Or Subcontractors To Obtain
This Ensure You Clearly State This In The
Proposal
To Be Considered Subcontractor Must
Complete A Consent Form - Exhibit B
Proposal Due at 10:00 AM, 13 May 2010
Proposal Must Be Signed By Officer Of Your
Company
No Facsimile Or Electronic Offers
Send or deliver to:
USPFO for South Carolina
9 National Guard Road
Columbia, SC 29201-4763
Reference Questionnaires Are Also Due By This Time And Date
Send Reference Questionnaires Out As Soon As Possible
Return to KO Via Mail, Fax Or E-mail
Exhibit A = Relevancy
Questionnaire
PART 1 (NTE 5) PART 2 (1)
Exhibit B = Subcontractor Consent
Form- if applicable
Exhibit C = Past Performance
Letter and Questionnaire (Send out to References)
Process Is Detailed In RFP Section 00120
Carefully Review Section 00120 When Preparing Proposal
Comply With Section 00100 And 00110 Requirements
Failure To Furnish A Complete Proposal May Result In Elimination From Consideration
Best Value Is Defined As An
Award Based On The Greatest
Overall Benefit In Response To
The Requirement. Award Is Based
On Price And Other Non-cost
Related Factors
The Contractor Whose Proposal Provides
The Best Value To The Government
Past Performance Is Approximately Equal
To Price
The Best Value May Not Be The Lowest
Price
Submit A Complete Proposal In Accordance With Instructions – Use Formats Provided
Award Without Discussions Is Intended, You May Not Have An Opportunity To Correct Or Revise Proposal
52.219-14 Limitations on Subcontracting Apply- Small Business must perform 15% of cost of contract, not including the cost of materials with it’s own employees
When Using A Subcontractor To Obtain/Enhance Relevancy Provide Subcontractor Consent Form, Exhibit B, Or The Information Will Not Be Considered
Award In This Process Does Not Necessarily Mean The Lowest Price Wins
Questions Must Be Submitted On Exhibit F Via Email To: shari.zimmerman@sc.ngb.army.mil
Submit Questions NLT COB 7 May 10
Answers will be provided NLT COB 11 May 10
Questions Received After 7 May 10 May Be Held And Addressed After RFP Closing With Those Offerors Determined To Be In The Competitive Range If Discussions Are Deemed Necessary
Do Not Call Technical Personnel Or A&E- This Will Delay Getting An Answer
All Questions, On A Non-Attribution Basis, And The Answers Will Be Posted To The Web Site https://www.fbo.gov/
If Necessary Addendums, Issued By An Amendment, Will Also Be Posted
Check Web Site Regularly And Don’t Forget To Refresh Web Page https://www.fbo.gov www.ccr.gov/ http://orca.bpn.gov/ http://www.gpo.gov/davisbacon/all states.html
Email: shari.zimmerman@sc.ngb.army.mil
UNCLASSIFIED 27
Mr. Gary B. Grant, P.E.
LTC Andrew W. Batten
Mr. John F. Taylor, AIA
Addition to existing aircraft maintenance facility
Additional hangar and shop space
Supports UH-60 & AH-64 helicopters
Approximately 78,000 SF
2-multibay hangars separated by shops
UNCLASSIFIED 30
UNCLASSIFIED 31
Structure is clear span custom fabricated steel trusses and joists
Exterior
Masonry walls
Insulated metal panels
Translucent panels
Interior partitions-concrete block
Interior finishes-paint, ceramic tile, VCT floors, suspended acoustical ceilings
Hangar floor finish-painted
UNCLASSIFIED 33
Hangar doors
Motorized rolling steel doors
Enclose air side of each hangar
Roof
Standing seam metal
Over rigid insulation & metal deck
Hangar bays serviced by multiple rolling bridge cranes
Gas fired radiant heaters & ventilation fans service hangars
Existing water-foam fire suppression system to be expanded
UNCLASSIFIED 34
Limited air conditioned shops
Electrical includes power, lighting, emergency generator, P.A. system, fire alarm system
Approximately 50% existing airside apron replacement
Site utilities, grading, paved vehicle parking
UNCLASSIFIED 35
Operational aircraft apron & existing facility
Work hours
Fencing
Safety
Security
Contractors will have limited access
Base security measures
E-verify
Foreign Object Damage (FOD)
UNCLASSIFIED 36
Storm Water/Land Disturbance NPDES Co-permitee agreement
Traffic Control or informational message boards on the public roadways
Base Excavation Permit (AF Form 103)
Base Hot Work Permit (AF Form 592)
Base Confined Space Entry Permit (AF
Form 1024)
In the event that there is a conflict between the
RFP terms and conditions and the information that is disseminated during today’s conference, the
RFP terms and conditions takes precedence.
The formal RFP is the only document that should be relied upon in determining the Government’s requirements. Any changes to the RFP will be with a formal amendment.