Ft_Bragg_SOF_PRF_Specs_Vol_3of3_Amendment_0003_2018-01-18.pdf

PDF 29 MB Posted

Attached to
PN74813 SOF Parachute Rigging Facility, Fort Bragg NC Federal contract opportunity
Solicitation number
W912PM18R0001
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

SPECS Volume 3 of 3 amended changes

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. W912PM18R0001

Special Operations

Forces (SOF) Parachute

Rigging Facility

PN: 74813

Fort Bragg, North Carolina

Specifications – Volume 3 of 3 (FF&E and AV)

AMENDMENT:

Date of Issue: 18 Jan 2018

SOF Parachute Rigging Facility

Fort Bragg, NC PN #74813

THIS PAGE IS INTENTIONALLY LEFT BLANK

PROJECT TABLE OF CONTENTS

REQUEST FOR PROPOSAL

SOF PARACHUTE RIGGING FACILITY; PN 74813

FORT BRAGG, NORTH CAROLINA

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS (SEE VOLUME 1 OF 3)

BID SCHEDULES

SOLICITATION, OFFER, AND AWARD (TO BE PROVIDED BY USACE)

INSTRUCTIONS TO OFFERORS (TO BE PROVIDED BY USACE)

PROPOSAL REQUIREMENTS (TO BE PROVIDED BY USACE)

PROPOSAL EVALUATION CRITERIA (TO BE PROVIDED BY USACE)

THE DESIGN/BUILD PROCESS (TO BE PROVIDED BY USACE)

REPRESENTATIONS AND CERTIFICATIONS (TO BE PROVIDED BY USACE)

CONTRACT CLAUSES (TO BE PROVIDED BY USACE)

DIVISION 01 – GENERAL REQUIREMENTS (SEE VOLUME 1 OF 3)

01 11 00 SUMMARY OF WORK

01 11 01 STATEMENT OF WORK - GENERAL REQUIREMENTS

01 11 02 STATEMENT OF WORK - SITE, CIVIL, UTILITIES & LANDSCAPING

01 11 03 STATEMENT OF WORK - ARCHITECTURAL & INTERIOR DESIGN

SYSTEMS

01 11 04 STATEMENT OF WORK - STRUCTURAL SYSTEMS

01 11 05 STATEMENT OF WORK - MECHANICAL, PLUMBING

AND FIRE SUPPRESSION SYSTEMS

01 11 06 STATEMENT OF WORK - ELECTRICAL AND ELECTRONICS

01 11 07 STATEMENT OF WORK - SPECIAL EQUIPMENT

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 30 00 ATTACHMENT A PRELIMINARY DIVISION 01 SUBMITTAL REGISTER

01 30 00 ATTACHMENT B ENG FORM 4025-R SAMPLE

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD)

01 33 16.00 10 ATT A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS

01 33 16.00 10 ATT B FURNITURE, FIXTURES & EQUIPMENT (FF&E) REQUIREMENTS

01 33 16.00 10 ATT C TRACKING COMMENTS IN DRCHECKS

01 33 16.00 10 ATT D SAMPLE FIRE PROTECTION & LIFE SAFETY CODE REVIEW

01 33 16.00 10 ATT E ANALYSIS OF WINDOW UNIT STRUCTURAL SUPPORT

01 33 16.00 10 ATT F BIM REQUIREMENTS

01 33 16.00 10 ATT G DESIGN SUBMITTAL DIRECTORY & SUBDIRECTORY

FILE ARRANGEMENT

01 33 16.00 10 ATT H LEED SUBMITTALS

01 33 16.00 10 ATT I DQC SUBMITTAL MATRIX SUMMARY EXHIBIT I-A-1

01 33 16.00 10 ATT J 1-TOTAL DESIGN ANALYSIS

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.00 10 ATT A 1-QC CHECKLISTS PART 4 2016-03-18

01 45 00.00 10 ATT B 2010 QA CODE COMPLIANCE CHECKLIST – TELCOM

01 45 00.00 10 ATT C DQC - COST ESTIMATE CHECKLIST

01 45 00.00 10 ATT D DQC - DRAWINGS CHECKLIST

01 45 00.00 10 ATT E DQC - ENERGY ANALYSIS CHECKLIST

01 45 00.00 10 ATT F DQC – PREDESIGN CHECKLIST

01 45 00.00 10 ATT G DQC – SPECIFICATION PREP CHECKLIST

01 45 00.00 10 ATT H DQC – STRUCTURAL CHECKLIST

01 45 00.10 10 QUALITY C0NTROL SYSTEM (QCS)

01 45 35 SPECIAL INSPECTIONS

01 45 35 ATTACHMENT A STATEMENT OF SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 10 OPERATION AND MAINTENANCE FACILITY DATA REQUIREMENTS

01 91 00.15 TOTAL BUILDING COMMISSIONING

APPENDICES (SEE VOLUME 2 OF 3)

A PRELIMINARY SUBSURFACE EXPLORATION & GEOTECHNICAL ENGINEERING REPORT

B PARACHUTE LIFT SYSTEM SPECIFICATION

***Amendment 0003***

C ADDITIONAL WATER HYDRAULIC MODELING FOR PATRIOT POINT

***Amendment 0003***

D RECORD OF ENVIRONMENTAL CONSIDERATION

E FORT BRAGG TREE MITIGATION

F INSTALLATION BADGE REQUEST FORM

G FORT BRAGG SEEDING SPECIFICATIONS

G-1 SECTION 02921FB – EROSION CONTROL AND TURF SEEDING

G-2 SECTION 02936 – TURF-BERMUDA GRASS SEEDING (FOR FORT BRAGG AND POPE AFB)

H SUSTAINABILITY GUIDANCE

I UTILITY RATES

J FORT BRAGG IGI&S NON-DISCLOSURE STATEMENT/DATA SHARING AGREEMENT

FOR GIS DATA

K FORT BRAGG PLANT LIST

L USASNEC INSTALLATION DESIGN CRITERIA FOR FORT BRAGG SPECIFIC

COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS

M FORT BRAGG NEC LABELING SCHEME

N FORT BRAGG INTERIOR FINISH STANDARDS

O TELECOM ROOM REQUIREMENTS

P ENVIRONMENTAL PROTECTION PLAN

Q FORT BRAGG TRAFFIC CONTROL AND WORKZONE SAFETY POLICY

R BASIS OF DESIGN PRODUCT DATA SHEETS

S TELECOMMUNICATIONS INTERIOR INFRASTRUCTURE PLANNING & DESIGN

T ENERGY AND SUSTAINABILITY RECORD CARD TEMPLATE

U ELECTRICAL SERVICE LOAD CALCULATIONS

V SOLID WASTE AND RECYCLING REQUIREMENTS

W MATERIAL RECYCLE/DIVERSION/DISPOSAL REPORTING FORM

X PROBABILITY ASSESSMENT FOR THE FORMER ASP AT FORT BRAGG

Y FORT BRAGG TYPICAL SECTIONS

Z PIEDMONT NATURAL GAS (PNG) SPECIFICATION

AA GEOTHERMAL CONDUCTIVITY TEST

BB TRAFFIC ENGINEERING INSTALLATION DESIGN GUIDELINES

CC TOPOGRAPHIC SURVEY

DD USASOC IT TECHNICAL DESIGN GUIDE

***Amendment 0003***

EE PARACHUTIST OXYGEN EQUIPMENT STORAGE ROOM & OXYGEN MAINTENANCE

SAFE ROOM MEMORANDUM

***Amendment 0003***

FURNISHINGS, FIXTURES & EQUIPMENT AND AV PACKAGE (VOLUME 3 OF 3)

--END OF SECTION--

RFP No.

SOF PARACHUTE RIGGING

FACILITY

PN: 74813, FY17

Fort Bragg, North Carolina

Furniture, Fixtures &

Equipment (FF&E)

US Army Corps of Engineers Wilmington District

W912PM18R0001

Purchase Description Sheets..………………………………………………………………………………………………

Equipment and Furniture Plan……………………………………………………………………………………………...

Enlarged Equipment and Furniture Plan………………………………………………………………………………..

Equipment and Furniture Schedule……………………………………………………………………………………….

SOF Parachute Rigging Facility PN #74813 Fort Bragg, NC

Furniture, Fixtures & Equipment (FF&E) Package Table of Contents

PURCHASE DESCRIPTION SHEET

Job Name: Job Order Number: PN-74813

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Roll Plan Storage

Item Number: Finishes: DK-1

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Roll Plan Storage; 36 storage slots w/ lockable door

15.25” Width

38” Depth

15.25” Height

Finishes:

Qty: 1

Unit Cost:

$177.99 Price Total:

Steel

Delivery:

Installation:

Total:

Location: Mechanical Room 148

Prepared By:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Workstation, Admin

Item Number: Finishes: WS-1

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Consult workstation typical plan. 6’x6’ L-shaped workstation with general construction style of frame and tile systems furniture consisting overhead storage with glides, locking drawers and doors, two drawer pedestal, telecommunication wire management tray and keyboard tray. Power telecommunication devices shall not be hardwired to systems furniture.

Finishes:

Qty: 8

Unit Cost:

$9,254 Price Total:

Composite on Worksurface: TBD

Painted Metal Chassis, File Pedestal, drawers, Supports, connectors & trim:

TBD

Tackboard Fabric: Grade 3

Delivery:

Installation:

Total:

Location: 3rd MFF Office 107, 3rd Admin 116, 528th

Admin 123

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Workstation, Office

Item Number: Finishes: WS-2

Source:

Photo: Similar w/ Overhead Storage

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Consult workstation typical plan. 6’x8’ L-shaped workstation with general construction style of frame and tile systems furniture consisting overhead storage with glides, attached task lighting, locking drawers and doors, a freestanding two drawer pedestal on casters, storage tower, telecommunication wire management tray and keyboard tray. Power telecommunication devices shall not be hardwired to systems furniture.

Finishes:

Qty: 8

Unit Cost:

$16,175 Price Total:

Composite on Worksurface: TBD

Painted Metal Chassis, File Pedestal, drawers, Supports, connectors & trim:

TBD

Tackboard Fabric: Grade 3

Delivery:

Installation:

Total:

Location: Bldg. Manager Office 146, SWCS Office 129, 528th Office 124, 3rd Office 117

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Task Chair

Item Number: CH-1

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Office chair with standard tilt; adjustable arms in the vertical and horizontal direction; standard arm pads;

base with frame; carpet casters; star base; lumbar support; mesh fabric seat and back. Provide with lifetime warranty. Dimensions 41-45” H x 25.75-

28.25”W x 15.75-18.5” D

Finishes:

Qty: 18

Unit Cost:

$679 Price Total:

Color: TBD

Delivery:

Installation:

Total:

Location: Bldg. Manager 146, SWCS Office 129, 528th

Office 124, 528th Admin 123, 3rd Office 117, SWCS MFF

RFI 133

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Guest Chair

Item Number: CH-2

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Stackable visitor chair with casters, glides, mesh fabric seat and back. Provide with lifetime warranty.

Finishes:

Qty: 17

Unit Cost:

$549 Price Total:

Color: TBD

Delivery:

Installation:

Total:

Location: Bldg. Manager 146, 528th Office 124, 528th

Admin 123, 3rd Office 117, SWCS MFF RFI 133

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Stacking Classroom Chair

Item Number: CH-3

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Stacking chairs mesh bottom and back, no arm rest, base with casters.

Finishes:

Qty: 60

Unit Cost:

$271.15 Price Total:

Color: TBD

Delivery:

Installation:

Total:

Location: Classroom 143

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Industrial Chair

Item Number: CH-4

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Seat: 18.5” W x 18.5” D x 2” T

Back: 16.5” W x 15.5” H x 2” T

Base: 25” Dia., 6” H

Finishes:

Qty: 3

Unit Cost:

$219 Price Total:

Color: TBD

Delivery:

Installation:

Total:

Location: O2 Storage 112

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Locker Room Bench

Item Number: CH-5

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

NOT USED

Pedestal Bench made with HDPE plastic. Impervious to moisture. Custom width to fit space.

12”D x 18.5”H

Finishes:

Qty: 0

Unit Cost:

$219 Price Total:

Color: TBD

Delivery:

Installation:

Total:

Location: NOT USED

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Standard Packing Table

Item Number: TA-1

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Standard (Packing) Table (3’W x 8’L x 32”H) – Steel

Frame with solid wood surface. Includes plywood shelf with steel frame 12” above floor level. 2” x 3” steel handle bolted/welded to smaller frame ends of plywood shelf.

Finishes:

Qty: 150

Unit Cost:

$620 Price Total:

Delivery:

Installation:

Total:

Location:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Cafeteria Table

Item Number: TA-5

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Foldable Cafeteria Table, lockable casters. ADA

Compliant; 14-gauge steel; seats 8-12; Laminate finish;

0.75” tabletop Thickness

Width: 30 in.

Length: 96.5 in.

Weight: 250 lbs.

Finishes:

Qty: 6

Unit Cost:

$1065 Price Total:

Composite top: TBD

Painted Metal Supports: TBD

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Printer/Fax Table

Item Number: TA-6

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Rectangular table 60“W x 30"D x 30"H work table, folding, stackable, 4-leg, lockable casters, composite top to fit printer and fax.

Finishes:

Qty: 4

Unit Cost:

$654 Price Total:

Composite top: TBD

Painted Metal Supports: TBD

Delivery:

Installation:

Total:

Location:3RD Admin 116, 528th Admin 123, SWCS

Admin 128, SWCS MFF RFI 133

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Classroom Table

Item Number: TA-7

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Rectangular table 60"wx24"Dx30"H training table with tubular steel legs, blow-molded polyethylene top, modesty panel, lockable casters, grommet hole 1 each on either end with wire management tray, partial modesty panel, 18 gauge stainless steel.

Finishes:

Qty: 32

Unit Cost:

$844 Price Total:

Composite top: TBD

Painted Metal Supports: TBD

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Padded Table

Item Number: TA-11

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Padded Inspection Table to match TA-1

Padded Tables (3’W x 8’L x 32”H) – Table top is 3’ wide.

Base is constructed of steel with one side of 28”W x

28”D drawers . (2) 4”H drawers, (2) 6”H drawers, and

(1) 8” drawer at base. Shelf extending from legs into drawers to be 12” above floor level.

Finishes:

Qty: 30

Unit Cost:

$750 Price Total:

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Padded Table w/ Drawer

Item Number: TA-11A

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Padded Inspection Table to match TA-1

Padded Tables (3’W x 8’L x 32”H) – Table top is 3’ wide.

Base is constructed of steel with one side of 28”W x

28”D drawers . (2) 4”H drawers, (2) 6”H drawers, and

(1) 8” drawer at base. Shelf extending from legs into drawers to be 12” above floor level. 6” castors on legs.

Finishes:

Qty: 12

Unit Cost:

$750 Price Total:

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Tool Shelving/Open Shelving

Item Number: S-1

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Tool Shelving – Open sides industrial steel shelves; 4'W x 18"D x 84”H

Provide five shelves with 2,750 lb. capacity for each shelf. 14 gauge steel posts, 16 gauge steel shelves.

Finishes:

Qty: 31

Unit Cost:

$375 Price Total:

Delivery:

Installation:

Total:

Location: 528th Supply Storage 119, 3rd Supply Storage

115, O2 Stor. Room 112, 3rd Secure Area Storage 137, 528th Secure Area Storage 138

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Tool Storage

Item Number: S-3

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Tool Organized, Clear View, Steel Storage. 3’-0”W x 2’-

0”D x 60”H. Provide pegboard and doors with impact resistant acrylic windows. Doors fully open 270 degrees with 3-point locking system with pry resistant latching rod. 16 gauge steel pegboard with holes 1” on center with standard pegboard hooks.

Finishes:

Qty: 20

Unit Cost:

$475 Price Total:

Delivery:

Installation:

Total:

Location: O2 Storage 112, 3rd Supply Storage 115, 528th Supply Storage 119, 3rd Secure Area Storage 137, 528th Secure Area Storage 138

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Floor Bins

Item Number: S-4

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Floor Bin (55.5”W x 80.25”L x 58.75”H) – Steel construction, no castors, fold down sides, and split top hinged on two sides, stackable. All smooth surfaces to prevent snagging on inside of bin.

Finishes:

Qty: 66

Unit Cost:

$690 Price Total:

Delivery:

Installation:

Total:

Location: Maintenance 136, Unpacked Stor. SWCS 140, Unpacked Stor. 528th 141, Unpacked Stor. 3rd 142

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Bins Storage Racks

Item Number: S-7

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

5 row high storage system to accommodate 36”W x

32”H x 48”D bins. One section of S-7 storage systems is

8’-0” wide.

Finishes:

Qty: 48

Unit Cost:

$520 Price Total:

Delivery:

Installation:

Total:

Location: Common Equip. Battery Stor. 104A, 3rd

Storage 104B, SWCS Stor. 104C, 528th Stor. 104D

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina

Item Name: Metal Lockers w/ Wood

Bench

Item Number: S-8

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Metal Lockers w/ Wood Bench (12”W x 18”D x 60”H) – Single tier vented commercial quality galvanized metal lockers installed on a pre-built base with integral wood bench. Contractor to fabricate custom base. Top of wood bench shall be 17” – 19” above the finish floor. Lockers to have steel sheet doors, hinges, latching mechanisms, and latch strikes; padlock eye in the door latching mechanisms; coat hooks, metal shelf, door handle, and silencers.

Provide sloping top in addition to the locker-section flat tops, continuous in length. Provide baked enamel finish. Provide aluminum number plates, with lockers numbered consecutively.

Wood bench shall be durable hardwood on aluminum or painted steel pedestal or frames; size of bench shall be 12”W by length of locker aisles. Refer to plans for locker locations.

Finishes:

Qty: 115

Unit Cost:

$230 Price Total:

Delivery:

Installation:

Total:

Location: Women’s RR/Locker, Men’s RR/Locker, Maintenance Room 147

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Open Shelving

Item Number: S-9

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Open shelving for Battery Charging (small units) 2' x 2'

Finishes:

Qty: 16

Unit Cost:

$553 Price Total:

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Rolling Shelf System

Item Number: S-11

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Rolling Storage

High Density Parachute Steel Storage; 5’-0”W x 5’-0”D x

7’-0”H. Industrial type all sides open double loaded. 3-steel shelves capacity 1500 lbs each. Steel rails embedded in concrete. Triple arm operating mechanical assist controls. Drive system shall be designed to provide a movement of up to 4,000 lbs of load with only 1 lb. All shall be rounded and exposed edges shall be deburred to prevent snagging and puncturing of stored materials. Made from nonreactive fabrication material.

Finishes:

Qty: 1

Unit Cost:

$20,000 Price Total:

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Vertical Parachute Storage

Item Number: S-12

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Vertical Parachute Storage Board

10’W x 80”H. Steel peg board with cantilever arms, adjustable vertically and horizontally (6” increments) to accommodate different size bags. Made from nonreactive fabrication material. All corners rounded and exposed edges deburred to prevent snagging and puncturing of stored materials.

Finishes:

Qty: 4

Unit Cost:

$400 Price Total:

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Oxygen Storage

Item Number: S-13

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

20 Cylinder Storage Locker Cage; vertical; weather resistant aluminum; padlock optional

60”W x 32”D x 65”H

Finishes:

Qty: 3

Unit Cost:

$1,517 Price Total:

Painted Metal: Color to match desks

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Oxygen Storage

Item Number: S-14

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Oxygen Storage 4'w x 2'd x 73”H steel shelving w/ 9 shelves.

Provide shelving w/ 14 gauge steel uprights, closed side and back panels. Shelves shall be 20 gauge and have a 550 lb capacity. Shelves shall have the ability to adjust vertically on 1” centers. Provide shelving with 6” height between shelves.

Structure shall be sized based on the units K-bottle requirements. Cylinder or container restraint shall meet NFPA section 4-3.5.2.1(b)27 requirements. The structure shall provide the following protection for cylinders:

• Cylinders will be stored in a well-ventilated area away from flames, sparks, or any source of heat or ignition.

• Cylinders may be stored outdoors but should be protected from the ground to prevent bottom corrosion. Where extreme temperatures prevail, cylinders will be stored so they are protected from the direct rays of the sun. Keep cylinders away from electrical circuits i.e. electrical motors like what a compressors uses.

• Cylinders will not be exposed to continuous dampness, stored near salt or other corrosive chemicals or fumes.

• Cylinders will not be exposed to an open flame or to any temperature above one-hundred-twenty-five (125) degrees F.

Finishes:

Qty: 4

Unit Cost:

$950 Price Total:

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Rolling Storage

Item Number: S-15

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Rolling Storage

Provide 5 cabinets on steel rails ; cabinet size 5’W x 2’D x 5’H. Provide high density steel rolling bottle storage, one side load. Provide 8 steel shelves with a capacity of

550 lbs each.

Steel rails embedded in concrete. Triple arm operating mechanical assist controls. All corners rounded and exposed edges deburred to prevent snagging and puncturing of stored materials. Made from nonreactive fabrication material.

Finishes:

Qty: 6

Unit Cost:

$25,000 Price Total:

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Heavy-Duty Storage Bins

Item Number: S-16

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Heavy duty container for bulk packaging; suitable for standard racking systems; high-density polyethylene material; integral skids (monolithic pallet base); dry smooth walls to prevent snagging of material;

stackable; lockable lid. Container size: 1200mmL x 800mmW x 805mmH. Containers shall be compatible with the Automated Storage and

Retrieval System (ASRS) and associated shelving.

Coordinate final requirements with User during the

Design Phase.

Finishes:

Qty: 1,170 Unit Cost: $ Price Total:

Delivery:

Installation:

Total:

Location: Common Equip. Battery Stor. 104A, 3rd

Storage 104B, SWCS Storage 104C, 528th Storage 104D, 528th RFI 120, 3rd RFI 114, SWCS RFI 134

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: 3-Drawer Lateral File

Item Number: S-18

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Three High Lateral File 39"H x 30"W x 18"D with drawer locks

Finishes:

Qty: 10

Unit Cost:

$489 Price Total:

Painted Metal: Color to match desks

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Fabric Storage

Item Number: S-19

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Fabric Storage 8’W x 2’D x 75.5”H

“A” frame manual feeder. Holding three rolls on side.

With each bar able to hold up to 250 lbs. It accommodates 8’-0” wide materials.

Finishes:

Qty: 4

Unit Cost:

$950 Price Total:

Delivery:

Installation:

Total:

Location: 528th Secure Area Stor. 138, 3rd Secure Area

Stor. 137

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Storage Open Shelves

Item Number: S-20

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Open Shelving Storage

4’-0”W x 2’-0”D x 6’-0”H Steel Storage. Industrial type w/ open sides. Provide 5 shelves with a capacity of

2,750 lbs./shelf, 14 gauge steel posts, 16 gauge steel shelves.

Finishes:

Qty: 12

Unit Cost:

$315 Price Total:

Delivery:

Installation:

Total:

Location: 3rd Supply Stor 115, 528th Supply Stor. 119

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Tread Roll Storage

Item Number: S-21

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Thread Roll Storage (non-automated)

36”W x 24”D x 84”H

Steel reel rack w/ (6) levels that adjust on 1 ½” centers and can hold up to 3 axles each. Provide (3) ½” diameter axles and (3) ¾” diameter axles for longer reels.

Secure to wall or floor for maximum stability.

½” diameter axle holds 45 lbs (max.). ¾” diameter axle holds 90 lbs (max.)

Finishes:

Qty: 3

Unit Cost:

$800 Price Total:

Delivery:

Installation:

Total:

Location: 3rd Area Secure Stor 137, 528th Secure Area

Stor. 138, SWCS Secure Area Stor. 139

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Lockers

Item Number: S-22

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Cell Phone Storage Locker with Front Access Panel; 4

Door High Unit (8 Inch Deep Compartments); 12 A

Doors (11 Usable doors); Surface Mounted; Resettable

Combination Locks (key override)

24" W x 25.5" H x 9.25" D

Finishes:

Qty: 31

Unit Cost:

$505.00 Price Total:

Color: TBD

Delivery:

Installation:

Total:

Location: Corridor 101A, Corridor 101B, Packing Area

106, Packing Area 118, Packing Area 127.

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Work Bench

Item Number: WB-2

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Work Bench w/ Solid Top and Tool Drawers

42”W x 18.75”D x 38”H (5) drawer alloy steel roller cabinet with ¾” moisture and warp resistant hard wood top. (3) drawers 37-3/8”W x 3 7/8”H x 16 ¼”D (single compartment). (2) drawers 37 3/8”W x 6 1/8”H x 16

¼”D (single compartment). Total storage capacity of

10,471 cubic inches. Provide heavy duty casters 5” x 2”

(2 fixed, 2 swivel w/ toe locks). Provide keyed locking system for lockable drawers, ball bearing drawer slide, and scratch resistant powder coat paint finish.

50 lb drawer weight capacity

Finishes:

Qty: 17

Unit Cost:

$1456.20 Price Total:

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Wall Clock

Item Number: A-1

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Battery operated wall clock. 12 hour analog

Finishes:

Qty: 11

Unit Cost:

$15 Price Total:

White face trim to complement other office furniture

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Trash Container, 14-qt

Item Number: A-2

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Black Soft Molded Plastic Leak Resistant Wastebasket

14 Quart.

Finishes:

Qty: 21

Unit Cost:

$25 Price Total:

Black plastic

Delivery:

Installation:

Total:

Location: (2) 3RD MFF Office 107, (3) 3rd Admin 116, (3)

3rd Office 117, (3) 528th Admin 123, (3) 528th Office

124, (3) SWCS Admin #128, (2) SWCS Office 129, (1)

SWCS MFF RFI 133, (1) Building Manager Office 146

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Trash Container, 55-gal

Item Number: A-3

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Heavy-duty plastic construction, dent-, bending- and cracking-resistant; molded-in handles for easy lifting, leak resistant.

Finishes:

Qty: 9

Unit Cost:

$69 Price Total:

Capacity: 55 gallon, 33”Hx26”D

Color: TBD

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Recycling Container, 14-qt

Item Number: A-4

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Desk side leak resistant recycling container, Plastic 14

Quart.

Finishes:

Qty:

Unit Cost:

$25 Price Total:

Blue plastic with Recycling Symbol

Delivery:

Installation:

Total:

Location: (2) 3RD MFF Office 107, (3) 3rd Admin 116, (3)

3rd Office 117, (3) 528th Admin 123, (3) 528th Office

124, (3) SWCS Admin #128, (2) SWCS Office 129, (1)

SWCS MFF RFI 133, (1) Building Manager Office 146

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Recycling Container, 55-gal

Item Number: A-5

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Bulk leak resistant recycling container heavy duty plastic can with wheels, and slot in, hinged, lockable lid;

50 gallon.

Finishes:

Qty: 2

Unit Cost:

$109 Price Total:

Color: Blue

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Tack Board

Item Number: A-6

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Large Tack Board

Finishes:

Qty: 13

Unit Cost:

$45 Price Total:

Delivery:

Installation:

Total:

Location: SWCS Packing, 528th Packing, and 3rd

Packing, Women’s/Men’s Restrooms, Maintenance

Room

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Mobile Board

Item Number: A-7

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Mobile Dry Erase Board

Finishes:

Qty: 12

Unit Cost:

$182 Price Total:

Delivery:

Installation:

Total:

Location: Location: SWCS Packing, 528th Packing, and

3rd Packing, 3RD Admin, Building manager office, Classroom

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Restroom Trash Receptacle

Item Number: A-10

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Waste receptacle is a freestanding garbage can. The lid opens by depressing the foot pedal. A plastic pail with a wire bail is included. This item is stainless steel with a satin finish.

Finishes:

Qty: 6

Unit Cost:

$29.19 Price Total:

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina

Item Name: Locker Room Waste

Receptacle

Item Number: A-11

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Waste Receptacle is a freestanding trashcan that makes an attractive, yet functional addition to any commercial restroom.

The receptacle holds 13 gallons of waste and is outfitted with a top that bears a hinged door and conceals the waste within the unit.

At the bottom of the receptacle, four rubber supports are positioned with one located near each of the unit's corners. These supports provide stability and keep the unit from rocking, sliding and easily tipping over. Vinyl edges are positioned on both the upper and lower edges of the unit all the way around the perimeter to protect the waste receptacle from dents and bumps.

The upper vinyl edge also prevents injuries when the receptacle is being used or serviced. The exposed surfaces of the receptacle bear a No. 4 satin finish. This unit also has hooks for liners.

Finishes:

Qty: 2

Unit Cost:

$197.19 Price Total:

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Anti-Fatigue Mat

Item Number: A-12

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Provide anti-fatigue mats intended for heavy-use areas; sponge base PVC loaded with nitrile rubber; all edges shall have a safety bevel; diamond plated surface; resistant to abrasion/chemical spills; color: black with yellow borders for safety awareness;

minimum of 50% recycled content; size: 9/16” Thickness – 4’W by length to match table aisles

Finishes:

Qty: 39 Unit Cost: $ Price Total:

Delivery:

Installation:

Total:

Location:

Maintenance 136, SWCS Packing 127, 528th Packing

118, 3rd Packing 106

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Portable Eye Wash Station

Item Number: A-13

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Gravity Fed Freeze Resistant 16 Gallon Eyewash; Portable; Plug-in

Type.

Finishes:

Qty: 1

Unit Cost:

$1.549.00 Price Total:

Delivery:

Installation:

Total:

Location: Common Equipment Battery Storage Area

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: AED Device

Item Number: A-14

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Defibrillator w/ alarmed AED cabinet

Finishes:

Qty: 1

Unit Cost:

$1.559.00 Price Total:

Delivery:

Installation:

Total:

Location: Corridor 101A

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Fire Extinguisher

Item Number: A-15

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Fire Extinguisher (Bottles Only).

Fire extinguisher cabinets and wall brackets to be MILCON funded.

Class A: Wood, Paper, cloth, trash, plastics (solids that are not metals).

Class B: Flammable Liquids-Gasoline, oil, grease, acetone (includes flammable gases).

Class C: Electrical: Energized electrical equipment (anything that is plugged in).

Finishes:

Qty: 22

Unit Cost:

$91.00 Price Total:

Delivery:

Installation:

Total:

Location: In accordance with Life Safety.

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Coffee Maker

Item Number: E-1

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Professional coffee maker with pour over, one brewing plate, one warmer plate, and two pots.

Finishes:

Qty: 1

Unit Cost:

$415 Price Total:

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Ice Maker and Storage Bin

Item Number: E-2

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Ice machine and storage bin combo unit; 30”W x

34”Dx73”H; air-cooled condenser; filter line kit;

exterior grade stainless steel; 562-lbs of ice yield per day; Energy Star rated.

Finishes:

Qty: 1

Unit Cost:

$2742 Price Total:

Note: Select unit intended for use outdoors.

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Refrigerator/Freezer

Item Number: E-4

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Full size refrigerator with out ice maker. Energy Star refrigerator with freezer upfront temperature controls, two leveling glides, two rollers.

Finishes:

Qty: 3

Unit Cost:

$1399.99 Price Total:

Color: TBD

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Microwave Oven

Item Number: E-5

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Countertop microwave oven 2.0 cu.ft. 24-hour time display, microwave oven rotating plate, commercial grade, heavy duty.

Finishes:

Qty: 3

Unit Cost:

$285 Price Total:

Color: TBD

Delivery:

Installation:

Total:

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Key Cabinet

Item Number: E-13

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

Finishes:

Qty: 1

Unit Cost:

$84 Price Total:

Delivery:

Installation:

Total:

Location: Bldg. Manager 146

SOF Parachute Rigging Facility Date:

Fort Bragg-North Carolina Item Name: Compressor

Item Number: E-14

Source:

Photo: Similar

POC:

Telephone:

GSA Contract Number:

FSC Group:

Model#:

Item Description:

GFGI.

Finishes:

Qty: 1 Unit Cost: Price Total:

Delivery:

Installation:

Total:

S-38

S-21

WB-2

TA-11

TA-1

TA-4

S-4

DK-1

S-32

S-29

S-31

S-29

A-9

TA-1 TA-1

TA-1

S-4

S-7

S-10

S-9

E-9

S-1

WB-2

S-20

S-3

S-11

S-12

S-14

S-13

S-1

E-10

S-3

WB-2

S-15

S-1WB-2

S-20

S-1

S-3

S-21

S-19

WB-2

S-1

S-3

S-21

S-19

WB-4

A-6 A-7

A-6 A-7

A-6

S-48

S-48

S-48

E-14

DK-3 E-17

S-33

CH-1

S-29

S-41

S-27

S-40

S-38

S-43

S-46

S-47

S-30

S-26

CH-4

S-1

TA-10

S-28

E-20 S-42

TA-6

S-3

A-3

A-3

A-3 A-3 A-3

S-7S-7

A-3

S-15

S-22S-22

A-7

A-6

A-6

A-7

A-6

S-8

S-22 S-22S-22

S-22

391'-4"

F E

F E

F E

F E

MECHANICAL

BREAK

ROOM

BLDG MGR

OFFICE

CORRIDOR

A

101A

MEN'S

RR/LOCKER RM

WOMEN'S

RR/LOCKER RM

ELEC.

TELECOMMUNICATIONS

ROOM

3RD MFF

OFFICE

3RD

MFF RFI

UNISEX

LATRINE

108,109

JANITOR

CLOSET

3RD MFF

PACKING

AREA

106B

O2 SAFE

ROOM

O2

STORAGE

3RD

PACKING

3RD RFI

528TH RFI

528TH

PACKING

528TH

ADMIN

528TH

OFFICE

UNISEX

LATRINE

121,2

UNISEX

LATRINE

131,2

SWCS

OFFICE

SWCS

ADMIN

SWCS

PACKING

SWCS

RFI

CLASSROOM

3RD

SECURE

AREA STOR.

MECHANICAL

ELECTRICAL

SWCS

SECURE

AREA STOR.

528TH

SECURE

AREA STOR.

MAINTENANCE

ELEC.

UNISEX

LATRINE

WASH BINS

UNPACKED

STORAGE

SWCS

UNPACKED

STORAGE

528TH

UNPACKED

STORAGE

3RD

COMMON

EQUIP.

BATTERY

STORAGE

104A

3RD

STORAGE

104B

SWCS

STORAGE

104C

JANITOR

CLOSET

528TH

STORAGE

104D

JAN.

CLST.

UNISEX

LATRINE

(3)CUBICLE

AREA

136A

ESS TR

SWCS MFF

PACKING

AREA

127B

SWCS

MFF RFI

FIRE

PUMP

SWCS

SUPPLY

STORAGE

CORRIDOR

101B

528TH

SUPPLY

STORAGE

3RD

SUPPLY

STORAGE

55'-7"

PARACHUTE

DRYING

TOWER

3RD

ADMIN

3RD

OFFICE

W1 W1

TELECOMMUNICATIONS

ROOM

FE

F E

FE FEFEFE

FE

FE

FE

FE

FEFE

F E

F E

F E

F E

FE

F E

FE

A E

D

A-12 A-12 A-12

A-12 A-12 A-12

E-26

TA-11A

TA-11

TA-11

TA-11A

TA-11

TA-11A

E-11

TA-3

A-12A-12

A-7

A-6

TA-3

TA-11

A-7

A-6

TA-3

TA-11

TA-1 A-12

TA-1

TA-4

TA-4

TA-3

A-2

A N

S I D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E

D A

T E

J A

N

T B

D

SHEET ID

***AMENDMENT 0003***

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

US Army Corps of Engineers

C A

T E

G O

R Y

C O

D E

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D E

S C

R

IP

T

IO

N

M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

IL

T :3

.6

.7 w w w .e x p fe d e ra l.

c o m p ro j n o

-A

D A

R L

IN

G

T O

N A

V E

N U

E

W

IL

M

IN

G T

O N

N

O R

T H

C A

R O

L

IN

A W

P

M

R

-8

-0

F O

R T

B R

A G

G

N O

R T

H C

A R

O L

IN

A D

E V

E L

O P

R E

Q U

E S

T F

O R

P R

O P

O S

A L F

O R

P N

S O

F P

A R

A C

H U

T E

R

IG

G

IN

G F

A C

IL

IT

Y

/1

/2

A M

E N

D M

E N

T

IN101

IN

T

E R

IO

R

D E

S

IG

N

E U

IP

M

E N

T A

N D

F U

R N

IT

U

R E

P L A

N

A K

A K

P Z

K S

B V

Q

IN

.D

G N

IN102

IN102

IN102

32'8'0 16'SCALE 1/16" = 1' - 0"

EQUIPMENT AND FURNITURE PLAN

N

EXISTING FURNITURE & EQUIPMENT TO BE

REUSED AND RELOCATED. REFER TO

SHEETS IN603 & IN604

LOCATION OF PADDED CARPET AREA

LOCATION OF ANTI-FATIGUE PADDING

PADDED WORK TABLES ON CASTORS

PADDED WORK TABLES (STANDARD)

PROVIDE FIRE EXTINGUISHER (FE) BOTTLES

UNDER THE FF&E PACKAGE OPTIONAL BID

ITEM. FE CABINETS AND BRACKETS SHALL

BE PROVIDED AS PART OF THE BASE BID.

REFER TO SHEET GI101 FOR FE LOCATIONS.

SEWING MACHINES ARE TO BE GFGI.

GENERAL NOTE:

1.

LOCATION OF PADDED CARPET AREA.

PROVIDE AED DEVICE AS PART OF THE FF&E

PACKAGE. ELECTRICAL ROUGH-IN FOR THE AED

DEVICE SHALL BE PROVIDED AS PART OF THE

BASE BID.

LOCATION OF VENDING MACHINE, GFGI.

LOCATION OF AUTOMATED STORAGE AND

RETRIEVAL SYSTEM (ASRS) AND ASSOCIATED

SHELVING.

PROVIDE HEAVY-DUTY STORAGE CONTAINERS

(S-16) AT ALL SHELVING LOCATIONS. CONTAINERS

SHALL BE COMPATIBLE WITH THE ASRS SYSTEM.

KEY NOTES

1 1

LEGEND

2.

5 5 5

F E

A

143A

143B

144B

101A

152C

B

A

A E

D

E-8 E-8

E-5 E-7

E-4

CH-2

CH-1

S-28

CH-3

TA-7

TA-7

TA-5

A-3A-3

A-5

S-8

S-8

S-8

S-8

A-3

E-3

BREAK

ROOM

BLDG MGR

OFFICE

CORRIDOR

A

101A

MEN'S

RR/LOCKER

ROOM

WOMEN'S

RR/LOCKER

ROOM

CLASSROOM

JAN.

CLST.

S-22

A-6

A-6

A-6

A-6

WS-2

E-12

E-13

CH-3

TA-7

CH-3

TA-7

CH-3

TA-7

CH-3

TA-7

CH-3

TA-7

A-8 A-7

A-7

A-11

A-5

A-2

A-7

E-27

E-24

E-25

B

A

B 140B

B

126 125

FE

FEFE

S-24

DK-3

CH-6

CH-2

TA-6

S-23

DK-4

CH-1

CH-1

WS-2

CH-1

WS-2

S-18

CH-2

CH-2

WS-2

CH-1

WS-2

CH-1

S-18

WS-1

CH-1

S-18CH-6

DK-2

CH-1

WS-1

CH-2

TA-6

CH-6

DK-3

528TH

PACKING

528TH

ADMIN

528TH

OFFICE

LATRINE

121,2

LATRINE

131,2

SWCS

OFFICE

SWCS

ADMIN

CS

ING

CORRIDOR

101B

JANITOR

CLOSET

CSS

S-23 S-25

S-27

CH-5

E-21

E-18

E-19

E-17

S-41

MB-1

A-7

A-7

WS-1

CH-1

S-23

CH-7

DK-5

TELECOMMUNICATIONS

ROOM

A-10

A-2

A-2

A-2

A-2 A-2

A-2

A-2

A-2

MB-1

F E

106B

117116

A

B

FE

112A

CH-1

WS-2

CH-2

S-18

CH-2

CH-2

WS-2

CH-1S-18

S-18

CH-1

WS-1

CH-2

TELECOMMUNICATIONS ROOM

3RD MFF

OFFICE

3RD

MFF RFI

LATRINE

108,109

JANITOR

CLOSET

3RD

ADMIN

3RD

OFFICE

3RD SUPPLY STORAGE

A-2

A-2

A-2

A-10

WS-2

CH-1

A-2

S-18

TA-6CH-2

A-2

WS-1

WS-1

CH-1 CH-1

S-18

A-7

A N

S I D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E

D A

T E

J A

N

T B

D

SHEET ID

***AMENDMENT 0003***

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

US Army Corps of Engineers

C A

T E

G O

R Y

C O

D E

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D E

S C

R

IP

T

IO

N

M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

T :3

.6

.7 w w w .e x p fe d e ra l.

c o m p ro j n o

-A

D A

R L

IN

G

T O

N A

V E

N U

E

W

IL

M

IN

G T

O N

N

O R

T H

C A

R O

L

IN

A W

P

M

R

-8

-0

F O

R T

B R

A G

G

N O

R T

H C

A R

O L

IN

A D

E V

E L

O P

R E

Q U

E S

T F

O R

P R

O P

O S

A L F

O R

P N

S O

F P

A R

A C

H U

T E

R

IG

G

IN

G F

A C

IL

IT

Y

/1

/2

A M

E N

D M

E N

T

IN102

IN

T

E R

IO

R

D E

S

IG

N

E N

L A

R G

E D

E Q

U

IP

M E

N T

A N

D F

U R

N

IT

U R

E P

L A

N

J

D E

S

IG

N E

R

J

D R

A W

N E

R

J

C H

E C

K E

R

J

S U

B M

IT

T

E R

B V

Q

IN

.D

G N true north

PROJECT NORTH

EXISTING FURNITURE & EQUIPMENT TO BE

REUSED AND RELOCATED. REFER TO

SHEETS IN603 & IN604.

LOCATION OF PADDED CARPET AREA.

16'0 4' 8'SCALE 1/8" = 1' - 0"

ENLARGED EQUIPMENT LAYOUT PLAN

16'0 4' 8'SCALE 1/8" = 1' - 0"

ENLARGED EQUIPMENT LAYOUT PLAN

16'0 4' 8'SCALE 1/8" = 1' - 0"

ENLARGED EQUIPMENT LAYOUT PLAN

EXACT LOCATION TO BE DETERMINED BY DOR.

KEY NOTES

LEGEND

A N

S I D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E

D A

T E

J A

N

T B

D

SHEET ID

***AMENDMENT 0003***

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

US Army Corps of Engineers

C A

T E

G O

R Y

C O

D E

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D E

S C

R

IP

T

IO

N

M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

T :3

.6

.7 w w w .e x p fe d e ra l.

c o m p ro j n o

-A

D A

R L

IN

G

T O

N A

V E

N U

E

W

IL

M

IN

G T

O N

N

O R

T H

C A

R O

L

IN

A W

P

M

R

-8

-0

F O

R T

B R

A G

G

N O

R T

H C

A R

O L

IN

A D

E V

E L

O P

R E

Q U

E S

T F

O R

P R

O P

O S

A L F

O R

P N

S O

F P

A R

A C

H U

T E

R

IG

G

IN

G F

A C

IL

IT

Y

/1

/2

A M

E N

D M

E N

T

IN601

IN

T

E R

IO

R

D E

S

IG

N

N E

W E

Q U

IM

E

N T

A N

D F

U R

N

IT

U R

E S

C H

E D

U L E

I

A K

A K

P Z

K S

B V

Q

IN

.D

G N

FURNITURE, FIXTURES, AND EQUIPMENT

ITEM # ITEM NAME QTY.

CORRIDOR A

#101A

CORRIDOR

#101B

MEN'S

RR/LOCKER

RM#101

WOMEN'S

RR/LOCKER

RM #102

JAN.

CLST.

#103

SWCS

EQUIP.

BATTERY

STORAGE

#104A

STORAGE

#104B

STORAGE

#104C

STORAGE

#104D

TELECOM

MUNICATI

ONS RM

#105

PACKING

AREA #106

3RD MFF

PACKING

AREA #106B

3rd MFF

OFFICE

#107

LATRINE

#108

LATRINE

#109

JAN.

CLST.

#110

3rd

MFF

RFI

#111

O2

STORAGE

#112

O2

SAFE

ROOM

#113

3rd

RFI

#114

3rd

SUPPLY

STOR.

#115

3rd

ADMIN

#116

3rd

OFFICE

#117

528th

PACKING

#118

528th

SUPPLY

STORAGE#119

528th

RFI

#120

WORKSTATIONS

WS-1 WORKSTATION, ADMIN 8 2 3

WS-2 WORKSTATION, OFFICE 8 3

CHAIRS

CH-1 CHAIR, TASK 18 2 3 3

CH-2 CHAIR, GUEST 17 2 1 6

CH-3 CHAIR, STACKING 60

CH-4 CHAIR, INDUSTRIAL 3 3 0

TABLES

TA-1 INSPECTION TABLE 8' X 3' 150 30 35

TA-2 NOT IN USE 0

TA-3 SEWING MACHINE TABLE 4' X 2' 0

TA-4 SEWING MACHINE TABLE 6' X 2'-6" 0

TA-5 CAFETERIA TABLE, BREAK ROOM 6

TA-6 TABLE, PRINTER/FAX 4 1

TA-7 TABLE, CLASSROOM W/ PANEL 5' X 2' 32

TA-11 PADDED TABLE 30 6 7

TA-11A PADDED TABLE W/ DRAWER 12 4 4

STORAGE

DK-1 ROLL PLAN STORAGE 38"D x 15 1/4"W 1

S-1 TOOL SHELVING-OPEN SHELVES 4'W X 1'-6"D X 7'H 31 1 6 14

S-2 NOT IN USE 0

S-3 TOOLS ORGANIZED STORAGE 5'H X 2'D X 3'W 20 1 0 5 5

S-4 FLOOR BINS 55.5"W X 80.25"L X 58.75"H 66

S-5 NOT IN USE 0 0 0 0 0

S-6 NOT IN USE 0

S-7 STORAGE RACKS TO ACCOMMODATE (10) BINS 48 7 17 12 12

S-8 LOCKERS, ONE-TIER 115 82 32

S-9 OPEN SHELVING FOR BATTERY CHARGING (SMALL UNITS) 2' X 2' 16 16

S-10

STORAGE FOR DIAGNOSTIC CHARGING 4'W X 2'D X 6'H (POWER

INSTALLED AT FRONT OF THE UNIT) EACH UNIT ACCOMMODATE FOR 6

(GFGI) 18 18

S-11 ROLLING SHELF SYSTEM 1 1

S-12 VERTICAL PARACHUTE STORAGE BOARD 4 4

S-13

OXYGEN CYLINDER STORAGE (8'W X 3'D) CAPACITY 20 VERTICAL

CYLINDERS 3

S-14 OXYGEN STORAGE 4'W X 2'D X 73"H 4 4

S-15 ROLLING STORAGE 5'W X 2'D X 5'H 6 5 1

S-16 HEAVY-DUTY STORAGE BINS 1170 70 170 120 120 230 230

S-18 FILE, 3-DRAWER LATERAL (39"H X 30"W X 18"D) 10 2 2 2

S-19 FABRIC STORAGE 8'W X 2'D X 75.5"H 4

S-20 STORAGE OPEN SHELVES 4'W X 2'D X 6'H 12 8 4

S-21 THREAD ROLL STORAGE 3

S-22 CELL PHONE LOCKERS 31 16 12 1 1

S-48 PARACHUTE SHAKEOUT (BASE BID ITEM, NOT FF&E) 8 3

WORK BENCHES

WB-1 WORK BENCH- SOLID TOP AND TOOL DRAWERS W TASK LIGHT - 30" H 0 0

WB-2 WORK BENCH- SOLID TOP AND TOOL DRAWERS- 38" H 17 3 2 4

ACCESSORIES

A-1 CLOCK, WALL 11 1 1 1 1

A-2 CONTAINER, 14 QUART TRASH 21 2 3 3

A-3 CONTAINER, 55 GAL TRASH 9 2 2

A-4 CONTAINER, 14 QUART RECYCLING 21 2 3 3

A-5 55-GAL RECYCLING CONTAINER, ROLLING 2

A-6 TACK BOARD 13 1 1 2 2

A-7 MARKER BOARD 12 1 1 1

A-8 LECTURN (AV OPTIONAL BID ITEM) 1

A-10 RESTROOM TRASH RECEPTACLE 6 1 1

A-11 LOCKER ROOM WASTE RECEPTACLE 2 1 1

A-12 ANTI-FATIGUE MATTING 39 9 10

A-13 PORTABLE EYE WASH STATION 1

A-14 AED DEVICE 1 1

A-15 FIRE EXTINGUISHER 22 1 5 1 1 1 1 2

EQUIPMENT

E-1 COFFEE MAKER 1

E-2 ICE MAKER AND STORAGE BIN 1

E-4 REFRIGERATOR/FREEZER, FULL SIZE 3

E-5 MICROWAVE OVEN 3

E-7 VENDING MACHINE (GFGI) 5

E-8 MONITORS (60" DIAG.) (AV OPTIONAL BID ITEM) 2

E-9 FORKLIFT BATTERY CHARGING STATION (GFGI) 3 3

E-10 02 TRANSFER PUMP 4' x 3' (BASE BID ITEM, NOT FF&E) 1 1

E-11 PALLET JACKS (GFGI) 3

E-12 ENROLLMENT STATION (ESS OPTIONAL BID ITEM) 1

E-13 KEY CABINET 1

E-14 COMPRESSOR (GFGI) 1 1 1

E-24 A-V SPEAKERS (AV OPTIONAL BID ITEM) 1

E-25 A-V RACK (AV OPTIONAL BID ITEM) 1

E-26 ESS CABINET (ESS OPTIONAL BID ITEM) 1

E-27 SECURITY MONITOR (ESS OPTIONAL BID ITEM) 1

S I D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E

D A

T E

J A

N

T B

D

SHEET ID

***AMENDMENT 0003***

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

US Army Corps of Engineers

C A

T E

G O

R Y

C O

D E

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D E

S C

R

IP

T

IO

N

M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

T :3

.6

.7 w w w .e x p fe d e ra l.

c o m p ro j n o

-A

D A

R L

IN

G

T O

N A

V E

N U

E

W

IL

M

IN

G T

O N

N

O R

T H

C A

R O

L

IN

A W

P

M

R

-8

-0

F O

R T

B R

A G

G

N O

R T

H C

A R

O L

IN

A D

E V

E L

O P

R E

Q U

E S

T F

O R

P R

O P

O S

A L F

O R

P N

S O

F P

A R

A C

H U

T E

R

IG

G

IN

G F

A C

IL

IT

Y

/1

/2

A M

E N

D M

E N

T

IN602

IN

T

E R

IO

R

D E

S

IG

N

N E

W E

Q U

IM

E

N T

A N

D F

U R

N

IT

U R

E S

C H

E D

U L E

I I

A K

A K

P Z

K S

B V

Q

IN

.D

G N

FURNITURE, FIXTURES, AND EQUIPMENT

ITEM # ITEM NAME QTY.

WORKSTATIONS

WS-1 WORKSTATION, ADMIN 8

WS-2 WORKSTATION, OFFICE 8

CHAIRS

CH-1 CHAIR, TASK 18

CH-2 CHAIR, GUEST 17

CH-3 CHAIR, STACKING 60

CH-4 CHAIR, INDUSTRIAL 3

TABLES

TA-1 INSPECTION TABLE 8' X 3' 150

TA-2 NOT IN USE 0

TA-3 SEWING MACHINE TABLE 4' X 2' 0

TA-4 SEWING MACHINE TABLE 6' X 2'-6" 0

TA-5 CAFETERIA TABLE, BREAK ROOM 6

TA-6 TABLE, PRINTER/FAX 4

TA-7 TABLE, CLASSROOM W/ PANEL 5' X 2' 32

TA-11 PADDED TABLE 30

TA-11A PADDED TABLE W/ DRAWER 12

STORAGE

DK-1 ROLL PLAN STORAGE 38"D x 15 1/4"W 1

S-1 TOOL SHELVING-OPEN SHELVES 4'W X 1'-6"D X 7'H 31

S-2 NOT IN USE 0

S-3 TOOLS ORGANIZED STORAGE 5'H X 2'D X 3'W 20

S-4 FLOOR BINS 55.5"W X 80.25"L X 58.75"H 66

S-5 NOT IN USE 0

S-6 NOT IN USE 0

S-7 STORAGE RACKS TO ACCOMMODATE (10) BINS 48

S-8 LOCKERS, ONE-TIER 115

S-9 OPEN SHELVING FOR BATTERY CHARGING (SMALL UNITS) 2' X 2' 16

S-10

STORAGE FOR DIAGNOSTIC CHARGING 4'W X 2'D X 6'H (POWER

INSTALLED AT FRONT OF THE UNIT) EACH UNIT ACCOMMODATE FOR 6

(GFGI) 18

S-11 ROLLING SHELF SYSTEM 1

S-12 VERTICAL PARACHUTE STORAGE BOARD 4

S-13

OXYGEN CYLINDER STORAGE (8'W X 3'D) CAPACITY 20 VERTICAL

CYLINDERS 3

S-14 OXYGEN STORAGE 4'W X 2'D X 73"H 4

S-15 ROLLING STORAGE 5'W X 2'D X 5'H 6

S-16 HEAVY-DUTY STORAGE BINS 1170

S-18 FILE, 3-DRAWER LATERAL (39"H X 30"W X 18"D) 10

S-19 FABRIC STORAGE 8'W X 2'D X 75.5"H 4

S-20 STORAGE OPEN SHELVES 4'W X 2'D X 6'H 12

S-21 THREAD ROLL STORAGE 3

S-22 CELL PHONE LOCKERS 31

S-48 PARACHUTE SHAKEOUT (BASE BID ITEM, NOT FF&E) 8

WORK BENCHES

WB-1 WORK BENCH- SOLID TOP AND TOOL DRAWERS W TASK LIGHT - 30" H 0

WB-2 WORK BENCH- SOLID TOP AND TOOL DRAWERS- 38" H 17

ACCESSORIES

A-1 CLOCK, WALL 11

A-2 CONTAINER, 14 QUART TRASH 21

A-3 CONTAINER, 55 GAL TRASH 9

A-4 CONTAINER, 14 QUART RECYCLING 21

A-5 55-GAL RECYCLING CONTAINER, ROLLING 2

A-6 TACK BOARD 13

A-7 MARKER BOARD 12

A-8 LECTURN (AV OPTIONAL BID ITEM) 1

A-10 RESTROOM TRASH RECEPTACLE 6

A-11 LOCKER ROOM WASTE RECEPTACLE 2

A-12 ANTI-FATIGUE MATTING 39

A-13 PORTABLE EYE WASH STATION 1

A-14 AED DEVICE 1

A-15 FIRE EXTINGUISHER 22

EQUIPMENT

E-1 COFFEE MAKER 1

E-2 ICE MAKER AND STORAGE BIN 1

E-4 REFRIGERATOR/FREEZER, FULL SIZE 3

E-5 MICROWAVE OVEN 3

E-7 VENDING MACHINE (GFGI) 5

E-8 MONITORS (60" DIAG.) (AV OPTIONAL BID ITEM) 2

E-9 FORKLIFT BATTERY CHARGING STATION (GFGI) 3

E-10 02 TRANSFER PUMP 4' x 3' (BASE BID ITEM, NOT FF&E) 1

E-11 PALLET JACKS (GFGI) 3

E-12 ENROLLMENT STATION (ESS OPTIONAL BID ITEM) 1

E-13 KEY CABINET 1

E-14 COMPRESSOR (GFGI) 1

E-24 A-V SPEAKERS (AV OPTIONAL BID ITEM) 1

E-25 A-V RACK (AV OPTIONAL BID ITEM) 1

E-26 ESS CABINET (ESS OPTIONAL BID ITEM) 1

E-27 SECURITY MONITOR (ESS OPTIONAL BID ITEM) 1

LATRINE

#121

LATRINE

#122

528th

ADMIN

#123

528th

OFFICE

#124

ESS TR

#125

TELECOM

MUNICATI

ONS RM

#126

SWCS

PACKING

#127

SWCS

MFF

PACKING

#127B

SWCS

ADMIN

#128

SWCS

OFFICE

#129

LATRINE

#130

LATRINE

#131

LATRINE

#132

SWCS

MFF RFI

#133

SWCS

RFI

#134

SWCS

SUPPLY

STORAGE

#135

MAINT.

#136

SECURE

AREA

STOR.

#137

SECURE

AREA

STOR.

#138

SECURE

AREA

STOR.

#139

UNPACKED

STOR.

SWCS #140

UNPACKED

STOR. 528th

#141

UNPACKED

STOR. 3rd

#142

CLASS

RM.

#143

BREAK

ROOM

#144

JAN.

CLST.

#145

BLDG

MGR

OFFICE

#146

3 1 1

3 3 2 1 1

1 4 1 2

40 45

1 1 1

8 9

5 5

4 5

5 29 16 16

0 0

0 0 0

0 0 0 0

2 2

2 2

1 1 1

3 2

0 4 4

1 1 1 1 1 1 1

3 3 3 2 1 1

2 2 1

3 3 3 2 1 1

1 1

2 3 1 1

1 1 1 3 2 1

1 1 1 1

11 9

3 1 1

2 3

2 1

S I D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E

D A

T E

J A

N

T B

D

SHEET ID

***AMENDMENT 0003***

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

US Army Corps of Engineers

C A

T E

G O

R Y

C O

D E

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D E

S C

R

IP

T

IO

N

M

IC

H

IG

A

N A

V E

S

U

IT

E

C H

IC

A

G O

T :3

.6

.7 w w w .e x p fe d e ra l.

c o m p ro j n o

-A

D A

R L

IN

G

T O

N A

V E

N U

E

W

IL

M

IN

G T

O N

N

O R

T H

C A

R O

L

IN

A W

P

M

R

-8

-0

F O

R T

B R

A G

G

N O

R T

H C

A R

O L

IN

A D

E V

E L

O P

R E

Q U

E S

T F

O R

P R

O P

O S

A L F

O R

P N

S O

F P

A R

A C

H U

T E

R

IG

G

IN

G F

A C

IL

IT

Y

/1

/2

A M

E N

D M

E N

T

IN603

IN

T

E R

IO

R

D E

S

IG

N

N E

W E

Q U

IM

E

N T

A N

D F

U R

N

IT

U R

E S

C H

E D

U L E

I

II

A K

A K

P Z

K S

B V

Q

IN

.D

G N

FURNITURE, FIXTURES, AND EQUIPMENT

ITEM # ITEM NAME QTY.

WORKSTATIONS

WS-1 WORKSTATION, ADMIN 8

WS-2 WORKSTATION, OFFICE 8

CHAIRS

CH-1 CHAIR, TASK 18

CH-2 CHAIR, GUEST 17

CH-3 CHAIR, STACKING 60

CH-4 CHAIR, INDUSTRIAL 3

TABLES

TA-1 INSPECTION TABLE 8' X 3' 150

TA-2 NOT IN USE 0

TA-3 SEWING MACHINE TABLE 4' X 2' 0

TA-4 SEWING MACHINE TABLE 6' X 2'-6" 0

TA-5 CAFETERIA TABLE, BREAK ROOM 6

TA-6 TABLE, PRINTER/FAX 4

TA-7 TABLE, CLASSROOM W/ PANEL 5' X 2' 32

TA-11 PADDED TABLE 30

TA-11A PADDED TABLE W/ DRAWER 12

STORAGE

DK-1 ROLL PLAN STORAGE 38"D x 15 1/4"W 1

S-1 TOOL SHELVING-OPEN SHELVES 4'W X 1'-6"D X 7'H 31

S-2 NOT IN USE 0

S-3 TOOLS ORGANIZED STORAGE 5'H X 2'D X 3'W 20

S-4 FLOOR BINS 55.5"W X 80.25"L X 58.75"H 66

S-5 NOT IN USE 0

S-6 NOT IN USE 0

S-7 STORAGE RACKS TO ACCOMMODATE (10) BINS 48

S-8 LOCKERS, ONE-TIER 115

S-9 OPEN SHELVING FOR BATTERY CHARGING (SMALL UNITS) 2' X 2' 16

S-10

STORAGE FOR DIAGNOSTIC CHARGING 4'W X 2'D X 6'H (POWER

INSTALLED AT FRONT OF THE UNIT) EACH UNIT ACCOMMODATE FOR 6

(GFGI) 18

S-11 ROLLING SHELF SYSTEM 1

S-12 VERTICAL PARACHUTE STORAGE BOARD 4

S-13

OXYGEN CYLINDER STORAGE (8'W X 3'D) CAPACITY 20 VERTICAL

CYLINDERS 3

S-14 OXYGEN STORAGE 4'W X 2'D X 73"H 4

S-15 ROLLING STORAGE 5'W X 2'D X 5'H 6

S-16 HEAVY-DUTY STORAGE BINS 1170

S-18 FILE, 3-DRAWER LATERAL (39"H X 30"W X 18"D) 10

S-19 FABRIC STORAGE 8'W X 2'D X 75.5"H 4

S-20 STORAGE OPEN SHELVES 4'W X 2'D X 6'H 12

S-21 THREAD ROLL STORAGE 3

S-22 CELL PHONE LOCKERS 31

S-48 PARACHUTE SHAKEOUT (BASE BID ITEM, NOT FF&E) 8

WORK BENCHES

WB-1 WORK BENCH- SOLID TOP AND TOOL DRAWERS W TASK LIGHT - 30" H 0

WB-2 WORK BENCH- SOLID TOP AND TOOL DRAWERS- 38" H 17

ACCESSORIES

A-1 CLOCK, WALL 11

A-2 CONTAINER, 14 QUART TRASH 21

A-3 CONTAINER, 55 GAL TRASH 9

A-4 CONTAINER, 14 QUART RECYCLING 21

A-5 55-GAL RECYCLING CONTAINER, ROLLING 2

A-6 TACK BOARD 13

A-7 MARKER BOARD 12

A-8 LECTURN (AV OPTIONAL BID ITEM) 1

A-10 RESTROOM TRASH RECEPTACLE 6

A-11 LOCKER ROOM WASTE RECEPTACLE 2

A-12 ANTI-FATIGUE MATTING 39

A-13 PORTABLE EYE WASH STATION 1

A-14 AED DEVICE 1

A-15 FIRE EXTINGUISHER 22

EQUIPMENT

E-1 COFFEE MAKER 1

E-2 ICE MAKER AND STORAGE BIN 1

E-4 REFRIGERATOR/FREEZER, FULL SIZE 3

E-5 MICROWAVE OVEN 3

E-7 VENDING MACHINE (GFGI) 5

E-8 MONITORS (60" DIAG.) (AV OPTIONAL BID ITEM) 2

E-9 FORKLIFT BATTERY CHARGING STATION (GFGI) 3

E-10 02 TRANSFER PUMP 4' x 3' (BASE BID ITEM, NOT FF&E) 1

E-11 PALLET JACKS (GFGI) 3

E-12 ENROLLMENT STATION (ESS OPTIONAL BID ITEM) 1

E-13 KEY CABINET 1

E-14 COMPRESSOR (GFGI) 1

E-24 A-V SPEAKERS (AV OPTIONAL BID ITEM) 1

E-25 A-V RACK (AV OPTIONAL BID ITEM) 1

E-26 ESS CABINET (ESS OPTIONAL BID ITEM) 1

E-27 SECURITY MONITOR (ESS OPTIONAL BID ITEM) 1

MECH.

ROOM#147

MECH.

RO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.