SPECIFICATIONS - PN 74813 VOLUME 1 OF 3

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. W912PM18R0001

SOF

Parachute Rigging Facility

PN: 74813

Fort Bragg, North Carolina

Specifications - Volume 1 of 3

November 2017

SOF Parachute Rigging Facility Fort Bragg, NC PN #74813

PROJECT TABLE OF CONTENTS

REQUEST FOR PROPOSAL

SOF PARACHUTE RIGGING FACILITY; PN 74813

FORT BRAGG, NORTH CAROLINA

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS (VOLUME 1 OF 3)

STANDARD FORM 1442

00 10 00 SOLICITATION

00 21 16 INSTRUCTIONS TO PROPOSERS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 70 00 CONDITIONS OF THE CONTRACT

00 73 00 SUPPLEMENTARY CONDITIONS

DIVISION 01 – GENERAL REQUIREMENTS (VOLUME 1 OF 3)

01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 11 01 STATEMENT OF WORK - GENERAL REQUIREMENTS

01 11 02 STATEMENT OF WORK - SITE, CIVIL, UTILITIES & LANDSCAPING

01 11 03 STATEMENT OF WORK - ARCHITECTURAL & INTERIOR DESIGN

SYSTEMS

01 11 04 STATEMENT OF WORK - STRUCTURAL SYSTEMS

01 11 05 STATEMENT OF WORK - MECHANICAL, PLUMBING

AND FIRE SUPPRESSION SYSTEMS

01 11 06 STATEMENT OF WORK - ELECTRICAL AND ELECTRONICS

01 11 07 STATEMENT OF WORK - SPECIAL EQUIPMENT

01 14 00 WORK RESTRICTIONS

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 30 00 ATTACHMENT A PRELIMINARY DIVISION 01 SUBMITTAL REGISTER

01 30 00 ATTACHMENT B ENG FORM 4025-R SAMPLE

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD)

01 33 16.00 10 ATT A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS

01 33 16.00 10 ATT B FURNITURE, FIXTURES & EQUIPMENT (FF&E) REQUIREMENTS

01 33 16.00 10 ATT C TRACKING COMMENTS IN DRCHECKS

01 33 16.00 10 ATT D SAMPLE FIRE PROTECTION & LIFE SAFETY CODE REVIEW

01 33 16.00 10 ATT E ANALYSIS OF WINDOW UNIT STRUCTURAL SUPPORT

01 33 16.00 10 ATT F BIM REQUIREMENTS

01 33 16.00 10 ATT G DESIGN SUBMITTAL DIRECTORY & SUBDIRECTORY

FILE ARRANGEMENT

01 33 16.00 10 ATT H LEED SUBMITTALS

01 33 16.00 10 ATT I DQC SUBMITTAL MATRIX SUMMARY EXHIBIT I-A-1

01 33 16.00 10 ATT J 1-TOTAL DESIGN ANALYSIS

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.00 10 ATT A 1-QC CHECKLISTS PART 4 2016-03-18

01 45 00.00 10 ATT B 2010 QA CODE COMPLIANCE CHECKLIST – TELCOM

01 45 00.00 10 ATT C DQC - COST ESTIMATE CHECKLIST

01 45 00.00 10 ATT D DQC - DRAWINGS CHECKLIST

01 45 00.00 10 ATT E DQC - ENERGY ANALYSIS CHECKLIST

01 45 00.00 10 ATT F DQC – PREDESIGN CHECKLIST

01 45 00.00 10 ATT G DQC – SPECIFICATION PREP CHECKLIST

01 45 00.00 10 ATT H DQC – STRUCTURAL CHECKLIST

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)

01 45 35 SPECIAL INSPECTIONS

01 45 35 ATTACHMENT A STATEMENT OF SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 58 00 PROJECT IDENTIFICATION

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 24.00 10 OPERATION AND MAINTENANCE FACILITY DATA REQUIREMENTS

01 91 00.15 TOTAL BUILDING COMMISSIONING

APPENDICES (SEE VOLUME 2 OF 3)

A PRELIMINARY SUBSURFACE EXPLORATION & GEOTECHNICAL ENGINEERING REPORT

B PARACHUTE LIFT SYSTEM SPECIFICATION

C ADDITIONAL WATER HYDRAULIC MODELING FOR PATRIOT POINT

D RECORD OF ENVIRONMENTAL CONSIDERATION

E FORT BRAGG TREE MITIGATION

F INSTALLATION BADGE REQUEST FORM

G FORT BRAGG SEEDING SPECIFICATIONS

G-1 SECTION 02921FB – EROSION CONTROL AND TURF SEEDING

G-2 SECTION 02936 – TURF-BERMUDA GRASS SEEDING (FOR FORT BRAGG AND POPE AFB)

H SUSTAINABILITY GUIDANCE

I UTILITY RATES

J FORT BRAGG IGI&S NON-DISCLOSURE STATEMENT/DATA SHARING AGREEMENT

FOR GIS DATA

K FORT BRAGG PLANT LIST

L USASNEC INSTALLATION DESIGN CRITERIA FOR FORT BRAGG SPECIFIC

COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS

M FORT BRAGG NEC LABELING SCHEME

N FORT BRAGG INTERIOR FINISH STANDARDS

O TELECOM ROOM REQUIREMENTS

P ENVIRONMENTAL PROTECTION PLAN

Q FORT BRAGG TRAFFIC CONTROL AND WORKZONE SAFETY POLICY

R BASIS OF DESIGN PRODUCT DATA SHEETS

S TELECOMMUNICATIONS INTERIOR INFRASTRUCTURE PLANNING & DESIGN

T ENERGY AND SUSTAINABILITY RECORD CARD TEMPLATE

U ELECTRICAL SERVICE LOAD CALCULATIONS

V SOLID WASTE AND RECYCLING REQUIREMENTS

W MATERIAL RECYCLE/DIVERSION/DISPOSAL REPORTING FORM

X PROBABILITY ASSESSMENT FOR THE FORMER ASP AT FORT BRAGG

Y FORT BRAGG TYPICAL SECTIONS

Z PIEDMONT NATURAL GAS (PNG) SPECIFICATION

AA GEOTHERMAL CONDUCTIVITY TEST

BB TRAFFIC ENGINEERING INSTALLATION DESIGN GUIDELINES

CC TOPOGRAPHIC SURVEY

DD USASOC IT TECHNICAL DESIGN GUIDE

FURNISHINGS, FIXTURES & EQUIPMENT AND AV PACKAGE (SEE VOLUME 3 OF 3)

--END OF SECTION--

THIS PAGE IS INTENTIONALLY LEFT BLANK

THIS PAGE IS INTENTIONALLY LEFT BLANK

W912PM18R0001 Construct PN 74813 SOF Parachute Rigging Facility, Fort Bragg, NC

In accordance w ith FAR 15.101-2, this procurement is being solicited and procured using the Best Value Continuum, Low est Price Technically Acceptable Source Selection Process.

The is an UNRESTRICTED SOLICITATION

The Magnitude of Construction is betw een $10,000,000.00 and $25,000,000.00.

Point of Contact:

Michael Mullen michael.m.mullen@usace.army.mil 910-251-4710

MICHAEL M MULLEN 910-251-4710

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

16-Nov-2017

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________540 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________00 73 00

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________03 Jan 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______180 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U S ARMY CORPS OF ENGINEERS, WILMINGTON

WILMINGTON DISTRICT

ATTN: JOHN HILL

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

910-251-4454FAX:TEL: 910-251-4451 TEL: FAX:

W912PM18R0001 103

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 01 10 - Table of Contents

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 APPENDIX A, EXAMPLE 1

Attachment 2 APPENDIX A, EXAMPLE 2

Attachment 3 APPENDIX A, EXAMPLE 3

Section 00 10 00 - Solicitation

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job BASE BID: Design Services Parachute Rigging Facility

Engineering and Design Fees, Complete

For CLINS 0002 thru 0003 and 0015-0018

*Reference Note 1 FOB: Destination

NET AMT

0002 1 Job BASE BID: Building Construction Parachute Rigging Facility, Complete

0003 1 Job BASE BID: Site Development Outside the Five Foot (5') Line, Complete

0004 1 Job PAYMENT AND PERFORMANCE BONDSFOB: Destination

OPTION Optional Bid Item 1: Provide 160 POV Parking Lot and a cross walk and sidewalk, Complete

(Information only, Offerors should only Price the SubCLINs for this Bid Item)

*Reference Note 2

0005AA 1 Job OPTION Optional Bid Item 1: Provide Design of 160 POV Parking Lot and a cross walk and sidewalk, Complete

0005AB 1 Job OPTION Optional Bid Item 1: Provide Construction of 160 POV Parking Lot and a cross walk and sidewalk, Complete

OPTION Optional Bid Item 2: Provide a Concrete Pad for for 12 ISU 90 containers, Complete

(Information only, Offerors should only Price the SublCLINs for this Bid Item)

0006AA 1 Job OPTION Optional Bid Item 2: Provide Design - Concrete Pad for for 12 ISU 90 containers, Complete

0006AB 1 Job OPTION Optional Bid Item 2: Provide Construction of Concrete Pad for for 12 ISU 90 containers, Complete

OPTION Optional Bid Item 3: Provide Additional 35 hooks for MC-6 chutes for a total parachute lift system capacity of 200 hooks, Complete

0007AA 1 Job OPTION Optional Bid Item 3: Provide Design for additional 35 hooks for MC-6 chutes for a total parachute lift system capacity of 200 hooks, Complete

0007AB 1 Job OPTION Optional Bid Item 3: Provide Construction of additional 35 hooks for MC-6 chutes for a total parachute lift system capacity of 200 hooks, Complete

OPTION Optional Bid Item 4: Provide Parachute lift system batten bars configured at each end with eyebolt hooks and vertical cable guides, Complete

0008AA 1 Job OPTION Optional Bid Item 4: Provide Design for parachute lift system batten bars configured at each end with eyebolt hooks and vertical cable guides, Complete

0008AB 1 Job OPTION Optional Bid Item 4: Provide Construction for parachute lift system batten bars configured at each end with eyebolt hooks and vertical cable guides, Complete

OPTION Optional Bid Item 5: Provide Automated Storage & Retrieval System (ASRS) at the three (3) Ready For Issue (RFI) Rooms. Note: complete ASRS and infrastructure design is part of the Base Bid, Complete

0009AA 1 Job OPTION Optional Bid Item 5: Provide Automated Storage & Retrieval System (ASRS)

Equipment Purchase, Complete

0009AB 1 Job OPTION Optional Bid Item 5: Provide Automated Storage & Retrieval System (ASRS)

Equipment Installation, Complete

OPTION Optional Bid Item 6: Provide Interior partitions with 8” CMU 10’-0” high instead of metal studs and plywood panels, Complete

IF AWARDED, THIS ITEM WILL REPLACE THE BASE BID

REQUIREMENT. OFFERORS SHALL PRICE ONLY THE INCREASE IN

COST OVER THE BASE BID CONSTRUCTION REQUIREMENT.

0010AA 1 Job OPTION Optional Bid Item 6: Provide design interior partitions with 8” CMU 10’-0” high instead of metal studs and plywood panels, Complete

0010AB 1 Job OPTION Optional Bid Item 6: Provide construction of interior partitions with 8” CMU 10’-

0” high instead of metal studs and plywood panels, Complete

0011 1 Job OPTION Optional Bid Item 7: Replace Ceramic Wall and ceramic floor tile with porcelain wall tile and porcelain floor tile, Complete

IF AWARDED, THIS ITEM WILL REPLACE THE BASE BID

REQUIREMENT. OFFERORS SHALL PRICE ONLY THE INCREASE IN

COST OVER THE BASE BID CONSTRUCTION REQUIREMENT.

OPTION Optional Bid Item 8: Provide industrial fans, Complete

0012AA 1 Job OPTION Optional Bid Item 8: Provide design of building to include industrial fans, Complete

0012AB 1 Job OPTION Optional Bid Item 8: Provide construction of industrial fans, Complete

OPTION Optional Bid Item 9: Provide Parachute Landing Fall (PLF) Area and Aircraft

Mock-Ups, Complete

0013AA 1 Job OPTION Optional Bid Item 9: Provide Design of Parachute Landing Fall (PLF) Area and

Aricraft Mock-ups, Complete

0013AB 1 Job OPTION Optional Bid Item 9: Provide Construction of Parachute Landing Fall (PLF) Area and Aricraft Mock-ups, Complete

OPTION Optional Bid Item 10: Provide celerestory windows at the roof extending above the main corridor of the building, Complete

0014AA 1 Job OPTION Optional Bid Item 10: Provide Design of clerestory windows at the roof extending above the main corridor of the building.

0014AB 1 Job OPTION Optional Bid Item 10: Provide the Construction of clerestory windows at the roof extending above the main corridor of the building.

OPTION Optional Bid Item 11: FF&E Purchase and Installation (Note: complete FF&E and infrastructure design is part of the Base Bid), Complete

0015AA 1 Job OPTION OPTIONAL BID ITEM 11: FF&E Purchase Complete

0015AB 1 Job OPTION OPTIONAL BID ITEM 11: FF&E Installation Complete

OPTION Optional Bid Item 12: Access Control Equipment Purchase and Installation (Note:

complete equipment and infrastructure design is part of the Base Bid), Complete

0016AA 1 Job OPTION OPTIONAL BID ITEM 12: Access Control Equipment Purchase, Complete

0016AB 1 Job OPTION OPTIONAL BID ITEM 12: Access Control Equipment Installation, Complete

OPTION Optional Bid Item 13: CCTV Equipment Purchase and Installation (Note:

complete equipment and infrastructure design is part of the Base Bid), Complete

0017AA 1 Job OPTION OPTIONAL BID ITEM 13: CCTV Equipment Purchase, Complete

0017AB 1 Job OPTION OPTIONAL BID ITEM 13: CCTV Equipment Installation, Complete

OPTION Optional Bid Item 14: Intrusion Detection System (IDS), Purchase and Installation

(Note: complete equipment and infrastructure design is part of the Base Bid), Complete

0018AA 1 Job Optional Bid Item 14: Intrusion Detection System (IDS) Equipment Purchase, Complete

0018AB 1 Job Optional Bid Item 14: Intrusion Detection System (IDS) Equipment Installation, Complete

NOTICE TO OFFERORS

TOTAL ALL BASE BID ITEMS CLINs 0001-0004

Total Amount Of Optional Bid Item 1 (CLINs 0005AA – 0005AB)

Total Amount Of Optional Bid Item 2 (CLINs 0006AA – 0006AB)

Total Amount Of Optional Bid Item 3 (CLINs 0007AA – 0007AB)

Total Amount Of Optional Bid Item 4 (CLINs 0008AA – 0008AB)

Total Amount Of Optional Bid Item 5 (CLINs 0009AA – 0009AB)

Total Amount Of Optional Bid Item 6 (CLINs 0010AA – 0010AB)

Total Amount Of Optional Bid Item 7 (CLIN 0011)

Total Amount Of Optional Bid Item 8 (CLINs 0012AA– 0012AB)

Total Amount Of Optional Bid Item 9 (CLINs 0013AA – 0013AB)

Total Amount Of Optional Bid Item 10 (CLINs 0014AA – 0014AB)

Total Amount Of Optional Bid Item 11 (CLINs 0015AA – 0015AB)

Total Amount Of Optional Bid Item 12 (CLINs 0016AA – 0016AB)

Total Amount Of Optional Bid Item 13 (CLINs 0017AA – 0017AB)

Total Amount Of Optional Bid Item 14 (CLINs 0018AA – 0018AB)

Total Amount Of All Optional Bid Items 1-14 (CLINs 00005 – 0018)

TOTAL ALL BID ITEMS CLINs 0001 – 0018

PROPOSED CONTRACT DURATION: 540

NOTICE TO OFFERORS

NOTE 1:

The maximum allowable gross area for the Parachute Rigging Facility is limited to 84,500 square feet (SF) for the base bid items.

NOTE 2:

For Optional Bid Items 1-14 (CLINs 0005– 0018), if exercised, the period of performance shall not be extended beyond the original contract duration of 540 calendar days. Performance of any awarded optional bid items shall run concurrently with the base bid items contract duration so that the period of performance shall not exceed 540 calendar days.

NOTE 3:

The government reserves the right to exercise Optional Bid Items 1-5 (CLIN items 0005 – 0009), within 60 calendar days of notice to proceed. The government reserves the right to exercise Optional Bid Items 6-14 (CLIN items 0010 – 0018), within 270 calendar days of notice to proceed.

NOTE 4:

The exercise of Optional Bid Items 1-14 (CLIN items 0005 – 0018), shall be subject to the availability of funds.

NEED OPTIONAL BID ITEM MEMO

Section 00 21 16 - Instructions to Proposers

INSTRUCTIONS AND REQUIREMENTS

GENERAL PROPOSAL SUBMISSION INSTRUCTIONS & REQUIREMENTS

W912PM18R0001

PN74813

SOF Parachute Rigging Facility, Fort Bragg, NC

1. OVERVIEW.

1.1 This Request for Proposal (RFP) solicits construction and design of a Parachute Rigging Facility. The scope of work includes: construction includes a parachute drying tower, packing lanes, parachute repair room, supply rooms, storage areas, oxygen systems maintenance room, and a classroom approximately 84,500 SF in size, and significant site work. Access for persons with disabilities will be provided. Comprehensive interior design, electronic security systems, and audio visual design services are included. Built-in building systems include fire alarm/mass notification, fire suppression, utility management control, telephone, advanced unclassified and classified communications networks, cable television, intrusion detection, closed circuit surveillance, electronic access control, and protected distribution. The project includes demolition of existing facilities. Special construction includes sustainable construction features complying with Leadership in Energy and Environmental Design (LEED) "Silver" with enhanced commissioning. Air conditioning: 791kW (225 tons).

The period of performance is 540 calendar days. Work location is Fort Bragg, North Carolina. Antiterrorism/Force protection measures and sustainment mandates will be incorporated. The resultant contract will be Firm-Fixed Price (FFP).

1.2 The instructions and requirements contained herein establish uniform evaluation procedures for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Source Selection Authority (SSA) using the Lowest Price Technically Acceptable Source Selection Process (See Federal Acquisition Regulation 15.101-2). Proposals should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.

2. GENERAL INSTRUCTIONS.

In accordance with FAR Clause 52.215-1, Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to make award without discussions. Therefore, offerors should submit their best technical and price terms in their initial offer and not automatically assume that they will have an opportunity to participate in discussions or to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interests of the Government.

In accordance with 15.306(c) (1) and FAR Clause 52.215-1(f) (4), Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

2.1 Contractor Team Arrangements. The Government will recognize the integrity and validity of contractor teaming arrangements, provided the arrangements are identified and company relationships are fully disclosed in the offer. As further described in paragraph 2.3, below, the Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code.

2.2 If applicable, a 8(a) Joint Venture or SBA/DoD approved Mentor-Protégé must submit all required documentation with their offer to be considered responsive, IAW the requirements set forth in Title 13 Code of Federal Regulations (CFR) Part 125.8.

2.3 The Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code. However, IAW CFR 125.8(e), the Government will also evaluate past experience and past performance submitted by the individual firms that make up a joint venture.

2.4 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractor, WILL NOT be evaluated for any factor.

2.5 Offerors shall submit their proposal in accordance with the Section 3. General Proposal Format, paragraph 3.4.

2.6 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

3. GENERAL PROPOSAL FORMAT.

3.1 Cover Page. Include the title of the solicitation, solicitation number, offeror name, and date of the submittal.

3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. If more than one Adobe PDF file is used for a volume, the complete table of contents shall be included in each. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.

3.3 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not cross-reference similar material in the Price Proposal, or vice versa. No dollar amounts from the Price Proposal are to be included in the Technical proposal.

3.4 Each offeror must submit Price, Technical, and Past Performance Proposals via the AMRDEC SAFE website. No hard paper copies will be accepted or evaluated. The Price, Technical, and Past Performance Proposals must be received by the closing date and time set for receipt of proposals.

In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically.

All submissions shall be in Adobe PDF format and shall be on 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W912PM18R0001_COMPANY NAME_VOLUME I

W912PM18R0001_COMPANY NAME_VOLUME II

Submit the Price, Technical, and Past Performance Proposals electronically via the AMRDEC SAFE website at: https://safe.amrdec.army.mil/SAFE/welcome.aspx. At the AMRDEC SAFE website, select the blue button labeled ‘Click Here’, below the ‘Non-CAC Users’ title. Register, access the site and submit your proposal(s). [Note: It has been reported that documents are more quickly uploaded into the AMRDEC SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that offerors will have more success utilizing any particular browser.

When your proposals are submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the Government recipients. When completing the information for transmittal at the AMRDEC SAFE website, you will be required to enter email addresses for the recipients. For this solicitation, the recipients will be the Contracting Officer and Contract Specialist. The Contract Specialist for this project Michael Mullen: email address is michael.m.mullen@usace.army.mil. The Contracting Officer for this project is Mr. John Hill:

email address is john.t.hill@usace.army.mil. BOTH of these email addresses are the ones you will enter as recipients.

In addition, after uploading your documents, you will be required to verify your email address before AMRDEC will send notification to the Government recipients. This is a very important step – even if you successfully upload your proposal to AMRDEC SAFE, notification will not be sent to the Government until you verify your email address, which may result in the rejection of your proposal for lateness. Follow the instructions on the AMRDEC website and confirmation emails you receive from AMRDEC.

Proposal due Date and Time:

Request For Proposal No: W912PM18R0001 Due Date of Proposal: January 3, 2018 Time by which Proposals are due: 2:00 P.M. (Eastern Time) Title of Project: PN 74813 SOF Parachute Rigging Facility, Fort Bragg, NC

The date and time of delivery will be established by the time of receipt of the email notification to the Contract Specialist and Contracting Officer by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ email inboxes until after the deadline, the submission will be considered late. The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.

3.5 The offeror is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the offeror shall be clear and concise in its proposal. The Government will not make assumptions concerning the offeror’s intent.

3.6 The technical data criteria specified for each factor identified herein and as described in these instructions shall be submitted as part of the proposal. Failure to submit all the data required by the RFP, and these instructions may be cause for determining a proposal incomplete and, therefore, not considered for award.

3.7 Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to the submission of the offer.

3.8 Tabs. Proposal shall be organized and tabbed as follows:

3.8.1 VOLUME I: OFFEROR’S CERTIFICATIONS AND PRICE (FACTOR 1)

One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted and one (1) original copy of the bid guarantee in both electronic and hardcopy shall be submitted.

TAB CONTENTS OF THE PRICE PROPOSAL

A The Proposal Cover Sheet B Standard Form 1442 C Acknowledgement of Amendments (If Applicable)

D FACTOR 1: PRICE

E Section 00 45 00 – Representations and Certifications F Teaming Arrangement (If Applicable) G Bid Guarantee (Bid Bond) H Subcontracting Plan (Large Businesses Only)

TAB A – The proposal cover sheet is required by FAR 52.215-1 (c) (2) and must be submitted by all offerors. The format for the proposal cover sheet is as follows:

PROPOSAL COVER SHEET

Offerors should ensure telephone number; fax number, e-mail address, DUNS number and CAGE Code are all included. DUNS number will be used to access Contractor Performance Assessment Reporting System (CPARS) data. Offerors should also provide any other assigned number that identifies them in the CPARS database. If a separate DUNS has been created for a joint venture (J-V) it must be submitted. The offeror should also submit their Tax ID number on the proposal data Sheet.

TAB B - Standard Form 1442, completed and signed by authorized individual(s) of the offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

TAB C - If applicable - All amendments must be acknowledged by all offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102.

TAB D – Factor 1 - Price. Proposed price schedule is to be completed in its entirety by all offerors to include the Subtotals and Totals section as found in Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule.

TAB E - Section 00 45 00 – Representations and Certifications. Offerors shall include any narratives as it pertains to the requirement at 2.2 to document any teaming arrangement the offeror has or will enter into.

1. The solicitation number;

2. The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);

3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and

5. Name, title, and signature of person authorized to sign the proposal.

Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

TAB F - Teaming Agreement, if applicable. See paragraph 2.1 and 2.2 Note to 8(a)—SBA must approve a joint venture agreement prior to the award of an 8(a) contract on behalf of the joint venture.

TAB G - Offerors shall provide a fully executed Bid Bond as required by FAR Clause 52.228-1, Bid Guarantee in both Hard copy and electronically in Tab G.

For the purposes of this Request for Proposal, please note that in accordance with (IAW) FAR 28.001:

“Bond means a written instrument executed by a bidder or contractor (the “principal”), and a second party (the “surety” or “sureties”) (except as provided in 28.204), to assure fulfillment of the principal’s obligations to a third party (the “obligee” or “Government”), identified in the bond. If the principal’s obligations are not met, the bond assures payment, to the extent stipulated, of any loss sustained by the obligee.”

Bonds shall therefore be executed in the name of the legal entity, whether a joint venture, partnership or the Prime Contractor of an informal teaming arrangement, with whom the government would enter into a contract for a successful offeror. The entity named on the bond must be able to acquire bonding capacity on its own merits, and not as the result of indemnification from a subcontractor or third party.

TAB H - Subcontracting Plan – FOR LARGE BUSINESS OFFERORS ONLY.

Large businesses will not be eligible for award if they fail to submit an acceptable Subcontracting Plan. Subcontracting Plan shall be prepared in accordance with FAR 52.219- 9, DFARS 252.219-7003 and SBA’s Electronic Subcontracting Reporting System (eSRS) located at http://esrs.gov. Instructions for completion of requisite forms, as well as guidance on coordinating and preparing for all compliance reviews by Federal agencies can be found at this website. Offerors are to ensure subcontractors agree to submit to ESRS.

3.8.2 VOLUME II: TECHNICAL PROPOSAL (FACTORS 2-5)

One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted.

TAB CONTENTS OF THE TECHNICAL PROPOSAL

A Factor 2: Past Experience – Construction

B Factor 3: Past Experience - Design

C Factor 4: Key Personnel

D Factor 5: Past Performance

Page Limitations: The following page limitations are established for each factor described above:

Factor 2: Past Experience, Construction – Limited to 20 pages (maximum of 5 forms) Factor 3: Past Experience, Design – Limited to 20 pages (maximum of 5 forms) Factor 4: Key Personnel – Limited to 5 pages per individual resume

Factor 5: Limited to no fewer than three (3) and no more than five (5) projects.

Individual project Past Performance Assessment Questionnaires shall not exceed four (4) pages; Government evaluators will review and evaluate only the information contained on the first four (4) pages.

NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.

Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.

Offerors are cautioned that “parroting” of the Technical requirements or the Scope of Work with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal.

Proprietary information shall be clearly marked.

4. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB A—FACTOR 2 – PAST EXPERIENCE, CONSTRUCTION

4.1 SUBMISSION/MINIMUM REQUIREMENTS:

4.1.1 The offeror shall demonstrate the experience as a prime contractor on projects of similar size, scope, and complexity.

4.1.2 The minimum requirement for a project of similar size, scope, or complexity is defined as having all of the following criteria:

o Fifty thousand 50,000 square feet (SF) or more aggregate interior space.

o Includes a multi-story building or multiple buildings on a single project.

o Total value of project equal to or greater than $15,000,000.00

4.1.3 The offeror shall complete a minimum of three (3), but no more than five (5), “Experience Information” forms, (See Example 1), in response to this factor. All projects submitted must be at least 50% complete within the last six (6) years preceding the date of the solicitation

4.1.4 Offerors shall utilize Experience Information Form in Appendix A, Example 1. This sheet is MANDATORY and SHALL be used to submit project information. For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded;

however, total length for each project data sheet shall not exceed FOUR (4) pages.

4.1.5 If the offeror is a Joint Venture (J-V), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the joint venture. Offerors that are part of the DoD Mentor Protégé program may only submit two

(2) recent and relevant project completed by the Mentor. Offerors are still limited to a total of five (5) projects. Experience of proposed subcontractors to be utilized on this project will not be considered.

4.2 EVALUATION CRITERIA:

4.2.1 The Government will evaluate the extent of recent, relevant experience of the prime contractor as identified in paragraph 4.1.2. Projects that were awarded on an individual task/delivery order basis will not be aggregated for purposes of meeting minimum or additional criteria. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience.

4.2.2 To be considered eligible for award, the Government will verify that each offeror has submitted a minimum of three (3) projects which meet the minimum criteria of paragraph 4.1.2.

4.2.3 The offeror’s Past Experience will be evaluated based on the Government’s assessment of each submitted project’s similarity (in terms of size, scope and complexity) to the work described in this RFP.

4.2.4 The Government will review the project experience of the offeror on projects provided in response to the Past Experience Factor. Offerors must meet all of the minimum acceptability standards to receive an “ACCEPTABLE” rating on this factor.

5. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB B—FACTOR 3 – PAST EXPERIENCE, DESIGN

5.1 SUBMISSION/MINIMUM REQUIREMENTS:

5.1.1 Submit a minimum of three (3) and a maximum of five (5) relevant and recent design projects for the design team that best demonstrates design experience similar in size, scope, and complexity to the RFP. The Government will consider the qualifications, performance, and experience of the proposed designer of record, only if the prime contractor is firmly committed to using that designer (through a teaming agreement or other appropriate arrangement).

5.1.2 The minimum requirement for a project of similar size, scope, or complexity is defined as having all of the following criteria:

o Fifty thousand 50,000 square feet (SF) or more aggregate interior space.

o Includes a multi-story building or multiple buildings on a single project.

5.1.3 The offeror shall complete a minimum of three (3), but no more than five (5), “Experience Information” forms, (See Example 1), in response to this factor. All DESIGN projects submitted must be at least 50% (CONSTRUCTION) complete within the last six (6) years preceding the date of the solicitation.

5.1.4 Offerors shall utilize Experience Information Form in Appendix A, Example 1. This sheet is MANDATORY and SHALL be used to submit project information. For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded;

however, total length for each project data sheet shall not exceed FOUR (4) pages.

5.1.5 If the offeror is a Joint Venture (J-V), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the joint venture. Offerors that are part of the DoD Mentor Protégé program may only submit two

(2) recent and relevant project completed by the Mentor. Offerors are still limited to a total of five (5) projects. Experience of proposed subcontractors other than the designer of record, to be utilized on this project will not be considered.

5.2 EVALUATION CRITERIA:

5.2.1 The Government will evaluate the extent of recent, relevant experience of the prime contractor as identified in paragraph 5.1.2. Projects that were awarded on an individual task/delivery order basis will not be aggregated for purposes of meeting minimum or additional criteria. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience.

5.2.2 To be considered eligible for award, the Government will verify that each offeror has submitted a minimum of three (3) projects which meet the minimum criteria of paragraph 5.1.2.

5.2.3 The offeror’s Past Experience will be evaluated based on the Government’s assessment of each submitted project’s similarity (in terms of size, scope and complexity) to the work described in this RFP.

5.2.4 The Government will review the project experience of the offeror on projects provided in response to the Past Experience Factor. Offerors must meet all of the minimum acceptability standards to receive an “ACCEPTABLE” rating on this factor.

6. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB C —FACTOR 4 – KEY PERSONNEL.

6.1 SUBMISSION/MINIMUM REQUIREMENTS:

6.1.1 Each offeror shall provide resumes for the following Key Personnel proposed for this contract. Resumes shall not exceed five (5) pages per person. The proposed position of each person shall be clearly stated at the beginning of the resume.

CQC System Manager The CQC System Manager shall be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years construction experience on construction similar to this contract, or a construction person with a minimum of 10 years in related work.

Refer to:

3.4.2 CQC SYSTEM MANAGER

SECTION 01 45 00.00 10 QUALITY CONTROL

Project Superintendent The Project Superintendent shall have a minimum of 5 years of experience as a Project Superintendent.

Refer to:

3.1 GENERAL REQUIREMENTS

SECTION 01 45 00.00 10 QUALITY CONTROL

Licensed Architect/Designer of Record (DOR) The DOR is registered or licensed to practice their respective design profession as defined by the statutory requirements of the professional registration laws in state in which the design professional works. The DOR shall have a minimum of five (5) years of experience as a licensed design professional.

Refer to:

1.3.10 DESIGNER OF RECORD (DOR)

SECTION 01 45 35 SPECIAL INSPECTIONS

6.1.2 Sample suggested resume format is included with this RFP (Appendix A, Example 2). If offerors elect not to use the suggested resume format, all information identified on the sample format is still required for each resume submitted under this Factor. Proposals that fail to include resumes or that fail to include all required information on these resumes may be rejected as unacceptable.

6.1.3 The Key Personnel identified must be used on the project. No deviations will be permitted unless they meet the same qualifications and experience of those individuals proposed and are expressly approved by the Contracting Officer in advance. An offeror’s use of different personnel than those proposed without approval from the Contracting Officer will be grounds for a Termination for Default.

6.2 EVALUATION CRITERIA:

6.2.1 The Government will review the resumes provided in response to the Personnel Factor.

Offerors must demonstrate all of the following minimum acceptability standards to receive an “ACCEPTABLE” rating on this factor.

6.2.2 The offeror must demonstrate in all resumes that the key personnel proposed have a minimum of five (5) years of specialized and relevant experience in the following roles: CQC System Manager, Project Superintendent, and Licensed Architect/Designer of Record

(DOR).

6.2.3 Failure to demonstrate the minimally acceptability standards under this factor will result in an “UNACCEPTABLE” rating and possible elimination from further consideration for contract award.

7. SUBMISSION REQUIREMENTS & EVALUATION FACTORS

VOLUME II: TAB D — FACTOR 5 - PAST PERFORMANCE.

7.1 SUBMISSION/MINIMUM REQUIREMENTS:

7.1.1 Past performance refers to the quality of recent and relevant project experience from the owner’s perspective. The offeror shall complete and provide a Past Performance Assessment Questionnaire (Appendix A, Example 3) on no fewer than three (3) and no more than five (5) projects. Projects submitted under this factor must first be deemed recent and relevant.

7.1.1.1 Relevant: Offer must demonstrate experience as a prime contractor on projects of similar size, scope, or complexity. The minimum requirement for a project of similar size, scope, or complexity is defined as a requirement with all of the following:

o Fifty thousand 50,000 square feet (SF) or more aggregate interior space o Includes a multi-story building or multiple buildings on a single project

7.1.1.2 Recent: Projects of projects of similar size, scope, and complexity that must have been completed (fully designed and at least 50% construction progress completed) within six (6) years preceding the date of the solicitation

7.1.2 Though not required, ideally project past performance information submitted under this factor would be on the same projects submitted for consideration under FACTOR 2, PAST EXPERIENCE. Individual project Past Performance Assessment Questionnaires shall not exceed four (4) pages; Government evaluators will review and evaluate only the information contained on the first four (4) pages. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer. The Government will call and confirm information provided by the offeror on the Past Performance Assessment Questionnaire with the points of contact, to the extent necessary to conduct a meaningful evaluation. The Government reserves the right to interview other individuals if the point of contact is not available.

7.1.3 The Government may contact sources other than those provided by the offeror for information with respect to past performance. These other sources may include but are not limited to: Contract Performance Assessment Report (CPAR), Past Performance Information Retrieval System (PPIRS), other Government sources, and interviews with organizations or individuals familiar with the offeror’s performance.

7.1.4 Offerors shall utilize the Past Performance Assessment Questionnaire in Appendix A, Example 3.

7.1.5 If the offeror is a Joint Venture (J-V), relevant project experience should be submitted for projects completed by the Joint Venture entity, or the individual firms that make up the joint venture. Offerors that are part of the DoD Mentor Protégé program may only submit two

(2) recent and relevant project completed by the Mentor. Offerors are still limited to a total of five (5) projects. Experience of proposed subcontractors to be utilized on this project will not be considered.

7.2 EVALUATION CRITERIA:

7.2.1 The Government will consider past performance of the prime construction contractor. If a firm has multiple functions or divisions, the Government will only evaluate the past performance of the unit or division submitting the offer. Where the Government views an offeror’s role, or that of its team members, if any, as not significant or as not clearly defined, the Government reserves the right to view this lack of involvement, or clarity, as a risk which may impact an offeror’s rating for this factor despite the quality of recent, relevant past performance information.

7.2.2 Past performance shall be initially evaluated to determine whether the offeror’s present/past performance is recent, and relevant to the effort to be acquired.

Relevant: The minimum requirement for a project of similar size, scope, and complexity is defined as a Fifty thousand 50,000 square feet (SF) or more aggregate interior space, including a multi-story or multiple buildings on a single project, with a total value equal to or greater than $15,000,000.00.

Recent: Projects of projects of similar size, scope, and complexity that must have been completed (fully designed and at least 50% construction progress completed) within six (6) years preceding the date of the solicitation

7.2.3 The Government will evaluate ONLY recent and relevant past performance based on the elements listed below to assign a confidence rating of acceptable/unacceptable.

7.2.4 Second, the past performance evaluation shall determine how well the offeror performed on the prior contracts. The contractor shall have no “unsatisfactory” or “marginal” ratings in the following criteria in Contract Performance Assessment Report (CPAR): quality, schedule, cost control, management, and utilization of small business, regulatory compliance, and safety.

(1) Quality of Construction. The Government will evaluate all information available with respect to the quality of the actual construction undertaken and the offeror’s ability to maintain quality control and accuracy of quality control documentation.

(2) Schedule. The Government will evaluate all information available with respect to the completion of projects within the scheduled completion times.

(3) Cost Control.

This is the start of the file's text. The full file is on GovTribe.