W912PQ-19-Q-8014_RFI_Response.docx
DOCX document 13 KB Posted
- Attached to
- Static Display Air Park
- Solicitation number
- W912PQ19Q8014
About this file
RFI answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PQ-19-Q-8014_Static_Display.pptx | PPTX presentation | |
| W912PQ-19-Q-8014_Air_Park.pdf | ||
| C-1.1_F-16_F-86_Drawing.pdf | ||
| C-3.1_F-84-A-37__Drawing.pdf | ||
| C-1.0_C-2.0_F-16_F-86_A-10_SIte_Plan.pdf | ||
| C-2.1_A-10__Drawing.pdf | ||
| W912PQ-19-Q-8014_Air_Park.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912PQ-19-Q-8014
Installation of Concrete Pads Static Displays
Request for Information
1. RFI Question 1: request provide footprint of aircraft for the 3 ea. pads that currently have no aircraft on them
Answer Question 1: see attached file (W912PQ-19-G-8014) for general dimensions of each aircraft. The contract awardee will be responsible to field verify actual dimensions from aircraft on premises. The COR (Contracting Officer Representative) will escort the contract awardee to aircraft staging area.
1. RFI Question 2: are expansion joints required or will control joints suffice (ie, are you only looking for us to quarter the slabs with control joints.
Answer Question 2: expansion joints will be required around the perimeter of (2) existing piers and the new concrete slabs for F-16 and F-86 Aircraft. Control joints will be acceptable for the (3) new aircraft displays so long as they are a monolithic pour.
1. RFI Question 3: Will a broom finish suffice for the pads?
Answer Question 3: A broom finish is the desired final finish