SPECIFICATIONS - PN 74813 VOLUME 3 OF 3
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. W912PM18R0001
SOF
Parachute Rigging Facility
PN: 74813
Fort Bragg, North Carolina
Furnishings, Fixtures, & Equipment (FF&E)
Specifications - Volume 3 of 3
November 2017
SOF Parachute Rigging Facility
Fort Bragg, NC PN #74813
THIS PAGE IS INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS
REQUEST FOR PROPOSAL
SOF PARACHUTE RIGGING FACILITY; PN 74813
FORT BRAGG, NORTH CAROLINA
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS (VOLUME 1 OF 3)
STANDARD FORM 1442
00 10 00 SOLICITATION
00 21 16 INSTRUCTIONS TO PROPOSERS
00 45 00 REPRESENTATIONS AND CERTIFICATIONS
00 70 00 CONDITIONS OF THE CONTRACT
00 73 00 SUPPLEMENTARY CONDITIONS
DIVISION 01 – GENERAL REQUIREMENTS (VOLUME 1 OF 3)
01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 11 01 STATEMENT OF WORK - GENERAL REQUIREMENTS
01 11 02 STATEMENT OF WORK - SITE, CIVIL, UTILITIES & LANDSCAPING
01 11 03 STATEMENT OF WORK - ARCHITECTURAL & INTERIOR DESIGN
SYSTEMS
01 11 04 STATEMENT OF WORK - STRUCTURAL SYSTEMS
01 11 05 STATEMENT OF WORK - MECHANICAL, PLUMBING
AND FIRE SUPPRESSION SYSTEMS
01 11 06 STATEMENT OF WORK - ELECTRICAL AND ELECTRONICS
01 11 07 STATEMENT OF WORK - SPECIAL EQUIPMENT
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 30 00 ATTACHMENT A PRELIMINARY DIVISION 01 SUBMITTAL REGISTER
01 30 00 ATTACHMENT B ENG FORM 4025-R SAMPLE
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD)
01 33 16.00 10 ATT A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS
01 33 16.00 10 ATT B FURNITURE, FIXTURES & EQUIPMENT (FF&E) REQUIREMENTS
01 33 16.00 10 ATT C TRACKING COMMENTS IN DRCHECKS
01 33 16.00 10 ATT D SAMPLE FIRE PROTECTION & LIFE SAFETY CODE REVIEW
01 33 16.00 10 ATT E ANALYSIS OF WINDOW UNIT STRUCTURAL SUPPORT
01 33 16.00 10 ATT F BIM REQUIREMENTS
01 33 16.00 10 ATT G DESIGN SUBMITTAL DIRECTORY & SUBDIRECTORY
FILE ARRANGEMENT
01 33 16.00 10 ATT H LEED SUBMITTALS
01 33 16.00 10 ATT I DQC SUBMITTAL MATRIX SUMMARY EXHIBIT I-A-1
01 33 16.00 10 ATT J 1-TOTAL DESIGN ANALYSIS
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.00 10 ATT A 1-QC CHECKLISTS PART 4 2016-03-18
01 45 00.00 10 ATT B 2010 QA CODE COMPLIANCE CHECKLIST – TELCOM
01 45 00.00 10 ATT C DQC - COST ESTIMATE CHECKLIST
01 45 00.00 10 ATT D DQC - DRAWINGS CHECKLIST
01 45 00.00 10 ATT E DQC - ENERGY ANALYSIS CHECKLIST
01 45 00.00 10 ATT F DQC – PREDESIGN CHECKLIST
01 45 00.00 10 ATT G DQC – SPECIFICATION PREP CHECKLIST
01 45 00.00 10 ATT H DQC – STRUCTURAL CHECKLIST
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 45 35 ATTACHMENT A STATEMENT OF SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 OPERATION AND MAINTENANCE FACILITY DATA REQUIREMENTS
01 91 00.15 TOTAL BUILDING COMMISSIONING
APPENDICES (SEE VOLUME 2 OF 3)
A PRELIMINARY SUBSURFACE EXPLORATION & GEOTECHNICAL ENGINEERING REPORT
B PARACHUTE LIFT SYSTEM SPECIFICATION
C ADDITIONAL WATER HYDRAULIC MODELING FOR PATRIOT POINT
D RECORD OF ENVIRONMENTAL CONSIDERATION
E FORT BRAGG TREE MITIGATION
F INSTALLATION BADGE REQUEST FORM
G FORT BRAGG SEEDING SPECIFICATIONS
G-1 SECTION 02921FB – EROSION CONTROL AND TURF SEEDING
G-2 SECTION 02936 – TURF-BERMUDA GRASS SEEDING (FOR FORT BRAGG AND POPE AFB)
H SUSTAINABILITY GUIDANCE
I UTILITY RATES
J FORT BRAGG IGI&S NON-DISCLOSURE STATEMENT/DATA SHARING AGREEMENT
FOR GIS DATA
K FORT BRAGG PLANT LIST
L USASNEC INSTALLATION DESIGN CRITERIA FOR FORT BRAGG SPECIFIC
COMMUNICATIONS INFRASTRUCTURE REQUIREMENTS
M FORT BRAGG NEC LABELING SCHEME
N FORT BRAGG INTERIOR FINISH STANDARDS
O TELECOM ROOM REQUIREMENTS
P ENVIRONMENTAL PROTECTION PLAN
Q FORT BRAGG TRAFFIC CONTROL AND WORKZONE SAFETY POLICY
R BASIS OF DESIGN PRODUCT DATA SHEETS
S TELECOMMUNICATIONS INTERIOR INFRASTRUCTURE PLANNING & DESIGN
T ENERGY AND SUSTAINABILITY RECORD CARD TEMPLATE
U ELECTRICAL SERVICE LOAD CALCULATIONS
V SOLID WASTE AND RECYCLING REQUIREMENTS
W MATERIAL RECYCLE/DIVERSION/DISPOSAL REPORTING FORM
X PROBABILITY ASSESSMENT FOR THE FORMER ASP AT FORT BRAGG
Y FORT BRAGG TYPICAL SECTIONS
Z PIEDMONT NATURAL GAS (PNG) SPECIFICATION
AA GEOTHERMAL CONDUCTIVITY TEST
BB TRAFFIC ENGINEERING INSTALLATION DESIGN GUIDELINES
CC TOPOGRAPHIC SURVEY
DD USASOC IT TECHNICAL DESIGN GUIDE
FURNISHINGS, FIXTURES & EQUIPMENT AND AV PACKAGE (SEE VOLUME 3 OF 3)
--END OF SECTION--
RFP No.
SOF PARACHUTE RIGGING
FACILITY
PN: 74813, FY17
Fort Bragg, North Carolina
Furniture, Fixtures &
Equipment (FF&E)
US Army Corps of Engineers Wilmington District
W912PM18R0001
Purchase Description Sheets..………………………………………………………………………………………………
Equipment and Furniture Plan……………………………………………………………………………………………...
Enlarged Equipment and Furniture Plan………………………………………………………………………………..
Equipment and Furniture Schedule……………………………………………………………………………………….
SOF Parachute Rigging Facility PN #74813 Fort Bragg, NC
Furniture, Fixtures & Equipment (FF&E) Package Table of Contents
PURCHASE DESCRIPTION SHEET
Job Name: Job Order Number: PN-74813
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Roll Plan Storage
Item Number: Finishes: DK-1
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Roll Plan Storage; 36 storage slots w/ lockable door
15.25” Width 38” Depth 15.25” Height
Finishes:
Qty: 1 Unit Cost:
$177.99 Price Total:
Steel
Delivery:
Installation:
Total:
Location: Mechanical Room 148
Prepared By:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Workstation, Admin
Item Number: Finishes: WS-1
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Consult workstation typical plan. 6’x6’ L-shaped workstation with general construction style of frame and tile systems furniture consisting overhead storage with glides, locking drawers and doors, two drawer pedestal, telecommunication wire management tray and keyboard tray. Power telecommunication devices shall not be hardwired to systems furniture.
Finishes:
Qty: 8 Unit Cost:
$9,254 Price Total:
Composite on Worksurface: TBD Painted Metal Chassis, File Pedestal, drawers, Supports, connectors & trim:
TBD
Tackboard Fabric: Grade 3
Delivery:
Installation:
Total:
Location:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Workstation, Office
Item Number: Finishes: WS-2
Source:
Photo: Similar w/ Overhead Storage
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Consult workstation typical plan. 6’x8’ L-shaped workstation with general construction style of frame and tile systems furniture consisting overhead storage with glides, attached task lighting, locking drawers and doors, a freestanding two drawer pedestal on casters, storage tower, telecommunication wire management tray and keyboard tray. Power telecommunication devices shall not be hardwired to systems furniture.
Finishes:
Qty: 8 Unit Cost:
$16,175 Price Total:
Composite on Worksurface: TBD Painted Metal Chassis, File Pedestal, drawers, Supports, connectors & trim:
TBD
Tackboard Fabric: Grade 3
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Task Chair
Item Number: CH-1
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Office chair with standard tilt; adjustable arms in the vertical and horizontal direction; standard arm pads;
base with frame; carpet casters; star base; lumbar support; mesh fabric seat and back. Provide with lifetime warranty. Dimensions 41-45” H x 25.75- 28.25”W x 15.75-18.5” D
Finishes:
Qty: 17 Unit Cost:
$679 Price Total:
Color: TBD
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Guest Chair
Item Number: CH-2
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Stackable visitor chair with casters, glides, mesh fabric seat and back. Provide with lifetime warranty.
Finishes:
Qty: 22 Unit Cost:
$549 Price Total:
Color: TBD
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Stacking Classroom Chair
Item Number: CH-3
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Stacking chairs mesh bottom and back, no arm rest, base with casters.
Finishes:
Qty: 60 Unit Cost:
$271.15 Price Total:
Color: TBD
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Industrial Chair
Item Number: CH-4
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Seat: 18.5” W x 18.5” D x 2” T Back: 16.5” W x 15.5” H x 2” T Base: 25” Dia., 6” H
Finishes:
Qty: 1 Unit Cost:
$219 Price Total:
Color: TBD
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Locker Room Bench
Item Number: CH-5
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Pedestal Bench made with HDPE plastic. Impervious to moisture. Custom width to fit space.
12”D x 18.5”H
Finishes:
Qty: 10 Unit Cost:
$219 Price Total:
Color: TBD
Delivery:
Installation:
Total:
Location: Men’s RR/Locker Room, Women’s RR/Locker Room
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Inspection Table
Item Number: TA-1
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Inspection Table Wood Top w/ Optional Metal Shelving 8’W x 3’D
Finishes:
Qty: 141 Unit Cost:
$620 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Sm. Sewing Machine Table
Item Number: TA-3
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Industrial Sewing Machine Table w/ Equipment 4’W x 2’D
Finishes:
Qty: 42 Unit Cost:
$3,500 Price Total: $147,000.00
Delivery:
Installation
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Lg. Sewing Machine Table
Item Number: TA-4
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Industrial Sewing Machine Table w/ Equipment 6’W x 2’-6”D
Finishes:
Qty: 3 Unit Cost:
$5,995.00 Price Total: $ 17,985
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Cafeteria Table
Item Number: TA-5
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Foldable Cafeteria Table, lockable casters. ADA Compliant; 14-gauge steel; seats 8-12; Laminate finish;
0.75” tabletop Thickness
Width: 30 in.
Length: 96.5 in.
Weight: 250 lbs.
Finishes:
Qty: 6 Unit Cost:
$1065 Price Total:
Composite top: TBD Painted Metal Supports: TBD
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Printer/Fax Table
Item Number: TA-6
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Rectangular table 60“W x 30"D x 30"H work table, folding, stackable, 4-leg, lockable casters, composite top to fit printer and fax.
Finishes:
Qty: 4 Unit Cost:
$654 Price Total:
Composite top: TBD Painted Metal Supports: TBD
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Classroom Table
Item Number: TA-7
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Rectangular table 60"wx24"Dx30"H training table with tubular steel legs, blow-molded polyethylene top, modesty panel, lockable casters, grommet hole 1 each on either end with wire management tray, partial modesty panel, 18 gauge stainless steel.
Finishes:
Qty: 32 Unit Cost:
$844 Price Total:
Composite top: TBD Painted Metal Supports: TBD
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Padded Table
Item Number: TA-11
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Padded Inspection Table to match TA-1 w/ upholstery TBD Include Steel Drawer Storage at end of Padded Table 8’W x 3’D
Finishes:
Qty: 30 Unit Cost:
$750 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Tool Shelving/Open Shelves
Item Number: S-1
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Tool Shelving-Open Shelves 4'WX 2'-6"DX 7'H
Finishes:
Qty: 37 Unit Cost:
$375 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Tool Storage
Item Number: S-3
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Tools Organized Storage 5' high, 2' deep, 3' wide
Finishes:
Qty: 17 Unit Cost:
$475 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Bins
Item Number: S-4
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Bins 60" x 60"
Finishes:
Qty: 6 Unit Cost:
$690 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Bins
Item Number: S-7
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Bins 48” x48”
Finishes:
Qty: 27 Unit Cost:
$520 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Lockers
Item Number: S-8
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
1 Tier w/ shelving units and hooks.
Finishes:
Qty: 108 Unit Cost:
$230 Price Total:
Delivery:
Installation:
Total:
Location: Women’s RR/Locker, Men’s RR/Locker, Maintenance Room 147
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Open Shelving
Item Number: S-9
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Open shelving for Battery Charging (small units) 2' x 2'
Finishes:
Qty: 9 Unit Cost:
$553 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Open Shelving
Item Number: S-10
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Diagnostic Charging Power Installed at front of the unit Each unit accommodates for 6
Finishes:
Qty: 18 Unit Cost:
$1,950 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Rolling Shelf System
Item Number: S-11
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Rolling Storage 5’W x 7’D x 5’H 3 Double Shelving Units
Finishes:
Qty: 1 Unit Cost:
$20,000 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Vertical Parachute Storage
Item Number: S-12
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Vertical Parachute Storage Board
Finishes:
Qty: 4 Unit Cost:
$400 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Oxygen Storage
Item Number: S-13
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
20 Cylinder Storage Locker Cage; Vertical; Weather Resistant Aluminum; padlock optional
60” Width 32” Depth 65” Height
Finishes:
Qty: 4 Unit Cost:
$655 Price Total:
Painted Metal: Color to match desks
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Oxygen Storage
Item Number: S-14
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Oxygen Storage 4'w X 2'd X 5'h
Finishes:
Qty: 4 Unit Cost:
$950 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Rolling Storage
Item Number: S-15
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Rolling Storage 2‘W x 6‘D x 5‘H 7 Shelving Units
Finishes:
Qty: 6 Unit Cost:
$25,000 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: 3-Drawer Lateral File
Item Number: S-18
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Three High Lateral File 39"H x 30"W x 18"D with drawer locks
Finishes:
Qty: 13 Unit Cost:
$489 Price Total:
Painted Metal: Color to match desks
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Fabric Storage
Item Number: S-19
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Fabric Storage 4’W x 2’D
Finishes:
Qty: 6 Unit Cost:
$950 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Storage Open Shelves
Item Number: S-20
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Open Shelving Storage 6’H
Finishes:
Qty: 18 Unit Cost:
$315 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Tread Roll Storage
Item Number: S-21
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Thread Roll Storage 5’W x 2’D
Finishes:
Qty: 3 Unit Cost:
$800 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Lockers
Item Number: S-22
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Cell Phone Storage Locker with Front Access Panel; 4 Door High Unit (8 Inch Deep Compartments); 12 A Doors (11 Usable doors); Surface Mounted; Resettable Combination Locks (key override)
24" W x 25.5" H x 9.25" D
Finishes:
Qty: 31 Unit Cost:
$505.00 Price Total:
Color: TBD
Delivery:
Installation:
Total:
Location: Corridor 101A, Corridor 101B, Packing Area 106, Packing Area 118, Packing Area 127.
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Work Bench
Item Number: WB-1
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Solid Top and Tool Drawers W/ Task Light 30” Height
Finishes:
Qty: 1 Unit Cost:
$1956.20 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Work Bench
Item Number: WB-2
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Solid Top and Tool Drawers 44” Height
Finishes:
Qty: 22 Unit Cost:
$1456.20 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Wall Clock
Item Number: A-1
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Battery operated wall clock. 12 hour analog
Finishes:
Qty: 11 Unit Cost:
$15 Price Total:
White face trim to complement other office furniture
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Trash Container, 14-qt
Item Number: A-2
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Black Soft Molded Plastic Leak Resistant Wastebasket 14 Quart.
Finishes:
Qty: 23 Unit Cost:
$25 Price Total:
Black plastic
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Trash Container, 55-gal
Item Number: A-3
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Heavy-duty plastic construction, dent-, bending- and cracking-resistant; molded-in handles for easy lifting, leak resistant.
Finishes:
Qty: 9 Unit Cost:
$69 Price Total:
Capacity: 55 gallon, 33”Hx26”D Color: TBD
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Recycling Container, 14-qt
Item Number: A-4
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Desk side leak resistant recycling container, Plastic 14 Quart.
Finishes:
Qty: 23 Unit Cost:
$25 Price Total:
Blue plastic with Recycling Symbol
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Recycling Container, 55-gal
Item Number: A-5
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Bulk leak resistant recycling container heavy duty plastic can with wheels, and slot in, hinged, lockable lid;
50 gallon.
Finishes:
Qty: 2 Unit Cost:
$109 Price Total:
Color: Blue
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Tack Board
Item Number: A-6
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Large Tack Board
Finishes:
Qty: 14 Unit Cost:
$45 Price Total:
Delivery:
Installation:
Total:
Location: SWCS Packing, 528th Packing, and 3rd
Packing, Women’s/Men’s Restrooms, Maintenance Room
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Mobile Board
Item Number: A-7
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Mobile Dry Erase Board
Finishes:
Qty: 11 Unit Cost:
$182 Price Total:
Delivery:
Installation:
Total:
Location: Location: SWCS Packing, 528th Packing, and 3rd Packing, 3RD Admin, Building manager office, Classroom
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Restroom Trash Receptacle
Item Number: A-10
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Waste receptacle is a freestanding garbage can. The lid opens by depressing the foot pedal. A plastic pail with a wire bail is included. This item is stainless steel with a satin finish.
Finishes:
Qty: 6 Unit Cost:
$29.19 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Locker Room Waste Receptacle
Item Number: A-11
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Waste Receptacle is a freestanding trashcan that makes an attractive, yet functional addition to any commercial restroom.
The receptacle holds 13 gallons of waste and is outfitted with a top that bears a hinged door and conceals the waste within the unit.
At the bottom of the receptacle, four rubber supports are positioned with one located near each of the unit's corners. These supports provide stability and keep the unit from rocking, sliding and easily tipping over. Vinyl edges are positioned on both the upper and lower edges of the unit all the way around the perimeter to protect the waste receptacle from dents and bumps.
The upper vinyl edge also prevents injuries when the receptacle is being used or serviced. The exposed surfaces of the receptacle bear a No. 4 satin finish. This unit also has hooks for liners.
Finishes:
Qty: 2 Unit Cost:
$197.19 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Anti-Fatigue Mat
Item Number: A-12
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Dense vinyl sponge anti-fatigue mat. Made to order.
Finishes:
Qty: 41 Unit Cost: $ Price Total:
Delivery:
Installation:
Total:
Location:
Maintenance 136, SWCS Packing 127, 528th Packing 118, 3rd Packing 106
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Portable Eye Wash Station
Item Number: A-13
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Gravity Fed Freeze Resistant 16 Gallon Eyewash; Portable; Plug-in Type.
Finishes:
Qty: 1 Unit Cost:
$1.549.00 Price Total:
Delivery:
Installation:
Total:
Location: Common Equipment Battery Storage Area
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: AED Device
Item Number: A-14
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Defibrillator w/ alarmed AED cabinet
Finishes:
Qty: 1 Unit Cost:
$1.559.00 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Fire Extinguisher
Item Number: A-15
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Fire Extinguisher (Bottles Only).
Fire extinguisher cabinets and wall brackets to be MILCON funded.
Class A: Wood, Paper, cloth, trash, plastics (solids that are not metals).
Class B: Flammable Liquids-Gasoline, oil, grease, acetone (includes flammable gases).
Class C: Electrical: Energized electrical equipment (anything that is plugged in).
Finishes:
Qty: 23 Unit Cost:
$91.00 Price Total:
Delivery:
Installation:
Total:
Location: In accordance with Life Safety.
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Coffee Maker
Item Number: E-1
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Professional coffee maker with pour over, one brewing plate, one warmer plate, and two pots.
Finishes:
Qty: 1 Unit Cost:
$415 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Ice Maker and Storage Bin
Item Number: E-2
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Ice machine and storage bin combo unit; 30”W x 34”Dx73”H; air-cooled condenser; filter line kit;
exterior grade stainless steel; 562-lbs of ice yield per day; Energy Star rated.
Finishes:
Qty: 1 Unit Cost:
$2742 Price Total:
Note: Select unit intended for use outdoors.
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Refrigerator/Freezer
Item Number: E-4
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Full size refrigerator with out ice maker. Energy Star refrigerator with freezer upfront temperature controls, two leveling glides, two rollers.
Finishes:
Qty: 3 Unit Cost:
$1399.99 Price Total:
Color: TBD
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Microwave Oven
Item Number: E-5
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Countertop microwave oven 2.0 cu.ft. 24-hour time display, microwave oven rotating plate, commercial grade, heavy duty.
Finishes:
Qty: 3 Unit Cost:
$285 Price Total:
Color: TBD
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Pallet Jack
Item Number: E-11
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Heavy gauge steel construction. Reinforced frame and bulkhead.
3-position hand control – Raise, lower, neutral.
3" lowered and 7.5" raised height.
7" polyurethane steering wheels. Two front wheels on each side. 180° steering arc.
7,700 lbs. Capacity
GFGI.
Finishes:
Qty: 7 Unit Cost:
$489 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Key Cabinet
Item Number: E-13
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
Finishes:
Qty: 1 Unit Cost:
$84 Price Total:
Delivery:
Installation:
Total:
SOF Parachute Rigging Facility Date:
Fort Bragg-North Carolina Item Name: Compressor
Item Number: E-14
Source:
Photo: Similar
POC:
Telephone:
GSA Contract Number:
FSC Group:
Model#:
Item Description:
GFGI.
Finishes:
Qty: 1 Unit Cost: Price Total:
Delivery:
Installation:
Total:
S-38
S-21
WB-2
TA-3
TA-3
TA-11 TA-11
TA-1
TA-1
TA-4 TA-4
S-4
DK-1
S-16
S-32
S-29
S-31
S-29
A-9
TA-1 TA-1
TA-1
S-7
S-5
E-11
S-5 S-5
S-10
S-9
E-9
S-1
WB-2
S-20
S-3
S-11
S-12
WB-1
S-14
S-13
S-1
E-10
S-3
WB-2
S-15
S-1WB-2
S-20
S-16
S-1
S-3
S-21
S-19
WB-2
S-1
S-3
S-45
S-19
WB-4
A-6 A-7
A-6 A-7
A-6
S-48
S-48
S-48
E-14
DK-3 E-17
S-33
CH-1
S-29
S-41
S-27
S-40
S-38
S-43
S-46
S-47
S-30
S-26
CH-4
S-1
TA-10
TA-11 TA-11 TA-11
S-28
E-20 S-42
TA-6
S-3
A-3
A-3
A-3 A-3 A-3
S-5S-5
A-3
S-15
S-22S-22
A-7
A-6
A-6
A-7 A-7 A-7
A-6 A-6 A-6
S-8
S-22 S-22S-22
S-22
391'-4"
F E
F E
F E
F E
MECHANICAL
BREAK
ROOM
BLDG MGR
OFFICE
CORRIDOR
A
101A
MEN'S
RR/LOCKER RM
WOMEN'S
RR/LOCKER RM
ELEC.
TELECOMMUNICATIONS
ROOM
3RD MFF
OFFICE
3RD
MFF RFI
UNISEX
LATRINE
108,109
JANITOR
CLOSET
3RD MFF
PACKING
AREA
106B
O2
STORAGE
O2
SAFE ROOM
3RD
PACKING
3RD RFI
528TH RFI
528TH
PACKING
528TH
ADMIN
528TH
OFFICE
UNISEX
LATRINE
121,2
UNISEX
LATRINE
131,2
SWCS
OFFICE
SWCS
ADMIN
SWCS
PACKING
SWCS
RFI
CLASSROOM
3RD
SECURE
AREA STOR.
MECHANICAL
ELECTRICAL
SWCS
SECURE
AREA STOR.
528TH
SECURE
AREA STOR.
MAINTENANCE
ELEC.
UNISEX
LATRINE
WASH BINS
UNPACKED
STORAGE
SWCS
UNPACKED
STORAGE
528TH
UNPACKED
STORAGE
3RD
COMMON
EQUIP.
BATTERY
STORAGE
104A
3RD
STORAGE
104B
SWCS
STORAGE
104C
JANITOR
CLOSET
528TH
STORAGE
104D
JAN.
CLST.
UNISEX
LATRINE
(3)CUBICLE
AREA
136A
ESS TR
SWCS MFF
PACKING
AREA
127B
SWCS
MFF RFI
FIRE
PUMP
SWCS
SUPPLY
STORAGE
CORRIDOR
101B
528TH
SUPPLY
STORAGE
3RD
SUPPLY
STORAGE
55'-7"
PARACHUTE
DRYING
TOWER
3RD
ADMIN
3RD
OFFICE
W1 W1
TELECOMMUNICATIONS
ROOM
FE
F E
FE FEFEFE
FE
FE
FE
FE
FEFE
F E
F E
F E
F E
FE
F E
FE
A E
DA-12
A-12 A-12
A-12
A-12 A-12 A-12
A-12 A-12 A-12
E-26
A N
S I D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
T E
O C
T
T B
D
SHEET ID
READY TO ADVERTISE
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
US Army Corps of Engineers
C A
T E
G O
R Y
C O
D E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W
IL
M
IN
G T
O N
D
IS
T R
IC
T
D E
S C
R
IP
T
IO
N
M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
IL
T :3
.6
.7 w w w .e x p fe d e ra l.
c o m p ro j n o
-A
D A
R L
IN
G
T O
N A
V E
N U
E
W
IL
M
IN
G T
O N
N
O R
T H
C A
R O
L
IN
A W
P
M
R
-8
-0
F O
R T
B R
A G
G
N O
R T
H C
A R
O L
IN
A D
E V
E L
O P
R E
Q U
E S
T F
O R
P R
O P
O S
A L F
O R
P N
S O
F P
A R
A C
H U
T E
R
IG
G
IN
G F
A C
IL
IT
Y
IN101
IN
T
E R
IO
R
D E
S
IG
N
E U
IP
M
E N
T A
N D
F U
R N
IT
U
R E
P L A
N
A K
A K
P Z
K S
B V
Q
IN
.D
G N
IN102
IN102
IN102
32'8'0 16'SCALE 1/16" = 1' - 0"
EQUIPMENT AND FURNITURE PLAN
N
EXISTING FURNITURE & EQUIPMENT TO BE
REUSED AND RELOCATED. REFER TO
SHEETS IN603 & IN604.
LOCATION OF PADDED CARPET AREA.
LOCATION OF ANTI-FATIGUE PADDING.
PROVIDE FIRE EXTINGUISHER (FE) BOTTLES
UNDER THE FF&E PACKAGE OPTIONAL BID
ITEM. FE CABINETS AND BRACKETS SHALL
BE PROVIDED AS PART OF THE BASE BID.
REFER TO SHEET GI101 FOR FE LOCATIONS.
GENERAL NOTE:
1.
LOCATION OF PADDED CARPET AREA.
PROVIDE AED DEVICE AS PART OF THE
FF&E PACKAGE. ELECTRICAL ROUGH-IN
FOR THE AED DEVICE SHALL BE PROVIDED
AS PART OF THE BASE BID.
LOCATION OF VENDING MACHINE, GFGI.
KEY NOTES
1 1
LEGEND
F E
A
143A
143B
144B
101A
52C
B
A
A E
D
E-8 E-8
E-5 E-7
E-4
CH-2
CH-1
S-28
CH-3
TA-7
TA-7
TA-5
A-3A-3
A-5
S-8
S-8
S-8
S-8
A-3
E-3
BREAK
ROOM
BLDG MGR
OFFICE
CORRIDOR
A
101A
MEN'S
RR/LOCKER
ROOM
WOMEN'S
RR/LOCKER
ROOM
CLASSROOM
JAN.
CLST.
S-22
A-6
A-6
A-6
A-6
WS-2
E-12
E-13
CH-3
TA-7
CH-3
TA-7
CH-3
TA-7
CH-3
TA-7
CH-3
TA-7
A-8 A-7
A-7
A-11
A-5
A-2
CH-5
CH-5
CH-5
CH-5
A-7
E-27
E-24
E-25
B
A
B 140B
B
126 125
FE
FEFE
S-24
DK-3
CH-6
CH-2
TA-6
S-23
DK-4
CH-1
CH-1
WS-2
CH-1
WS-2
S-18
CH-2
CH-2
WS-2
CH-1
WS-2
CH-1
S-18
WS-1
CH-1
S-18CH-6
DK-2
CH-1
WS-1
CH-2
TA-6
CH-6
DK-3
528TH
PACKING
528TH
ADMIN
528TH
OFFICE
LATRINE
121,2
LATRINE
131,2
SWCS
OFFICE
SWCS
ADMIN
CS
ING
CORRIDOR
101B
JANITOR
CLOSET
CSS
S-23 S-25
S-27
CH-5
E-21
E-18
E-19
E-17
S-41
MB-1
MB-1
MB-2
WS-1
CH-1
S-23
CH-7
DK-5
TELECOMMUNICATIONS
ROOM
A-10
A-2
A-2
A-2
A-2 A-2
A-2
A-2
A-2
F E
106B
117116
A
B
FE
CH-1
WS-2
CH-2
S-18
CH-2
CH-2
WS-2
CH-1S-18
S-18
CH-1
WS-1
CH-2
TELECOMMUNICATIONS ROOM
3RD MFF
OFFICE
3RD
MFF RFI
LATRINE
108,109
JANITOR
CLOSET
3RD
ADMIN
3RD
OFFICE
3RD SUPPLY STORAGE
A-2
A-2
A-2
A-10
WS-2
CH-1
A-2
S-18
TA-6CH-2
A-2
WS-1
WS-1
CH-1 CH-1
S-18
A-7
A N
S I D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
T E
O C
T
T B
D
SHEET ID
READY TO ADVERTISE
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
US Army Corps of Engineers
C A
T E
G O
R Y
C O
D E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W
IL
M
IN
G T
O N
D
IS
T R
IC
T
D E
S C
R
IP
T
IO
N
M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
T :3
.6
.7 w w w .e x p fe d e ra l.
c o m p ro j n o
-A
D A
R L
IN
G
T O
N A
V E
N U
E
W
IL
M
IN
G T
O N
N
O R
T H
C A
R O
L
IN
A W
P
M
R
-8
-0
F O
R T
B R
A G
G
N O
R T
H C
A R
O L
IN
A D
E V
E L
O P
R E
Q U
E S
T F
O R
P R
O P
O S
A L F
O R
P N
S O
F P
A R
A C
H U
T E
R
IG
G
IN
G F
A C
IL
IT
Y
IN102
IN
T
E R
IO
R
D E
S
IG
N
E N
L A
R G
E D
E Q
U
IP
M E
N T
A N
D F
U R
N
IT
U R
E P
L A
N
J
D E
S
IG
N E
R
J
D R
A W
N E
R
J
C H
E C
K E
R
J
S U
B M
IT
T
E R
B V
Q
IN
.D
G N true north
PROJECT NORTH
EXISTING FURNITURE & EQUIPMENT TO BE
REUSED AND RELOCATED. REFER TO
SHEETS IN603 & IN604.
LOCATION OF PADDED CARPET AREA.
16'0 4' 8'SCALE 1/8" = 1' - 0"
ENLARGED EQUIPMENT LAYOUT PLAN
16'0 4' 8'SCALE 1/8" = 1' - 0"
ENLARGED EQUIPMENT LAYOUT PLAN
16'0 4' 8'SCALE 1/8" = 1' - 0"
ENLARGED EQUIPMENT LAYOUT PLAN
EXACT LOCATION TO BE DETERMINED BY DOR.
KEY NOTES
LEGEND
A N
S I D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
T E
O C
T
T B
D
SHEET ID
READY TO ADVERTISE
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
US Army Corps of Engineers
C A
T E
G O
R Y
C O
D E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W
IL
M
IN
G T
O N
D
IS
T R
IC
T
D E
S C
R
IP
T
IO
N
M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
T :3
.6
.7 w w w .e x p fe d e ra l.
c o m p ro j n o
-A
D A
R L
IN
G
T O
N A
V E
N U
E
W
IL
M
IN
G T
O N
N
O R
T H
C A
R O
L
IN
A W
P
M
R
-8
-0
F O
R T
B R
A G
G
N O
R T
H C
A R
O L
IN
A D
E V
E L
O P
R E
Q U
E S
T F
O R
P R
O P
O S
A L F
O R
P N
S O
F P
A R
A C
H U
T E
R
IG
G
IN
G F
A C
IL
IT
Y
IN601
IN
T
E R
IO
R
D E
S
IG
N
N E
W E
Q U
IM
E
N T
A N
D F
U R
N
IT
U R
E S
C H
E D
U L E
I
A K
A K
P Z
K S
B V
Q
IN
.D
G N
SOF PARACHUTE RIGGING FACILITY
FURNITURE, FIXTURES, AND EQUIPMENT
ITEM # ITEM NAME QTY.
CORRIDOR A
#101A
CORRIDOR
#101B
MEN'S
RR/LOCKER
RM#101
WOMEN'S
RR/LOCKER
RM #102
JAN.
CLST.
#103
SWCS
EQUIP.
BATTERY
STORAGE
#104A
STORAGE
#104B
STORAGE
#104C
STORAGE
#104D
TELECOM
MUNICATI
ONS RM
#105
PACKING
AREA #106
3RD MFF
PACKING
AREA #106B
3rd MFF
OFFICE
#107
LATRINE
#108
LATRINE
#109
JAN.
CLST.
#110
3rd
MFF
RFI
#111
O2
SAFE
ROOM
#112
O2
STORAGE
#113
3rd
RFI
#114
3rd
SUPPLY
STOR.
#115
3rd
ADMIN
#116
3rd
OFFICE
#117
528th
PACKING
#118
528th
SUPPLY
STORAGE#119
528th
RFI
#120
WORKSTATIONS
WS-1 WORKSTATION, ADMIN 8 2 2
WS-2 WORKSTATION, OFFICE 8 3
CHAIRS
CH-1 CHAIR, TASK 17 1 3 3
CH-2 CHAIR, GUEST 22 2 1 6
CH-3 CHAIR, STACKING 60
CH-4 CHAIR, INDUSTRIAL 1 1
TABLES
TA-1 INSPECTION TABLE 8' X 3' 141 30 35
TA-2 BACK LIT INSPECTION TABLE 8' X 3' 21 4 4
TA-3 SEWING MACHINE TABLE 4' X 2' 42
TA-4 SEWING MACHINE TABLE 6' X 2'-6" 3
TA-5 CAFETERIA TABLE, BREAK ROOM 6
TA-6 TABLE, PRINTER/FAX 4 1
TA-7 TABLE, CLASSROOM W/ PANEL 6' X 2' 32
TA-11 PADDED TABLE 30 6 7
STORAGE
DK-1 ROLL PLAN STORAGE 38"D x 15 1/4"W 1
S-1 TOOL SHELVING-OPEN SHELVES 4'W X 2'-6"D X 7'H 37 4 4 14
S-2 NOT IN USE 0
S-3 TOOLS ORGANIZED STORAGE 5'H X 2'D X 3'W 17 1 4
S-4 BINS 60" X 60" 6
S-5 RACKS OPEN BIN STORAGE 5'W x 4'D x 5 ROWS HIGH 121 10 34 24 24
S-6 PALLET STORAGE 40"w x 48"D x 5 ROWS HIGH 26
S-7 BINS 4' X4' 27
S-8 LOCKERS, ONE-TIER 108 75 32
S-9 OPEN SHELVING FOR BATTERY CHARGING (SMALL UNITS) 2' X 2' 9 9
S-10
STORAGE FOR DIAGNOSTIC CHARGING 4'W X 2'-0"D X 7'H (POWER
INSTALLED AT FRONT OF THE UNIT) EACH UNIT ACCOMMODATE FOR 6 18 18
S-11 ROLLING SHELF SYSTEM 1 1
S-12 VERTICAL PARACHUTE STORAGE BOARD 4 4
S-13
OXYGEN CYLINDER STORAGE (32"D X 60"W X 65"H) CAPACITY 20
VERTICAL CYLINDERS 4 4
S-14 OXYGEN STORAGE 4'W X 2'D X 5'H 4 4
S-15 ROLLING STORAGE 6'W X 2'D X 5'H 6 5 1
S-18 FILE, 3-DRAWER LATERAL (39"H X 30"W X 18"D) 13 2 2
S-19 FABRIC STORAGE 4' X 2' 6
S-20 STORAGE OPEN SHELVES 6'H 18 8 4
S-21 THREAD ROLL STORAGE 3
S-22 CELL PHONE LOCKERS 31 16 12 1 1
WORK BENCHES
WB-1 WORK BENCH- SOLID TOP AND TOOL DRAWERS W TASK LIGHT -30" H 1 1
WB-2 WORK BENCH- SOLID TOP AND TOOL DRAWERS-44" HIGH 22 2 4
ACCESSORIES
A-1 CLOCK, WALL 11 1 1 1 1
A-2 CONTAINER, 14 QUART TRASH 23 2 3 3
A-3 CONTAINER, 55 GAL TRASH 9 2 2
A-4 CONTAINER, 14 QUART RECYCLING 23 2 3 3
A-5 55-GAL RECYCLING CONTAINER, ROLLING 2
A-6 TACK BOARD 14 1 1 2 2
A-7 MARKER BOARD 11 1 1 1
A-8 LECTURN (AV OPTIONAL BID ITEM) 1
A-10 RESTROOM TRASH RECEPTACLE 6 1 1
A-11 LOCKER ROOM WASTE RECEPTACLE 2 1 1
A-12 ANTI-FATIGUE MATTING 41 9 10
A-13 PORTABLE EYE WASH STATION 1
A-14 AED DEVICE 1 1
A-15 FIRE EXTINGUISHER 23 1 5 1 1 1 1 1 1
EQUIPMENT
E-1 COFFEE MAKER 1
E-2 ICE MAKER AND STORAGE BIN 1
E-4 REFRIGERATOR/FREEZER, FULL SIZE 3
E-5 MICROWAVE OVEN 3
E-7 VENDING MACHINE (GFGI) 5
E-8 MONITORS (60" DIAG.) (AV OPTIONAL BID ITEM) 2
E-9 FORKLIFT BATTERY CHARGING STATION 5 3
E-10 02 TRANSFER PUMP 4' x 3' 4 2
E-11 PALLET JACKS 7
E-12 ENROLLMENT STATION (ESS OPTIONAL BID ITEM) 1
E-13 KEY CABINET 1
E-14 COMPRESSOR 1 1
E-24 A-V SPEAKERS (AV OPTIONAL BID ITEM) 1
E-25 A-V RACK (AV OPTIONAL BID ITEM) 1
E-26 ESS CABINET (ESS OPTIONAL BID ITEM) 1
E-27 SECURITY MONITOR (ESS OPTIONAL BID ITEM) 1
S I D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
T E
O C
T
T B
D
SHEET ID
READY TO ADVERTISE
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
US Army Corps of Engineers
C A
T E
G O
R Y
C O
D E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W
IL
M
IN
G T
O N
D
IS
T R
IC
T
D E
S C
R
IP
T
IO
N
M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
T :3
.6
.7 w w w .e x p fe d e ra l.
c o m p ro j n o
-A
D A
R L
IN
G
T O
N A
V E
N U
E
W
IL
M
IN
G T
O N
N
O R
T H
C A
R O
L
IN
A W
P
M
R
-8
-0
F O
R T
B R
A G
G
N O
R T
H C
A R
O L
IN
A D
E V
E L
O P
R E
Q U
E S
T F
O R
P R
O P
O S
A L F
O R
P N
S O
F P
A R
A C
H U
T E
R
IG
G
IN
G F
A C
IL
IT
Y
IN602
IN
T
E R
IO
R
D E
S
IG
N
N E
W E
Q U
IM
E
N T
A N
D F
U R
N
IT
U R
E S
C H
E D
U L E
I I
A K
A K
P Z
K S
B V
Q
IN
.D
G N
SOF PARACHUTE RIGGING FACILITY
FURNITURE, FIXTURES, AND EQUIPMENT
ITEM # ITEM NAME QTY.
WORKSTATIONS
WS-1 WORKSTATION, ADMIN 8
WS-2 WORKSTATION, OFFICE 8
CHAIRS
CH-1 CHAIR, TASK 17
CH-2 CHAIR, GUEST 22
CH-3 CHAIR, STACKING 60
CH-4 CHAIR, INDUSTRIAL 1
TABLES
TA-1 INSPECTION TABLE 8' X 3' 141
TA-2 BACK LIT INSPECTION TABLE 8' X 3' 21
TA-3 SEWING MACHINE TABLE 4' X 2' 42
TA-4 SEWING MACHINE TABLE 6' X 2'-6" 3
TA-5 CAFETERIA TABLE, BREAK ROOM 6
TA-6 TABLE, PRINTER/FAX 4
TA-7 TABLE, CLASSROOM W/ PANEL 6' X 2' 32
TA-11 PADDED TABLE 30
STORAGE
DK-1 ROLL PLAN STORAGE 38"D x 15 1/4"W 1
S-1 TOOL SHELVING-OPEN SHELVES 4'W X 2'-6"D X 7'H 37
S-2 NOT IN USE 0
S-3 TOOLS ORGANIZED STORAGE 5'H X 2'D X 3'W 17
S-4 BINS 60" X 60" 6
S-5 RACKS OPEN BIN STORAGE 5'W x 4'D x 5 ROWS HIGH 121
S-6 PALLET STORAGE 40"w x 48"D x 5 ROWS HIGH 26
S-7 BINS 4' X4' 27
S-8 LOCKERS, ONE-TIER 108
S-9 OPEN SHELVING FOR BATTERY CHARGING (SMALL UNITS) 2' X 2' 9
S-10
STORAGE FOR DIAGNOSTIC CHARGING 4'W X 2'-0"D X 7'H (POWER
INSTALLED AT FRONT OF THE UNIT) EACH UNIT ACCOMMODATE FOR 6 18
S-11 ROLLING SHELF SYSTEM 1
S-12 VERTICAL PARACHUTE STORAGE BOARD 4
S-13
OXYGEN CYLINDER STORAGE (32"D X 60"W X 65"H) CAPACITY 20
VERTICAL CYLINDERS 4
S-14 OXYGEN STORAGE 4'W X 2'D X 5'H 4
S-15 ROLLING STORAGE 6'W X 2'D X 5'H 6
S-18 FILE, 3-DRAWER LATERAL (39"H X 30"W X 18"D) 13
S-19 FABRIC STORAGE 4' X 2' 6
S-20 STORAGE OPEN SHELVES 6'H 18
S-21 THREAD ROLL STORAGE 3
S-22 CELL PHONE LOCKERS 31
WORK BENCHES
WB-1 WORK BENCH- SOLID TOP AND TOOL DRAWERS W TASK LIGHT -30" H 1
WB-2 WORK BENCH- SOLID TOP AND TOOL DRAWERS-44" HIGH 22
ACCESSORIES
A-1 CLOCK, WALL 11
A-2 CONTAINER, 14 QUART TRASH 23
A-3 CONTAINER, 55 GAL TRASH 9
A-4 CONTAINER, 14 QUART RECYCLING 23
A-5 55-GAL RECYCLING CONTAINER, ROLLING 2
A-6 TACK BOARD 14
A-7 MARKER BOARD 11
A-8 LECTURN (AV OPTIONAL BID ITEM) 1
A-10 RESTROOM TRASH RECEPTACLE 6
A-11 LOCKER ROOM WASTE RECEPTACLE 2
A-12 ANTI-FATIGUE MATTING 41
A-13 PORTABLE EYE WASH STATION 1
A-14 AED DEVICE 1
A-15 FIRE EXTINGUISHER 23
EQUIPMENT
E-1 COFFEE MAKER 1
E-2 ICE MAKER AND STORAGE BIN 1
E-4 REFRIGERATOR/FREEZER, FULL SIZE 3
E-5 MICROWAVE OVEN 3
E-7 VENDING MACHINE (GFGI) 5
E-8 MONITORS (60" DIAG.) (AV OPTIONAL BID ITEM) 2
E-9 FORKLIFT BATTERY CHARGING STATION 5
E-10 02 TRANSFER PUMP 4' x 3' 4
E-11 PALLET JACKS 7
E-12 ENROLLMENT STATION (ESS OPTIONAL BID ITEM) 1
E-13 KEY CABINET 1
E-14 COMPRESSOR 1
E-24 A-V SPEAKERS (AV OPTIONAL BID ITEM) 1
E-25 A-V RACK (AV OPTIONAL BID ITEM) 1
E-26 ESS CABINET (ESS OPTIONAL BID ITEM) 1
E-27 SECURITY MONITOR (ESS OPTIONAL BID ITEM) 1
LATRINE
#121
LATRINE
#122
528th
ADMIN
#123
528th
OFFICE
#124
ESS TR
#125
TELECOM
MUNICATI
ONS RM
#126
SWCS
PACKING
#127
SWCS
MFF
PACKING
#127B
SWCS
ADMIN
#128
SWCS
OFFICE
#129
LATRINE
#130
LATRINE
#131
LATRINE
#132
SWCS
MFF RFI
#133
SWCS
RFI
#134
SWCS
SUPPLY
STORAGE
#135
MAINT.
#136
SECURE
AREA
STOR.
#137
SECURE
AREA
STOR.
#138
SECURE
AREA
STOR.
#139
UNPACKED
STOR.
SWCS #140
UNPACKED
STOR. 528th
#141
UNPACKED
STOR. 3rd
#142
CLASS
RM.
#143
BREAK
ROOM
#144
JAN.
CLST.
#145
BLDG
MGR
OFFICE
#146
2 2
3 2
1 3 2 2 1 1
1 4 2 4 2
40 36
4 9
1 1 1
8 9
5 5 5
4 4 4
22 7
10 8 8
10 9 8
2 2 2 2 1
2 4
1 1 1
4 4 4 4
1 1 1 1 1 1 1
3 3 3 2 3 1
2 2 1
3 3 3 2 3 1
1 1
2 3 1 1
1 1 3 2 1
1 1 1 1
11 11
3 1 1 1
2 3
1 2 2 2
S I D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
T E
O C
T
T B
D
SHEET ID
READY TO ADVERTISE
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
US Army Corps of Engineers
C A
T E
G O
R Y
C O
D E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W
IL
M
IN
G T
O N
D
IS
T R
IC
T
D E
S C
R
IP
T
IO
N
M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
T :3
.6
.7 w w w .e x p fe d e ra l.
c o m p ro j n o
-A
D A
R L
IN
G
T O
N A
V E
N U
E
W
IL
M
IN
G T
O N
N
O R
T H
C A
R O
L
IN
A W
P
M
R
-8
-0
F O
R T
B R
A G
G
N O
R T
H C
A R
O L
IN
A D
E V
E L
O P
R E
Q U
E S
T F
O R
P R
O P
O S
A L F
O R
P N
S O
F P
A R
A C
H U
T E
R
IG
G
IN
G F
A C
IL
IT
Y
IN603
IN
T
E R
IO
R
D E
S
IG
N
N E
W E
Q U
IM
E
N T
A N
D F
U R
N
IT
U R
E S
C H
E D
U L E
I
II
A K
A K
P Z
K S
B V
Q
IN
.D
G N
SOF PARACHUTE RIGGING FACILITY
FURNITURE, FIXTURES, AND EQUIPMENT
ITEM # ITEM NAME QTY.
WORKSTATIONS
WS-1 WORKSTATION, ADMIN 8
WS-2 WORKSTATION, OFFICE 8
CHAIRS
CH-1 CHAIR, TASK 17
CH-2 CHAIR, GUEST 22
CH-3 CHAIR, STACKING 60
CH-4 CHAIR, INDUSTRIAL 1
TABLES
TA-1 INSPECTION TABLE 8' X 3' 141
TA-2 BACK LIT INSPECTION TABLE 8' X 3' 21
TA-3 SEWING MACHINE TABLE 4' X 2' 42
TA-4 SEWING MACHINE TABLE 6' X 2'-6" 3
TA-5 CAFETERIA TABLE, BREAK ROOM 6
TA-6 TABLE, PRINTER/FAX 4
TA-7 TABLE, CLASSROOM W/ PANEL 6' X 2' 32
TA-11 PADDED TABLE 30
STORAGE
DK-1 ROLL PLAN STORAGE 38"D x 15 1/4"W 1
S-1 TOOL SHELVING-OPEN SHELVES 4'W X 2'-6"D X 7'H 37
S-2 NOT IN USE 0
S-3 TOOLS ORGANIZED STORAGE 5'H X 2'D X 3'W 17
S-4 BINS 60" X 60" 6
S-5 RACKS OPEN BIN STORAGE 5'W x 4'D x 5 ROWS HIGH 121
S-6 PALLET STORAGE 40"w x 48"D x 5 ROWS HIGH 26
S-7 BINS 4' X4' 27
S-8 LOCKERS, ONE-TIER 108
S-9 OPEN SHELVING FOR BATTERY CHARGING (SMALL UNITS) 2' X 2' 9
S-10
STORAGE FOR DIAGNOSTIC CHARGING 4'W X 2'-0"D X 7'H (POWER
INSTALLED AT FRONT OF THE UNIT) EACH UNIT ACCOMMODATE FOR 6 18
S-11 ROLLING SHELF SYSTEM 1
S-12 VERTICAL PARACHUTE STORAGE BOARD 4
S-13
OXYGEN CYLINDER STORAGE (32"D X 60"W X 65"H) CAPACITY 20
VERTICAL CYLINDERS 4
S-14 OXYGEN STORAGE 4'W X 2'D X 5'H 4
S-15 ROLLING STORAGE 6'W X 2'D X 5'H 6
S-18 FILE, 3-DRAWER LATERAL (39"H X 30"W X 18"D) 13
S-19 FABRIC STORAGE 4' X 2' 6
S-20 STORAGE OPEN SHELVES 6'H 18
S-21 THREAD ROLL STORAGE 3
S-22 CELL PHONE LOCKERS 31
WORK BENCHES
WB-1 WORK BENCH- SOLID TOP AND TOOL DRAWERS W TASK LIGHT -30" H 1
WB-2 WORK BENCH- SOLID TOP AND TOOL DRAWERS-44" HIGH 22
ACCESSORIES
A-1 CLOCK, WALL 11
A-2 CONTAINER, 14 QUART TRASH 23
A-3 CONTAINER, 55 GAL TRASH 9
A-4 CONTAINER, 14 QUART RECYCLING 23
A-5 55-GAL RECYCLING CONTAINER, ROLLING 2
A-6 TACK BOARD 14
A-7 MARKER BOARD 11
A-8 LECTURN (AV OPTIONAL BID ITEM) 1
A-10 RESTROOM TRASH RECEPTACLE 6
A-11 LOCKER ROOM WASTE RECEPTACLE 2
A-12 ANTI-FATIGUE MATTING 41
A-13 PORTABLE EYE WASH STATION 1
A-14 AED DEVICE 1
A-15 FIRE EXTINGUISHER 23
EQUIPMENT
E-1 COFFEE MAKER 1
E-2 ICE MAKER AND STORAGE BIN 1
E-4 REFRIGERATOR/FREEZER, FULL SIZE 3
E-5 MICROWAVE OVEN 3
E-7 VENDING MACHINE (GFGI) 5
E-8 MONITORS (60" DIAG.) (AV OPTIONAL BID ITEM) 2
E-9 FORKLIFT BATTERY CHARGING STATION 5
E-10 02 TRANSFER PUMP 4' x 3' 4
E-11 PALLET JACKS 7
E-12 ENROLLMENT STATION (ESS OPTIONAL BID ITEM) 1
E-13 KEY CABINET 1
E-14 COMPRESSOR 1
E-24 A-V SPEAKERS (AV OPTIONAL BID ITEM) 1
E-25 A-V RACK (AV OPTIONAL BID ITEM) 1
E-26 ESS CABINET (ESS OPTIONAL BID ITEM) 1
E-27 SECURITY MONITOR (ESS OPTIONAL BID ITEM) 1
MECH.
ROOM#147
MECH.
ROOM
#148
ELEC.
ROOM
#149
LATRINE
#150
ELEC.
ROOM
#151
CHUTE.
DRYING
TOWER
#152
WASH
BINS
#153
FIRE
PUMP
#156
1 1 1 1 1
S I D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E
D A
T E
O C
T
T B
D
SHEET ID
READY TO ADVERTISE
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A
T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T
E D
B Y
D A
T E
C O
N T
R A
C T
N O
US Army Corps of Engineers
C A
T E
G O
R Y
C O
D E
U .S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
W
IL
M
IN
G T
O N
D
IS
T R
IC
T
D E
S C
R
IP
T
IO
N
M
IC
H
IG
A
N A
V E
S
U
IT
E
C H
IC
A
G O
T :3
.6
.7 w w w .e x p fe d e ra l.
c o m p ro j n o
-A
D A
R L
IN
G
T O
N A
V E
N U
E
W
IL
M
IN
G T
O N
N
O R
T H
C A
R O
L
IN
A W
P
M
R
-8
-0
F O
R T
B R
A G
G
N O
R T
H C
A R
O L
IN
A D
E V
E L
O P
R E
Q U
E S
T F
O R
P R
O P
O S
A L F
O R
P N
S O
F P
A R
A C
H U
T E
R
IG
G
IN
G F
A C
IL
IT
Y
IN604
IN
T
E R
IO
R
D E
S
IG
N
E X
IS
T
IN
G
E Q
U
IP
M E
N T
A N
D F
U R
N
IT
U R
E S
C H
E D
U L E
A K
A K
P Z
K S
B V
Q
IN
.D
G N
NOTE: EXISTING FURNITURE AND EQUIPMENT TO BE REUSED AND RELOCATED.
SOF PARACHUTE RIGGING FACILITY
EXISTING FURNITURE, FIXTURES, AND EQUIPMENT
ITEM # ITEM NAME QTY.
SWCS
PACKING
#127
SWCS
ADMIN
#128
SWCS
OFFICE
#129
SWCS
MFF RFI
#133
SWCS
SUPPLY
STORAGE
#135
MAINT.
#136
SECURE
AREA
STOR.
#139
DESKS
DK-2 54” x 30” DESK 1 1
DK-3 L-SHAPED DESK (66” x 28.5”) 3 2 1
DK-4 L-SHAPED DESK (24” x 66”) 1 1
DK-5 SMALL DESK (21” x 72”) 1 1
CHAIRS
CH-5 LOVESEAT (45” x 20.5”) 1 1
CH-6 CHAIR 3 3
CH-7 LOVESEAT (30” x 76”) 1 1
TABLES
TA-8 DINING TABLE (48” x 96”) NOT USED
TA-9 PING PONG TABLE NOT USED
TA-10 SEWING MACHINE W/ TABLE (20” x 48”) 1 1
STORAGE
S-23 BOOKSHELF (16” x 33”) 3 1 2
S-24 FILING CABINET (19” x 36”) 1 1
S-25 SMALL FILING CABINET (26.5” x 15”) 1 1
S-26 FILING CABINET (26.5” x 18”) 1 1
S-27 WALL LOCKER (20” x 31”) 2 1 1
S-28 FILING CABINET (18.5” x 15”) 1 1
S-29 STORAGE LOCKER (30” x 60”) 13 13
S-30 AVIATOR KIT BAG STORAGE CABINET (28” x 60”) 1 1
S-31 UTILITY CABINET (30” x 60”) 4 4
S-32 STORAGE CABINET (28” x 60”) 5 5
S-33 ROLLING PARACHUTE STORAGE RACK (38” x 74”) 2 2
S-34 WALL LOCKER (75.5” H) 14 OF 25 USED
S-35 STORAGE LOCKER (24” x 48”) 0
S-36 STORAGE LOCKER (28” x 60”) 0
S-37 STORAGE LOCKER (15” x 58.5”) 0
S-38 PARACHUTE STORAGE CABINET (28” x 60”) 8 8
S-39 ROLLING PARACHUTE STORAGE RACK (32” x 70”) NOT USED
S-40 WALL LOCKER (24” x 36”) 1 1
S-41 FILING CABINET (25” x 15”) 2 1 1
S-42 WALL LOCKER (18” x 35”) 1 1
S-43 CYPRESS STORAGE CABINET (28” x 30”) 1 1
S-44 ALTIMETER STORAGE CABINET (28” x 60”) 0
S-45 GENTEX HELMET STORAGE CABINET (20” x 31”) 1 1
S-46 CABINET (20” x 36”) 1 1
S-47 ROLLING STORAGE RACK (32” x 70”) 1 1
WORK BENCHES
WB-3 WORK BENCH (36” x 96”) NOT USED
WB-4 WORK BENCH (30” x 91”) 1 1
ACCESSORIES
MB-1 WHITE BOARD 2 1 1
A-9 BOARD OF EXCELLENCE 1 1
EQUIPMENT
E-15 SHOP FAN 1 1
E-16 REFRIGERATOR 0
E-17 MICROWAVE 2 1 1
E-18 COPY MACHINE 1 1
E-19 HP PRINTER 1 1
E-20 HONEYWELL A/C UNIT 1 1
E-21 SHREDDER 1 1
Furniture Item Descriptions (FID)
FID
ADMIN NC
SOF Parachute Rigging Facility, Fort Bragg, NC
PN #74813
Solicitation No.: W912PM18R0001
TABLE OF CONTENTS PAGE NO.
1.0 GENERAL
1.1 Submittal Requirements
2.0 PRODUCT DESCRIPTIONS AND QUALITY REQUIREMENTS
2.1 General Requirements
2.2 Metal/Solid Surface Desks
2.3 Solid Surface Tables and Training Tables
2.4 Metal Furniture: Storage Towers/Cabinets, Lateral Files, Vertical Files, and Bookcases
2.5 Wood Conference Tables, Executive II
2.6 Wood Casegoods, Executive II
2.7 Ergonomic Task and Conference Seating
2.8 Seating, Metal Frame
2.9 Lounge Seating
SOF Parachute Rigging Facility, Fort Bragg, NC
1.0 GENERAL
Item descriptions and quality requirements, as described in the FID (Furniture Item Descriptions), are for the quality, functional performance, and design intent of the furnishings required for this project. Products quoted that meet all functional and quality requirements, including all salient features listed in the product descriptions, will be considered responsive provided they are fully compliant with the RFQ requirements.
Compliance shall be determined by performance, features, quality, design intent, and value. Any item descriptions, salient features, or quality requirements listed within this document are not intended to be proprietary.
1.1 Submittal Requirements
All manufacturers shall provide technical documentation for each item quoted and manufacturers’ construction specifications to confirm that the proposed product meets all requirements listed in the FID.
Submittal of product brochures shall not be acceptable in place of technical documentation or construction specifications. Submittal of an entire price list shall not be acceptable. Submitted documentation for this RFQ response shall not be a cut and paste of the FID Section 2.0 and 3.0 requirements.
RFQ Response:
RFQ responses shall be clearly organized in numerical order per Section 3.0 of the FID. A master library is not kept, and specifications from previous projects will not be reviewed for other procurements. All product specifications shall be legible.
All technical documentation related to each item number shall be located within the same tab in the RFQ response and shall be submitted in the following order:
1. Product Information Required for Each Item Number in Section 3.0:
a. Item number for each product submitted in the RFQ response.
b. Manufacturer, product line, and model number for each item and its components.
c. Overall dimensions.
d. Product image.
e. All fabric and finishes that have been priced for each item.
2. Drawings:
a. Provide plan view drawings showing components and dimensions for each freestanding desk and panel-supported workstation, including clusters.
b. Provide elevations or isometrics.
c. Identify all locations of electrical outlets and data/communication outlets.
3. Section 3.0 Compliance Documentation:
a. Provide cut sheets from manufacturer’s published GSA Price List and any other required documentation to demonstrate compliance with requirements.
b. Highlight or circle the model, size, type, and any optional features proposed in the RFQ response.
4. Section 2.0 Compliance Documentation:
a. Provide manufacturer’s technical and construction specifications.
b. Documentation shall only be submitted once for multiple items from the same product line.
Clearly indicate the item numbers that submitted documentation supports.
5. Testing Documentation:
SOF Parachute Rigging Facility, Fort Bragg, NC
a. Provide actual test reports or test certifications for all applicable tests.
b. Test certifications submitted on manufacturer’s letterhead shall be acceptable in place of actual test reports, provided they include the following information:
i. Manufacturer’s name, product line, and model number of the item tested.
ii. Test method number(s) and edition date used for testing.
iii. Date or range of dates that the test(s) were performed.
iv. A statement that testing and certification apply to the product offered and that products offered meet all applicable test requirements.
v. Signature, date, and title of the company official accepting technical responsibility for testing.
c. Test reports and certifications shall be based upon the most recent edition of the ANSI/BIFMA test standard. All testing shall be within five years of the most current standard. If a new industry standard is issued, items on GSA shall be retested in accordance with the new test standard within 18 months of the issuance date regardless of the age of testing previously performed.
d. Provide actual reports for all flammability and acoustics tests.
6. Environmental Documentation:
a. Provide 3rd party certification for Indoor Air Quality (GREENGUARD or equivalent) when required.
b. Provide documentation regarding recycled content and recyclability for the product submitted, when required.
7. Warranty Documentation:
a. Provide manufacturer’s warranty plus terms and conditions for each item proposed.
b. Provide any additional or extended warranty that…