Section 00010 - Solicitation Contract Form

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Each

INSTALLATION OF BOLLARDS

FFP

PROJECT NUMBER & TITLE: 082021 Install South Entrance Gate Bollards, 106 Rescue Wing, F.S. Gabreski Airport (ANG), Westhampton Beach, NY.

PROJECT DESCRIPTION: 082021 Install South Entrance Gate Bollards as per the attached Statement of Work (See Statement of Work attachment dated 19 August 2008).

WAGE GRADE DETERMINATION NY080013 REV NO 13 DATED 08/22/08 SHALL APPLY.

PERFORMANCE AND PAYMENT BONDS: IN ACCORDANCE WITH CONTRACT CLAUSE 52.228-15, CONTRACTORS ARE REMINDED THAT ANY AMOUNT OVER $30,000.00 SHALL REQUIRE PERFORMANCE AND PAYMENT BONDS. BONDS ARE DUE NO LATER THAN 10 DAYS AFTER AWARD.

LIQUIDATED DAMAGES-REFERENCE CONTRACT CLAUSE 52.211-12, A ONE TIME CHARGE OF $300.00 AND A CHARGE OF $590.93 FOR EACH DAY OF DELAY AFTER THE REQUIRED PERFORMANCE PERIOD.

PERFORMANCE PERIOD: 59 Days after Acknowledgement of Notice to Proceed.

FOB: Destination

MILSTRIP: F9E7CE8232A003

PURCHASE REQUEST NUMBER: F9E7CE8232A003

SIGNAL CODE: A

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
0001
N/A
N/A
N/A
N/A

Section 00100 - Bidding Schedule/Instructions to Bidders

STATEMENT OF WORK

Statement of Work

19 August 2008

Project Name: WKVB 082021 Install South Entrance Gate Bollards.

106 RQW Francis S. Gabreski Airport (ANG)

150 Riverhead Road

Westhampton Beach, N.Y. 11978-1201

SCOPE: Install 70 “Removable” Bollards Type I

(Boundary Fence and Railing systems Inc. or equal)

1) The overall scope is to excavate one foot diameter circle through the asphalt and into the earth for a total depth of two feet and ten inches.

2) Center 2’ 10” tall galvanized steel conduit with 5 1/8 “O.D. in hole. Fill conduit with 1’ 4” of crushed stone for drainage. Encapsulate the conduit in concrete and restore asphalt to original state.

3) Install yellow powder coated bollard and sleeve over with 6’ tall yellow pvc. The bollard to be 4’ 6” tall and 4”diameter made of galvanized steel, concrete filled and capped with dome type cap.

*Suggested manufacturers cut included*

A walk through of the project will be required.

The contractor must provide necessary paperwork for obtaining necessary approvals and escorts including, but not limited to, the following:

· Temporary identification, as required, that allows contractor personnel access to F.S. Gabreski ANGB.

· Vehicular permits, as required, to allow all contractor vehicles onto the F.S. Gabreski ANGB facilities.

· All base, city, or state permits required to complete the project.

The contractor will provide a list of names for personnel who require access to F.S. Gabreski ANGB.

1) The Contractor shall be responsible for coordination of the work and his subcontractors / employees. He shall arrange and schedule the operation of his subcontractors / employees so that delays will be avoided. No extra payment shall be made for any such delays and compensation for any such delays and all extra work related thereto shall be considered as having been included in the bid price.

2) The Contractor shall examine the scope of the work area by review of supplied reference material and tour of proposed work site, in order to ascertain applicable knowledge of the proposed work. Any deficiencies in the work proposal shall be addressed in either the proposed job tour or within the bid price. It is incumbent solely on the contractor to animate the Air National Guard’s work proposal. No errors within the work proposal of either calculation or verbiage shall be considered as billable after the bid price.

3) The Air National Guard will conduct regular reviews during the course of the work. When there is interference in activities between the contractor(s) and the Air National Guard, the Air National Guard’s work will have priority. Disputes between Contractors as to their respective rights shall be submitted to the Air National Guard whose decision shall be final.

4) All materials and products shall have MSDS data available. Statements on product application and warranties will be presented to Air National Guard before use.

5) All workmanship and materials shall conform to all State laws, local ordinances and applicable Codes and Standards. In case of conflict with the Contract Drawings and Specifications, such laws, regulations and codes shall govern, except that the Contract Drawings and Specifications shall apply wherever they may require workmanship or materials other than required by the Codes and Standards. Applicable Codes and Standards shall include, but not be limited to, all pertinent requirements of the following organizations:

API ‑ American Petroleum Institute

NFPA ‑ National Fire Protection Association

UL ‑ Underwriters Laboratory, Inc.

ASTM ‑ American Society for Testing & Materials

ACI ‑ American Concrete Institute

ANSI ‑ American National Standard Institute

AIEE ‑ American Institute of Electrical Engineers

ASME ‑ American Society of Mechanical Engineers

CRSI ‑ Concrete Reinforcing Steel Institute

IPCEA ‑ Insulated Power Cable Engineers Association

NBS ‑ National Bureau of Standards

IEEE ‑ Institute of Electrical and Electronic

Engineers, Inc.

NEC ‑ National Electrical Code

NBFU ‑ National Board of Fire Underwriters

NEMA ‑ National Electric Manufacturers Association

OSHA ‑ Occupational Safety and Health Administration

SCDHS - Suffolk County Dept. of Health Services

*Should the Contractor perform any work that does not comply with the requirements of the applicable building codes, State laws, local ordinances and industry standards, he shall bear all costs arising in correcting the deficiencies.*

GENERAL NOTES:

A. The contractor shall, unless otherwise provided in the contract documents, secure and pay for any and all required construction permit(s), fee, licenses and inspections necessary for the proper execution of the work.

B. The contractor shall perform all required tasks necessary to complete the work properly without compromising the quality of the work.

C. The contractor shall be responsible for adequately protecting all work against damage, breakage, collapse, distortions, and misalignment during construction according to codes and standards of good practice.

PHASING OF WORK/ADDITIONAL REQUIREMENTS: Contractor must acknowledge awareness of the following impacts during bidding:

A. The contractors use of space will be coordinated with:

1. New York Air National Guard (NYANG) floor space requirements

2. other contractors use of the same area

3. The NYANG will require 36 hrs prior notice of when an area, if approved, will need to be vacated to a level different than the current NYANG use (i.e. plane moved, equipment moved, operations relocated, etc.). The contractor will have to provide and comply with, duration of time to complete the particular operation.

B. The NYANG is on a 9-8-1-work schedule, which means 1-day every two weeks will be a scheduled day off. The yearly NYANG work schedule is attached as part of this contract.

C. The contractor will be responsible for ensuring that operations will continue business as usual during most of the construction project. The contractor is asked to carry in his bid temporary protection as required to maintain safety and environmental levels to support a facility operations as defined by AFI, NYANG, local codes, and effected workers unions. For example if an operation will affect air quality or create falling debris a temporary cover for workers below may need to be erected, or air transfer equipment may need to be utilized. These measures and the contractors’ total safety and environmental protection plan will be approved by the Contracting Officers Representative (COR) at the Pre-construction conference.

D. The contractor will be wholly responsible for any circumstantial damage incidental or otherwise caused by any one of his operations such as welding, painting, cutting, cleaning, or any other action associated with work on this contract (i.e. overspray, sparks, slag, etc).

E. Any utilities other than those currently existing for contractor’s use, is the responsibility of the contractor.

F. Any work performed, solid waste generation and disposal or materials installed under this contract shall comply with the current environmental regulations of the NYANG, USAF, NYDEC. Disposal of all waste material shall be the sole responsibility of the contractor and shall be IAW 40 CFR and 49 CFR in its entirety. The government reserves the right to test any and all materials new or waste at any point to determine the required disposal method.

CODES & STANDARDS: All work performed under this contract shall be in accordance with the New York State (NYS) Fire Prevention and Building Code and USAF Heath and Safety standards as well as widely accepted industry standards, including but not limited to: American Institute of Architects, American Concrete Institute, American Institute of Electrical Engineers, American Institute of Steel Construction, American National Standards Institute, American Society of Heating, Refrigerating and Air-Conditioning Engineers, American Society of Mechanical Engineers, American Society of Testing Materials, National Bureau of Standards, National Electric Code, American Welding Society, Brick Institute of America, Building Officials and Code Administrators, Federal Aviation Administration, National Fire Protection Association, National Electric Code, Occupational Safety & Health Administration, Rubber Manufacturers Association, Underwriters Laboratories, and the New York DOT. standard specifications. Additionally, all requirements of the New York Department of Environmental Conservation must be satisfied in their entirety for any work performed or materials bought and/or placed under this contract. Failure to comply with any of the aforementioned codes and standards shall be considered as a failure to comply with contract specifications.

UTILITIES: Contractors shall coordinate with all local utilities having jurisdiction: Including but not limited to; Long Island Power Authority, Suffolk County Water Authority, local phone company, AT&T, Suffolk County Sewer Authority, and the Base Engineers Office.

CALL BEFORE YOU DIG: All contractors shall be responsible for "Call Before You Dig" for any excavations or penetrations into the ground. In addition, all contractors shall apply for a digging permit at the Base Engineer’s Office, for any excavations or penetrations into the ground. The contractor should expect a 7-day period from the date of the request to the issuance of a permit. No work shall begin without these permits.

MATERIALS: The materials shall conform to specifications, applicable industry codes and standards and the manufacturer's recommendations, which ever is more stringent. Certificates of compliance and Technical Data Sheets are required for all materials supplied.

SITE INSPECTION: The Contractor is required to acknowledge, at time of Bid Opening that said contractor has inspected, and is fully cognizant of conditions at the site. No allowance or consideration will be given after award for any condition(s) which existed at the time of the site visit.

BASE ACCESS: The contractor shall provide a list of names and their job or trade, to the COR, at the Pre-Construction meeting. This list will be given to the Base Security Police to apply for temporary Base passes for those individuals. Access to the Base is limited to travel from the Main Gate to the job site or Base Engineers Office. All other areas are off limits. Violations of these security requirements will revoke any or all passes. The Government reserves the right to deny access to any person, with no consequence to the contract.

SAFETY: The Contractor shall conduct his operation in accordance with all Federal, State and Local regulations and/or standards pertinent to "Safe Practices". Base Safety personnel shall inspect the job sit to insure safety standards are met. Base Safety, through the COR, shall issue warnings or stop work not in compliance. A safety plan must be submitted and approved prior to construction.

CLEAN UP: Clean up and remove debris generated by this contract to an approved off-base location. Two (2) copies of the receiving (tipping or dumping) tickets, with a cover letter from the Prime Contractor stating the full name and address of the location to which debris was taken shall be provided. The tickets shall identify whether the material was recycled or not and the method of recycling. The cover letter from the Prime Contractor shall certify that the materials disposal was in accordance with Federal, New York State and local environmental regulations and requirements.

GOVERNMENT RESOURCES: No Government resources shall be made available to the contractor, unless otherwise stated in this Statement of Work. The contractor shall provide for all necessary resources to provide a complete and usable facility or systems as described in the contract documents. The contractor shall not obligate Government resources in any manner. The Government shall seek remedy for any obligation or encumbrance imposed by the contractor’s actions. Government resources include, but are not limited to, government owned materials, equipment, tools, vehicles, personnel and facilities.

SPECIFICATIONS

Section 00700 - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.202-1
Definitions
JUL 2004
52.203-3
Gratuities
APR 1984
52.203-7
Anti-Kickback Procedures
JUL 1995
52.204-7
Central Contractor Registration
APR 2008
52.204-9
Personal Identity Verification of Contractor Personnel
SEP 2007
52.209-6
Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
SEP 2006
52.216-9
Fixed Fee--Construction
MAR 1997
52.222-3
Convict Labor
JUN 2003
52.222-6
Davis Bacon Act
JUL 2005
52.222-7
Withholding of Funds
FEB 1988
52.222-8
Payrolls and Basic Records
FEB 1988
52.222-9
Apprentices and Trainees
JUL 2005
52.222-10
Compliance with Copeland Act Requirements
FEB 1988
52.222-11
Subcontracts (Labor Standards)
JUL 2005
52.222-12
Contract Termination-Debarment
FEB 1988
52.222-13
Compliance with Davis-Bacon and Related Act Regulations.
FEB 1988
52.222-14
Disputes Concerning Labor Standards
FEB 1988
52.222-15
Certification of Eligibility
FEB 1988
52.222-21
Prohibition Of Segregated Facilities
FEB 1999
52.222-26
Equal Opportunity
MAR 2007
52.222-27
Affirmative Action Compliance Requirements for Construction
FEB 1999
52.222-39
Notification of Employee Rights Concerning Payment of Union Dues or Fees
DEC 2004
52.222-50
Combating Trafficking in Persons
AUG 2007
52.223-3
Hazardous Material Identification And Material Safety Data
JAN 1997
52.223-5
Pollution Prevention and Right-to-Know Information
AUG 2003
52.223-6
Drug-Free Workplace
MAY 2001
52.225-10
Notice of Buy American Act Requirement--Construction Materials
MAY 2002
52.225-13
Restrictions on Certain Foreign Purchases
JUN 2008
52.228-15
Performance and Payment Bonds--Construction
NOV 2006
52.229-3
Federal, State And Local Taxes
APR 2003
52.232-23
Assignment Of Claims
JAN 1986
52.232-27
Prompt Payment for Construction Contracts
SEP 2005
52.232-33
Payment by Electronic Funds Transfer--Central Contractor Registration
OCT 2003
52.233-1
Disputes
JUL 2002
52.233-3
Protest After Award
AUG 1996
52.233-4
Applicable Law for Breach of Contract Claim
OCT 2004
52.236-5
Material and Workmanship
APR 1984
52.236-6
Superintendence by the Contractor
APR 1984
52.236-7
Permits and Responsibilities
NOV 1991
52.236-8
Other Contracts
APR 1984
52.236-9
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10
Operations and Storage Areas
APR 1984
52.236-11
Use and Possession Prior to Completion
APR 1984
52.236-12
Cleaning Up
APR 1984
52.236-13
Accident Prevention
NOV 1991
52.236-14
Availability and Use of Utility Services
APR 1984
52.236-21
Specifications and Drawings for Construction
FEB 1997
52.236-26
Preconstruction Conference
FEB 1995
52.242-13
Bankruptcy
JUL 1995
52.242-14
Suspension of Work
APR 1984
52.243-4
Changes
JUN 2007
52.243-5
Changes and Changed Conditions
APR 1984
52.246-12
Inspection of Construction
AUG 1996
252.201-7000
Contracting Officer's Representative
DEC 1991
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
MAR 2008

CLAUSES INCORPORATED BY FULL TEXT

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than fifty nine (59) days. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (JAN 2005)

(a) Definitions. As used in this clause--

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States; or

(2) A construction material manufactured in the United States, if the cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference. (1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to the construction material or components listed by the Government as follows: [Contracting Officer to list applicable excepted materials or indicate “none”]

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unit of measure Quantity Price (dollars) \1\

Item 1

Foreign construction material

Domestic construction material

Item 2

Foreign construction material

Domestic construction material

Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

(End of clause)

52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000)

(a) The Contractor shall submit one of the following payment protections:

Payment Bond

(b) The amount of the payment protection shall be 100 percent of the contract price.

(c) The submission of the payment protection is required within 10 days of contract award.

(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.

(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.

(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.

(End of clause)

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil (End of clause)

Section 00800 - Special Contract Requirements

WAGE DETERMINATION

General Decision Number: NY080013 08/22/2008 NY13

Superseded General Decision Number: NY20070013

State: New York

Construction Types: Building, Heavy, Highway and Residential

Counties: Nassau and Suffolk Counties in New York.

BUILDING CONSTRUCTION PROJECTS, RESIDENTIAL CONSTRUCTION

PROJECTS (including single family homes and apartments up to and including 4 stories), HEAVY CONSTRUCTION PROJECTS, HIGHWAY

CONSTRUCTION PROJECTS

Modification Number Publication Date

0 02/08/2008

1 02/15/2008

2 02/22/2008

3 02/29/2008

4 03/14/2008

5 03/21/2008

6 05/02/2008

7 06/13/2008

8 07/04/2008

9 07/18/2008

10 07/25/2008

11 08/08/2008

12 08/22/2008

ASBE0012-001 12/31/2007

Rates Fringes

Asbestos Workers/Insulator includes application of all insulating materials, protective coverings,coatings and finishing to all types of mechanical systems..........$ 46.86 26.97

HAZARDOUS MATERIAL HANDLER.......$ 24.45 8.50

BOIL0005-001 01/01/2007

Rates Fringes

BOILERMAKER......................$ 44.98 28.95+a

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Thanksgiving Day, Memorial

Day, Independence Day, Labor Day and Good Friday, Friday after Thanksgiving, Christmas Eve Day and New Year's Eve

BRNY0001-001 07/01/2007

Rates Fringes

BRICKLAYER.......................$ 44.99 19.71

MASON - STONE....................$ 54.34 21.13

CARP0007-016 07/01/2008

Rates Fringes

Carpenters:

Building....................$ 36.63 26.93

Heavy & Highway.............$ 36.63 26.93

Residential.................$ 30.00 11.20

CARP0740-001 07/01/2005

Rates Fringes

MILLWRIGHT.......................$ 38.13 35.40

* CARP1456-009 07/01/2008

Rates Fringes

Carpenters:

DIVERS TENDERS..............$ 39.18 38.06

DIVERS......................$ 54.63 38.06

DOCKBUILDERS................$ 43.61 38.06

PILEDRIVERMAN...............$ 43.61 38.06

CARP1536-001 07/01/2003

Rates Fringes

Carpenters:

TIMBERMEN...................$ 34.47 26.05

ELEC0025-001 04/26/2008

Rates Fringes

ELECTRICIAN......................$ 44.75 28.52

* ELEC0025-002 02/09/2008

Rates Fringes

Electricians:

Maintenance Unit............$ 34.00 35.5%+3.46

Telephone Unit..............$ 31.00 47.5%+2.21

Wiring for single or multiple family dwellings and apartments up to and including 2 stories.........$ 24.30 13%+8.72

ELEC1049-002 04/02/2006

Rates Fringes

Line Construction:

Substation and Switching structures pipe type cable installation and maintenance jobs or projects; Railroad electrical distribution/ transmission systems maintenance (when work is not performed by railroad employees) Overhead and

Underground transmission/distribution line work. Fiber optic, telephone cable and equipment;

Groundman..................$ 22.86 13.93

Heavy Equipment Operator...$ 30.48 13.93

Lineman & Cable Splicer....$ 38.10 13.93

Material Man...............$ 33.15 13.93

ELEV0001-002 03/17/2008

Rates Fringes

ELEVATOR MECHANIC

Elevator Constructor........$ 48.19 21.085+a+b

Modernization and Repair....$ 38.46 20.935+a+b

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Good Friday, President's

Day, Memorial Day, Independence Day, Labor Day, Columbus

Day, Veteran's Day, Thanksgiving Day, Friday after

Thanksgiving, and Christmas Day.

b. PAID VACATION: An employee who has worked less than 5 years shall recieve vacation pay credit on the basis of 4% of his hourly rate for all hours worked; an employee who has worked 5 to 15 years shall receive vacation pay credit on the basis of 6% of his hourly rate for all hours worked;

an employee who has worked 15 or more years shall receive vacation pay credit on the basis of 8% of his hourly rate for all hours worked.

ENGI0138-001 06/01/2008

BUILDING CONSTRUCTION

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 46.04 27.94+a

GROUP 2.....................$ 43.65 27.94+a

GROUP 3.....................$ 42.06 27.94+a

GROUP 4.....................$ 38.85 27.94+a

GROUP 5.....................$ 37.24 27.94+a

NOTES:

Hazmat premiums:

Level A 3.50

Level B 2.50

Level C 1.50

Level D 1.00

Oiler on truck cranes with boom length of 100 ft. or more

.25

FOOTNOTE:

a. Paid Holidays: New Year's Day, Lincoln's Birthday, Washington's Birthday or President's Day (in lieu of

Lincoln's or Washington's Birthday), Good Friday, Memorial

Day, Indpendence Day, Labor Day, Veteran's Day, Thanksgiving Day, Christmas Day or days celebrated as such.

Any holiday that falls on a Saturday will be celebrated on

Friday.

POWER EQUIPMENT OPERATOR CASSIFICATIONS

GROUP 1: Asphalt spreader, backhoe crawler capacity over cater- piller 225 and lomatsu 300, Boiler (thermoplastic), Cherry picker, over 50 tons, CMI or maxim spreader, concrete pump (with oiler), crane (crawler truck), crane

(on barge), crane (stone setting), crane (structural steel), crane (with clam shell), derrick, dragline, dredge, gradall, grader, hoist (3 drum), loading machine (bucket) cap of 10 yds or over micro-trap, with compressor (negative air machine), milling machine, large pile driver, power winch, Stone setting/structural steel, power winch (truck mounted/stone steel) powerhouse, road paver scoop, carry-all, scraper in tandem shovel, sideboom tractor, sideboom tractor (used in tank work), stone spreader (self propelled tank work), zamboni (ice machine)

GROUP 2: Backhoe, boom truck, bulldozer, cherypicker, conveyor (multi), dinky locomotive, forklift, hoist, 2 drum, loading machine, loading machine (front end) mechanicl compactors, (machine drawn), mulch machine

(machine-fed), power winch, other than stone/structural steel, power winch (truck mounted other than stone steel) pump (hydraulic, with boring machine), roller, (asphalt), scoop (carry-all scraper), tower crane (maintenance man), trenching machine

GROUP 3: Comrpessor (structural steel), Compressor (2 or more in battery), concrete finishing mchine, concrete spreader, conveyor, curb machine (asphalt or concrete), curing machine, fireman, hoist (1 drum), micro-trap, (self contained, negative air machine), pump (4 inches or over), pump (hydraulic), pump (jet), pump (sumbersible), pump

(well point), pulvi-mixer, ridge cutter, roller (dirt), striping machine, vac-all, welding and burning, welding machine (pile work), welding machine (structural steel)

GROUP 4: Compressor, compressor (on crane), compressor (pile work), compressor (stone setting), concrete breaker, concrete saw or cutter, forklift (walk behind, power operated), generator-pile work, generator, hydra hammer, mechanical compactors (hand operated), oiler (truck crane), pin puller, portable heaters, powerbroom, power buggies, pump (double action diaphgrgm), pump (gypsum), trench machine (hand), welding machine

GROUP 5: Batching plant (on site of job), generator (small), mixer (with skip), mixer (2 small with or without skip), mixer (2 bag or over, with or without skip), mulch machine, oiler, pump (centrifugal, up to 3 inches), root cutter, stump chipper, tower crane (oiler), tractor (caterpillar or wheel vibrator)

ENGI0138-002 08/01/2008

HEAVY & HIGHWAY

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 47.31 27.94+a

GROUP 2.....................$ 44.14 27.94+a

GROUP 3.....................$ 42.54 27.94+a

GROUP 4.....................$ 39.33 27.94+a

GROUP 5.....................$ 37.74 27.94+a

GROUP 6.....................$ 29.91 9.05+10%

NOTES:

Hazmat premiums:

Level A 3.50

Level B 2.50

Level C 1.50

Truck and Crawler Cranes long boom premiums:

boom lengths (including jib) 100-149 ft .50 boom lenghts (including jib) 150-249 ft .75 boom lenghts (including jib) 250-349 ft 1.00 boom lengths (including jib) 350 ft 1.50

Cranes using clamshell buckets .25

Front end loader 10 yds and above .25

Oiler on truck cranes with boom length of 100 ft. or more .25

FOOTNOTE:

a. Paid Holidays: New Years Day, Lincoln's Birthday, Washington's Birthday or Presidents Day (in liew of

Lincoln's or Washington's Birthday, Good Friday, Memorial

Day, Independence Day, Labor Day, Columbus Day, Veteran's

Day, Thanksgiving Day, Christmas Day or days celebrated as such. Any holiday that falls on Saturday will be celebrated on Friday.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Asphalt spreader, backhoe crawler (capacity over caterpiller 225 and komatsu 300), boiler (thermoplastic), boring machine (post hole), cgherry picker (over 50 ton), CMI or maxim spreader, concrete pump, with oiler, crane

(crawler truck), crane (on barge), crane (stone setting) crane (structural steel), crane (with clam shell), derrick, dragline, dredge, gradall, grader, hoist (3 drums), loading machine (bucket) capacity of 10 yards or over, micro-trap

(with compressor-negative air machine), milling machine

(large), piledriver, power winch (stone setting structural steel), power winch (truck mounted/stone steel), power-house, road paver, scoop, carry all (scraper in tandem), shovel, sideboom tractor, sideboom tractor (used in tank work), stone spreader (self-propelled), tank work, tower crane

GROUP 2: Bulldozer, Backhoe, Boom Truck, Boring machine/augur, Cherrypicker, Conveyor (multi), Dinky

Locomotive, Forklift, Hoist (2 drum), Loading Machine, Loading Machine (front end), Mechanical Compactor (machine drawn), Mulch Machine (machine- fed), Power Winch (other than stone/structural steel), Power Winch (truck mounted/other than stone steel), Pump Hydraulic (with boring machine), Roller (asphalt), Scoop (carry-all, scraper), Tower Crane (maintenance man), Trenching Machine, Vermeer Cutter, Work Boat

GROUP 3: Curb Machine (asphalt or concrete), Maintenance

Engineer (small equipment), Maintenance engineer

(well-point) Mechanic (fieldman), Micro-Trap (self contained, negative air machine), Milling Machine (small), Pulvi-mixer, Pump (4 inches or over), Pump Hydraulic, Pump

Jet, Pump Submersible, Pump (well point), Roller Dirt, Vac-All, Welding and burning, Compressor (structural steel), Compressor (2 or more battery), Concrete Finishing

Machine, Concrete Spreader, Conveyor, Curing Machine, Fireman, Hoist (one drum), Ridge Cutter, Striping Machine, Welding Machine (pile work), Welding Machine (structural

Steel).

GROUP 4: Compressor, Compressor on crane, Compressor (pile work), Compressor (stone setting), Concrete Breaker, Concrete Saw or Cutter, Fork Lift (walk behind, power operated), Generator- Pile Work, Generator, Hydra Hammer, Mechanical Compoactors (hand operated), Oiler (truck crane), Pin Puller, Portable Heaters, Powerbroom, Power buggies, Power Grinders, Pump (double action diaphragm), Pump gypsum, Pump (single action 1 to 3 inches), Trench

Machine hand, Welding Machine

GROUP 5: Batching Plant (on site of job), Generator (small), Grinder, Mixer (with skip), Mixer (2 small with or without skip), Mixer (2 bag or over, with or without skip), Mulch

Machine, Oiler, Pump (centrifugal, up to 3 inches), Root

Cutter, Stump Chipper, Tower Crane (oiler), Track Tamper (2 engineers, each), Tractor (caterpillar or wheel), Vibrator, Work boat (deckhand), GROUP 6: Well drillers

IRON0046-003 07/01/2007

Rates Fringes

IRONWORKER

METALLIC LATHERS............$ 43.80 30.37

IRON0197-001 01/01/2008

Rates Fringes

IRONWORKER

STONE DERRICKMAN............$ 39.00 35.72

IRON0361-001 07/01/2008

Rates Fringes

IRONWORKER (STRUCTURAL)..........$ 39.65 49.81

IRON0580-001 07/01/2008

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 39.55 38.70

LABO0066-001 07/01/2008

BUILDING

Rates Fringes

Laborers:

Laborers....................$ 28.75 23.15

Plasterers Tenders..........$ 28.75 23.15

LABO0078-001 12/01/2006

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR

BUILDING CONSTRUCTION

ASBESTOS (Removal, Abatement, Encapsulation or Decontamination of asbestos); LEAD; &

HAZARDOUS WASTE LABORERS

(Hazardous Waste, Hazardous Materials, Biochemical and Mold

Remediation, HVAC, Duct

Cleaning, Re-spray

Fireproofing, etc).........$ 27.00 9.81

LABO1298-001 06/01/2007

HEAVY & HIGHWAY

Rates Fringes

Laborers:

Asphalt Rakers; Formsetters.$ 31.53 20.09+A

Asphalt Shovelers, Roller

Boys & Tampers..............$ 30.66 20.09+A

Regular Laborers............$ 28.05 20.09+A

FOOTNOTES:

Laborers working in a hazardous material hot zone shall receive an additional 20% premium.

Where the contract provides for night work outside the regular hours of work, the employees shall be paid at straight time plus a 25% night work premium for the 8 hours worked during the night.

Firewatch work performed after regular hours shall be paid an additional 10% premium. Second and Third Shift work will be paid at a 10% premium.

Contractor requesting laborers certified for hazardous material work and/or employed on hazardous material shall be required to pay an additional 10% premium.

PAIN0009-002 05/01/2008

Rates Fringes

Painters:

GLAZIERS....................$ 38.00 29.59

Painters, Drywall Finishers.$ 34.50 19.84

Spray, Scaffold, Sandblasting................$ 37.50 19.84

PAIN0806-010 10/01/2007

Rates Fringes

Painters:

Stuctural Steel and Bridge..$ 44.00 26.96

PAIN1974-002 07/04/2007

Rates Fringes

Painters:

DRYWALL TAPERS/POINTERS.....$ 38.32 19.39

PLAS0260-003 07/01/1999

Rates Fringes

PLASTERER........................$ 27.91 15.16

PLAS0780-001 07/01/2007

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 44.40 26.10

PLUM0200-001 05/01/2008

Rates Fringes

PLUMBER

BUILDING CONSTRUCTION:......$ 48.98 21.55

RESIDENTIAL CONSTRUCTION:...$ 26.73 8.15

PLUM0638-001 07/05/2006

Rates Fringes

PLUMBER

SERVICE FITTERS.............$ 26.30 2.55

SPRINKLER FITTERS,

STEAMFITTERS................$ 43.82 32.72

Service Fitter work shall consist of all repair, service and maintenance work on domestic, commercial and industrial refrigeration, air conditioning and air cooling, stoker and oil burner apparatus and heating apparatus etc., including but not exclusively the charging, evacuation, leak testing and assembling for all machines for domestic, commercial and industrial refrigeration, air conditioning and heating apparatus. Also, work shall include adjusting, including capacity adjustments, checking and repairing or replacement of all controls and start up of all machines and repairing all defects that may develop on any system for domestic, commercial and industrial refrigeration and all air conditioning, air cooling, stoker and oil burner apparatus and heating apparatus regardless of size or type.

ROOF0154-001 10/01/2007

Rates Fringes

ROOFER, Including Built Up, Composition and Single Ply

Roofs............................$ 36.50 23.78

SHEE0028-002 01/31/2008

Rates Fringes

Sheet metal worker...............$ 43.69 34.69

TEAM0282-002 07/01/2008

Rates Fringes

Truck drivers:

Asphalt.....................$ 31.235 29.2025+a+b

Euclids & turnapulls........$ 35.50 29.2025+a+b

High Rise...................$ 34.935 29.2025+a+b

FOOTNOTES:

a. PAID HOLIDAYS: New Year's Day, Presidents' Day, Memorial

Day, Independence Day, Labor Day, Columbus Day, Election

Day, Veterans' Day (Armistice Day), Thanksgiving Day and

Christmas Day. Employees working two (2) days in the calendar week in which a holiday falls are to be paid for such holiday, provided that they shape each remaining workday during such calendar week.

b.VACATION: For each 15 days worked with the contract year an employee will receive one day vacation with pay, maximum vacation of 3 weeks per year. In addition, an employee who qualifies for two weeks (10 days) vacation or more with pay and who has been continuously employed by his employer for six years before the close of any contract year, shall be entitled to one extra day vacation; seven years before the close of any contract year, shall be entitled to two extra days vacation; eight years before the close of any contract year, shall be entitled to three extra day vacation; nine years before the close of any contract year, shall be entitled to four extra day vaction; ten years before the close of any contract year or over shall be entitled to three weeks paid vacation with pay, but in no event shall any employee be entitled to more than three weeks vacation pay per year.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

LOCAL INSTRUCTIONS

LOCAL CLAUSES

AND INSTRUCTIONS INCORPORATED BY FULL TEXT

106 RQW – 0010

WARRANTY

UNLESS OTHERWISE STATED, STANDARD COMMERCIAL WARRANTIES APPLY, PLEASE FURNISH A WRITTEN COPY WITH YOUR DELIVERY.

106 RQW – 0020

FEDERAL, STATE AND LOCAL TAXES-GOVERNMENTAL ENTITY

The U.S. Government is exempt from state sales or use taxes and federal excise taxes. This purchase is not subject to New York State Sales. For additional information contact your local, state, or federal taxing authority.

106 RQW – 0030

SHIPPING INSTRUCTIONS

Your company is responsible for marking the shipment with the appropriate Delivery/Purchase Order number as well as the delivery information located in block 15 of the contract. The U.S. Government will not be held liable for any delays for delivery or acceptance of your order if you fail to provide the delivery/purchase order and delivery information that is located in block 15 of the contract.

106 RQW – 0040

DELIVERY TIMES

The following delivery times are established for contactors:

Standard hours for receiving deliveries are Tuesday-Friday 9:00am -1:00pm EST

Call in advance to ensure delivery availability:

(631) 723-7495 OR (631) 723-7502

No deliveries will be accepted on Federal holidays.

All vendors shall have a delivery ticket with each delivery. The delivery ticket will ensure prompt processing of payment.

106 RQW – 0050

DELIVERY INTENT/NOTIFICATION CLAUSE

DELIVERY INTENT: It is the contractor’s responsibility to notify the 106th Base Supply Receiving a minimum of three (3) days prior to the anticipated date of product delivery. Contractor shall provide:

1) Government purchase order number

2) Delivery Point

3.)

Carrier name and tracking information/estimated delivery date

DELIVERY PARTIAL/COMPLETE: It is the contractor’s responsibility to notify the Contracting Office within seven (7) days after a partial/complete delivery of goods. Contractor shall provide

1) Purchase order number

2) Delivery Point/Service Point

3.)

Name of the person who accepted delivery and actual date of delivery.

4.)

Other information as required by the contracting office

106 RQW – 0060

INSTALLATION PASSES/ACCESS TO F.S. GABRESKI ANG BASE

Contractors should be aware that this is a Military Installation and that all access to this installation is granted by the 106 Rescue Wing Security Forces. Prior to making deliveries please contact (631) 723-7478 and follow instructions provided by the Security Forces for access to the 106th Rescue Wing, Gabreski Airport, NY. The U.S. government will not be held liable for any delays or breach of contract caused by refusal of the 106th Rescue Wing Security Forces. If a gate pass is not granted to a contractor allowing the delivery of goods, execution of warranty support, or performance of services please contact the contracting officer.

A contractor’s badge will be issued once the contractor enters the main gate at F.S. Gabreski Airport. Be sure that all of your employees have the proper ID (drivers license, state ID, immigration card, U.S. Passport, etc.). If they do not have the proper ID, they will be turned away.

Again, the U.S. Government will not be held liable for any delays or breach of contract caused by refusal of the 106th RQW Security Forces.

A list of all prospective contractors (full name, date of birth, social security number, and home address) will be provided to Security Forces by the vendor no less than 10 business days from the date work is expected to start, for the purposes of a criminal history check. Note: All additions, deletions and/or changes to the contractor list provided to security forces will require the 10 work day lead time, unless otherwise agreed upon between Security Forces, Environmental, and Base Contracting, for the purposes of a criminal history check. The following is a guide to who will be allowed access to the installation.

1. All prospective contractors MUST be U.S. citizens or MUST have established and maintain legal residence in the U.S., and are authorized by the US government to work in the United States (i.e. Green card, worker authorization, etc.). All prospective contractors MUST have at least one form of U.S. government issued photo identification (drivers license, U.S. passport, U.S. work visa, etc.) for entry to the installation. Security Forces will review any questionable identification documents for determination as to whether or not said identification is authorized for access to the installation.

2. All prospective contractors, once it has been established that they maintain the appropriate credential as described in one above, are subject to a Criminal History Check. If a prospective contractor is found to have been “arrested” (conviction not required) within the last ten (10) years for any of the following offenses as defined in The New York State Penal Laws: any felony assault, draft evasion, any felony drug charges, Indecent acts of liberties with a child under 16, molestation to include child pornography and sex abuse, kidnapping, manslaughter, murder, rape and related sex offences, robbery, arson, felony criminal mischief, fire arms offences, any grand larceny, burglary and felony larceny charges, any charges related to terrorism, any active warrants from any jurisdiction, and any other offense deemed to be in the best interest of the government to refuse entry to, will not be allowed legal access to the installation for the purpose of employment unless otherwise agreed upon by Security Forces, Civil Engineering, Base Contracting, and authorized by the Base Commander.

Note: For the purposes of Contracting services at the 106 RQW, it is implied that, by the contracting agreement, that any and all parties agree to a Criminal History Background Check once entered into any contract with the 106 RQW. Any documents that are provided and found fraudulent to include, but not limited to driver’s licenses, contracting licenses, etc., will result in an arrest and potential termination for default from the contract. All contractors are subject to search in order to obtain entry onto the installation and while working on the installation. Any refusal to submit to a search of their person or vehicle will be deemed as a violent act of aggression against the installation and will be cause for dismissal from the installation and revocation of future privileges and installation access.

A contractor’s badge will be issued once the contractor enters the main gate at F.S. Gabreski Airport. Be sure that all of your employees have the proper ID (drivers license, state ID, immigration card, U.S. Passport, etc.). If they do not have the proper ID, they will be turned away.

The U.S. Government will not be held liable for any delays or breach of contract caused by refusal of the 106th RQW Security Forces.

106 RQW – 0070

PAYMENT INQUIRIES VIA WEB:

HTTP://WWW.DFAS.MIL/MONEY/VENDOR

EFT OR PAYMENT INQUIRES CALL: 800.330.8168 / 800-390-5620 / 800-337-0371

FAX: 207-328-1660/1699/1873

106 RQW –0080 INVOICING VIA WIDE AREA WORKFLOW- (WAWF)

MANDATORY AFTER 1 DEC 04 IAW DFARS 252.232-7003

NO PAPER INVOICES WILL BE ACCEPTED

https://wawf.eb.mil When completing the invoice it is recommended that Vendors create and submit invoices and receiving reports known as a COMBO to alleviate rejected invoices.

Do not submit paper invoices and submit through WAWF as this will result in duplicate submission and confusion at DFAS.