A21)_W912PM18R0016_Amend_0003.pdf

PDF 2 MB Posted

Attached to
SOF Replace Maze and Tower, Fort Bragg, NC
Solicitation number
W912PM18R0016
Issued by

About this file

AMENDMENT 0003

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is as follow s:

1) Section 00 21 00 1.1 Correct project description to reflect project is for a four-story tow er.

2) Section 00 21 00 3.4 Include information pertaining to proposal submission instructions.

3) Section 00 21 00 3.8.2 Correct Technical Proposal factors to reflect number of factors 2 through 4.

4) Section 00 21 00 4.1.2 Clarify Revelant requirement to include New Construction and/or Renovation projects.

5) Section 00 21 00 5.1.1 Correct reference for the Project Superintendent requirements

6) The proposal due date has been extended from 14FEB19 to 20FEB19. No change in time or location.

See Summary of Technical Changes for additional changes in technical specifications.

All other provisions of this solicitation remain unchanged.

///////////////////////////////////////////////LAST ITEM/////////////////////////////////////////////////

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Feb-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM18R0016

X 9B. DATED (SEE ITEM 11)

20-Dec-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Feb-2019

CODE

U S ARMY CORPS OF ENGINEERS, WILMINGTON

WILMINGTON DISTRICT

ATTN: JOHN HILL

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM18R0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 14-Feb-2019 02:00 PM to 20-Feb-2019 02:00 PM.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

PROPOSAL SUBMISSION INSTRUCTIO

GENERAL PROPOSAL SUBMISSION INSTRUCTIONS & REQUIREMENTS

PN 69251, SOF Replace Training Maze & Tower

Fort Bragg, North Carolina

1. OVERVIEW.

**************Amendment 03**************

1.1 This Request for Proposal (RFP) solicits construction of a three four-story training live-fire ballistic tower and a single-story live-fire ballistic training maze capable of up to 7.62mm high volume. The scope of work includes: Construct a 4-story rigid steel frame, AR-500 steel plate, ballistic block and ballistic Panel live-fire facility capable of up to 7.62mm rounds at high volume and a 4-story rigid steel frame with AR-500 steel plate, ballistic block and ballistic panel live-fire stair tower capable of up to 7.62mm rounds at high volume. Included are utilities, mechanical and architectural features, force protection, fire detection and dry-pipe suppression systems, communications, special training equipment areas, training space parking, and erosion control measures. Environmental ventilation for the project will be determined by an analysis conducted by the architect/engineer during the design phase. For planning purposes, the ventilation system is assumed to provide adequate protection for personnel using the facility. No air-conditioning is required with this project.

The period of performance is 365 calendar days. Work location is Fort Bragg, North Carolina. Antiterrorism/Force protection measures and sustainment mandates will be incorporated. The resultant contract will be Firm-Fixed Price (FFP).

**************Amendment 03**************

1.2 The instructions and requirements contained herein establish uniform evaluation procedures for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Source Selection Authority (SSA) using the Lowest Price Technically Acceptable Source Selection Process (See Federal Acquisition Regulation 15.101-2). Proposals should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.

2. GENERAL INSTRUCTIONS.

In accordance with FAR Clause 52.215-1, Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to make award without discussions. Therefore, offerors should submit their best technical and price terms in their initial offer and not automatically assume that they will have an opportunity to participate in discussions or to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interests of the Government.

In accordance with 15.306(c) (1) and FAR Clause 52.215-1(f) (4), Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

2.1 Contractor Team Arrangements. The Government will recognize the integrity and validity of contractor teaming arrangements, provided the arrangements are identified and company relationships are fully disclosed in the offer. As further described in paragraph 2.3, below, the Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code.

2.2 If applicable, a 8(a) Joint Venture or SBA/DoD approved Mentor-Protégé must submit all required documentation with their offer to be considered responsive.

2.3 The Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code. However, IAW CFR 125.8(e), the Government will also evaluate past experience and past performance submitted by the individual firms that make up a joint venture.

2.4 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractor, WILL NOT be evaluated for any factor. "Successor" means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger). Successor entities shall clearly demonstrate in Volume I, Tab A of their proposal the official legal means performed to transform the former Predecessor Company to its current Successor, legal business entity. Examples of substantive documentation may include but is not limited to Articles of Incorporation, Joint Venture Agreements, Novation Agreements, and Merger Documentation. Note: The term ''successor'' does not include new offices/ divisions of the same company or a company that only changes its name.

2.5 Offerors shall submit their proposal in accordance with the Section 3. General Proposal Format, paragraph 3.4.

2.6 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

3. GENERAL PROPOSAL FORMAT.

3.1 Cover Page. Include the title of the solicitation, solicitation number, offeror name, and date of the submittal.

3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. If more than one Adobe PDF file is used for a volume, the complete table of contents shall be included in each. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.

3.3 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not cross-reference similar material in the Price Proposal, or vice versa. No dollar amounts from the Price Proposal are to be included in the Technical proposal.

**************Amendment 03**************

3.4 Each offeror must submit Price and Technical Proposals as separate (CD-ROM) Discs via USPS, UPS, FedEx or DHL to the address in Box 6 of the SF-1442 solicitation document. Hand carried proposals are acceptable. No hard paper copies will be accepted or evaluated. The Price and Technical Proposals must be received by the closing date and time set for receipt of proposals.

In an effort to reduce paperwork and reduce cost, all proposals shall be submitted utilizing compac disks as the storage media. All submissions shall be in Adobe PDF format and shall be on 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W912PM18R0016_COMPANY NAME_VOLUME I

W912PM18R0016_COMPANY NAME_VOLUME II

Proposal due Date and Time:

Request For Proposal No: W912PM18R0016 Due Date of Proposal: 14 February 2019 20 February 2019 Time by which Proposals are due: 2:00 P.M. (Eastern Time) Title of Project: PN 69251, SOF Replace Training Maze & Tower, Fort Bragg, NC **************Amendment 03**************

3.5 The offeror is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the offeror shall be clear and concise in its proposal. The Government will not make assumptions concerning the offeror’s intent.

3.6 The technical data criteria specified for each factor identified herein and as described in these instructions shall be submitted as part of the proposal. Failure to submit all the data required by the RFP, and these instructions may be cause for determining a proposal incomplete and, therefore, not considered for award.

3.7 Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to the submission of the offer.

3.8 Tabs. Proposal shall be organized and tabbed as follows:

3.8.1 VOLUME I: OFFEROR’S CERTIFICATIONS AND PRICE (FACTOR 1)

One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted and one (1) original copy of the bid guarantee in both electronic and hardcopy shall be submitted.

TAB CONTENTS OF THE PRICE PROPOSAL

A The Proposal Cover Sheet B Standard Form 1442 C Acknowledgement of Amendments (If Applicable)

D FACTOR 1: PRICE

E Section 00 45 00 – Representations and Certifications F Teaming Arrangement (If Applicable) G Bid Guarantee (Bid Bond) H Financial Information and Bonding Capability I Subcontracting Plan (FOR LARGE BUSINESSES ONLY)

TAB A – The proposal cover sheet is required by FAR 52.215-1 (c) (2) and must be submitted by all offerors. The format for the proposal cover sheet is as follows:

TAB A – Cover sheet

1. The solicitation number;

2. The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and

5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

6. Offerors should ensure telephone number; fax number, e-mail address, DUNS number and CAGE Code are all included. DUNS number will be used to access Past Performance Information Retreival System (PPIRS) data. Offerors should also provide any other assigned number that identifies them in the PPIRS database. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. The offeror should also submit their Tax ID number on the proposal data sheet.

TAB B - Standard Form 1442, completed and signed by authorized individual(s) of the offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

TAB C - If applicable - All amendments must be acknowledged by all offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102.

TAB D – Factor 1 - Price. Proposed price schedule is to be completed in its entirety by all offerors to include the Subtotals and Totals section as found in Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule.

TAB E - Section 00 45 00 – Representations and Certifications. Offerors shall include any narratives as it pertains to the requirement at 2.2 to document any teaming arrangement the offeror has or will enter into.

TAB F - Teaming Agreement, if applicable. See paragraph 2.1 and 2.2 Note to 8(a)—SBA must approve a joint venture agreement prior to the award of an 8(a) contract on behalf of the joint venture.

TAB G - Offerors shall provide a fully executed Bid Bond as required by FAR Clause 52.228-1, Bid Guarantee in both hard copy and electronically in Tab G.

For the purposes of this Request for Proposal, please note that in accordance with

(IAW) FAR 28.001:

“Bond means a written instrument executed by a bidder or contractor (the “principal”), and a second party (the “surety” or “sureties”) (except as provided in 28.204), to assure fulfillment of the principal’s obligations to a third party (the “obligee” or “Government”), identified in the bond. If the principal’s obligations are not met, the bond assures payment, to the extent stipulated, of any loss sustained by the obligee.”

Bonds shall therefore be executed in the name of the legal entity, whether a joint venture, partnership or the Prime Contractor of an informal teaming arrangement, with whom the government would enter into a contract for a successful offeror. The entity named on the bond must be able to acquire bonding capacity on its own merits, and not as the result of indemnification from a subcontractor or third party.

TAB H - Financial Information & Bonding Capability (e.g. past three years financial statements, annual reports, Dun & Bradstreet Ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount.

TAB I - Subcontracting Plan – FOR LARGE BUSINESS OFFERORS ONLY.

Subcontracting Plan shall be prepared in accordance with FAR 52.219-9, and SBA’s Electronic Subcontracting Reporting System (eSRS) located at http://esrs.gov. Instructions for completion of requisite forms, as well as guidance on coordinating and preparing for all compliance reviews by Federal agencies can be found at this website. Offerors are to ensure subcontractors agree to submit to ESRS.

3.8.2 VOLUME II: TECHNICAL PROPOSAL (FACTORS 2-5 2-4)

One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted.

TAB CONTENTS OF THE TECHNICAL PROPOSAL

A Factor 2: Past Experience

B Factor 3: Key Personnel

C Factor 4: Past Performance

Page Limitations: The following page limitations are established for each factor described above:

Factor 2: Past Experience, Construction – Limited to 20 pages (maximum of 5 forms) Factor 3: Key Personnel – Limited to 5 pages per individual resume Factor 4: Past Performance –Limited to no fewer than three (3) and no more than five (5) projects. Individual project Past Performance Assessment Questionnaires shall not exceed five (5) pages; Government evaluators will review and evaluate only the information contained on the first five (5) pages.

NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.

Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.

Offerors are cautioned that “parroting” of the Technical requirements or the Scope of Work with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal.

Proprietary information shall be clearly marked.

4. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB A—FACTOR 2 – PAST EXPERIENCE

4.1 SUBMISSION/MINIMUM REQUIREMENTS:

4.1.1 The offeror shall demonstrate the experience as a prime contractor on projects of similar size, scope, and complexity.

**************Amendment 03**************

4.1.2 Relevant: The minimum requirement for a project (New Construction or Renovation) of similar size, scope, or complexity is defined as having all of the following criteria:

o Eight thousand (8,000) square feet (SF) or more aggregate interior space.

o Total value of project equal to or greater than $7,000,000.00 o At least one (1) of the projects submitted shall include a multi-story, steel frame building **************Amendment 03**************

4.1.3 Recent: The offeror shall complete a minimum of three (3), but no more than five (5), “Experience Information” forms, (See Appendix A, Example 1), in response to this factor. All projects submitted must be at least 50% complete within the last six (6) years preceding the date of the solicitation.

4.1.4 Offerors shall utilize Experience Information Form in Appendix A, Example 1. This sheet is MANDATORY and SHALL be used to submit project information. For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed FOUR (4) pages.

4.1.5 If the offeror is a Joint Venture (J-V), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the joint venture. Experience of proposed subcontractors to be utilized on this project will not be considered.

4.2 EVALUATION CRITERIA:

4.2.1 The Government will evaluate the extent of recent, relevant experience of the prime contractor as identified in paragraph 4.1.2. Projects that were awarded on an individual task/delivery order basis will not be aggregated for purposes of meeting minimum or additional criteria. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience.

4.2.2 To be considered eligible for award, the Government will verify that each offeror has submitted a minimum of three (3) projects which meet the minimum criteria of paragraph 4.1.2.

4.2.3 The offeror’s Past Experience will be evaluated based on the Government’s assessment of each submitted project’s similarity (in terms of size, scope and complexity) to the work described in this RFP.

4.2.4 The Government will review the project experience of the offeror on projects provided in response to the Past Experience Factor. Offerors must meet all of the minimum acceptability standards to receive an “ACCEPTABLE” rating on this factor.

5. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB B—FACTOR 3 – KEY PERSONNEL.

5.1 SUBMISSION/MINIMUM REQUIREMENTS:

5.1.1 Each offeror shall provide resumes for the following Key Personnel proposed for this contract. Resumes shall not exceed five (5) pages per person. The proposed position of each person shall be clearly stated at the beginning of the resume.

CQC System Manager The CQC System Manager is required to be a graduate engineer, graduate architect, or a graduate of construction management with a minimum of 5 years construction experience on construction similar to this requirement or possess 10 year’s construction experience as a CQC on construction similar in size, scope, and complexity as required under Factor 2.

For further information refer to:

3.4.2 CQC SYSTEM MANAGER

SECTION 01 45 00.00 10 QUALITY CONTROL

Project Superintendent The Project Superintendent shall have a minimum of 5 years of experience as a Project Superintendent.

Refer to:

3.1 1.3.2 GENERAL REQUIREMENTS

SECTION 01 45 00 01 30 00.00 10 QUALITY CONTROL ADMINISTRATIVE

REQUIREMENTS

5.1.2 Sample suggested resume format is included with this RFP (Appendix A, Example 2). If offerors elect not to use the suggested resume format, all information identified on the sample format is still required for each resume submitted under this Factor. Proposals that fail to include resumes or that fail to include all required information on these resumes may be rejected as unacceptable.

5.1.3 The Key Personnel identified must be used on the project. No deviations will be permitted unless they meet the same qualifications and experience of those individuals proposed and are expressly approved by the Contracting Officer in advance. An offeror’s use of different personnel than those proposed without approval from the Contracting Officer will be grounds for a Termination for Default.

5.2 EVALUATION CRITERIA:

5.2.1 The Government will review the resumes provided in response to the Key Personnel Factor. Offerors must demonstrate all of the following minimum acceptability standards to receive an “ACCEPTABLE” rating on this factor.

5.2.2 The offeror must demonstrate in all resumes that the key personnel proposed have the minimum specialized and relevant experience for the following roles as identified under paragraph 5.1.1 of this RFP: CQC System Manager and Project Superintendent.

5.2.3 Failure to demonstrate the minimally acceptability standards under this factor will result in an “UNACCEPTABLE” rating and possible elimination from further consideration for contract award.

6. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB C — FACTOR 4 - PAST PERFORMANCE.

6.1 SUBMISSION/MINIMUM REQUIREMENTS:

6.1.1 Past performance refers to the quality of recent and relevant project experience from the owner’s perspective. The offeror shall complete and provide a Past Performance Assessment Questionnaire (Appendix A, Example 3) on no fewer than three (3) and no more than five (5) projects. Projects submitted under this factor must first be deemed recent and relevant.

6.1.1.1 Relevant: Offer must demonstrate experience as a prime contractor on projects of similar size, scope, or complexity. The minimum requirement for a project of similar size, scope, or complexity is defined as a requirement with all of the following:

o Eight thousand (8,000) square feet (SF) or more aggregate interior space.

o Total value of project equal to or greater than $7,000,000.00 o At least one (1) of the projects submitted shall include a multi-story, steel frame building

6.1.1.2 Recent: Projects of similar size, scope, and complexity that must have been completed (fully designed and at least 50% construction progress completed) within six (6) years preceding the date of the solicitation.

6.1.2 Though not required, ideally project past performance information submitted under this factor would be on the same projects submitted for consideration under FACTOR 2, PAST EXPERIENCE. Individual project Past Performance Assessment Questionnaires shall not exceed five (5) pages; Government evaluators will review and evaluate only the information contained on the first five (5) pages. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer. The Government will call and confirm information provided by the offeror on the Past Performance Assessment Questionnaire with the points of contact, to the extent necessary to conduct a meaningful evaluation. The Government reserves the right to interview other individuals if the point of contact is not available.

6.1.3 The Government may contact sources other than those provided by the offeror for information with respect to past performance. These other sources may include but are not limited to: Past Performance Information Retrieval System (PPIRS), other Government sources, and interviews with organizations or individuals familiar with the offeror’s performance.

6.1.4 Offerors shall utilize the Past Performance Assessment Questionnaire in Appendix A, Example 3.

6.1.5 If the offeror is a Joint Venture (J-V), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the joint venture. Experience of proposed subcontractors to be utilized on this project will not be considered.

6.2 EVALUATION CRITERIA:

6.2.1 The Government will consider past performance of the prime construction contractor. If a firm has multiple functions or divisions, the Government will only evaluate the past performance of the unit or division submitting the offer. Where the Government views an offeror’s role, or that of its team members, if any, as not significant or as not clearly defined, the Government reserves the right to view this lack of involvement, or clarity, as a risk which may impact an offeror’s rating for this factor despite the quality of recent, relevant past performance information.

6.2.2 Past performance shall be initially evaluated to determine whether the offeror’s present/past performance is recent, and relevant to the effort to be acquired.

o Relevant: The minimum requirement for a project of similar size, scope, and complexity is defined as eight thousand 8,000 square feet (SF) or more aggregate interior space, with a total value equal to or greater than $7,000,000.00. At least one

(1) of the projects submitted should include a multi-story, steel frame building o Recent: Projects of similar size, scope, and complexity that must have been completed (fully designed and at least 50% construction progress completed) within six (6) years preceding the date of the initial proposal submission date.

6.2.3 The Government will evaluate ONLY recent and relevant past performance based on the elements listed below to assign a confidence rating of acceptable/unacceptable.

6.2.4 Second, the past performance evaluation shall determine how well the offeror performed on prior contracts. The contractor shall have no “unsatisfactory” or “marginal” ratings in the following criteria in Past Performance Information Retreival System (PPIRS): quality, schedule, cost control, management, and utilization of small business, regulatory compliance, and safety.

(1) Quality of Construction. The Government will evaluate all information available with respect to the quality of the actual construction undertaken and the offeror’s ability to maintain quality control and accuracy of quality control documentation.

(2) Schedule. The Government will evaluate all information available with respect to the completion of projects within the scheduled completion times.

(3) Cost Control. The Government will evaluate all information available with respect to the offeror’s ability to efficiently utilize resources and demonstrate cost responsibility.

(4) Management. The Government will evaluate all information available with respect to the offeror’s ability to manage resources and key personnel.

(5) Utilization of Small Business. The Government will evaluate all information available with respect to the offeror’s ability to meet small business subcontracting plan goals.

(6) Regulatory Compliance. The Government will evaluate all information available with respect the offeror’s ability to enforce laws and regulations, correct deficiencies when non-compliant, and communicate laws and regulations to subcontractors.

(7) Safety. The Government will evaluate all information available with respect to the contractor’s safety program or efforts.

6.2.5 Failure to demonstrate the minimally acceptability standards under this factor will result in an “UNACCEPTABLE” rating and possible elimination from further consideration for contract award.

7. EVALUATION STANDARDS.

7.1 The Government will evaluate proposals using the Lowest Price Technically Acceptable Source Selection Process of FAR 15.101-2.

7.2 Proposals will be evaluated for acceptability, but not ranked using non-cost/price factors.

7.3 Tradeoffs will not be permitted.

7.4 Each evaluation factor and its risk rating combined will be determined and assigned using the adjectival and color descriptions contained herein. Upon assessment of each individual sub- factor and its risk rating, the appropriate overall rating for the technical proposal will be assigned using these acceptable and unacceptable (pass/fail) ratings as defined below:

Color Rating Description

Green Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Red Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

7.5 Upon assessment of past performance information, the appropriate overall rating for past performance will be assigned using these acceptable and unacceptable (pass/fail) ratings as defined below:

Color Rating Description

Green Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. (See note below)

Red Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

7.6 In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a) (2) (iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “acceptable.”

7.7 To be considered technically acceptable, no technical factor in the proposal may be determined to be unacceptable. The failure of a proposal to meet any of the acceptability standards for non-cost factors will result in a technically unacceptable rating and preclude award.

8. RELATIVE IMPORTANCE OF FACTORS.

8.1 Evaluation factors other than cost or price are of equal importance. An unacceptable rating on any non-price factor will render a proposal ineligible for award.

9. PROPOSAL EVALUATION

9.1 Proposals must meet all the criteria stated in this RFP in order to be eligible for award, to include responsiveness, technical acceptability, and responsibility.

9.2 The Government will evaluate each proposal independently from other proposals using only the RFP evaluation criteria.

10. EXCEPTIONS.

10.1 Exceptions to the contractual terms and conditions of the solicitation (e.g., standard company terms and conditions) may result in a determination to reject a proposal.

11. RESTRICTIONS.

11.1 Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation, and for subsequent award.

12. PRICE.

12.1 Price analysis will be performed to determine fairness and reasonableness as well as to assure an understanding of the work and ability to execute the task order at the price proposed.

The evaluation will determine the extent to which the price proposal is realistic and consistent with the requirements of the RFP, to include limitations of the specified CCL, if any, reflect a clear understanding of the requirements, and are consistent with the information provided by the offeror.

Historical price information, competitive price information, the Independent Government Estimate (IGE), or any other pricing tool will be utilized as necessary in making this determination. Offerors are advised that any offer wherein pricing is deemed unbalanced or unreasonable, to include offers deemed to be unreasonably low, will be rendered ineligible for award. Additionally, all offers will be analyzed for unbalanced pricing.

Price will be evaluated and considered but will not be scored or combined with other aspects of the proposal evaluation.

The otherwise technically-acceptable, lowest-priced offeror may be required to confirm its price on either a, CLIN, element, or total price basis, and/or provide additional information in support of their price, prior to contract award at the Government’s request and discretion.

13. BASIS FOR AWARD.

13.1 Award will be made on the basis of the lowest evaluated price of technically acceptable proposals.

(End of Summary of Changes)

PN 69251

Amendment 0003

TECHNICAL SUMMARY OF CHANGES

A. TECHNICAL SPECIFICATION CHANGES: The revised and added Sections listed below (revised and added by Amendment No. 0003) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out.

Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1). The replaced Sections listed below (replaced by Amendment No. 000#) are hereby added to and made a part of the solicitation; such Sections are replaced in their entirety and changes are neither underlined nor struck out. Deleted Sections are also indicated below.

Revised Sections Added Section 01 11 00 27 10 00 01 30 00 01 33 00 05 50 13 06 10 00 07 81 00 11 67 23 21 30 05.16 26 51 00 28 31 76

B. CONTRACT DRAWINGS – File No. 179-10-04:

Volume 1:

Sheets GI104, CD101, CS101, CS501, CG101, CU101, CE101, CE102, CE103, CE701, CE702, ES102 and ES501 with Revision 0003 dated 06 February 2019 are hereby added to and made a part of the Contract Drawings.

Volume 2:

Sheets SB102, SB601, SF102, SF103, SF104, A-102, A-103, A-104, A-105, A-120, A-201, A- 202, A-302, A-303, A-304, A-401, A-402, A-403, A-404, A-408, A-409, A-410, A-602, FA001, FA101, FA601, FX001, FX101, FX102, FX103, FX104, FX501, and EP601 with Revision 0003 dated 06 February 2019 are hereby added to and made a part of the Contract Drawings.

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 83 13 LEAD IN CONSTRUCTION

DIVISION 03 - CONCRETE

03 15 00 CONCRETE ACCESSORIES

03 20 00 CONCRETE REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

03 39 00 CONCRETE CURING

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 19 00 WATER REPELLENTS

07 42 13 METAL WALL PANELS

07 46 46 FIBER-CEMENT SIDING

07 60 00 FLASHING AND SHEET METAL

07 81 00 SPRAY-APPLIED FIREPROOFING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 71 00 DOOR HARDWARE

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 24 23 CEMENT STUCCO

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 44 16 FIRE EXTINGUISHERS

DIVISION 11 - EQUIPMENT

11 67 23 SHOOTING RANGE EQUIPMENT

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 21 - FIRE SUPPRESSION

21 12 00 STANDPIPE SYSTEMS

21 13 18 PREACTION AND DELUGE SPRINKLER SYSTEMS, FIRE PROTECTION

21 30 05.16 FIRE PUMPS AND ENCLOSURES

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 48 VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 23 00 REFRIGERANT PIPING

23 82 02 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 05 48 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 28 01 COORDINATED POWER SYSTEM PROTECTION

26 41 00 LIGHTNING PROTECTION SYSTEM

26 42 14 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 *3 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 16 BASE COURSE FOR RIGID PAVING

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 17 HOT MIX BITUMINOUS PAVEMENT

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 92 19 SEEDING

32 92 23 SODDING

DIVISION 33 - UTILITIES

33 40 00 STORM DRAINAGE UTILITIES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

APPENDICES

APPENDIX A SECURITY PROCEDURES GUIDE

APPENDIX B ASBESTOS SURVEY

APPENDIX C GEOTECHNICAL REPORT

-- End of Project Table of Contents --

(Revised by Amendment 0003)

SOF REPLACE MAZE & TOWER BR69251

Ft . Br agg, NC

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 WORK COVERED BY CONTRACT DOCUMENTS

1. 1. 1 Pr oj ect Descr i pt i on

1. 1. 2 Locat i on

1. 2 OCCUPANCY OF PREMI SES

1. 3 EXI STI NG WORK

1. 4 LOCATI ON OF UNDERGROUND UTI LI TI ES

1. 4. 1 Not i f i cat i on Pr i or t o Excavat i on

PART 2 PRODUCTS

PART 3 EXECUTI ON

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 11 00 Page 1 ( Revi sed by Amendment 0003)

SECTI ON 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1. 1 WORK COVERED BY CONTRACT DOCUMENTS

1. 1. 1 Pr oj ect Descr i pt i on

The wor k i ncl udes const r uct i on of a 4- st or y, appr oxi mat el y 13, 000 gr oss squar e f oot ( GSF) , Li ve Fi r e Tower and Tr ai ni ng Maze, s i t ewor k t hat i ncl udes subgr ade i mpr ovement by t he i nst al l at i on of an aggr egat e pi er syst em, and i nci dent al r el at ed wor k.

1. 1. 2 Location

The wor k i s l ocat ed at For t Br agg, Nor t h Car ol i na, appr oxi mat el y as i ndi cat ed. The exact l ocat i on wi l l be shown by t he Cont r act i ng Of f i cer .

Access, gui dance, and est abl i shed pr ocedur es f or Secur i t y Oper at i ons Tr ai ni ng Faci l i t i es pr oj ect s shal l be as i ndi cat ed i n Appendi x A " Secur i t y Pr ocedur es Gui de" .

1. 2 OCCUPANCY OF PREMI SES

*3

Building (s) wi l l not be occupi ed dur i ng per f or mance of wor k under t hi s Contract.

Bef or e wor k i s st ar t ed, ar r ange wi t h t he Cont r act i ng Of f i cer a sequence of pr ocedur e, means of access, space f or st or age of mat er i al s and equi pment , and use of appr oaches, cor r i dor s, and st ai r ways.

1. 3 EXI STI NG WORK

I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:

a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.

b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.

1. 4 LOCATI ON OF UNDERGROUND UTI LI TI ES

Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on, and compl y wi t h I nst al l at i on r equi r ement s f or l ocat i ng and mar ki ng under gr ound ut i l i t i es.

Cont act l ocal ut i l i t y l ocat i ng ser vi ce a mi ni mum of 48 hour s pr i or t o excavat i ng, t o mar k ut i l i t i es, and wi t hi n suf f i c i ent t i me r equi r ed i f wor k occur s on a Monday or af t er a Hol i day. Ver i f y exi st i ng ut i l i t y l ocat i ons i ndi cat ed on cont r act dr awi ngs, wi t hi n ar ea of wor k.

I dent i f y and mar k al l ot her ut i l i t i es not managed and l ocat ed by t he l ocal ut i l i t y compani es. Scan t he const r uct i on s i t e wi t h Gr ound Penet r at i ng

SECTI ON 01 11 00 Page 2 ( Revi sed by Amendment 0003)

Radar ( GPR) , el ect r omagnet i c, or soni c equi pment , and mar k t he sur f ace of t he gr ound or paved sur f ace wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound or encased obst r uct i on not i ndi cat ed, or speci f i ed t o be r emoved, t hat i s i ndi cat ed or di scover ed dur i ng scanni ng, i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be conduct ed or i nst al l ed. Ver i f y el evat i ons bef or e i nst al l i ng new wor k c l oser t han near est manhol e or ot her st r uct ur e at whi ch an adj ust ment i n gr ade can be made.

1. 4. 1 Not i f i cat i on Pr i or t o Excavat i on

Not i f y t he Cont r act i ng Of f i cer at l east 15 days pr i or t o st ar t i ng excavat i on wor k.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

Not used.

- - End of Sect i on - -

SECTI ON 01 11 00 Page 3 ( Revi sed by Amendment 0003)

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 30 00

ADMI NI STRATI VE REQUI REMENTS

08/15

PART 1 GENERAL

1. 1 REFERENCES

1. 2 MI NI MUM I NSURANCE REQUI REMENTS

1. 3 SUPERVI SI ON

1. 3. 1 Mi ni mum Communi cat i on Requi r ement s

1. 3. 2 Super i nt endent Qual i f i cat i ons

1. 3. 2. 1 Dut i es

1. 3. 3 Non- Compl i ance Act i ons

1. 4 PRECONSTRUCTI ON CONFERENCE

1. 5 PARTNERI NG

1. 5. 1 I nf or mal Par t ner i ng

1. 6 ELECTRONI C MAI L ( E- MAI L) ADDRESS

PART 2 PRODUCTS

PART 3 EXECUTI ON

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 30 00 Page 1 ( Revi sed by Amendment 0003)

SECTI ON 01 30 00

ADMI NI STRATI VE REQUI REMENTS

08/15

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

1. 2 MI NI MUM I NSURANCE REQUI REMENTS

Pr ovi de t he mi ni mum i nsur ance cover age r equi r ed by FAR 28. 307- 2 Li abi l i t y , dur i ng t he ent i r e per i od of per f or mance under t hi s cont r act . Pr ovi de ot her i nsur ance cover age as r equi r ed by l aw.

1. 3 SUPERVISION

1. 3. 1 Mi ni mum Communi cat i on Requi r ement s

Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e at al l t i mes dur i ng t he per f or mance of cont r act wor k. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on skills.

1. 3. 2 Super i nt endent Qual i f i cat i ons *3

The pr oj ect super i nt endent must have a mi ni mum of 105 year s exper i ence i n construction wi t h at l east 5 of t hose year s as a super i nt endent on pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and const r uct i on dr awi ngs. The qual i f i cat i on r equi r ement s f or t he al t er nat e super i nt endent ar e t he same as f or t he pr oj ect super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he super i nt endent ' s qual i f i cat i ons at any poi nt i n t he pr oj ect i f t he per f or mance of t he super i nt endent i s i n quest i on.

1. 3. 2. 1 Duties

The pr oj ect super i nt endent i s pr i mar i l y r esponsi bl e f or managi ng and coor di nat i ng day- t o- day pr oduct i on and schedul e adher ence on t he pr oj ect .

The super i nt endent i s r equi r ed t o at t end par t ner i ng meet i ngs, and qual i t y cont r ol meet i ngs. The super i nt endent or qual i f i ed al t er nat i ve must be on- si t e at al l t i mes dur i ng t he per f or mance of t hi s cont r act unt i l t he wor k i s compl et ed and accept ed.

SECTI ON 01 30 00 Page 2 ( Revi sed by Amendment 0003)

1. 3. 3 Non- Compl i ance Act i ons

The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he cont r act and f or f ai l ur e t o manage t he pr oj ect t o ensur e t i mel y compl et i on. Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s i s accept abl e as t he subj ect of c l ai m f or ext ensi on of t i me f or excess cost s or damages by t he Cont r act or .

1. 4 PRECONSTRUCTION CONFERENCE

Af t er awar d of t he cont r act but pr i or t o commencement of any wor k at t he s i t e, meet wi t h t he Cont r act i ng Of f i cer t o di scuss and devel op a mut ual under st andi ng r el at i ve t o t he admi ni st r at i on of t he val ue engi neer i ng and saf et y pr ogr am, pr epar at i on of t he schedul e of pr i ces or ear ned val ue r epor t , shop dr awi ngs, and ot her submi t t al s, schedul i ng pr ogr ammi ng, pr osecut i on of t he wor k, and cl ear expect at i ons of t he " I nt er i m DD For m 1354" Submi t t al .

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.