FY19PN69251_SPECS_Vol2_IFC.PDF
PDF 3 MB Posted
- Attached to
- SOF Replace Maze and Tower, Fort Bragg, NC
- Solicitation number
- W912PM18R0016
About this file
SPECIFICATIONS - Volume 2 of 2
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. W912PM18R0016
SOF Replace Maze and Tower
PN 69251
Fort Bragg, North Carolina
Specifications - Volume 2 of 2
December 2018
Fort Bragg, North Carolina
Solicitation Number
W912PM-18-R-0016
Replace Maze And Tower Volume 2 of 2: Specification Divisions 21 - 31 and Appendices
PN 69251
December 2018
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
SOF REPLACE MAZE & TOWER BR69251
Ft. Bragg, NC
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 83 13 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 15 00 CONCRETE ACCESSORIES
03 20 00 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
03 39 00 CONCRETE CURING
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 19 00 WATER REPELLENTS
07 42 13 METAL WALL PANELS
07 46 46 FIBER-CEMENT SIDING
07 60 00 FLASHING AND SHEET METAL
07 81 00 SPRAY-APPLIED FIREPROOFING
07 92 00 JOINT SEALANTS
PROJECT TABLE OF CONTENTS Page 1
01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
Ft . Br agg, NC
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 71 00 DOOR HARDWARE
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 24 23 CEMENT STUCCO
09 90 00 PAI NTS AND COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 44 16 FI RE EXTI NGUI SHERS
DI VI SI ON 11 - EQUI PMENT
11 67 23 SHOOTI NG RANGE EQUI PMENT
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 48 00 SEI SMI C PROTECTI ON FOR MECHANI CAL EQUI PMENT
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 12 00 STANDPI PE SYSTEMS
21 13 18 PREACTI ON AND DELUGE SPRI NKLER SYSTEMS, FI RE PROTECTI ON
21 30 05. 16 FI RE PUMPS AND ENCLOSURES
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBI NG, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS
23 05 48 VI BRATI ON CONTROLS FOR HVAC PI PI NG AND EQUI PMENT
23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC
23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS
23 23 00 REFRI GERANT PI PI NG
23 82 02 UNI TARY HEATI NG AND COOLI NG EQUI PMENT
DI VI SI ON 26 - ELECTRI CAL
26 05 48 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT
26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM
26 28 01 COORDI NATED POWER SYSTEM PROTECTI ON
26 41 00 LI GHTNI NG PROTECTI ON SYSTEM
26 42 14 CATHODI C PROTECTI ON SYSTEM ( SACRI FI CI AL ANODE)
26 51 00 I NTERI OR LI GHTI NG
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARI NG AND GRUBBI NG
PROJECT TABLE OF CONTENTS Page 2
31 31 16. 13 CHEMI CAL TERMI TE CONTROL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D
PAVEMENTS
32 05 33 LANDSCAPE ESTABLI SHMENT
32 11 16 BASE COURSE FOR RI GI D PAVI NG
32 11 23 AGGREGATE AND/ OR GRADED- CRUSHED AGGREGATE BASE COURSE
32 12 10 BI TUMI NOUS TACK AND PRI ME COATS
32 12 17 HOT MI X BI TUMI NOUS PAVEMENT
32 13 13. 06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SI TE
FACILITIES
32 16 13 CONCRETE SI DEWALKS AND CURBS AND GUTTERS
32 92 19 SEEDING
32 92 23 SODDING
DI VI SI ON 33 - UTI LI TI ES
33 40 00 STORM DRAI NAGE UTI LI TI ES
33 71 02 UNDERGROUND ELECTRI CAL DI STRI BUTI ON
33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)
APPENDICES
APPENDI X A SECURI TY PROCEDURES GUI DE
APPENDI X B ASBESTOS SURVEY
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 3
SECTI ON TABLE OF CONTENTS
DI VI SI ON 21 - FI RE SUPPRESSI ON
SECTI ON 21 12 00
STANDPI PE SYSTEMS
05/11
PART 1 GENERAL
1. 1 REFERENCES
1. 2 SYSTEM DESCRI PTI ON
1. 3 SYSTEM DESCRI PTI ON
1. 3. 1 Resi dual Pr essur e
1. 3. 2 Fr i c t i on Losses
1. 3. 3 Wat er Suppl y
1. 3. 4 St andpi pe Syst em Dr awi ngs
1. 4 SUBMI TTALS
1. 5 QUALI TY ASSURANCE
1. 5. 1 Qual i f i cat i ons of I nst al l er
1. 5. 2 Syst em As- Bui l t Dr awi ngs
1. 6 DELI VERY, STORAGE AND HANDLI NG
PART 2 PRODUCTS
2. 1 ABOVEGROUND PI PI NG SYSTEMS
2. 1. 1 Pi pe and Fi t t i ngs
2. 1. 2 Pi pe Hanger s and Suppor t s
2. 1. 3 Val ves
2. 1. 4 I dent i f i cat i on Si gns
2. 1. 5 Pi pe Sl eeves
2. 1. 5. 1 Sl eeves i n Masonr y and Concr et e Wal l s, Fl oor s, and Roof s
2. 1. 5. 2 Sl eeves i n Par t i t i ons
2. 1. 6 Escut cheon Pl at es
2. 1. 7 Fi r e Depar t ment Connect i ons
2. 1. 8 Val ve Tamper Swi t ch
2. 1. 9 Fi r e Pumps
2. 2 BURI ED PI PI NG SYSTEMS
2. 2. 1 Bur i ed Pi pe and Fi t t i ngs
2. 2. 2 3. 8. 1 Bur i ed War ni ng and I dent i f i cat i on Tape
2. 2. 3 3. 8. 2 Bur i ed Det ect i on Wi r e
2. 3 ELECTRI CAL WORK
PART 3 EXECUTI ON
3. 1 EXCAVATI ON, BACKFI LLI NG, AND COMPACTI NG
3. 2 CONNECTI ONS TO EXI STI NG WATER SUPPLY SYSTEMS
3. 3 STANDPI PE SYSTEM I NSTALLATI ON
3. 4 FI ELD PAI NTI NG
3. 5 ELECTRI CAL WORK
3. 6 FLUSHI NG
3. 7 FI ELD QUALI TY CONTROL
3. 7. 1 Pr el i mi nar y Test s
3. 7. 2 For mal I nspect i on and Test s ( Accept ance Test s)
SECTI ON 21 12 00 Page 1
3. 7. 3 Addi t i onal Test s
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 21 12 00 Page 2
SECTI ON 21 12 00
STANDPI PE SYSTEMS
05/11
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
FM GLOBAL ( FM)
FM APP GUI DE ( updat ed on- l i ne) Appr oval Gui de http://www.approvalguide.com/
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 13 ( 2016; TI A 16- 1; TI A 16- 2; TI A 16- 3 2016;
Er r at a 17- 1; Er r at a 17- 2) St andar d f or t he I nst al l at i on of Spr i nkl er Syst ems
NFPA 14 ( 2016) St andar d f or t he I nst al l at i on of St andpi pes and Hose Syst ems
NFPA 24 ( 2016; ERTA 2016) St andar d f or t he I nst al l at i on of Pr i vat e Fi r e Ser v i ce Mai ns and Thei r Appur t enances
U. S. DEPARTMENT OF DEFENSE ( DOD)
UFC 3- 600- 01 ( 2016; wi t h Change 1) Fi r e Pr ot ect i on Engi neer i ng f or Faci l i t i es
UNDERWRI TERS LABORATORI ES ( UL)
UL Fi r e Pr ot Di r ( 2012) Fi r e Pr ot ect i on Equi pment Di r ect or y
1. 2 SYSTEM DESCRI PTI ON
Pr ovi de new aut omat i c, dry, Cl ass I st andpi pe spr i nkl er syst em. St andpi pe syst em shal l be desi gned and i nst al l ed i n accor dance wi t h UFC 3- 600- 01 and t he addi t i onal cr i t er i a r ef er enced t her ei n.
1. 3 SYSTEM DESCRI PTI ON
Syst em desi gn and manuf act ur er ' s pr oduct s shal l be i n accor dance wi t h t he r equi r ed and advi sor y pr ovi s i ons of NFPA 14 except as modi f i ed her ei n.
St andpi pe syst em shal l be desi gned by hydr aul i c cal cul at i ons. Provide spr i nkl er por t i on of syst em under Sect i on 21 13 18. 00 20 PREACTI ON AND DELUGE SPRI NKLER SYSTEMS, FI RE PROTECTI ON. Each syst em shal l be desi gned f or ear t hquakes and shal l i ncl ude mat er i al s, accessor i es, and equi pment i nsi de and out s i de t he bui l di ng necessar y t o pr ovi de each syst em compl et e and r eady f or use. Devi ces and equi pment shal l be UL Fi r e Pr ot Di r l i s t ed or FM APP GUI DE appr oved f or f i r e pr ot ect i on ser vi ce. I n t he publ i cat i ons r ef er r ed t o her ei n, t he advi sor y pr ovi s i ons shal l be consi der ed t o be
SECTI ON 21 12 00 Page 3 mandat or y, as t hough t he wor d " shal l " had been subst i t ut ed f or " shoul d" wher ever i t appear s; r ef er ence t o t he " aut hor i t y havi ng j ur i sdi ct i on" shal l be i nt er pr et ed t o mean t he Chi ef of Fi r e Pr ot ect i on, HQ USACE/ CECW- CE.
1. 3. 1 Resi dual Pr essur e
The mi ni mum r esi dual pr essur e at t he out l et s of t he t wo most r emot e 2. 5 i nch hose connect i ons shal l be 100 psi g whi l e t he syst em i s di schar gi ng at t he r equi r ed desi gn f l ow r at es.
1. 3. 2 Fr i ct i on Losses
Cal cul at e l osses i n pi pi ng i n accor dance wi t h t he Hazen- Wi l l i ams f or mul a wi t h ' C' val ue of 120 f or st eel pi pi ng, 150 f or copper t ubi ng, and 140 f or cement - l i ned duct i l e- i r on pi pi ng.
1. 3. 3 Wat er Suppl y
Base hydr aul i c cal cul at i ons on oper at i on of f i r e pumps pr ovi ded i n Sect i on
21 30 05. 16 FI RE PUMPS AND ENCLOSUI RES.
1. 3. 4 St andpi pe Syst em Dr awi ngs
Pr epar e i n accor dance wi t h t he r equi r ement s f or " Pl ans and Speci f i cat i ons" as speci f i ed i n NFPA 14. Each dr awi ng shal l be 34 by 22 i nches. Pl ans shal l be dr awn t o a scal e not l ess t han 1/ 8 i nch scal e Do not commence wor k unt i l t he desi gn of each syst em and t he var i ous component s have been appr oved. Show dat a essent i al f or pr oper i nst al l at i on of each syst em.
Show det ai l s , pl an v i ew, el evat i ons, and sect i ons of t he syst ems suppl y and pi pi ng. Show pi pi ng schemat i c of syst ems suppl y, devi ces, val ves, pi pe, and f i t t i ngs. Submi t dr awi ngs s i gned by a r egi st er ed f i r e pr ot ect i on engi neer . Show:
a. Room, space or ar ea l ayout and i ncl ude pi pe suppor t s and hanger s.
b. Fi el d wi r i ng di agr ams showi ng l ocat i ons of devi ces and poi nt s of connect i on and t er mi nal s used f or al l el ect r i cal f i el d connect i ons i n t he syst em, wi t h wi r i ng col or code scheme.
1. 4 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 02 Shop Dr awi ngs
St andpi pe syst em; G, DO
SD- 03 Pr oduct Dat a
Aboveground Pi pe and f i t t i ngs; G, RO
Mechani cal coupl i ngs; G, RO
Pi pe hanger s and suppor t s; G, RO
SECTI ON 21 12 00 Page 4
Valves , i ncl udi ng gat e, check, and hose; G, RO
Fi r e depar t ment connect i ons; G, RO
Val ve t amper swi t ch; G, RO
Bur i ed Pi pe and f i t t i ngs; G, RO
Dat a whi ch descr i bes mor e t han one t ype of i t em shal l be c l ear l y mar ked t o i ndi cat e whi ch t ype t he Cont r act or i nt ends t o pr ovi de.
SD- 06 Test Repor t s
Pr el i mi nar y t est s; G, RO
Accept ance t est s; G, RO
SD- 07 Cer t i f i cat es
Qual i f i cat i ons of i nst al l er ; G, RO
SD- 11 Cl oseout Submi t t al s
Syst em as- bui l t dr awi ngs; G, RO
1. 5 QUALI TY ASSURANCE
1. 5. 1 Qual i f i cat i ons of I nst al l er
Pr i or t o commenci ng wor k, submi t dat a showi ng t hat t he Cont r act or has successf ul l y i nst al l ed f i r e ext i ngui shi ng st andpi pe syst ems of t he same t ype and desi gn as speci f i ed her ei n, or t hat he has a f i r m cont r act ual agr eement wi t h a subcont r act or havi ng t he r equi r ed exper i ence. I nc l ude t he names and l ocat i ons of at l east t wo i nst al l at i ons wher e t he Cont r act or , or t he subcont r act or r ef er r ed t o above, has i nst al l ed such syst ems. I ndi cat e t he t ype and desi gn of each syst em, and cer t i f y t hat t he syst em has per f or med sat i sf act or i l y f or a per i od of at l east 18 mont hs.
Qual i f i cat i ons of Syst em Techni c i an: I nst al l at i on dr awi ngs, shop dr awi ng and as- bui l t dr awi ngs shal l be pr epar ed, by or under t he super vi s i on of , an i ndi v i dual who i s exper i enced wi t h t he t ypes of wor ks speci f i ed her ei n, and i s cur r ent l y cer t i f i ed by t he Nat i onal I nst i t ut e f or Cer t i f i cat i on i n Engi neer i ng Technol ogi es ( NI CET) as an engi neer i ng t echni c i an wi t h mi ni mum Level - I I I cer t i f i cat i on i n Aut omat i c Spr i nkl er Syst em pr ogr am. Cont r act or shal l submi t dat a f or appr oval showi ng t he name and cer t i f i cat i on of al l i nvol ved i ndi v i dual s wi t h such qual i f i cat i ons at or pr i or t o submi t t al of drawings.
1. 5. 2 Syst em As- Bui l t Dr awi ngs
Upon compl et i on, and bef or e f i nal accept ance of t he wor k, submi t a compl et e set of as- bui l t dr awi ngs of each syst em and a f ul l set of wor ki ng dr awi ngs i n accor dance wi t h Sect i on 01 78 00 CLOSEOUT SUBMI TTALS.
1. 6 DELI VERY, STORAGE AND HANDLI NG
Pr ot ect st or ed equi pment f r om weat her , humi di t y and t emper at ur e var i at i ons, di r t , dust , and ot her cont ami nant s.
SECTI ON 21 12 00 Page 5
PART 2 PRODUCTS
2. 1 ABOVEGROUND PI PI NG SYSTEMS
Pr ovi de f i t t i ngs f or changes i n di r ect i on of pi pi ng and f or connect i ons.
Make changes i n pi pi ng s i zes t hr ough t aper ed r educi ng pi pe f i t t i ngs;
bushi ngs wi l l not be per mi t t ed. Per f or m wel di ng i n t he shop; f i el d wel di ng wi l l not be per mi t t ed.
2. 1. 1 Pi pe and Fi t t i ngs
NFPA 14, except as modi f i ed her ei n. St eel pi pi ng shal l be Schedul e 40 f or s i zes l ess t han 8 i nches, and Schedul e 30 or 40 f or s i zes 8 i nches and l ar ger . Fi t t i ngs shal l be wel ded, t hr eaded, or gr ooved- end t ype.
Pl ai n- end f i t t i ngs wi t h mechani cal coupl i ngs and f i t t i ngs whi ch use st eel gr i ppi ng devi ces t o bi t e i nt o t he pi pe when pr essur e i s appl i ed wi l l not be per mi t t ed. Rubber gasket ed gr ooved- end pi pe and f i t t i ngs wi t h mechanical couplings shal l be per mi t t ed i n pi pe s i zes 1. 5 i nches and l ar ger . Fi t t i ngs shal l be UL Fi r e Pr ot Di r l i s t ed or FM APP GUI DE appr oved f or use i n dr y pi pe spr i nkl er syst ems. Fi t t i ngs, mechani cal coupl i ngs, and r ubber gasket s shal l be suppl i ed by t he same manuf act ur er . St eel pi pi ng wi t h wal l t hi ckness l ess t han Schedul e 30 shal l not be t hr eaded. Si de out l et t ees usi ng r ubber gasket ed f i t t i ngs shal l not be per mi t t ed. Pi pe and f i t t i ngs shal l be met al .
2. 1. 2 Pi pe Hanger s and Suppor t s
Pr ovi de i n accor dance wi t h NFPA 14.
2. 1. 3 Valves
NFPA 14. Pr ovi de val ves of t ypes appr oved f or f i r e ser vi ce. Hose and gat e val ves shal l open by count er cl ockwi se r ot at i on. Pr ovi de i sol at i on and check val ves as r equi r ed by NFPA 14. I sol at i on val ves shal l be OS&Y t ype.
Check val ves shal l be f l anged cl ear openi ng swi ng- check t ype wi t h f l anged i nspect i on and access cover pl at e f or s i zes 4 i nches and l ar ger .
Pr ovi de br onze hose val ve wi t h 2 1/ 2 i nch Nat i onal St andar d mal e hose t hr eads, and 2 1/ 2 i nch NH f emal e by 1 1/ 2 i nch I PT mal e r educer wi t h cap and chai n. Equi p val ve wi t h a devi ce t o r egul at e pr essur e at t he out l et t o a pr essur e not exceedi ng 100 psi .
2. 1. 4 I dent i f i cat i on Si gns
NFPA 14. At t ach pr oper l y l et t er ed and appr oved met al s i gns t o each val ve and al ar m devi ce.
2. 1. 5 Pi pe Sl eeves
Pr ovi de wher e pi pi ng passes ent i r el y t hr ough wal l s , f l oor s, r oof s and par t i t i ons. Secur e s l eeves i n posi t i on and l ocat i on dur i ng const r uct i on.
Pr ovi de s l eeves of suf f i c i ent l engt h t o pass t hr ough ent i r e t hi ckness of wal l s, f l oor s, r oof s and par t i t i ons. Pr ovi de one i nch mi ni mum cl ear ance bet ween ext er i or of pi pi ng and i nt er i or of s l eeve or cor e- dr i l l ed hol e.
Fi r ml y pack space wi t h mi ner al wool i nsul at i on. Seal space at bot h ends of t he s l eeve or cor e- dr i l l ed hol e wi t h pl ast i c wat er pr oof cement whi ch wi l l dr y t o a f i r m but pl i abl e mass, or pr ovi de a mechani cal l y adj ust abl e segment ed el ast omer i c seal . I n f i r e wal l s and f i r e f l oor s, seal bot h ends of pi pe s l eeves or cor e- dr i l l ed hol es wi t h UL l i s t ed f i l l , voi d, or cavi t y
SECTI ON 21 12 00 Page 6 material.
2. 1. 5. 1 Sl eeves i n Masonr y and Concr et e Wal l s, Fl oor s, and Roof s
Pr ovi de hot - di p gal vani zed st eel , duct i l e- i r on, or cast - i r on s l eeves. Cor e dr i l l i ng of masonr y and concr et e may be pr ovi ded i n l i eu of pi pe s l eeves when cavi t i es i n t he cor e- dr i l l ed hol e ar e compl et el y gr out ed smoot h.
Ext end sl eeves i n f l oor s l abs 3 i nches above f i ni shed f l oor s.
2. 1. 5. 2 Sl eeves i n Par t i t i ons
Pr ovi de 26 gauge gal vani zed st eel sheet .
2. 1. 6 Escut cheon Pl at es
Pr ovi de one pi ece or spl i t hi nge t ype met al pl at es f or pi pi ng passi ng t hr ough wal l s, f l oor s, and cei l i ngs i n bot h exposed and conceal ed spaces.
Pr ovi de pol i shed st ai nl ess st eel pl at es or chr omi um- pl at ed f i ni sh on copper al l oy pl at es i n f i ni shed spaces. Pr ovi de pai nt f i ni sh on met al pl at es i n unf i ni shed spaces. Secur el y anchor pl at es i n pl ace.
2. 1. 7 Fi r e Depar t ment Connect i ons
Provide f r ee- st andi ng, t wo- way f i r e depar t ment connection l ocat ed on t he east s i de of t he Ut i l i t y Room, and out of t he l i ne of f i r e. Fi r e depar t ment connect i on shal l be of br ass const r uct i on wi t h 2. 5 i nch Nat i onal St andar d f emal e hose t hr eads wi t h pl ug, chai n, and i dent i f y i ng f i r e depar t ment connect i on escut cheon pl at e. Escut cheon pl at e shal l i ndi cat e t hat t he f i r e depar t ment connect i on ser ves bot h t he st andpi pe and t he spr i nkl er syst em.
2. 1. 8 Val ve Tamper Swi t ch
Pr ovi de val ve t amper swi t ch( es) t o moni t or t he open posi t i on of val ve( s) cont r ol l i ng wat er suppl y t o t he st andpi pe syst em. Swi t ch cont act s shal l t r ansf er f r om t he nor mal ( val ve open) posi t i on t o t he of f - nor mal ( val ve c l osed) posi t i on dur i ng t he f i r st t wo r evol ut i ons of t he hand wheel or when t he st em of t he val ve has moved not mor e t han one- f i f t h of t he di st ance f r om i t s nor mal posi t i on. Swi t ch shal l be t amper r esi st ant . Removal of t he cover shal l cause swi t ch t o oper at e i nt o t he of f - nor mal posi t i on.
2. 1. 9 Fi r e Pumps
Pr ovi de as speci f i ed i n Sect i on 21 30 05. 16 FI RE PUMPS AND ENCLOSUI RES.
2. 2 BURI ED PI PI NG SYSTEMS
2. 2. 1 Bur i ed Pi pe and Fi t t i ngs
NFPA 24, out s i de coat ed, cement l i ned, duct i l e i r on pi pe and f i t t i ngs f or pi pi ng under t he bui l di ng and t o a poi nt 5 f eet out s i de t he bui l di ng wal l s. Anchor t he j oi nt s i n accor dance wi t h NFPA 24 usi ng pi pe c l amps and st eel r ods. Mi ni mum pi pe s i ze shal l be 6 i nches. Mi ni mum dept h of cover shal l be 3 f eet . Pi pi ng mor e t han 5 f eet out s i de t he bui l di ng wal l s shal l be pr ovi ded by Ol d Nor t h Ut i l i t i es Ser vi ces ( ONUS) .
2. 2. 2 3. 8. 1 Bur i ed War ni ng and I dent i f i cat i on Tape
Pr ovi de bur i ed ut i l i t y l i nes wi t h ut i l i t y i dent i f i cat i on t ape. Bur y t ape
1. 5 f eet bel ow f i ni shed gr ade; under pavement s and sl abs, bur y t ape 12
SECTI ON 21 12 00 Page 7 inches bel ow t op of subgr ade.
2. 2. 3 3. 8. 2 Bur i ed Det ect i on Wi r e
Bur y det ect i on wi r e di r ect l y above non- met al l i c pi pi ng at a di st ance not t o exceed 12 i nches above t he t op of pi pe. Ext end t he wi r e cont i nuousl y and unbr oken, f r om manhol e t o manhol e. Ter mi nat e t he ends of t he wi r e i nsi de t he manhol es at each end of t he pi pe, wi t h a mi ni mum of 3 f eet of wi r e, coi l ed, r emai ni ng accessi bl e i n each manhol e. Fur ni sh i nsul at ed wi r e over i t ' s ent i r e l engt h. I nst al l wi r es at manhol es bet ween t he t op of t he cor bel and t he f r ame, and ext end up t hr ough t he chi mney seal bet ween t he f r ame and t he chi mney seal . For f or ce mai ns, t er mi nat e t he wi r e i n t he val ve pi t at t he pump st at i on end of t he pi pe.
2. 3 ELECTRI CAL WORK
Pr ovi de el ect r i cal wor k associ at ed wi t h t hi s sect i on under Sect i on 26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM, except f or f i r e al ar m wi r i ng. Pr ovi de f i r e al ar m wi r i ng and connect i on t o f i r e al ar m syst ems under Sect i on 28 31 76
I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM.
PART 3 EXECUTI ON
3. 1 EXCAVATI ON, BACKFI LLI NG, AND COMPACTI NG
Pr ovi de under t hi s sect i on as speci f i ed i n Sect i on 31 00 00 EARTHWORK.
3. 2 CONNECTI ONS TO EXI STI NG WATER SUPPLY SYSTEMS
Connect i ons t o exi st i ng wat er suppl y syst em shal l be coor di nat ed wi t h Ol d Nor t h Ut i l t i es Ser vi ces, and per f or med i n accor dance wi t h ONUS' s requirements .
3. 3 STANDPI PE SYSTEM I NSTALLATI ON
Equi pment , mat er i al s, i nst al l at i on, wor kmanshi p, f abr i cat i on, assembl y, er ect i on, exami nat i on, i nspect i on, and t est i ng shal l be i n accor dance wi t h t he NFPA st andar ds r ef er enced her ei n. I nst al l pi pi ng st r ai ght and t r ue t o bear evenl y on hanger s and suppor t s. Conceal pi pi ng t o t he maxi mum ext ent possi bl e. Pi pi ng shal l be i nspect ed, t est ed and appr oved bef or e bei ng conceal ed. Pr ovi de f i t t i ngs f or changes i n di r ect i on of pi pi ng and f or al l connect i ons Make changes i n pi pi ng s i zes t hr ough st andar d r educi ng pi pe f i t t i ngs; do not use bushi ngs. Cut pi pe accur at el y and wor k i nt o pl ace wi t hout spr i ngi ng or f or c i ng. Ream pi pe ends and f r ee pi pe and f i t t i ngs f r om bur r s. Cl ean wi t h sol vent t o r emove al l var ni sh and cut t i ng oi l pr i or t o assembl e. Make scr ew j oi nt s wi t h PTFE t ape appl i ed t o mal e t hr ead onl y.
3. 4 FI ELD PAI NTI NG
Fi el d pai nt i ng of f i r e ext i ngui shi ng st andpi pe syst em shal l be speci f i ed i n Section 09 90 00 PAI NTS AND COATI NGS. Fi el d pai nt i ng r equi r ement s f or " Fi r e Ext i ngui shi ng Spr i nkl er Syst ems" shal l appl y.
Pr ovi de per manent l abel s i n mechani cal r ooms, spaced at 20 f oot maxi mum i nt er val s al ong pi pe, i ndi cat i ng " STANDPI PE. "
3. 5 ELECTRI CAL WORK
Pr ovi de el ect r i cal wor k associ at ed wi t h t hi s sect i on under Sect i on 26 20 00
SECTI ON 21 12 00 Page 8
I NTERI OR DI STRI BUTI ON SYSTEM, except f or f i r e al ar m wi r i ng. Pr ovi de f i r e al ar m wi r i ng and connect i on t o f i r e al ar m syst ems under Section 28 31 76
I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM.
3. 6 FLUSHING
Fl ush t he pi pi ng syst em wi t h pot abl e wat er i n accor dance wi t h NFPA 14.
Cont i nue f l ushi ng oper at i on unt i l wat er i s c l ear , but f or not l ess t han 10 minutes.
3. 7 FI ELD QUALI TY CONTROL
Pr i or t o i ni t i al oper at i on, i nspect equi pment and pi pi ng syst ems f or compl i ance wi t h dr awi ngs, speci f i cat i ons, and manuf act ur er ' s submi t t al s.
Per f or m t est s i n t he pr esence of t he Cont r act i ng Of f i cer t o det er mi ne conf or mance wi t h t he speci f i ed r equi r ement s.
3. 7. 1 Pr el i mi nar y Test s
Each pi pi ng syst em shal l be hydr ost at i cal l y t est ed at 200 psi g i n accor dance wi t h NFPA 14 and NFPA 24 and shal l show no l eakage or r educt i on i n gauge pr essur e af t er 2 hour s. The Cont r act or shal l conduct compl et e pr el i mi nar y t est s, whi ch shal l encompass al l aspect s of syst em oper at i on.
I ndi v i dual l y t est al ar ms, and al l ot her component s and accessor i es t o demonst r at e pr oper f unct i oni ng. Test wat er f l ow al ar ms by f l owi ng wat er .
When t est s have been compl et ed and al l necessar y cor r ect i ons made, submi t t o t he Cont r act i ng Of f i cer a s i gned and dat ed cer t i f i cat e, s i mi l ar t o t hat speci f i ed i n NFPA 13, at t est i ng t o t he sat i sf act or y compl et i on of al l t est i ng and st at i ng t hat t he syst em i s i n oper at i ng condi t i on. Al so i ncl ude a wr i t t en r equest f or a f or mal i nspect i on and t est .
3. 7. 2 For mal I nspect i on and Test s ( Accept ance Test s)
The Cont r act or ' s Qual i f i ed Fi r e Pr ot ect i on Engi neer wi l l wi t ness f or mal t est s and appr ove al l syst ems bef or e t hey ar e accept ed. The syst em shal l be consi der ed r eady f or such t est i ng onl y af t er al l necessar y pr el i mi nar y t est s have been performed, and al l def i c i enci es f ound have been cor r ect ed t o t he sat i sf act i on of t he Cont r act i ng Of f i cer and wr i t t en cer t i f i cat i on t o t hi s ef f ect i s r ecei ved by t he Di v i s i on Fi r e Pr ot ect i on Engi neer . Submi t t he r equest f or f or mal i nspect i on at l east 15 wor k i ng days pr i or t o t he dat e t he i nspect i on i s t o t ake pl ace. Exper i enced t echni c i ans r egul ar l y empl oyed by t he Cont r act or i n t he i nst al l at i on of bot h t he mechani cal and el ect r i cal por t i ons of such syst ems shal l be pr esent dur i ng t he i nspect i on and shal l conduct t he t est i ng. Al l i nst r ument s, per sonnel , appl i ances and equi pment f or t est i ng shal l be f ur ni shed by t he Cont r act or . Al l necessar y t est s encompassi ng al l aspect s of syst em oper at i on shal l be made i ncl udi ng t he f ol l owi ng, and any def i c i ency f ound shal l be cor r ect ed and t he syst em r et est ed at no cost t o t he Gover nment .
Per f or m f l ow t est s of each st andpi pe r i ser i n accor dance wi t h NFPA 14.
Affix 0- 200 psi pr essur e gauges t o l owest hose val ve and next - t o- hi ghest hose val ve. Connect l i ned, 2 1/ 2 i nch di amet er f i r e hose wi t h under wr i t er ' s pl aypi pe t o hi ghest hose val ve and f l ow at l east 250 gpm f or 5 mi nut es f r om st andpi pe t o a saf e l ocat i on out s i de t he bui l di ng. Fur ni sh hose, nozzl es and f i t t i ngs r equi r ed f or t hi s t est .
3. 7. 3 Addi t i onal Test s
When def i c i enci es, def ect s or mal f unct i ons devel op dur i ng t he t est s
SECTI ON 21 12 00 Page 9 r equi r ed, al l f ur t her t est i ng of t he syst em shal l be suspended unt i l pr oper adj ust ment s, cor r ect i ons or r evi s i ons have been made t o ensur e pr oper per f or mance of t he syst em. I f t hese r evi s i ons r equi r e mor e t han a nomi nal del ay, t he Cont r act i ng Of f i cer shal l be not i f i ed when t he addi t i onal wor k has been compl et ed, t o ar r ange a new i nspect i on and t est of t he syst em.
Al l t est s r equi r ed shal l be r epeat ed pr i or t o f i nal accept ance, unl ess di r ect ed ot her wi se.
- - End of Sect i on - -
SECTI ON 21 12 00 Page 10
SECTI ON TABLE OF CONTENTS
DI VI SI ON 21 - FI RE SUPPRESSI ON
SECTI ON 21 13 18
PREACTI ON AND DELUGE SPRI NKLER SYSTEMS, FI RE PROTECTI ON
05/09
PART 1 GENERAL
1. 1 REFERENCES
1. 2 SYSTEM DESCRI PTI ON
1. 2. 1 Hydr aul i c Desi gn
1. 2. 1. 1 Hose Demand
1. 2. 1. 2 Basi s f or Cal cul at i ons
1. 2. 2 Spr i nkl er Cover age
1. 2. 3 Cont r ol Syst em
1. 2. 3. 1 Power Suppl y
1. 2. 3. 2 Ci r cui t Requi r ement s
1. 2. 4 Syst em Oper at i onal Feat ur es
1. 2. 4. 1 Syst em Act uat i on
1. 2. 4. 2 Al ar m Funct i ons
1. 2. 4. 3 Super vi sor y Funct i ons
1. 3 SUBMI TTALS
1. 4 QUALI TY ASSURANCE
1. 4. 1 Fi r e Pr ot ect i on Speci al i s t
1. 4. 1. 1 Fi r e Pr ot ect i on Engi neer
1. 4. 1. 2 Engi neer i ng Techni c i an
1. 4. 2 I nst al l er Qual i f i cat i ons
1. 4. 3 Shop Dr awi ngs
1. 5 DELI VERY, STORAGE, AND HANDLI NG
1. 6 EXTRA MATERI ALS
PART 2 PRODUCTS
2. 1 STANDARD PRODUCTS
2. 2 NAMEPLATES
2. 3 REQUI REMENTS FOR FI RE PROTECTI ON SERVI CE
2. 4 UNDERGROUND PI PI NG SYSTEMS
2. 4. 1 Pi pe
2. 4. 2 Fi t t i ngs and Gasket s
2. 4. 3 Gat e Val ve and I ndi cat or Post s
2. 5 ABOVEGROUND PI PI NG COMPONENTS
2. 5. 1 St eel Pi pe
2. 5. 2 Fi t t i ngs f or Non- Gr ooved St eel Pi pe
2. 5. 3 Gr ooved Mechani cal Joi nt s and Fi t t i ngs
2. 5. 4 Fl anges
2. 5. 4. 1 Bol t s
2. 5. 4. 2 Nut s
2. 5. 4. 3 Washer s
2. 5. 5 Pi pe Hanger s
2. 5. 6 Val ves
2. 5. 6. 1 Cont r ol Val ve and Gat e Val ve
2. 5. 6. 2 Check Val ves
SECTI ON 21 13 18 Page 1
2. 6 AUTOMATI C WATER CONTROL VALVE ( DELUGE VALVE)
2. 7 SUPERVI SORY NI TROGEN GENERATI ON SYSTEM
2. 7. 1 Ni t r ogen Gener at i on Syst em
2. 7. 2 Ai r Compr essor
2. 7. 3 Ai r Pr essur e Mai nt enance Devi ce
2. 7. 4 Pr e- Act i on Syst em Vent i ng Devi ce( s)
2. 7. 5 Ai r Suppl y Pi pi ng Syst em
2. 7. 6 Low Gas Pr essur e Swi t ch
2. 8 FI RE DEPARTMENT CONNECTI ON
2. 9 SPRI NKLERS
2. 9. 1 Pendent Spr i nkl er
2. 9. 2 Upr i ght Spr i nkl er
2. 10 ACCESSORI ES
2. 10. 1 Spr i nkl er Cabi net
2. 10. 2 Pi pe Escut cheon
2. 10. 3 Spr i nkl er Guar d
2. 10. 4 I dent i f i cat i on Si gn
2. 11 DOUBLE- CHECK VALVE BACKFLOW PREVENTI ON ASSEMBLY
2. 12 CONTROL PANEL
2. 12. 1 Zone Annunci at or
2. 12. 2 Syst em Zoni ng
2. 12. 3 Pr i mar y Power Suppl y
2. 12. 4 Emer gency Power Suppl y
2. 12. 4. 1 St or age Bat t er i es
2. 12. 4. 2 Bat t er y Char ger
2. 13 ALARM I NI TI ATI NG DEVI CES
2. 13. 1 Heat Det ect or s
2. 13. 2 Spr i nkl er Pr essur e Al ar m Swi t ch
2. 13. 3 Wat er f l ow Al ar m
2. 13. 4 Val ve Super vi sor y ( Tamper ) Swi t ch
2. 14 NOTI FI CATI ON APPLI ANCES
2. 15 WI RI NG
PART 3 EXECUTI ON
3. 1 EXAMI NATI ON
3. 2 I NSPECTI ON BY FI RE PROTECTI ON SPECI ALI ST
3. 3 ABOVEGROUND PI PI NG I NSTALLATI ON
3. 3. 1 Pr ot ect i on of Pi pi ng Agai nst Ear t hquake Damage
3. 3. 2 Pi pi ng i n Exposed Ar eas
3. 3. 3 Pi pi ng i n Fi ni shed Ar eas
3. 3. 4 Upr i ght Spr i nkl er s
3. 3. 5 Pendent Spr i nkl er s
3. 3. 6 Pi pe Joi nt s
3. 3. 7 Reducer s
3. 3. 8 Pi pe Penet r at i ons
3. 3. 9 Escut cheons
3. 3. 10 I nspect or ' s Test Connect i on
3. 3. 11 Dr ai ns
3. 3. 12 I nst al l at i on of Fi r e Depar t ment Connect i on
3. 3. 13 I dent i f i cat i on Si gns
3. 4 UNDERGROUND PI PI NG I NSTALLATI ON
3. 5 ELECTRI CAL WORK
3. 5. 1 Over cur r ent and Sur ge Pr ot ect i on
3. 5. 2 Gr oundi ng
3. 5. 3 Wi r i ng
3. 5. 4 Cont r ol Panel
3. 5. 5 Det ect or s
3. 5. 6 Manual Act uat i on St at i ons
SECTI ON 21 13 18 Page 2
3. 5. 7 Not i f i cat i on Appl i ances
3. 6 PI PE COLOR CODE MARKI NG
3. 7 PRELI MI NARY TESTS
3. 7. 1 Under gr ound Pi pi ng
3. 7. 2 Hydr ost at i c Test i ng
3. 7. 3 Abovegr ound Pi pi ng
3. 7. 3. 1 Hydr ost at i c Test i ng
3. 7. 3. 2 Ai r Pr essur e Test
3. 7. 3. 3 Backf l ow Pr event i on Assembl y For war d Fl ow Test
3. 7. 4 Det ect i on and Cont r ol Syst em Test s
3. 7. 5 Aut omat i c Wat er Cont r ol Val ve Test
3. 8 FI NAL ACCEPTANCE TESTS
3. 8. 1 Cont r ol Syst em Test
3. 8. 2 Tr i p- t est s of Aut omat i c Wat er Cont r ol Val ves
3. 8. 3 Test s of Super vi sor y Ni t r ogen Syst em
3. 9 ONSI TE TRAI NI NG
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 21 13 18 Page 3
SECTI ON 21 13 18
PREACTI ON AND DELUGE SPRI NKLER SYSTEMS, FI RE PROTECTI ON
05/09
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN WATER WORKS ASSOCI ATI ON ( AWWA)
AWWA C104/ A21. 4 ( 2016) Cement - Mor t ar Li ni ng f or Duct i l e- I r on Pi pe and Fi t t i ngs f or Wat er
AWWA C110/ A21. 10 ( 2012) Duct i l e- I r on and Gr ay- I r on Fi t t i ngs f or Wat er
AWWA C111/ A21. 11 ( 2017) Rubber - Gasket Joi nt s f or Duct i l e- I r on Pr essur e Pi pe and Fi t t i ngs
AWWA C151/ A21. 51 ( 2017) Duct i l e- I r on Pi pe, Cent r i f ugal l y Cast
AWWA C203 ( 2008) Coal - Tar Pr ot ect i ve Coat i ngs and Li ni ngs f or St eel Wat er Pi pel i nes - Enamel and Tape - Hot - Appl i ed
ASME I NTERNATI ONAL ( ASME)
ASME B16. 1 ( 2015) Gr ay I r on Pi pe Fl anges and Fl anged Fi t t i ngs Cl asses 25, 125, and 250
ASME B16. 11 ( 2016) For ged Fi t t i ngs, Socket - Wel di ng and Threaded
ASME B16. 21 ( 2011) Nonmet al l i c Fl at Gasket s f or Pi pe Flanges
ASME B16. 3 ( 2011) Mal l eabl e I r on Thr eaded Fi t t i ngs, Cl asses 150 and 300
ASME B16. 4 ( 2011) St andar d f or Gr ay I r on Thr eaded Fi t t i ngs; Cl asses 125 and 250
ASME B16. 9 ( 2012) St andar d f or Fact or y- Made Wr ought St eel But t wel di ng Fi t t i ngs
ASME B18. 2. 2 ( 2015) Nut s f or Gener al Appl i cat i ons:
Machi ne Scr ew Nut s, Hex, Squar e, Hex Fl ange, and Coupl i ng Nut s ( I nch Ser i es)
ASTM I NTERNATI ONAL ( ASTM)
ASTM A135/ A135M ( 2009; R2014) St andar d Speci f i cat i on f or
SECTI ON 21 13 18 Page 4
El ect r i c- Resi st ance- Wel ded St eel Pi pe
ASTM A183 ( 2014) St andar d Speci f i cat i on f or Car bon St eel Tr ack Bol t s and Nut s
ASTM A449 ( 2014) St andar d Speci f i cat i on f or Hex Cap Scr ews, Bol t s, and St uds, St eel , Heat Tr eat ed, 120/ 105/ 90 ksi Mi ni mum Tensi l e St r engt h, Gener al Use
ASTM A47/ A47M ( 1999; R 2014) St andar d Speci f i cat i on f or Fer r i t i c Mal l eabl e I r on Cast i ngs
ASTM A53/ A53M ( 2012) St andar d Speci f i cat i on f or Pi pe, St eel , Bl ack and Hot - Di pped, Zi nc- Coat ed, Wel ded and Seaml ess
ASTM A536 ( 1984; R 2014) St andar d Speci f i cat i on f or Duct i l e I r on Cast i ngs
ASTM A795/ A795M ( 2013) St andar d Speci f i cat i on f or Bl ack and Hot - Di pped Zi nc- Coat ed ( Gal vani zed) Wel ded and Seaml ess St eel Pi pe f or Fi r e Pr ot ect i on Use
ASTM F436 ( 2011) Har dened St eel Washer s
FM GLOBAL ( FM)
FM APP GUI DE ( updat ed on- l i ne) Appr oval Gui de http://www.approvalguide.com/
I NSTI TUTE OF ELECTRI CAL AND ELECTRONI CS ENGI NEERS ( I EEE)
I EEE C62. 41. 1 ( 2002; R 2008) Gui de on t he Sur ges Envi r onment i n Low- Vol t age ( 1000 V and Less) AC Power Ci r cui t s
I EEE C62. 41. 2 ( 2002) Recommended Pr act i ce on Char act er i zat i on of Sur ges i n Low- Vol t age ( 1000 V and Less) AC Power Ci r cui t s
MANUFACTURERS STANDARDI ZATI ON SOCI ETY OF THE VALVE AND FI TTI NGS
I NDUSTRY ( MSS)
MSS SP- 71 ( 2011; Er r at a 2013) Gr ay I r on Swi ng Check Val ves, Fl anged and Thr eaded Ends
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 101 ( 2018; TI A 18- 1; TI A 18- 2; TI A 18- 3) Li f e Saf et y Code
NFPA 13 ( 2016; TI A 16- 1; TI A 16- 2; TI A 16- 3 2016;
Er r at a 17- 1; Er r at a 17- 2) St andar d f or t he I nst al l at i on of Spr i nkl er Syst ems
NFPA 24 ( 2016; ERTA 2016) St andar d f or t he I nst al l at i on of Pr i vat e Fi r e Ser v i ce Mai ns
SECTI ON 21 13 18 Page 5 and Thei r Appur t enances
NFPA 70 ( 2017; ERTA 1- 2 2017; TI A 17- 1; TI A 17- 2;
TI A 17- 3; TI A 17- 4; TI A 17- 5; TI A 17- 6;
TI A 17- 7; TI A 17- 8; TI A 17- 9; TI A 17- 10;
TI A 17- 11; TI A 17- 12; TI A 17- 13; TI A
17- 14; TI A 17- 15; TI A 17- 16; TI A 17- 17 )
Nat i onal El ect r i cal Code
NFPA 72 ( 2016; Er r at a 1 2018) Nat i onal Fi r e Al ar m and Si gnal i ng Code
NATI ONAL I NSTI TUTE FOR CERTI FI CATI ON I N ENGI NEERI NG TECHNOLOGI ES
(NICET)
NI CET 1014- 7 ( 2012) Pr ogr am Det ai l Manual f or Cer t i f i cat i on i n t he Fi el d of Fi r e Pr ot ect i on Engi neer i ng Technol ogy ( Fi el d Code 003) Subf i el d of Aut omat i c Spr i nkl er Syst em Layout
U. S. DEPARTMENT OF DEFENSE ( DOD)
UFC 3- 310- 04 ( 2013; wi t h Change 1) Sei smi c Desi gn of Buildings
UFC 3- 600- 01 ( 2016; wi t h Change 1) Fi r e Pr ot ect i on Engi neer i ng f or Faci l i t i es
UNDERWRI TERS LABORATORI ES ( UL)
UL Bl d Mat Di r ( updat ed cont i nuousl y onl i ne) Bui l di ng Mat er i al s Di r ect or y
UL Fi r e Pr ot Di r ( 2012) Fi r e Pr ot ect i on Equi pment Di r ect or y
1. 2 SYSTEM DESCRI PTI ON
a. Fur ni sh pi pi ng of f set s, f i t t i ngs, and any ot her accessor i es as r equi r ed t o pr ovi de a compl et e i nst al l at i on and t o el i mi nat e i nt er f er ence wi t h ot her const r uct i on. I nst al l spr i nkl er over and under duct s, pi pi ng and pl at f or ms when such equi pment can negat i vel y af f ect or di sr upt t he spr i nkl er di schar ge pat t er n and cover age.
b. Pr ovi de a pr eact i on spr i nk l er syst em f or t he Maze & Tower Bui l di ng.
The spr i nkl er syst em shal l pr ovi de f i r e spr i nkl er pr ot ect i on f or t he entire bui l di ng. Except as modi f i ed her ei n, t he syst em shal l meet t he r equi r ement s of UFC 3- 600- 01, NFPA 13, and NFPA 72. The spr i nkl er syst em shal l be a single i nt er l ocked syst em t hat r equi r es t he act uat i on of an al ar m i ni t i at i ng devi ce t o open t he wat er cont r ol ( del uge) val ve.
c. Desi gn any por t i ons of t he spr i nkl er syst em t hat ar e not i ndi cat ed on t he dr awi ngs or ar e not speci f i ed her ei n, i ncl udi ng l ocat i ng spr i nkl er s, pi pi ng, and equi pment , and s i ze pi pi ng and equi pment .
Det er mi ne pi pe s i zes whi ch ar e not i ndi cat ed on t he dr awi ngs by hydr aul i c cal cul at i ons.
SECTI ON 21 13 18 Page 6
1. 2. 1 Hydr aul i c Desi gn
Hydr aul i cal l y desi gn t he syst em t o di schar ge a mi ni mum densi t y of 0.30 gpm/ squar e f oot over t he hydr aul i cal l y most demandi ng 2,500 squar e f eet of f l oor ar ea, i n accor dance wi t h t he r equi r ement s f or an Ext r a Hazar d c l assi f i cat i on i n UFC 3- 600- 01. The mi ni mum pi pe s i ze f or br anch l i nes i n gr i dded syst ems shal l be 1- 1/ 4 i nch. Hydr aul i c cal cul at i ons shal l be i n accor dance wi t h t he Ar ea/ Densi t y Met hod of NFPA 13. Wat er vel oci t y i n t he pi pi ng shal l not exceed 20 f t / s .
1. 2. 1. 1 Hose Demand
Add an al l owance f or ext er i or hose st r eams of 500 gpm t o t he spr i nkl er syst em demand at t he f i r e hydr ant shown on t he dr awi ngs c l osest t o t he poi nt wher e t he wat er ser vi ce ent er s t he bui l di ng.
1. 2. 1. 2 Basi s f or Cal cul at i ons
Base t he desi gn of t he syst em upon oper at i on of t he f i r e pump( s) pr ovi ded i n Sect i on 21 30 05. 16 FI RE PUMPS AND ENCLOSUI RES. Base hydr aul i c cal cul at i ons upon t he Hazen- Wi l l i ams f or mul a wi t h a " C" val ue of 120 f or gal vani zed st eel pi pi ng, 140 f or new cement - l i ned duct i l e- i r on pi pi ng, and 100 f or exi st i ng under gr ound pi pi ng.
a. Out l i ne hydr aul i c cal cul at i ons as i n NFPA 13, except t hat cal cul at i ons shal l be per f or med by comput er usi ng sof t war e i nt ended speci f i cal l y f or f i r e pr ot ect i on syst em desi gn usi ng t he desi gn dat a shown on t he dr awi ngs. Submi t hydr aul i c cal cul at i ons, i ncl udi ng a dr awi ng showi ng hydr aul i c r ef er ence poi nt s and pi pe segment s. Sof t war e t hat uses k- f act or s f or t ypi cal br anch l i nes i s not accept abl e. Cal cul at i ons shal l subst ant i at e t hat t he desi gn ar ea used i n t he cal cul at i ons i s t he most demandi ng hydr aul i cal l y .
b. Pl ot wat er suppl y cur ves and syst em r equi r ement s on semi - l ogar i t hmi c gr aph paper so as t o pr esent a summar y of t he compl et e hydr aul i c cal cul at i on. Pr ovi de a summar y sheet l i s t i ng spr i nkl er s i n t he desi gn ar ea and t hei r r espect i ve hydr aul i c r ef er ence poi nt s, el evat i ons, act ual di schar ge pr essur es and act ual f l ows. I ndi cat e el evat i ons of hydr aul i c r ef er ence poi nt s ( nodes) . Document at i on shal l i dent i f y each pi pe i ndi v i dual l y and t he nodes connect ed t her et o. I ndi cat e f or each pi pe t he di amet er , l engt h, f l ow, vel oci t y, f r i c t i on l oss, number and t ype f i t t i ngs, t ot al f r i c t i on l oss i n t he pi pe, equi val ent pi pe l engt h and Hazen- Wi l l i ams coef f i c i ent .
c. For gr i dded syst ems, cal cul at i ons shal l show peaki ng of demand ar ea f r i c t i on l oss t o ver i f y t hat t he hydr aul i cal l y most demandi ng ar ea i s bei ng used. Al so f or gr i dded syst ems, i ncl ude a f l ow di agr am i ndi cat i ng t he quant i t y and di r ect i on of f l ows. A dr awi ng showi ng hydr aul i c r ef er ence poi nt s ( nodes) and pi pe desi gnat i ons used i n t he cal cul at i ons shal l be i ncl uded and shal l be i ndependent of shop drawings.
1. 2. 2 Spr i nkl er Cover age
Uni f or ml y space spr i nkl er s on br anch l i nes. I n bui l di ngs pr ot ect ed by aut omat i c spr i nk l er s, pr ovi de cover age t hr oughout 100 per cent of t he bui l di ng. Thi s i ncl udes, but i s not l i mi t ed t o, t el ephone r ooms, el ect r i cal equi pment r ooms, boi l er r ooms, swi t chgear r ooms, t r ansf or mer r ooms, and ot her el ect r i cal and mechani cal spaces. Cover age per spr i nkl er
SECTI ON 21 13 18 Page 7 shal l be i n accor dance wi t h NFPA 13, but shal l not exceed 100 squar e f eet f or ext r a hazar d occupanci es, 130 squar e f eet f or or di nar y hazar d occupanci es, and 225 squar e f eet f or l i ght hazar d occupanci es. Except i ons ar e as f ol l ows:
a. Spr i nkl er s may be omi t t ed f r om smal l r ooms whi ch ar e exempt ed f or speci f i c occupanci es i n accor dance wi t h NFPA 101.
1. 2. 3 Cont r ol Syst em
The cont r ol syst em shal l meet t he r equi r ement s of NFPA 72. The cont r ol panel shal l be l i s t ed i n UL Fi r e Pr ot Di r or FM APP GUI DE f or " Rel easi ng Devi ce Ser vi ce" . The cont r ol panel and t he sol enoi d val ve t hat act i vat es t he wat er cont r ol val ves shal l be compat i bl e wi t h each ot her .
Compat i bi l i t y shal l be i n accor dance wi t h speci f i c UL l i s t i ng or FM appr oval of t he cont r ol equi pment .
1. 2. 3. 1 Power Suppl y
Pr ovi de t he pr i mar y oper at i ng power f r om t wo si ngl e- phase 120 VAC ci r cui t s. Tr ansf er f r om nor mal t o backup power and r est or at i on f r om backup t o nor mal power shal l be f ul l y aut omat i c and shal l not i ni t i at e a f al se al ar m. Loss of pr i mar y power shal l not pr event act uat i on of t he r espect i ve aut omat i c wat er cont r ol val ve upon act i vat i on of any al ar m i ni t i at i ng devi ce. Pr ovi de backup power t hr ough use of r echar geabl e, seal ed, l ead cal c i um st or age bat t er i es.
1. 2. 3. 2 Ci r cui t Requi r ement s
Pat hways f or addr essabl e det ect i on, not i f i cat i on, and si gnal i ng l i ne c i r cui t s shal l be i n accor dance wi t h 28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM Pr ovi de a separ at e c i r cui t f or act uat i on of each i ndi v i dual aut omat i c wat er cont r ol val ve. Ful l y super vi se t he c i r cui t s t hat act uat e t he wat er cont r ol val ves so t hat t he occur r ence of a s i ngl e open or a s i ngl e gr ound f aul t condi t i on i n t he i nt er connect i ng conduct or s wi l l be i ndi cat ed at t he cont r ol panel .
1. 2. 4 Syst em Oper at i onal Feat ur es
I ncl ude i n t he syst em a heat det ect i on syst em, manual act uat i on st at i ons, super vi sor y and al ar m swi t ches, al ar m not i f i cat i on appl i ances, cont r ol panel and associ at ed equi pment . Pr ovi de pr eact i on spr i nkl er syst em pi pi ng wi t h super vi sor y ai r pr essur e not t o exceed 30 psi g.
1. 2. 4. 1 Syst em Act uat i on
Act i vat i on of any s i ngl e heat det ect or or a s i ngl e manual act uat i on st at i on shal l act uat e al ar m zone ci r cui t s of t he cont r ol panel t hat , i n t ur n, shal l act uat e t he cor r espondi ng aut omat i c wat er cont r ol val ve. Act uat i on of t he aut omat i c wat er cont r ol val ve shal l cause wat er t o f i l l t he pr eact i on syst em pi pi ng and be di schar ged f r om f used spr i nkl er s.
1. 2. 4. 2 Al ar m Funct i ons
Act i vat i on of any heat det ect or or spr i nkl er pr essur e al ar m swi t ch or manual act uat i on st at i on shal l cause t he i l l umi nat i on of t he r espect i ve zone annunci at or , and act i vat i on of t he bui l di ng f i r e al ar m syst em. Val ve t amper al ar m shal l be moni t or ed by t he syst em cont r ol panel and t r ansmi t t ed t o t he bui l di ng f i r e al ar m syst em as a t r oubl e al ar m.
SECTI ON 21 13 18 Page 8
1. 2. 4. 3 Super vi sor y Funct i ons
The r educt i on of super vi sor y gas pr essur e wi t hi n t he spr i nkl er syst em pi pi ng t o l ess t han 10 psi or t he occur r ence of a s i ngl e open or a s i ngl e gr ound f aul t i n any al ar m i ni t i at i ng devi ce c i r cui t , i n t he aut omat i c wat er cont r ol val ve act uat i on c i r cui t , i n any al ar m i ndi cat i ng appl i ance c i r cui t or i n ot her el ect r i cal l y super vi sed c i r cui t shal l cause t he i ndi v i dual l y l abel l ed cont r ol panel t r oubl e l i ght t o be i l l umi nat ed, t he audi bl e t r oubl e al ar m t o be act i vat ed, and a t r oubl e al ar m t o be t r ansmi t t ed t o t he bui l di ng f i r e al ar m cont r ol panel and t o base- wi de f i r e r epor t i ng syst em.
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 02 Shop Dr awi ngs
Shop Dr awi ngs; G, DO
As- Bui l t Dr awi ngs
SD- 03 Pr oduct Dat a
Fi r e Pr ot ect i on Speci al i s t ; G, RO
I nst al l er Qual i f i cat i ons; G, RO
Fi r e Pr ot ect i on Rel at ed Submi t t al s
Mat er i al s and Equi pment ; G, RO
Spar e Par t s
OnSi t e Tr ai ni ng; G, RO
SD- 05 Desi gn Dat a
Sway Br aci ng
Hydr aul i c Cal cul at i ons; G, DO
St or age Bat t er i es; G, RO
SD- 06 Test Repor t s
Pr el i mi nar y Test s; G, RO
Fi nal Accept ance Test s; G, RO
SD- 07 Cer t i f i cat es
I nspect i on by Fi r e Pr ot ect i on Speci al i s t ; G, RO
SD- 10 Oper at i on and Mai nt enance Dat a
SECTI ON 21 13 18 Page 9
Oper at i ng and Mai nt enance I nst r uct i ons; G, RO
1. 4 QUALI TY ASSURANCE
Compl i ance wi t h r ef er enced NFPA st andar ds i s mandat or y. Appl i cabl e mat er i al and i nst al l at i on st andar ds r ef er enced i n Appendi x A of NFPA 13 and NFPA 24 shal l be consi der ed mandat or y t he same as i f such r ef er enced st andar ds wer e speci f i cal l y l i s t ed i n t hi s speci f i cat i on. I n t he event of a conf l i c t bet ween speci f i c pr ovi s i ons of t hi s speci f i cat i on and appl i cabl e NFPA st andar ds, t hi s speci f i cat i on gover ns. I ncor por at e al l r equi r ement s t hat exceed t he mi ni mum r equi r ement s of NFPA 13 i nt o t he desi gn. I nt er pr et r ef er ence t o " aut hor i t y havi ng j ur i sdi ct i on" t o mean t he Cont r act i ng Officer.
1. 4. 1 Fi r e Pr ot ect i on Speci al i s t
Fi r e Pr ot ect i on Speci al i s t ( s) shal l be r egul ar l y engaged i n t he desi gn and i nst al l at i on of t he t ype and compl exi t y of syst em speci f i ed i n t he Cont r act , and shal l have ser ved i n a s i mi l ar capaci t y f or at l east 3 syst ems t hat have per f or med i n t he manner i nt ended f or a per i od of not l ess t han 6 mont hs. Submi t t he name and document at i on of cer t i f i cat i on of t he pr oposed Fi r e Pr ot ect i on Speci al i s t s no l at er t han 14 days af t er t he Not i ce t o Pr oceed and pr i or t o t he submi t t al of t he spr i nkl er syst em dr awi ngs and hydr aul i c cal cul at i ons. The Fi r e Pr ot ect i on Speci al i s t s shal l pr epar e and submi t a l i s t of t he f i r e pr ot ect i on r el at ed submi t t al s, no l at er t han 7 days af t er t he appr oval of t he Fi r e Pr ot ect i on Speci al i s t s, f r om t he Cont r act Submi t t al Regi st er t hat r el at e t o t he successf ul i nst al l at i on of t he spr i nkl er syst ems( s) . The submi t t al s i dent i f i ed on t hi s l i s t shal l be accompani ed by a l et t er of appr oval s i gned and dat ed by t he Fi r e Pr ot ect i on Engi neer when submi t t ed t o t he Gover nment .
1. 4. 1. 1 Fi r e Pr ot ect i on Engi neer
I n accor dance wi t h UFC 3- 600- 01, f i r e pr ot ect i on syst em desi gn shal l be per f or med under t he super vi s i on of , and cer t i f i ed by, t he cont r act or ' s Qual i f i ed Fi r e Pr ot ect i on Engi neer ( QFPE) . The Qual i f i ed Fi r e Pr ot ect i on Engi neer i s an i ndi v i dual , r egi st er ed, pr of essi onal engi neer who has passed t he f i r e pr ot ect i on engi neer i ng wr i t t en exami nat i on admi ni st er ed by t he Nat i onal Counci l of Exami ner s f or Engi neer i ng and Sur veys ( NCEES) , and has r el evant f i r e pr ot ect i on engi neer i ng exper i ence.
The dut i es of t he Qual i f i ed Fi r e Pr ot ect i on Engi neer i ncl ude but ar e not l i mi t ed t o:
a. Eval uat i ng t he br oad r ange of hazar ds and pr ot ect i on schemes r equi r ed t o devel op a wor kabl e, i nt egr at ed sol ut i on t o a f i r e saf et y problem.
b. Pr epar i ng desi gn document s f or f i r e pr ot ect i on syst ems. Thi s includes:
( 1) Concept ual and det ai l ed engi neer i ng document s
( 2) Hazar d and r i sk anal yses
( 3) Per f or mance- based desi gn anal yses
( 4) I nt egr at ed bui l di ng syst ems anal yses
SECTI ON 21 13 18 Page 10
( 5) Layout f i r e pr ot ect i on syst ems
( 6) Per f or m necessar y cal cul at i ons f or al l f i r e pr ot ect i on syst ems
( 7) Af f i x a pr of essi onal st amp or seal wi t h s i gnat ur e and dat e t o document s pr epar ed under t he Engi neer ' s di r ect super vi s i on and control.
c. Revi ewi ng t he wor k by engi neer i ng t echni c i ans t o ensur e conf or mance wi t h t he QFPE' s desi gn
d. Revi ewi ng f i r e pr ot ect i on i nst al l at i on shop dr awi ngs and submi t t al s f or compl i ance wi t h t he QFPE' s desi gn
e. Devel op commi ssi…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.