F9GGGA7017AW01
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide updated information w ithin the Statement of Work and to extend the response date and time. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Feb-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PQ-17-T-0013
X 9B. DATED (SEE ITEM 11)
09-Feb-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Feb-2017
CODE
W912PQ- 174TH ATKW/NYANG
6001 E. MOLLOY ROAD
HANCOCK FIELD
SYRACUSE NY 13211-7099
W912PQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PQ-17-T-0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 24-Feb-2017 12:00 AM to 03-Mar-2017 04:30 PM.
The following have been added by full text:
STATEMENT OF WORK
REMOVE AND REPLACE DC BATTERIES
Room 116 / 128A
BUILDING 700
EASTERN AIR DEFENSE SECTOR
GRIFFISS BUSINESS AND TECHNOLOGY PARK
BUILDING 700
366 OTIS STREET
ROME, NEW YORK 13441-4812
EADS PROJECT
GRCL-17-0006
28 February 2017
Table of contents
1. SCOPE OF WORK
2. AREA OF WORK
3. DESCRIPTION OF WORK
4. PERIOD OF PERFORMANCE
5. MATERIALS
6. GENERAL CONDITIONS
7. GOVERNMENT WORKING HOURS
8. UTILITIES
9. DISPOSAL OF MATERIALS AND CLEANUP
10. SECURITY
11. ESCORTS
12. SITE VISIT
13. POINT OF CONTACT
1. SCOPE OF WORK:
The contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, and other items and services necessary to complete the work as described in this Performance Work Statement. Work location is at the Eastern Air Defense Sector (EADS), Building 700, 366 Otis Street, Rome, New York 13441-4812 on the Griffiss Business and Technology Park.
2. AREA OF WORK:
Contractor shall work only in the areas designated by the Engineer in Charge. Area of work is located in of Building 700 Rooms 116 and 128A.
Contractor to verify all measurements and quantities at site visit.
3. DESCRIPTION OF WORK:
1) Room 116 - Contractor remove existing (32) batteries and install new GNB batteries onto the existing battery tray. Contractor shall remove only one string of batteries at one time. Cleaning all connections, inspecting cables and connectors’. Measure and record the voltage, impedance, and micro-ohms of the new battery strings. Lace and label all cables. Batteries to be install in the existing Power ware Eaton, 48 volt dc, 320 Amp, Model # 9pr48 system.
2) Room 128A - Contractor remove existing (12) batteries and install new GNB batteries onto the existing battery tray’s. Contractor shall remove only one string of batteries at one time. Cleaning all connections, inspecting cables and connectors’.
Measure and record the voltage, impedance, and micro-ohms of the new battery strings. Lace and label all cables. Batteries to be installed in the existing C&D Technology, 50Amp, Model # ARE-N0245048 system.
4. PERIOD OF PERFORMANCE:
Work must be completed in conjunction with the Mission Schedule without interruption of or interference with the function of the military personnel unless prescheduled prior to start of work. All work shall be completed in 59 days from NTP.
5. MATERIALS: Any materials must be submitted on AF Form 3000 prior to using for approval by Engineer.
Contractor shall provide (GNB Marathon M12V105FT) Batteries for room 116 and (GNB 12/90G-11) Batteries) for room 128 or approved equal. Battery lead time is 1-2 weeks.
EADS shall not accept, sign for, or receive any materials associated with this project delivered directly to site.
6. GENERAL CONDITIONS:
Contractor and all personnel shall comply with the OSHA, NEC, NFPA, and ASTM Standards. Contractor shall protect all government property (Personnel, Buildings, Foliage, Grounds) while work is in progress. Contractor shall be 100% responsible for any clean-up cost associated with any spills. Contractor shall work with the time line of
EADS.
7. GOVERNMENT WORKING HOURS:
Work hours shall be Monday thru Friday 0700-1530 hours, with the exception of Federal holidays. Due to EADS 24/7 Mission, the contractor may need to work outside these hours to include weekends. Contractor must have prior approval in writing to work outside these guidelines and must coordinate with the Engineer in charge.
8. UTILITIES:
The Government shall provide at no cost to the Contractor reasonable amounts of water and electricity to support the contract. Hook up will be to existing outlets and will be the contractor’s responsibility.
9. DISPOSAL OF MATERIALS AND CLEANUP:
The contractor shall dispose of all containment debris associated with this job off base and provide valid documentation of disposal. Contractor shall clean up after each work period and dispose of all debris at the close of each day.
Contractor shall verify all site conditions, quantities, measurements, and project requirements before bidding or ordering materials.
Contractor shall protect and barricade all work areas at all times to protect workers and the public from injury.
Contractor shall protect all structures, utilities, vegetation, sidewalks and vehicles from damage at all times. Replace all damaged materials with new materials to the satisfaction of the Government, at no additional cost to the Government.
10. SECURITY:
EADS Security Forces shall monitor the incoming and outgoing of work personnel during the duration of the project. All deliveries shall be coordinated with the Engineer to arrange for their entrance into the compound.
The contractor shall submit a list of all personnel names, copy of valid driver’s license within one week after award of contract. Any personnel that will work onsite shall be vetted through EADS security. No one will work on site until a background check is completed and personnel cleared. If at any time the contractor submits additional names for clearance, EADS security will require at least 48 hours’ notice to clear individual.
All Contractor personnel shall have a minimum of one (1) Form of Photo Identification with them at all times.
11. ESCORTS:
The work area (B-700) is located in a high security compound. A security briefing will be conducted prior to the start of the contract.
12. SITE VISIT:
One (1) site visit will be scheduled with date and time determined when solicitation issued. Contractors will meet at EADS Building 703, 366 Otis St., Griffiss Business and
Technology Park, Rome, New York 13441-4805. Call Mrs. Christine Proper,
(315) 334-6781, if you plan to attend site visit.
13. POINT OF CONTACT:
Mr. Daniel Melie, Chief, Engineering Services (315) 334-6142.
Mr. Gregory Hatzinger, CEE (315) 334-6731
The following have been deleted:
(End of Summary of Changes)