W912PM-16-R-0020-0002__PN80773.pdf

PDF 360 KB Posted

Attached to
PN80773 SOF Battalion Operations Facility Federal contract opportunity
Solicitation number
W912PM-16-R-0020
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to PN80773 SOF Battalion Operations Facility, newest first.
File Type Posted
Amendment_0005_PN80773.pdf PDF
Amd4_PN80773_W912PM-16-R-0020.pdf PDF
PN_80773_-_Amendment_0003.pdf PDF
AMD0003_PN80773_PLANS_Vol1_CADDfiles.zip ZIP file
AMD0003_PN80773_PLANS_Vol2.pdf PDF
AMD0003_PN80773_PLANS_Vol1.pdf PDF
AMD0002_PLANS_PN80773_VOL1_Caddfiles.zip ZIP file
AMD0002_PLANS_PN80773_VOL1.pdf PDF
AMD0002_PLANS_PN80773_VOL2.pdf PDF
AMD0001_PLANS_PN80773_V2.pdf PDF
Amendment_0001_-_PN_80773.pdf PDF
AMD0001_PLANS_PN80773_V1_Caddfiles.zip ZIP file
AMD0001_PLANS_PN80773_V1.pdf PDF
Site_Visit_Sign-In.pdf PDF
BR80773vol3.pdf PDF
ADV_PLANS_PN80773_Vol1.pdf PDF
BR80773vol1.pdf PDF
ADV_PLANS_PN80773_Vol2.pdf PDF
BR80773vol2.pdf PDF
BR80773vol4-FF E.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PN80773

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

W912PM-16-R-0020 is hereby amended to incorporate the follow ing Changes:

1) Revise the Projnet closing date to 30 August 2016 at C.O.B in "Technical Matters" in section 00 00 00.

2) Add "Note 4" to the "Notice to Offerors" in section 00 10 00 regarding As-built Draw ings for CLINS 0005-0007 and attach appllicable request form.

3) See Technical Summary of Changes

All other terms and condtions remain unchanged and are in full force and effect.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 6

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-16-R-0020

X 9B. DATED (SEE ITEM 11)

27-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Aug-2016

CODE

U S ARMY CORPS OF ENGINEERS

WILMINGTON DISTRICT

ATTN: CONTRACTING DIVISION

69 DARLINGTON AVE

WILMINGTON NC 28403-1343

W912PM 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PM-16-R-0020

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SUMMARY OF CHANGES

SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

The following have been modified:

TECHNICAL MATTERS

Technical inquiries and questions relating to proposal procedures or bonds shall be submitted via Bidder Inquiry in ProjNet at www.projnet.org\projnet.

Offerors shall not submit their proposals via ProjNet. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login.

Fill in all required information and click create user. Verify that information on next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been reviewed and response approved by the Contracting Officer.

i. The Solicitation Number is: W912PM-16-R-0020

ii. The Bidder Inquiry Key is: ZAJJ4K-Z77RH7

Bidders/Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The name of the submitter or firm is not published for the public on the report of all Bidder Inquiries. Bidders/ Offerors are on notice of, and assumed to be aware of, all inquiries, responses, and information posted in the Bidder Inquiry System up to the date of proposal submission, whether the inquiry was generated by the Offeror themselves or another potential Bidder/Offeror.

Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment to the solicitation is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment.

The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled no later than, 30 August 2016 at Close of Business. The Government reserves the right to not respond to questions/inquiries received after this date. No inquiries will be accepted by the Bidder Inquiry system after the above specified date, prior to the proposal due date. However, the Bidder Inquiry system may still be accessed to view answers/replies to previous inquiries until the proposal due date.

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Attachment 5: Small

Business Participation

Attachment 2 Attachment 4: Key Personnel

Attachment 3 Attachment 3: PPQ

NAVFAC-USACE

Attachment 4 Attachment 2: Corporate Relevant Specialized Experience

Attachment 5 Attachment 1: Proposal Data Sheet to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Attachment 5: Small

Business Participation

Attachment 2 Attachment 4: Key Personnel

Attachment 3 Attachment 3: PPQ

NAVFAC-USACE

Attachment 4 Attachment 2: Corporate Relevant Specialized Experience

Attachment 5 Attachment 1: Proposal Data Sheet

Attachment 6 Fort Bragg IGI&S Data Request Form

SECTION 00 10 00 - SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

The following have been modified:

NOTICE TO OFFERORS

NOTICE TO BIDDERS/OFFERORS

NOTE 1:

THE PERIOD OF PERFORMANCE OF THE ENTIRE CONTRACT SHALL NOT EXCEED

730 CALENDAR DAYS. FOR OPTIONAL BID ITEMS 1 to 9 (CLIN’s 0004-0012), IF

EXERCISED, SHALL RUN CONCURRENTLY, SO THAT THE PERIOD OF

PERFORMANCE SHALL NOT BE EXTENDED BEYOND THE ORIGINAL CONTRACT

DURATION OF 730 CALENDAR DAYS.

NOTE 2:

THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE OPTIONAL BID ITEMS 1-9

(CLIN’s 0004-0012) NO LATER THAN 30 SEPTEMBER 2017.

NOTE 3:

THE EXERCISE OF OPTIONAL BID ITEMS 1 to 9 (CLIN’s 0004-0012), SHALL BE

SUBJECT TO THE AVAILABILITY OF FUNDS.

NOTE 4:

OFFERORS MAY REQUEST AS-BUILT DRAWINGS FOR OPTIONAL BID ITEMS 2, 3

AND 4 (CLIN’s 0005-007). OFFERORS ARE REQUIRED TO COMPLETE THE ATTACHED NON-DISCLOSURE FORM ENTITLED “Fort Bragg IGI&S Data Request Form”

AND FORWARD THE COMPLETED FORM TO DEBRA MORGAN AT DPW GIS VIA

EMAIL AT DEBRA.H.MORGAN.CIV@MAIL.MIL. UPON APPROVAL, OFFERORS WILL

RECEIVE AN EMAIL TO DOWNLOAD THE FILES USING THE AMRDEC SAFE SITE.

SUBMISSION OF PROPOSALS

HAND CARRIED PROPOSALS AND OTHER FORMS OF ELECTRONIC PROPOSAL

SUBMISSION, TO INCLUDE E-MAIL, (CD-ROM) DISCS AND FACSIMILE

TRANSMISSIONS, ARE NOT AUTHORIZED.

Proposals shall be submitted, organized and tabbed in accordance with Paragraph 3 of the General Proposal Submission and Tabbing Requirements section of this Request for Proposal.

Proposals shall be electronically signed by a duly authorized official of the Offeror’s company and are required as indicated below:

Request For Proposal No: W912PM-16-R-0020 Due Date of Proposal: 6 September 2016 Time by which Proposals are Due: 2:00 P.M. (Eastern time) Title of Project: PN80773 SOF Battalion Operations Facility

Offerors are responsible for allowing sufficient time for the proposal to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for receipt of proposals.

The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the office designated for receipt of proposals.

Offerors are responsible for allowing sufficient time for the proposal to be physically received and processed by Mailroom personnel in accordance with the information provided.

QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System. Please see Section 01 45 00.10 10 for additional information.

SECURITY REQUIREMENTS: Increased security at military installations may require vehicle and personnel registration, as well as 100% ID checks and random vehicle searches.

Additionally, construction of this facility is located within a high security area. A high security control area is defined as an area requiring armed security guard escort at all times, perimeter intrusion detection or access control measures, contractor personnel require identification badges and are subject to random searches of vehicles, equipment and personnel.

Due to the location of the construction site there are specific requirements with regard to security that must be adhered to including identification requirements, background checks, delivery coordination, Master Access Control Roster, work stoppages, etc. Please see Section 01 00 60 for additional information.

(End of Summary of Changes)

*Name

*Organization

*Email

*Phone

*Statement of what the data will be used for: *Statement of how the products will be distributed:

*Statement of what products will be created from the data: *Statement of who the products will be available to:

Fort Bragg Installation Geospatial Information & Services Data Request Form

Fort Bragg geospatial data can be requested by completing and submitting the following form. All required fields are marked with an asterisk.

Requestor Information Government POC Information

*Name

*Organization

*Email

*Phone

Justification

*Mail Address

AUDITORY (noise contours)

BOUNDARY (cantonment, county, etc)

BUILDINGS (sheds, existing structures, addresses points, housing area, demolished buildings, points of interest)

GeoSpatial Data available in CADD or GIS Formats

CADASTRE (installation boundary, use area)

CULTURAL (cemetery, historical features, historical district, historical structures, mitigated districts, etc)

COMUMUNICATIONS (tower, etc)

ENV HAZ Characterization (groundwater sta points, field sample points, landfill gas monitoring points)

ENV HAZWASTE (storage sites, munitions, etc)

ENV HAZ POLLUTION (gwt pollution plume area)

ENV REGULATED TANK (above & underground tanks)

ENV REMEDIATION (rem operable unit area)

ENV SITE MGMT ( environmental restoration site)

ENV HAZ SOLID WASTE (landfill area)

ESB (RCW Trees, RCW Clusters, RCW Partitions, restoration area, presettlement, OldGrowth Pines, etc) RCW data will only be given out for specific requirements.

FAUNA (special species area, habitats, forage area)

FLORA (special species, forest stands, vegetation, etc)

FORESTRY (burn blocks, smoke management)

FUTURE PROJECTS (areas)

GEODETIC (ngs control points, image area, grids, etc)

HYDRO (streams, lakes, watershed, wetlands, etc)

IMPROVEMENT FLOODCONTROL (Dams)

IMPROVEMENT GENERAL (Fence, gates, access control)

IMPROVEMENT RECREATION (parks, athletic fields, etc)

IMPROVEMENT WELLS (Water well points)

LAND STATUS (restricted areas)

LANDFORM (elevation contour lines)

MILITARY OPERATIONS (landing/drop zones, impact areas, firing sites, ranges, etc)

SOIL (soil map units)

TRANSPORTATION AIR (Airfield, APZ, etc )

TRANSPORTATION RROAD ( railroad lines)

TRANSPORTATION VEHICLE ( center lines, bridges, etc)

UTILITIES (WATER, ELECTRIC, WASTE, GAS, etc) List utility system needed in other data section.

Other Data Layers

*Please select one or more of the following data layers

GIS (GeoDatabase) MicroStation (DGN) Both

NOTE: Certain Data layers are only available in GIS format, mainly the Environmental data.

This Data Request Form is NOT intended for Maps or DGN projects drawings such as:

floor plans, building utilities drawings, or any other project maps. Maps and Drawing can be requested on separate Map Request Form.

FOR OFFICIAL USE ONLY (FOUO): Data will not be duplicated nor secondary distribution of the original data.

Data shall be kept in a secure location. Upon termination of use, the hardcopy prints and electronic media shall be destroyed by shredding the prints and reformatting of the electronic media. All data shall be removed from any computers. DO NOT COPY, SCAN, OR POST THIS DATA ON THE INTERNET.

Distribution authorized to U.S. Government Agencies and their contractors only.

Your data request will be reviewed and you will be contacted if additional information is required.

The average data request processing time is 5 days.

You can submit the completed data request form using one of the following options:

1. Preferred method is by email to kirk.p.rutkofske.ctr@mail.mil, attaching this digitally signed PDF or scanned image of the signed printout.

2. Alternatively, the signed form can be faxed to 1-910-907-2473 Attn: DPW - CADD/GIS OFFICE - Data Request

Name (Print):

Signature:

Date:

Digital signature requires Adobe Acrobat Professional - Acrobat Reader users must print, sign, and email the form.

Print Form

Amendment 0002

TECHNICAL SUMMARY OF CHANGES

A. TECHNICAL SPECIFICATION CHANGES: The revised and added Sections listed below (revised and added by RFPLetter_R2) are hereby added to and made a part of the solicitation.

Revised or added information is underlined, printed in bold and deleted information is struck out.

Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *2). Deleted Sections are also indicated below.

Revised Sections Added Sections Deleted Sections

PROJECT TABLE OF CONTENTS

01 33 00 Attachment 1-ENG 4288 07 21 29 05 50 13 08 41 13 33 61 13.13 09 83 13

B. CONTRACT DRAWINGS:

Volume 1:

Sheets CS101, CS104, and CG501 with Revision 1 dated August 2016 are hereby added to and made a part of the Contract Drawings.

Volume 2:

Sheets A-203, A-204, A-301, A-403, A-535, A-601, A-602, A-606, and M-001 with Revision 1 dated August 2016 are hereby added to and made a part of the Contract Drawings.

SOF BATTALION OPERATIONS FACILITY PN80773

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

STANDARD FORM 1442

00 10 00 SOLICITATION, CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

00 21 16 INSTRUCTIONS TO PROPOSERS

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 70 00 CONDITIONS OF THE CONTRACT

00 73 00 SUPPLEMENTARY CONDITIONS

00 01 15 LIST OF DRAWINGS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.00 37 INDOOR AIR QUALITY (IAQ) MANAGEMENT

01 74 19.00 37 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 83 16.00 37 EXTERIOR ENCLOSURE PERFORMANCE REQUIREMENTS

01 91 00.00 37 COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING

03 15 00.00 10 CONCRETE ACCESSORIES

03 20 00.00 10 CONCRETE REINFORCING

03 30 00.00 10 CAST-IN-PLACE CONCRETE

DIVISION 05 - METALS

05 05 23.16 STRUCTURAL WELDING

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

PROJECT TABLE OF CONTENTS Page 1 (ADDED and/or Revised by Amendment 0002)

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

*2

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

07 13 53 ELASTOMERIC SHEET WATERPROOFING

07 16 19 METALLIC OXIDE WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 21 29 SPRAY-APPLIED FOAM INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 27 FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR RETARDING

07 31 13 ASPHALT SHINGLES

07 54 19 POLYVINYL-CHLORIDE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

*2

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 34 59 VAULT DOORS AND DAY GATES

08 34 73 SOUND CONTROL DOOR ASSEMBLIES

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 06 90 COLOR SCHEDULE

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 24 23 STUCCO

09 29 00 GYPSUM BOARD

09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 68 00 CARPET

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 14 01 EXTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 13 WIRE MESH PARTITIONS

10 22 39 FOLDING PANEL PARTITIONS

10 26 13 WALL AND CORNER GUARDS

10 28 13 TOILET ACCESSORIES

PROJECT TABLE OF CONTENTS Page 2

10 44 16 FIRE EXTINGUISHERS

10 51 13 METAL LOCKERS

DIVISION 11 - EQUIPMENT

11 05 40 COMMON WORK RESULTS FOR FOODSERVICE EQUIPMENT

11 47 00 ICE MACHINES

DIVISION 12 - FURNISHINGS

12 21 00 WINDOW BLINDS

12 48 13.13 ENTRANCE FLOOR MATS

DIVISION 13 - SPECIAL CONSTRUCTION

13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT

13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT

DIVISION 14 - CONVEYING EQUIPMENT

14 24 00 HYDRAULIC ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 15 COMMON PIPING FOR HVAC

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 23 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER

BUILDING CONTROL SYSTEMS

23 11 25 FACILITY GAS PIPING

23 23 00 REFRIGERANT PIPING

23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS

23 52 00 HEATING BOILERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 41 00 LIGHTNING PROTECTION AND GROUNDING SYSTEM

26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)

26 51 00 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM

PROJECT TABLE OF CONTENTS Page 3

27 05 29.00 10 PROTECTIVE DISTRIBUTION SYSTEM (PDS) FOR SIPRNET

COMMUNICATION SYSTEMS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

27 40 00 AUDIO VIDEO SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 16 01.00 10 SMALL INTRUSION DETECTION SYSTEM

28 20 01.00 10 ELECTRONIC SECURITY SYSTEM

28 23 23.00 10 CLOSED CIRCUIT TELEVISION SYSTEMS

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 31 16.13 CHEMICAL TERMITE CONTROL

31 32 11 SOIL SURFACE EROSION CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 16.16 BASE COURSE FOR RIGID AND SUBBASE COURSE FOR FLEXIBLE

PAVING

32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE

32 12 10 BITUMINOUS TACK AND PRIME COATS

32 12 17 HOT MIX BITUMINOUS PAVEMENT

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS

32 17 23.00 20 PAVEMENT MARKINGS

32 92 19 SEEDING

32 92 23 SODDING

32 93 00 EXTERIOR PLANTS

*2

DIVISION 33 - UTILITIES

33 40 00 STORM DRAINAGE UTILITIES

33 51 15 NATURAL-GAS/LIQUID PETROLEUM GAS DISTRIBUTION

33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION

33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

*2

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 4

SUBMITTAL REGISTER (ER 415-1-10)

TITLE AND LOCATION DATE

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

PN 80773 SOF BATTALION OPERATIONS

W912PM-16-R-0020 NA

23 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

SECTION - 01 10 00.10 38 SUPPLEMENTARY SPECIAL CONTRACT REQUIREMENTS

1 01 10 00.10 38 1.10 List of Subcontractors PRECON SUBMTL FIO

2 01 10 00.10 38 1.2 Progress Chart PRECON SUBMTL GA

3 01 10 00.10 38 1.10 Quality Control Plan PRECON SUBMTL GA

4 01 10 00.10 38 1.10 Certificate of Insurance PRECON SUBMTL FIO

5 01 10 00.10 38 1.2 WORK PLAN PRODUCT DATA FIO

6 01 10 00.10 38 1.2 PROGRESS SCHEDULE PRODUCT DATA FIO

7 01 10 00.10 38 1.10 Completion of Corps CQC Course CERTIFICATES FIO

8 01 10 00.10 38 1.10 Letter Appointing Superintendent CERTIFICATES FIO

9 01 10 00.10 38 1.9 Commercial testing laboratory CERTIFICATES GA

10 01 10 00.10 38 1.9 Contractor testing laboratory CERTIFICATES GA

SECTION - 01 32 01.00 10 PROJECT SCHEDULE

1 01 32 01.00 10 1.3 Project Scheduler Qualifications PRECON SUBMTL GA

2 01 32 01.00 10 3.4.1 Preliminary Project Schedule PRECON SUBMTL GA

3 01 32 01.00 10 3.4.2 Initial Project Schedule PRECON SUBMTL GA

4 01 32 01.00 10 3.6.2 Periodic Schedule Update PRECON SUBMTL GA

SECTION - 01 33 00 SUBMITTAL PROCEDURES

1 01 33 00 1.9 Submittal Register PRECON SUBMTL GA

SECTION - 01 33 29 LEED(TM) DOCUMENTATION

1 01 33 29 1.3 SDD Implementation Plan PRECON SUBMTL GA

2 01 33 29 3.1 Preconstruction Meeting PRECON SUBMTL FIO

3 01 33 29 1.6.1 Energy-using Equipment PRODUCT DATA FIO

4 01 33 29 3.1 Pre-Closeout Meeting CERTIFICATES FIO

5 01 33 29 1.4 SDD Notebook CLOSEOUT SUBMTL GA

6 01 33 29 1.5.1 Energy & Sustainability (E&S) Record Car CLOSEOUT SUBMTL FIO

7 01 33 29 3.1 Closeout Meeting CLOSEOUT SUBMTL FIO

SECTION - 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

1 01 35 26 1.7 Accident Prevention Plan (APP) PRECON SUBMTL GA

2 01 35 26 1.4 Monthly Exposure Reports TEST REPORTS FIO

3 01 35 26 1.12 Notifications and Reports TEST REPORTS FIO

4 01 35 26 1.12.2 Accident Reports TEST REPORTS GA

5 01 35 26 1.12.3 LHE Inspection Reports TEST REPORTS FIO

6 01 35 26 1.6.1.5 Crane Operators/Riggers CERTIFICATES FIO

7 01 35 26 1.7.2.2 Standard Lift Plan CERTIFICATES GA

8 01 35 26 1.7.2.3 Critical Lift Plan CERTIFICATES GA

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

PN 80773 SOF BATTALION OPERATIONS

W912PM-16-R-0020 NA

23 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

9 01 35 26 1.8 Activity Hazard Analysis (AHA) CERTIFICATES FIO

10 01 35 26 1.9.1 Confined Space Entry Permit CERTIFICATES FIO

11 01 35 26 1.9.1 Hot Work Permit CERTIFICATES FIO

12 01 35 26 1.12.4 Certificate of Compliance CERTIFICATES FIO

13 01 35 26 1.14 License Certificates CERTIFICATES FIO

14 01 35 26 1.14.1 Radiography Operation Planning Work Shee CERTIFICATES GA

SECTION - 01 45 00.00 10 QUALITY CONTROL

1 01 45 00.00 10 3.2 Contractor Quality Control (CQC) Plan PRECON SUBMTL GA

2 01 45 00.00 10 3.9 Verification Statement TEST REPORTS FIO

SECTION - 01 45 35 Special Inspection For Seismic-Resisting Systems

1 01 45 35 3.1.2 Daily Reports TEST REPORTS FIO

2 01 45 35 3.1.1 Biweekly Reports TEST REPORTS FIO

3 01 45 35 2.1 Fabrication Plant CERTIFICATES FIO

4 01 45 35 2.1 Steel Joist Institute Membership CERTIFICATES FIO

5 01 45 35 2.1 Certificate of Compliance CERTIFICATES FIO

6 01 45 35 1.5 Special Inspector CERTIFICATES GA

7 01 45 35 2.1 Comprehensive Final Report CLOSEOUT SUBMTL GA

8 01 45 35 3.1.2 Comprehensive Final Report CLOSEOUT SUBMTL GA

SECTION - 01 50 00 Temporary Construction Facilities And Controls

1 01 50 00 1.3 Construction Site Plan PRECON SUBMTL GA

2 01 50 00 3.4.1 Traffic Control Plan PRECON SUBMTL GA

3 01 50 00 1.4 Backflow Preventers CERTIFICATES FIO

SECTION - 01 57 19 Temporary Environmental Controls

1 01 57 19 1.5.1 Preconstruction Survey PRECON SUBMTL FIO

2 01 57 19 1.10 Solid Waste Management Permit PRECON SUBMTL GA

3 01 57 19 1.5.2 Regulatory Notifications PRECON SUBMTL GA

4 01 57 19 1.6 Environmental Protection Plan PRECON SUBMTL GA

5 01 57 19 3.2.1.2 Stormwater Notice of Intent PRECON SUBMTL GA

6 01 57 19 1.6.9.1 Dirt and Dust Control Plan PRECON SUBMTL GA

7 01 57 19 1.5.5 Employee Training Records PRECON SUBMTL GA

8 01 57 19 1.5.4 Environmental Manager Qualifications PRECON SUBMTL GA

9 01 57 19 3.2.1.3 Inspection Reports TEST REPORTS GA

10 01 57 19 3.7.2.1 Solid Waste Management Report TEST REPORTS GA

11 01 57 19 1.5.5 Employee Training Records CERTIFICATES GA

12 01 57 19 1.5.5 Erosion and Sediment Control Inspector CERTIFICATES GA

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

PN 80773 SOF BATTALION OPERATIONS

W912PM-16-R-0020 NA

23 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

13 01 57 19 3.2.1.4 Stormwater Pollution Prevention Plan Com CLOSEOUT SUBMTL GA

14 01 57 19 3.2.1.5 Stormwater Notice of Termination CLOSEOUT SUBMTL GA

15 01 57 19 3.7.1 Waste Determination Documentation CLOSEOUT SUBMTL GA

16 01 57 19 3.7.3.5 Disposal Documentation for Hazardous and CLOSEOUT SUBMTL GA

17 01 57 19 1.5.5 Assembled Employee Training Records CLOSEOUT SUBMTL GA

18 01 57 19 1.10 Solid Waste Management Permit CLOSEOUT SUBMTL GA

19 01 57 19 3.7.2.1 Solid Waste Management Report CLOSEOUT SUBMTL GA

20 01 57 19 3.7.3.1 Hazardous Waste/Debris Management CLOSEOUT SUBMTL GA

21 01 57 19 1.5.2 Regulatory Notifications CLOSEOUT SUBMTL GA

22 01 57 19 3.7.2.1 Sales Documentation CLOSEOUT SUBMTL GA

23 01 57 19 3.2.1.5 As-Built Topographic Survey CLOSEOUT SUBMTL FIO

SECTION - 01 57 19.00 37 INDOOR AIR QUALITY (IAQ) MANAGEMENT

1 01 57 19.00 37 1.3 Indoor Air Quality (IAQ) Management Plan PRECON SUBMTL GA

2 01 57 19.00 37 1.3.2 Air Contamination Testing TEST REPORTS FIO

3 01 57 19.00 37 1.3.2 LEED CLOSEOUT SUBMTL FIO

SECTION - 01 74 19.00 37 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

1 01 74 19.00 37 1.5 Records CLOSEOUT SUBMTL FIO

SECTION - 01 78 00 CLOSEOUT SUBMITTALS

1 01 78 00 1.3.2 As-Built Record of Equipment and Materia PRODUCT DATA FIO

2 01 78 00 1.6.1 Warranty Management Plan PRODUCT DATA FIO

3 01 78 00 1.6.5 Warranty Tags PRODUCT DATA FIO

4 01 78 00 1.4 Spare Parts Data PRODUCT DATA FIO

5 01 78 00 1.5 Preventative Maintenance MFRS INSTR FIO

6 01 78 00 1.5 Condition Monitoring (Predictive Testing MFRS INSTR FIO

7 01 78 00 1.5 Inspection MFRS INSTR FIO

8 01 78 00 1.6.1 Instructions MFRS INSTR FIO

9 01 78 00 1.7 Operation and Maintenance Manuals O&M DATA FIO

10 01 78 00 1.3.1 Record Drawings CLOSEOUT SUBMTL FIO

11 01 78 00 1.9 Interim Form DD1354 CLOSEOUT SUBMTL GA

12 01 78 00 1.9 Checklist for Form DD1354 CLOSEOUT SUBMTL GA

SECTION - 01 78 23 OPERATION AND MAINTENANCE DATA

1 01 78 23 1.4 O&M Database O&M DATA GA

2 01 78 23 3.1.1 Training Plan O&M DATA GA

3 01 78 23 3.1.3 Training Outline O&M DATA GA

4 01 78 23 3.1.2 Training Content O&M DATA GA

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

PN 80773 SOF BATTALION OPERATIONS

W912PM-16-R-0020 NA

23 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

5 01 78 23 3.1.4 Training Video Recording CLOSEOUT SUBMTL GA

6 01 78 23 3.1.6 Validation of Training Completion CLOSEOUT SUBMTL GA

SECTION - 01 83 16.00 37 EXTERIOR ENCLOSURE PERFORMANCE REQUIREMENTS

1 01 83 16.00 37 3.2.1 Test Documentation DESIGN DATA GA

2 01 83 16.00 37 3.3.1 Building Airtightness Test TEST REPORTS GA

3 01 83 16.00 37 3.3.2 Thermography Test TEST REPORTS GA

SECTION - 01 91 00.00 37 COMMISSIONING

1 01 91 00.00 37 1.11.2 Control Drawings SHOP DRAWINGS FIO

2 01 91 00.00 37 3.7 Filled out functional test readiness for TEST REPORTS GA

3 01 91 00.00 37 3.1.3 Completed PFT checklists TEST REPORTS GA

4 01 91 00.00 37 3.1.4.1 Completed startup checklists TEST REPORTS GA

5 01 91 00.00 37 3.7.4 Completed FPT forms TEST REPORTS FIO

6 01 91 00.00 37 3.1.5 Nonconformance and Approval in PFT check TEST REPORTS FIO

7 01 91 00.00 37 3.2 Calibration documentation CERTIFICATES FIO

8 01 91 00.00 37 3.2 Calibration certification CERTIFICATES FIO

9 01 91 00.00 37 1.10 Startup and Checkout Plan MFRS INSTR FIO

10 01 91 00.00 37 1.10 Checkout Forms MFRS INSTR FIO

11 01 91 00.00 37 1.10 Test Procedures MFRS INSTR FIO

12 01 91 00.00 37 3.10.1 Training Plan O&M DATA GA

13 01 91 00.00 37 3.10.3 Training Documentation O&M DATA GA

14 01 91 00.00 37 3.10.4 Training Verification O&M DATA FIO

15 01 91 00.00 37 3.8.1 Deficiency Report and Resolution Record O&M DATA FIO

SECTION - 02 41 00 DEMOLITION

1 02 41 00 1.2.1 Demolition Plan PRECON SUBMTL GA

2 02 41 00 1.9 Existing Conditions PRECON SUBMTL FIO

3 02 41 00 1.6 Notification CERTIFICATES GA

SECTION - 03 11 13.00 10 STRUCTURAL CONCRETE FORMWORK

1 03 11 13.00 10 2.2.1 Formwork SHOP DRAWINGS GA

2 03 11 13.00 10 3.1.1 Formwork SHOP DRAWINGS GA

3 03 11 13.00 10 2.2.1 Form Removal Schedule SHOP DRAWINGS GA

4 03 11 13.00 10 2.2 Form Materials PRODUCT DATA FIO

5 03 11 13.00 10 1.3 Sample Panels SAMPLES GA

6 03 11 13.00 10 2.1 Calculations DESIGN DATA FIO

7 03 11 13.00 10 3.2 Inspection TEST REPORTS FIO

SECTION - 03 15 00.00 10 CONCRETE ACCESSORIES

K7EPEOAF

Highlight

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

PN 80773 SOF BATTALION OPERATIONS

W912PM-16-R-0020 NA

23 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

1 03 15 00.00 10 2.2 Preformed Expansion Joint Filler PRODUCT DATA FIO

2 03 15 00.00 10 2.2 Preformed Expansion Joint Filler CERTIFICATES FIO

SECTION - 03 20 00.00 10 CONCRETE REINFORCING

1 03 20 00.00 10 3.1 Reinforcement SHOP DRAWINGS GA

2 03 20 00.00 10 1.5 LEED product data PRODUCT DATA FIO

3 03 20 00.00 10 2.3 Reinforcing Steel CERTIFICATES FIO

4 03 20 00.00 10 1.3.1 Qualified Welders CERTIFICATES FIO

5 03 20 00.00 10 1.3.2 Qualification of Steel Bar Butt-Splicers CERTIFICATES FIO

SECTION - 03 30 00.00 10 CAST-IN-PLACE CONCRETE

1 03 30 00.00 10 1.4.2 Quality Control Plan PRECON SUBMTL GA

2 03 30 00.00 10 1.4.1 Laboratory Accreditation PRECON SUBMTL FIO

3 03 30 00.00 10 3.10.5.6 Sampling Plan PRECON SUBMTL GA

4 03 30 00.00 10 1.6 LEED product data PRODUCT DATA FIO

5 03 30 00.00 10 2.2 Cementitious Materials PRODUCT DATA FIO

6 03 30 00.00 10 2.11 Vapor Retarder PRODUCT DATA FIO

7 03 30 00.00 10 2.9 Floor Hardener PRODUCT DATA FIO

8 03 30 00.00 10 2.4 Chemical Admixtures PRODUCT DATA FIO

9 03 30 00.00 10 2.4.5 Surface Retarder SAMPLES FIO

10 03 30 00.00 10 2.1.1 Mixture Proportions DESIGN DATA GA

11 03 30 00.00 10 3.3 Lightweight Aggregate Concrete DESIGN DATA FIO

12 03 30 00.00 10 2.1.1 Mixture Proportions TEST REPORTS GA

13 03 30 00.00 10 3.10 Testing and Inspection for CQC TEST REPORTS GA

14 03 30 00.00 10 2.2.4 Fly Ash TEST REPORTS FIO

15 03 30 00.00 10 2.2.7 Ground Granulated Blast-Furnace (GGBF) S TEST REPORTS FIO

16 03 30 00.00 10 2.3 Aggregates TEST REPORTS FIO

17 03 30 00.00 10 3.10.5.1 Air Content TEST REPORTS FIO

18 03 30 00.00 10 3.10.5.3 Slump TEST REPORTS FIO

19 03 30 00.00 10 3.10.5.6 Compressive Strength TEST REPORTS FIO

20 03 30 00.00 10 2.5 Water TEST REPORTS FIO

21 03 30 00.00 10 1.4 Contractor Quality Control personnel CERTIFICATES FIO

22 03 30 00.00 10 3.2.1 Ready-Mix Plant CERTIFICATES FIO

SECTION - 05 05 23.16 STRUCTURAL WELDING

1 05 05 23.16 3.2 Welding Quality Assurance Plan PRECON SUBMTL FIO

2 05 05 23.16 1.3 Welding Procedure Qualifications PRODUCT DATA GA

3 05 05 23.16 1.3.5 Welder, Welding Operator, and Tacker Qua PRODUCT DATA FIO

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

PN 80773 SOF BATTALION OPERATIONS

W912PM-16-R-0020 NA

23 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

4 05 05 23.16 1.3.6 Inspector Qualification PRODUCT DATA FIO

5 05 05 23.16 1.3.2 Previous Qualifications PRODUCT DATA FIO

6 05 05 23.16 1.3.3 Pre-Qualified Procedures PRODUCT DATA FIO

7 05 05 23.16 2.2 Welding Electrodes and Rods PRODUCT DATA FIO

8 05 05 23.16 3.3 Nondestructive Testing TEST REPORTS FIO

9 05 05 23.16 1.3.1 Certified Welding Procedure Specificatio CERTIFICATES FIO

10 05 05 23.16 1.3.1 Certified Brazing Procedure Specificatio CERTIFICATES FIO

11 05 05 23.16 1.3.1 Certified Procedure Qualification Record CERTIFICATES FIO

12 05 05 23.16 1.3.1 Certified Welder Performance Qualificati CERTIFICATES FIO

13 05 05 23.16 1.3.1 Certified Brazer Performance Qualificati CERTIFICATES FIO

SECTION - 05 12 00 STRUCTURAL STEEL

1 05 12 00 1.4.1.1 Erection Drawings PRECON SUBMTL GA

2 05 12 00 1.4.2 Fabrication drawings SHOP DRAWINGS GA

3 05 12 00 2.5.2 Shop primer PRODUCT DATA FIO

4 05 12 00 2.4.1 Welding electrodes and rods PRODUCT DATA FIO

5 05 12 00 2.3.2.3 Direct Tension Indicator Washers PRODUCT DATA FIO

6 05 12 00 2.4.2 Non-Shrink Grout PRODUCT DATA FIO

7 05 12 00 1.5 LEED product data PRODUCT DATA FIO

8 05 12 00 2.5.2 Class B coating TEST REPORTS FIO

9 05 12 00 2.3 Bolts, nuts, and washers TEST REPORTS FIO

10 05 12 00 3.6.1.2 Weld Inspection Reports TEST REPORTS FIO

11 05 12 00 3.6.2.1 Direct Tension Indicator Washer Inspecti TEST REPORTS FIO

12 05 12 00 3.6.3.1 Bolt Testing Reports TEST REPORTS FIO

13 05 12 00 2.2 Steel CERTIFICATES FIO

14 05 12 00 2.3 Bolts, nuts, and washers CERTIFICATES FIO

15 05 12 00 1.3 AISC Fabrication Plant Quality Certifica CERTIFICATES FIO

16 05 12 00 1.3 AISC Erector Quality Certification CERTIFICATES FIO

17 05 12 00 1.4.3.1 Welding procedures and qualifications CERTIFICATES FIO

18 05 12 00 2.4.1 Welding electrodes and rods CERTIFICATES FIO

SECTION - 05 21 00 Steel Joist Framing

1 05 21 00 1.3.2 Welder Qualification PRECON SUBMTL FIO

2 05 21 00 1.3.1 Steel Joist Framing SHOP DRAWINGS GA

3 05 21 00 1.5 LEED product data PRODUCT DATA FIO

4 05 21 00 2.2 Design Calculations DESIGN DATA GA

5 05 21 00 3.3 Erection Inspection TEST REPORTS FIO

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

PN 80773 SOF BATTALION OPERATIONS

W912PM-16-R-0020 NA

23 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

6 05 21 00 3.3 Welding Inspections TEST REPORTS FIO

7 05 21 00 1.3.2 Certification of Compliance CERTIFICATES FIO

SECTION - 05 30 00 STEEL DECKS

1 05 30 00 1.3.5 Fabrication Drawings SHOP DRAWINGS GA

2 05 30 00 2.2 Accessories PRODUCT DATA FIO

3 05 30 00 2.1 Deck Units PRODUCT DATA FIO

4 05 30 00 2.1.4 Galvanizing Repair Paint PRODUCT DATA FIO

5 05 30 00 2.2.15 Mechanical Fasteners PRODUCT DATA FIO

6 05 30 00 2.1.4 Touch-up Paint PRODUCT DATA FIO

7 05 30 00 1.3.3 Welding Equipment PRODUCT DATA FIO

8 05 30 00 1.3.3 Welding Rods and Accessories PRODUCT DATA FIO

9 05 30 00 1.6 LEED product data PRODUCT DATA FIO

10 05 30 00 2.1.1 Metal Roof Deck Units SAMPLES FIO

11 05 30 00 2.2.4 Flexible Closure Strips SAMPLES FIO

12 05 30 00 2.1 Deck Units DESIGN DATA GA

13 05 30 00 1.3.2 Powder-Actuated Tool Operator CERTIFICATES FIO

14 05 30 00 1.3.3 Welder Qualifications CERTIFICATES FIO

15 05 30 00 1.3.3 Welding Procedures CERTIFICATES FIO

16 05 30 00 1.3.4.1 Fire Safety CERTIFICATES FIO

17 05 30 00 1.3.4.2 Wind Storm Resistance CERTIFICATES FIO

18 05 30 00 1.3.1 Manufacturer's Certificate CERTIFICATES FIO

19 05 30 00 2.2.10 Stud Manufacture's Certification CERTIFICATES FIO

20 05 30 00 2.2.10 Stud Manufacture's Test Reports CERTIFICATES FIO

SECTION - 05 40 00 COLD-FORMED METAL FRAMING

1 05 40 00 1.6.1 Framing Components SHOP DRAWINGS GA

2 05 40 00 2.1 Studs, Joists PRODUCT DATA FIO

3 05 40 00 1.6.2 Metal Framing Calculations DESIGN DATA GA

4 05 40 00 1.7 LEED product data DESIGN DATA FIO

5 05 40 00 1.4 Load-Bearing Cold-Formed Metal Framing CERTIFICATES FIO

6 05 40 00 3.2.1 Welds CERTIFICATES FIO

SECTION - 06 10 00 ROUGH CARPENTRY

1 06 10 00 1.8 Fire-retardant treatment PRODUCT DATA FIO

2 06 10 00 1.9 LEED product data PRODUCT DATA FIO

3 06 10 00 1.4.3 Preservative-treated lumber and plywood TEST REPORTS FIO

4 06 10 00 1.7 Preservative treatment CERTIFICATES FIO

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

PN 80773 SOF BATTALION OPERATIONS

W912PM-16-R-0020 NA

23 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

SECTION - 06 20 00 FINISH CARPENTRY

1 06 20 00 1.3 Detail Drawings SHOP DRAWINGS FIO

2 06 20 00 1.6.6 LEED product data PRODUCT DATA FIO

3 06 20 00 1.4 Certificates of grade CERTIFICATES FIO

4 06 20 00 1.4 Certificates of compliance CERTIFICATES FIO

SECTION - 06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK

1 06 41 16.00 10 1.5.2 Shop Drawings SHOP DRAWINGS GA

2 06 41 16.00 10 2.10 Shop Drawings SHOP DRAWINGS GA

3 06 41 16.00 10 3.1 Installation SHOP DRAWINGS GA

4 06 41 16.00 10 2.1 Wood Materials PRODUCT DATA GA

5 06 41 16.00 10 1.3 LEED product data PRODUCT DATA FIO

6 06 41 16.00 10 2.3 Plastic Laminates SAMPLES GA

7 06 41 16.00 10 2.6 Cabinet Hardware SAMPLES GA

8 06 41 16.00 10 1.5 Quality Assurance CERTIFICATES GA

9 06 41 16.00 10 3.1 Laminate Clad Casework CERTIFICATES GA

10 06 41 16.00 10 3.2 Casework and Countertops O&M DATA FIO

SECTION - 06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS

1 06 61 16 1.5.2 Detail Drawings SHOP DRAWINGS GA

2 06 61 16 3.1 Installation SHOP DRAWINGS GA

3 06 61 16 2.1 Solid polymer material PRODUCT DATA FIO

4 06 61 16 1.5.1 Qualifications PRODUCT DATA FIO

5 06 61 16 2.3 Fabrications PRODUCT DATA FIO

6 06 61 16 1.3 LEED product data PRODUCT DATA FIO

7 06 61 16 2.1 Material SAMPLES GA

8 06 61 16 2.3.5 Counter and Vanity Tops SAMPLES GA

9 06 61 16 2.1 Solid polymer material TEST REPORTS FIO

10 06 61 16 2.3 Fabrications CERTIFICATES FIO

11 06 61 16 1.5.1 Qualifications CERTIFICATES FIO

12 06 61 16 3.3 Countertops O&M DATA FIO

13 06 61 16 3.3 Maintenance kit O&M DATA FIO

SECTION - 07 05 23 PRESSURE TESTING AIR BARRIER SYSTEM

1 07 05 23 1.4 Work Plan PRECON SUBMTL GA

2 07 05 23 2.2 Thermal Imaging Camera PRODUCT DATA GA

3 07 05 23 3.2 Envelope Surface Area Calculations DESIGN DATA GA

4 07 05 23 1.6.2.1 Pressure Test Agency CERTIFICATES FIO

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

PN 80773 SOF BATTALION OPERATIONS

W912PM-16-R-0020 NA

23 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

5 07 05 23 1.6.2.2 Thermographer Qualifications CERTIFICATES FIO

6 07 05 23 1.6.3 Test Instruments CERTIFICATES FIO

7 07 05 23 1.6.3 Date Of Last Calibration CERTIFICATES FIO

8 07 05 23 3.5 Pressure Test Procedures TEST REPORTS GA

9 07 05 23 3.5.8 Air Leakage Test Report TEST REPORTS GA

10 07 05 23 3.6.5 Diagnostic Test Report TEST REPORTS GA

SECTION - 07 13 53 ELASTOMERIC SHEET WATERPROOFING

1 07 13 53 2.1 Elastomeric waterproofing sheet material PRODUCT DATA GA

2 07 13 53 2.5 Protection board PRODUCT DATA FIO

3 07 13 53 2.1 Primers, adhesives, and mastics PRODUCT DATA FIO

4 07 13 53 1.6 LEED product data PRODUCT DATA FIO

5 07 13 53 2.1 Materials SAMPLES FIO

6 07 13 53 2.1 Elastomeric waterproofing sheet material TEST REPORTS FIO

7 07 13 53 3.1 Verification Of Conditions TEST REPORTS FIO

8 07 13 53 3.6 Protective Covering TEST REPORTS FIO

9 07 13 53 2.1 Primers, adhesives, and mastics MFRS INSTR FIO

SECTION - 07 16 19 METALLIC OXIDE WATERPROOFING

1 07 16 19 1.4 Metallic waterproofing SAMPLES FIO

2 07 16 19 1.3 Iron content TEST REPORTS FIO

3 07 16 19 1.3 Oxidizing agent content TEST REPORTS FIO

4 07 16 19 3.3 Mixing MFRS INSTR FIO

SECTION - 07 21 13 BOARD AND BLOCK INSULATION

1 07 21 13 2.1 Block or board insulation PRODUCT DATA GA

2 07 21 13 2.2 Vapor retarder PRODUCT DATA FIO

3 07 21 13 2.3 Pressure sensitive tape PRODUCT DATA FIO

4 07 21 13 2.4 Protection board or coating PRODUCT DATA FIO

5 07 21 13 2.5 Accessories PRODUCT DATA FIO

6 07 21 13 1.3 LEED product data PRODUCT DATA FIO

7 07 21 13 2.1 Block or Board Insulation MFRS INSTR FIO

8 07 21 13 2.5.1 Adhesive MFRS INSTR FIO

SECTION - 07 21 16 MINERAL FIBER BLANKET INSULATION

1 07 21 16 2.1 Blanket insulation PRODUCT DATA FIO

2 07 21 16 2.4 Accessories PRODUCT DATA FIO

3 07 21 16 1.3 LEED product data PRODUCT DATA FIO

4 07 21 16 3.3.1 Insulation MFRS INSTR FIO

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

PN 80773 SOF BATTALION OPERATIONS

W912PM-16-R-0020 NA

23 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

SECTION - 07 21 29 Sprayed Insulation

1 07 21 29 2.1 Spray Urethane Foam PRODUCT DATA GA

2 07 21 29 1.3.1 Qualification of Manufacturer CERTIFICATES FIO

3 07 21 29 1.3.3 Qualification of Applicator CERTIFICATES FIO

4 07 21 29 2.2 ICC Evaluation Report CERTIFICATES FIO

5 07 21 29 2.1 Spray Urethane Foam MFRS INSTR FIO

6 07 21 29 3.3.1 Surface preparation MFRS INSTR FIO

SECTION - 07 22 00 ROOF AND DECK INSULATION

1 07 22 00 2.5 Wood nailers SHOP DRAWINGS FIO

2 07 22 00 2.1.4 Tapered roof insulation SHOP DRAWINGS GA

3 07 22 00 2.4 Fasteners PRODUCT DATA GA

4 07 22 00 2.1 Insulation PRODUCT DATA FIO

5 07 22 00 1.7 LEED product data PRODUCT DATA FIO

6 07 22 00 1.4.1 Flame spread and smoke developed ratings TEST REPORTS FIO

7 07 22 00 1.3 qualifications CERTIFICATES FIO

8 07 22 00 2.4 fasteners MFRS INSTR FIO

9 07 22 00 2.1 insulation MFRS INSTR FIO

SECTION - 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

1 07 27 10.00 10 3.1.2 Mock-Up SAMPLES GA

2 07 27 10.00 10 3.1.3 Testing and Inspection TEST REPORTS GA

SECTION - 07 27 27 FLUID-APPLIED MEMBRANE AIR BARRIER, PERMEABLE

1 07 27 27 Certificates of insurance PRECON SUBMTL GA

2 07 27 27 Surety bonds PRECON SUBMTL GA

3 07 27 27 List of proposed subcontractors PRECON SUBMTL GA

4 07 27 27 List of proposed products PRECON SUBMTL GA

5 07 27 27 Quality control plan PRECON SUBMTL GA

6 07 27 27 Shop Drawings SHOP DRAWINGS GA

7 07 27 27 Product Data] PRODUCT DATA GA

8 07 27 27 Samples SAMPLES GA

9 07 27 27 Design Data DESIGN DATA GA

10 07 27 27 Test Reports TEST REPORTS GA

11 07 27 27 Investigation reports TEST REPORTS GA

12 07 27 27 Daily checklists TEST REPORTS GA

13 07 27 27 Final acceptance test and operational te TEST REPORTS GA

14 07 27 27 Confined space entry permits CERTIFICATES GA

Page 10 of 43 (Revised by Amendment 0002)

K7EPEOAF

Highlight

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

PN 80773 SOF BATTALION OPERATIONS

W912PM-16-R-0020 NA

23 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

15 07 27 27 Material Safety Data MFRS INSTR GA

16 07 27 27 Factory test reports MFRS FLD REPT GA

17 07 27 27 Maintenance Manuals O&M DATA GA

18 07 27 27 As-built Drawings CLOSEOUT SUBMTL GA

SECTION - 07 31 13 ASPHALT SHINGLES

1 07 31 13 2.1.1 Shingles PRODUCT DATA FIO

2 07 31 13 1.6 LEED product data PRODUCT DATA FIO

3 07 31 13 1.6.1 Solar Reflectance Index PRODUCT DATA FIO

4 07 31 13 2.1.1 Shingles SAMPLES GA

5 07 31 13 3.3 Application MFRS INSTR FIO

SECTION - 07 54 19 POLYVINYL CHLORIDE (PVC) ROOFING

1 07 54 19 1.8 Detail Drawings SHOP DRAWINGS GA

2 07 54 19 1.8 Roof plan SHOP DRAWINGS GA

3 07 54 19 3.1.2 PVC Roofing Membrane PRODUCT DATA GA

4 07 54 19 2.1.2 Bonding Adhesive PRODUCT DATA FIO

5 07 54 19 1.7.4 Flashing PRODUCT DATA FIO

6 07 54 19 3.1.2.2 Flashing PRODUCT DATA FIO

7 07 54 19 2.1.5 Membrane Fasteners and Plates PRODUCT DATA FIO

8 07 54 19 2.1.10 Roof Insulation PRODUCT DATA FIO

9 07 54 19 2.1.1 Information Card PRODUCT DATA FIO

10 07 54 19 1.4 LEED product data PRODUCT DATA FIO

11 07 54 19 1.3.2 Wind Uplift Resistance DESIGN DATA GA

12 07 54 19 1.7.1 Qualification of manufacturer CERTIFICATES FIO

13 07 54 19 1.7.2 Qualifications of Applicator CERTIFICATES FIO

14 07 54 19 1.3.1 Fire Resistance CERTIFICATES FIO

15 07 54 19 2.1.1 Minimum Polymer Thickness CERTIFICATES FIO

16 07 54 19 2.1.4 Minimum Polymer Thickness CERTIFICATES FIO

17 07 54 19 1.12 sample certificate CERTIFICATES GA

18 07 54 19 3.1 Application Method MFRS INSTR GA

19 07 54 19 2.1.4 Membrane Flashing MFRS INSTR GA

20 07 54 19 3.2.2 Membrane Flashing MFRS INSTR GA

21 07 54 19 3.1.4 Perimeter Attachment MFRS INSTR FIO

22 07 54 19 2.1.5.2 Auxiliary Fasteners MFRS INSTR FIO

23 07 54 19 1.12 Warranty CLOSEOUT SUBMTL GA

24 07 54 19 3.8 Instructions to Government Personnel CLOSEOUT SUBMTL GA

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

PN 80773 SOF BATTALION OPERATIONS

W912PM-16-R-0020 NA

23 Aug 2016

SORT : SECTION & ITEMRANGE : ALL

SECTION - 07 60 00 FLASHING AND SHEET METAL

1 07 60 00 3.1.20 Covering on flat, sloped, or curved surf SHOP DRAWINGS GA

2 07 60 00 3.1.14 Gutters SHOP DRAWINGS GA

3 07 60 00 3.1.15 Downspouts SHOP DRAWINGS GA

4 07 60 00 3.1.21 Expansion joints SHOP DRAWINGS GA

5 07 60 00 3.1.16 Flashing for roof drains SHOP DRAWINGS GA

6 07 60 00 3.1.10 Base flashing SHOP DRAWINGS GA

7 07 60 00 3.1.11 Counterflashing SHOP DRAWINGS GA

8 07 60 00 3.1.22 Flashing at roof penetrations SHOP DRAWINGS GA

9 07 60 00 3.1.12 Reglets SHOP DRAWINGS GA

10 07 60 00 3.1.17 Scuppers SHOP DRAWINGS GA

11 07 60 00 3.1.25 Copings SHOP DRAWINGS GA

12 07 60 00 3.1.13 Drip edge SHOP DRAWINGS GA

13 07 60 00 3.1.19 Eave flashing SHOP DRAWINGS GA

14 07 60 00 1.5 LEED product data PRODUCT DATA FIO

15 07 60 00 3.5 Quality Control Plan CLOSEOUT SUBMTL FIO

SECTION - 07 84 00 FIRESTOPPING

1 07 84 00 2.1 Firestopping Materials SHOP DRAWINGS GA

2 07 84 00 1.6 LEED Product Data PRODUCT DATA FIO

3 07 84 00 3.3 Inspection TEST REPORTS GA

4 07 84 00 2.1 Firestopping Materials CERTIFICATES FIO

5 07 84 00 1.4.1 Installer Qualifications CERTIFICATES GA

SECTION - 07 92 00 JOINT SEALANTS

1 07 92 00 2.1 Sealants PRODUCT DATA FIO

2 07 92 00 2.2 Primers PRODUCT DATA FIO

3 07 92 00 2.3 Bond breakers PRODUCT DATA FIO

4 07 92 00 1.7 LEED product data PRODUCT DATA FIO

5 07 92 00 2.4 Backstops PRODUCT DATA FIO

6 07 92 00 3.3.6 Sealant CERTIFICATES FIO

SECTION - 08 11 13 STEEL DOORS AND FRAMES

1 08 11 13 2.1 Doors SHOP DRAWINGS GA

2 08 11 13 2.1 Doors SHOP DRAWINGS GA

3 08 11 13 2.6 Frames SHOP DRAWINGS GA

4 08 11 13 2.6 Frames SHOP DRAWINGS GA

5 08 11 13 2.4 Accessories SHOP DRAWINGS FIO

CONTRACTOR CONTRACT NUMBER

ACTIVITY

No.

TRANS-

MITTAL

No.

ITEM

No.

SPEC

PARAGRAPH

No.

DESCRIPTION OF

SUBMITTAL

TYPE OF SUBMITTAL

CLASSI-

FICATION

FIO

GA, DA,

CR, or S

REVIEWER

OFFICE / NAME

CONTRACTOR

SCHEDULE DATES

CONTRACTOR

ACTION

GOVERNMENT

ACTION

SUBMIT

NEEDED

BY

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

CODE

CORPS

RECEIVED

DATE

CODE

CORPS

RETURNED

DATE

PN 80773 SOF BATTALION OPERATIONS

W912PM-16-R-0020 NA

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .