Ventura Harbor Maintenance Dredging

Closed Pre-Solicitation Posted

Solicitation number
W912PL22B0001
Agency
ENDIST Los Angeles US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y1KF Construction Of Dredging Facilities
Place of performance
Ventura, California 93001, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice seeks bids for annual maintenance dredging of Ventura Harbor in California. The U.S. Army Corps of Engineers Los Angeles District will dredge between 350,000 to 750,000 cubic yards per cycle from the federal navigation channel and sand trap, placing suitable material on nearby beaches. The proposed three-year contract requires one base dredging period and two option periods to complete each 60-day cycle. Qualified contractors must have experience with similar dredging magnitudes and open ocean environments, maintain a 20,000 cubic yard per day production rate, and dredge to depths of 0 to -40 feet. The solicitation will issue on November 9th, 2021 with bids due by December 9th and award anticipated within 14 days thereafter.

The contract has no set-aside designations. The primary NAICS code is 237990 and PSC code is D203 for dredging services. Current contractors capable of meeting the requirements include those with past performance on comparable harbor dredging projects. The estimated value for each individual dredging cycle ranges from $1,000,000 to $5,000,000 total. Key details specify dredging between 350,000 to 750,000 cubic yards per annual cycle completed within 60 days.

Notice text

4 versions

Update #4 · Latest ·

Post the Bid Results 

Project consists if the annual maintenance dredging of Ventura Harbor federal navigation channel and sand traps, with placement of dredge material on the nearby downcoast South Beach.  The proposed 3 year maintenance dredging contract contains a base dredging period (1st cycle) and two option periods (2nd and 3rd cycles), with a completion time of approximately 50 days per dredge cycle.  Amount of dredging is dependent upon federal funding and amount of available material within the dredge prism for each dredge cycle.  The typical range of quantity dredged is 300,000 cubic yards to 600,000 cubic yards per dredge cycle.  Design channel depths vary from  -20 ft to -40 ft MLLW.

The first dredge cycle is scheduled to commence approximately February 1st, 2022.

Magnitude of the Proposed Project:  $10,000,000  to  $20,000,000.

Minimum contractor capabilities required include: 1.  Previous dredging experience with similar magnitude in quantity and complexity.  Must have previous experience dredging in open ocean environments. 2.  Contractor must be able to sustain a minimum production of 20,000 cubic yards per day. 3.  Contractor must be able to dredge in a range from 0.0 to -40.0 ft (MLLW). 4.  Must be able to maintain a submerged pipeline crossing in navigation channels without impact to shipping and boating activity. 5.  Must be able to dredge material ranging from Fines, Sand, Gravel, and Cobbles. Other materials encountered may include tires, trash, debris, etc. 6.  Must meet all bonding requirements. 7.  Must have an Air Quality Permit from the Ventura County Air Pollution Control District (or State of California Air Resources Board) that allows contractor to dredge the contract volumes. 8.  All vessels and equipment must be certified by the U.S. Coast Guard.  9.  Equipment must have the ability to operate in open water (outside line of demarcation). 

This acquisition is being solicited as an Unrestricted IFB and  will be awarded under FAR Part 14 Sealed Bidding.  The solicitation will be issued on 10 November 2021 with a bid opening date of 10 December 2021.  The anticipated award date is within 14 days of the bid opening date.  

Update #3 ·

Project consists if the annual maintenance dredging of Ventura Harbor federal navigation channel and sand traps, with placement of dredge material on the nearby downcoast South Beach.  The proposed 3 year maintenance dredging contract contains a base dredging period (1st cycle) and two option periods (2nd and 3rd cycles), with a completion time of approximately 50 days per dredge cycle.  Amount of dredging is dependent upon federal funding and amount of available material within the dredge prism for each dredge cycle.  The typical range of quantity dredged is 300,000 cubic yards to 600,000 cubic yards per dredge cycle.  Design channel depths vary from  -20 ft to -40 ft MLLW.

The first dredge cycle is scheduled to commence approximately February 1st, 2022.

Magnitude of the Proposed Project:  $10,000,000  to  $20,000,000.

Minimum contractor capabilities required include: 1.  Previous dredging experience with similar magnitude in quantity and complexity.  Must have previous experience dredging in open ocean environments. 2.  Contractor must be able to sustain a minimum production of 20,000 cubic yards per day. 3.  Contractor must be able to dredge in a range from 0.0 to -40.0 ft (MLLW). 4.  Must be able to maintain a submerged pipeline crossing in navigation channels without impact to shipping and boating activity. 5.  Must be able to dredge material ranging from Fines, Sand, Gravel, and Cobbles. Other materials encountered may include tires, trash, debris, etc. 6.  Must meet all bonding requirements. 7.  Must have an Air Quality Permit from the Ventura County Air Pollution Control District (or State of California Air Resources Board) that allows contractor to dredge the contract volumes. 8.  All vessels and equipment must be certified by the U.S. Coast Guard.  9.  Equipment must have the ability to operate in open water (outside line of demarcation). 

This acquisition is being solicited as an Unrestricted IFB and  will be awarded under FAR Part 14 Sealed Bidding.  The solicitation will be issued on 10 November 2021 with a bid opening date of 10 December 2021.  The anticipated award date is within 14 days of the bid opening date.  

Update #2 ·

Project consists if the annual maintenance dredging of Ventura Harbor federal navigation channel and sand traps, with placement of dredge material on the nearby downcoast South Beach.  The proposed 3 year maintenance dredging contract contains a base dredging period (1st cycle) and two option periods (2nd and 3rd cycles), with a completion time of approximately 50 days per dredge cycle.  Amount of dredging is dependent upon federal funding and amount of available material within the dredge prism for each dredge cycle.  The typical range of quantity dredged is 300,000 cubic yards to 600,000 cubic yards per dredge cycle.  Design channel depths vary from  -20 ft to -40 ft MLLW.

The first dredge cycle is scheduled to commence approximately February 1st, 2022.

Magnitude of the Proposed Project:  $10,000,000  to  $20,000,000.

Minimum contractor capabilities required include: 1.  Previous dredging experience with similar magnitude in quantity and complexity.  Must have previous experience dredging in open ocean environments. 2.  Contractor must be able to sustain a minimum production of 20,000 cubic yards per day. 3.  Contractor must be able to dredge in a range from 0.0 to -40.0 ft (MLLW). 4.  Must be able to maintain a submerged pipeline crossing in navigation channels without impact to shipping and boating activity. 5.  Must be able to dredge material ranging from Fines, Sand, Gravel, and Cobbles. Other materials encountered may include tires, trash, debris, etc. 6.  Must meet all bonding requirements. 7.  Must have an Air Quality Permit from the Ventura County Air Pollution Control District (or State of California Air Resources Board) that allows contractor to dredge the contract volumes. 8.  All vessels and equipment must be certified by the U.S. Coast Guard.  9.  Equipment must have the ability to operate in open water (outside line of demarcation). 

This acquisition is being solicited as an Unrestricted IFB and  will be awarded under FAR Part 14 Sealed Bidding.  The solicitation will be issued on or about 9 November 2021 with a tentative bid opening date of 9 December 2021.  The anticipated award date is within 14 days of the bid opening date.  

Update #1 ·

The project consists of the annual maintenance dredging of Ventura Harbor of the federal navigation channel and sand trap, with placement of suitable dredge material on nearby downcoast South Beach, McGrath State Beach or in the nearshore (or both). Dredged material would not be placed in the mouth of the Santa Clara River or its estuary. Amount of dredging is dependent upon federal funding, which can vary for each dredge cycle. The typical range of quantity that is funded is 350,000 cubic yards to 750,000 cubic yards per dredge cycle. The proposed 3 year Ventura Maintenance Dredging contract contains a base dredging period (1st cycle) and two option periods (2nd and 3rd cycles), with a completion time of approximately 60 days per dredge cycle. The contractor needs to have the capacity to dredge  approximately 20,000 cubic yards per day.  The first cycle dredging of Ventura Harbor is scheduled to occur in Winter 2021.

The estimated magnitude of construction for each Ventura dredge cycle is between $1,000,000 -
$5,000,000.

Minimum contractor capabilities required include:  Previous dredging experience with similar magnitude in quantity and complexity. Must have previous experience dredging in open ocean environments.  
Contractor must be able to sustain a minimum production of 20,000 cubic yards per day.
Contractor must be able to dredge in a range from 0.0 to -40.0 ft (MLLW).
Must be able to maintain a submerged pipeline crossing in navigation channels without
impact to shipping and boating activity.  Must be able to dredge material ranging from Fines, Sand, Gravel, and Cobbles. Other materials encountered may include tires, trash, debris, etc.
Must be able to accomplish work in an open ocean / high-energy wave environment
Must meet all bonding requirements.  The contractor must have an Air Quality Permit from the Ventura County Air Pollution Control District (or State of California Air Resources Board) that allows contractor to
dredge the contract volumes.  All vessels and equipment must be certified by the U.S. Coast Guard.
Equipment must have the ability to operate in open water (outside line of demarcation).  This acquisition is being solicited as an Unrestricted IFB and  will be awarded under FAR Part 14 Sealed Bidding.  The solicitation will be issued on or about 9 November 2021 with a tentative bid opening date of 9 December 2021.  The anticipated award date is within 14 days of the bid opening date.  

Attachments

Files attached to this notice, newest first
File Type Posted
Bid Abstract_W912PL-22-B-0001_Ventura Dredging_10Dec2021_.pdf PDF
W912PL22B0001_Am01_Ventura Dredging_.pdf PDF
Spec_W912PL22B0001_Ventura Dredging_.pdf PDF
Plans_W912PL22B0001_Ventura Dredging.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Ventura Harbor Maintenance Dredging This notice · Latest pre-solicitation Pre-Solicitation
Ventura Harbor Maintenance Dredging Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity