St. Johns RFI’s

1. Please list what, if any FFE is to be supplied by the awarded contractor.

a. FFE is not required

2. Is a hot Water recirculation system desired for this (these) structure(s), or should the contractor provide a tank type and/or insta‐hot water heaters?

a. Contractor is to provide an adequate system that meets the requirements.

3. Attachment B and A‐3 show access ramps to the structure, is contractor required to provide these ramps? If so, they appear to be too short based upon the assumed finish floor elevation and will not meet ADA/ABA requirements. Is the Government stating that the Finish floor elevation must be unusually low (for modular construction), or is this just a concept to show the intent is to have a ramp at these entrances?

a. Government provided design is a concept. Contractor design shall meet ADA/ABA requirements.

4. Due to the proximity to the ocean, will any anti‐corrosive HVAC coil coating be required? Would

Anti‐corrosive coating be required for the HVAC cabinet?

a. No

5. Is there any special lighting required in the exam rooms (overhead exam lighting, etc.) Is there any particular color temperature of the lamps to be used, any minimum color rendering index values, any special LUX value or Foot‐Candle requirements?

a. Follow the applicable codes

6. Is survey information available for the site? Are the exact dimensions of the buildable area available?

a. No

7. The drawing seems to indicate an “Emergency Room”. Please confirm that there will be no more than 5 people incapable of self‐preservation in this structure at any one time.

a. Not Applicable

8. Is there any special power or mechanical requirements needed for the Emergency room? Please elaborate on the types of procedures to be performed in this room.

Please be as specific as possible as requirements change dramatically based upon the use of the structure.

a. Standard emergency medical procedures. Follow the applicable codes for HVAC and electrical

9. Please elaborate on what is expected of the contractor for the freezer box? There can be many possible variations based upon government intent… We are unclear if we are

10. providing any space for this area, or if we are to provide something for user installed equipment, can we get cut sheets and utility requirements of this equipment?

a. Just provide a room for user to install equipment. Cut sheets are not available for this equipment.