Bid Abstract_W912PL-22-B-0001_Ventura Dredging_10Dec2021_.pdf
PDF 222 KB Posted
- Attached to
- Ventura Harbor Maintenance Dredging
- Solicitation number
- W912PL22B0001
About this file
This document contains details of a federal contract opportunity for annual maintenance dredging of Ventura Harbor in California. The project involves dredging the federal navigation channel and sand trap to a depth of 0 to -40 feet and placing suitable dredged material on nearby beaches. The typical annual dredging quantity ranges from 350,000 to 750,000 cubic yards. The proposed three-year contract contains a base dredging period and two option periods, each with an estimated completion time of 60 days. Bids were solicited with an opening date of December 10, 2021 and anticipated award within 14 days thereafter. The soliciting agency is the U.S. Army Corps of Engineers Los Angeles District. Minimum contractor requirements include experience with similar dredging quantities and complexities, dredging in open ocean environments, sustaining a minimum daily production of 20,000 cubic yards, dredging various materials from fines to cobbles, and meeting all necessary permitting and certification requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PL22B0001_Am01_Ventura Dredging_.pdf | ||
| Spec_W912PL22B0001_Ventura Dredging_.pdf | ||
| Plans_W912PL22B0001_Ventura Dredging.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912PL-22-B-0001
ABSTRACT OF BIDS
INVITATION FOR BIDS NO. W912PL-22-B-0001
FOR
Ventura Harbor Maintenance Dredging Ventura County, California
With 1 Amendment
Bid Opening Date: 10 December 2021
1 bidder.
1. Manson Construction Company Seattle, WA $ 15,495,000
Government Estimate $ 12,610,500
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
Name and Title of Certifying Official: ______________________________________
Date: ____________________
Signature: _______________________________
SEKACOV.STANISL
AV.Y.1241539730
Digitally signed by
SEKACOV.STANISLAV.Y.1241539
Date: 2021.12.10 14:52:42 -08'00'
Manson Construction Co.
5209 E. Marginal Way S.
Seattle, WA 98134
PRICING SCHEDULE
Item No. Description Unit Unit Price Amount
1 Mobilization and Demobilization, 1st Cycle 1 Job Lump Sum $1,990,000.00
2 Dredging, First Cycle - All Areas 2A First 300,000 yd³ 300,000 Cubic Yards 9.00$ $2,700,000.00
2B Over 300,000 yd³ 50,000 Cubic Yards 9.50$ $475,000.00
TOTAL BASE BID AMOUNT $5,165,000.00
3 Mobilization and Demobilization, 2nd Cycle 1 Job Lump Sum $1,990,000.00
4 Dredging, 2nd Cycle - All Areas 4A First 300,000 yd³ 300,000 Cubic Yards 9.00$ $2,700,000.00
4B Over 300,000 yd³ 50,000 Cubic Yards 9.50$ $475,000.00
$5,165,000.00
5 Mobilization and Demobilization, 3rd Cycle 1 Job Lump Sum $1,990,000.00
6 Dredging, 3rd Cycle - All Areas 6A First 300,000 yd³ 300,000 Cubic Yards 9.00$ $2,700,000.00
6B Over 300,000 yd³ 50,000 Cubic Yards 9.50$ $475,000.00
$5,165,000.00
$15,495,000.00
Manson Construction
OPTION 3rd Cycle Dredging - TOTAL ESTIMATED AMOUNT
TOTAL ESTIMATED AMOUNT OF BASE BID PLUS ALL OPTIONS
Estimated _ Quantity
OPTION ITEMS
OPTION 2nd Cycle Dredging
OPTION 2nd Cycle Dredging - TOTAL ESTIMATED AMOUNT
OPTION 3rd Cycle Dredging
Ventura Harbor Maintenance Dredging 1 Amendment
Bid Opening 10 December 2021
Independent Government Estimate
PRICING SCHEDULE
Item No. Description Unit Unit Price Amount
1 Mobilization and Demobilization, 1st Cycle 1 Job Lump Sum $1,663,000.00
2 Dredging, First Cycle - All Areas 2A First 300,000 yd³ 300,000 Cubic Yards 7.00$ $2,100,000.00
2B Over 300,000 yd³ 50,000 Cubic Yards 6.00$ $300,000.00
TOTAL BASE BID AMOUNT $4,063,000.00
3 Mobilization and Demobilization, 2nd Cycle 1 Job Lump Sum $1,716,000.00
4 Dredging, 2nd Cycle - All Areas 4A First 300,000 yd³ 300,000 Cubic Yards 7.25$ $2,175,000.00
4B Over 300,000 yd³ 50,000 Cubic Yards 6.25$ $312,500.00
$4,203,500.00
5 Mobilization and Demobilization, 3rd Cycle 1 Job Lump Sum $1,769,000.00
6 Dredging, 3rd Cycle - All Areas 6A First 300,000 yd³ 300,000 Cubic Yards 7.50$ $2,250,000.00
6B Over 300,000 yd³ 50,000 Cubic Yards 6.50$ $325,000.00
$4,344,000.00
$12,610,500.00
IGE
TOTAL ESTIMATED AMOUNT OF BASE BID PLUS ALL OPTIONS
Estimated _ Quantity
OPTION 2nd Cycle Dredging
OPTION 3rd Cycle Dredging
OPTION 2nd Cycle Dredging - TOTAL ESTIMATED AMOUNT
OPTION 3rd Cycle Dredging - TOTAL ESTIMATED AMOUNT
OPTION ITEMS
Ventura Harbor Maintenance Dredging 1 Amendment
Bid Opening 10 December 2021
| Binder1.pdf |
| Bid Abstract_W912PL-22-B-0001_Ventura Dredging_10Dec2021_Draft_ |
| Manson |
| IGE |