W912PL-19-R-0015_Amendment0005.pdf

PDF 340 KB Posted

Attached to
FY 18 HYDRAZINE FUEL STORAGE AND SERVICING FACILITY
Solicitation number
W912PL19R0015
Issued by

About this file

Amendment 0005

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

0005 25 MAR 2019

USACE, Los Angeles District ATTN: Contracting Division East Region Branch 915 Wilshire Boulevard, Suite 930 Los Angeles, CA 90017

W912PL19R0015

04 MARCH 2019

FY 18 HYDRAZINE FUEL STORAGE AND SERVICING FACILITY, NELLIS AIR FORCE BASE, NEVADA

THE PURPOSE OF THIS AMENDMENT IS TO (1)REPLACE DRAWING SHEET A-101 (2)REPLACE DRAWING SHEET A-201 (3)REPLACE DRAWING SHEET A-301 (4)REPLACE DRAWING SHEET A-620 (5)REPLACE THE CFM COLUMN FOR THE R1 DIFFUSER/GRILL SCHEDULE ON M-601 SHEET FROM 250 TO 300 (6)EXTEND BID PROPOSAL FROM

03 APR 2019 TO 12 APR 2019 AT 2:00 PM PACIFIC.

ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.

FD

FD

FD

A-400

A-301

FD

FD

FD

COMP. RM

MECH ROOM

ELEC

STORAGE ROOM

SERVICE AREA

UNISEX TOILET

OFFICE

101A

102A

A-301

A

C A

AC

D

A

BA

E F

F

F

B

E

E E

D

E

A

FIRE RISER

1 2

B

A

SHEET

IDENTIFICATION

1 2 3 4

D ra wn B y:

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e:

Pr oj ec t

N o:

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

R ev ie we d by

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S ca le

Pl ot

D at e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct io n

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

JU

N

E

/4

'-0

3/

/2

:4 3:

P

M

HY

DR

AZ

IN

E

FU

EL

S

TO

RA

G E

AN

D

SE

R V

IC

IN

G F

AC

IL

IT

Y

BU

IL

D I

NG

R

KM

F1

O R

A Q

U

IN

O O

R A

/s / M ar k

K.

B ag le y

En te r R ev it Fi le N am e

9-

-0

A-101

FL

O

O R

PL

AN

M V

N

EV

AD

A

N

EL

LI

S

AI

R

F O

R C

E

BA

SE

FI

N

A L D

ES

IG

N

1/4" = 1'-0"A-101

1 FLOOR PLAN

PLAN NORTH

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

Keynote Legend

Key Value Keynote Text

1 FINISH FLOOR SLAB ELEVATED 2" ABOVE THE SERVICE

AREA.

2 2" HIGH CONCRETE SPILL CONTAINMANENT CURB AROUND

THE PERIMETER OF THE STORAGE AND SERVICE AREA

ROOMS.

3 POURED IN PLACE CONCRETE RAMP WITH 1:12 SLOPE,

TYPICAL.

4 CONCRETE FLOOR SLAB SLOPE 1/8"/FT (MINIMUM) TO FLOOR

DRAIN AS INDICATED. REFER TO STRUCTURAL AND

PLUMBING DRAWINGS.

5 18"W x 6"D X 9'-0"L SERVICE TRENCH WITH STAINLESS STEEL

GRATING AND 304 GA. STAINLESS STEEL LINER WELDED TO

STEEL ANGLE. SEE STRUCT. FOR DETAIL.

6 DELUGE SHOWER. SEE PLUMBING DRAWINGS.

7 EMERGENCY EYE WASH. SEE PLUMBING DRWINGS.

8 UTILITY SINK. REFER TO PLUMBING DRAWINGS.

9 BUILT-IN UPPER/LOWER CABINETS WITH COUNTERTOP AND

SINK.

10 3' X 3' ONE-PIECE FIBERGLASS SHOWER STALL. SEE

PLUMBING DRAWINGS.

11 MOP SINK. REFER TO PLUMBING DRAWINGS.

12 18"D x 24"W 3-SIDED VENTILATED LOCKERS.

13 LOCKER BENCH.

14 EMERGENCY SHOWER/EYEWASH COMBINATION. SEE

PLUMBING DRAWINGS.

15 PROVIDE 6" DIAMETER HOLE, 4 FEET ABOVE FINISH FLOOR

BETWEEN THE SERVICING AND STORAGE ROOM. SEE DETAIL

7/A-570.

16 CONCRETE SLAB SLOPE 1/8"/FT (MINIMUM) TO FLOOR DRAIN.

SEE A-102 FOR DIMENSIONS.

GENERAL NOTES:

1. SEE SHEET A-102 FOR DIMENSIONS.

2. SEE SHEET A-001 FOR ABBREVIATIONS AND LEGEND.

3. SEE SHEET A-400 FOR ENLARGED PLAN AND INTERIOR ELEVATIONS.

4. SEE SHEET I-610 FOR FINISH SCHDULE.

5. SEE MECHANICAL AND ELECTRICAL FOR ADDITIONAL INFORMATION.

6. SLAB IS RECESSED 2" IN ROOMS STORAGE AND SERVICE AREA. SEE KEYNOTE 3.

7. COORDINATE WITH CIVIL DRAWINGS FOR CONCRETE SIDEWALK LOCATIONS

AT EXTERIOR DOORS.

8. ALL EXPOSED STRUCTURAL STEEL (BEAMS, LEDGERS, PLATES, BOLTS, ETC.), METAL

DECK, DOORS AND FRAMES, AND WINDOW FRAMES (IN STORAGE ROOM AND SERVICE

AREA ONLY) SHALL BE EPOXY PAINTED TO PREVENT CORROSION FROM THE EFFECTS OF

HYDRAZINE. EPOXY COATING SHALL BE TL-91 AT 35 TO 40 MILS APPLIED WITH PLURAL

COMPONENT SPRAY EQUIPMENT. ALL EDGES AND BOLT CONNECTIONS MUST BE STRIP

COATED. PREPARE STEEL SURFACE WITH SP10 BLAST, 1 TO 2 MIL BLAST PROFILE, PER

COATING MANUFACTURER'S INSTRUCTIONS. COATING SYSTEM AS MANUFACTURED BY

"BLOME INTERNATIONAL", O'FALLON, MO OR APPROVED EQUAL. MANUFACTURER LISTED

IS FOR REFERENCE ONLY AND IS NOT INTENDED TO LIMIT SELECTION OF SIMILAR

PRODUCT BY OTHER MANUFACTURERS. COLOR TO MATCH ADJACENT WALLS.

Room Schedule

Number Name Area

101 STORAGE

ROOM

134 SF

102 SERVICE AREA 313 SF

103 OFFICE 115 SF

104 UNISEX TOILET 115 SF

105 FIRE RISER 27 SF

106 MECH ROOM 50 SF

107 ELEC 15 SF

108 COMP. RM 32 SF

M

AR

K D

E S C

R

IP

TI

O

N D

AT

E

AP

PR

Ad de d do or s id el ite

3/

/1

O

R A

AM-04

TOS

0"

TOM

12' - 0"

TOS

0"

TOM

12' - 0"

TOS

0"

TOM

12' - 0"

TOS

0"

TOM

12' - 0"

SHEET

IDENTIFICATION

1 2 3 4

D ra wn B y:

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e:

Pr oj ec t

N o:

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

R ev ie we d by

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S ca le

Pl ot

D at e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct io n

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

JU

N

E

/4

'-0

3/

/2

:4 3:

P

M

HY

DR

AZ

IN

E

FU

EL

S

TO

RA

G E

AN

D

SE

R V

IC

IN

G F

AC

IL

IT

Y

BU

IL

D I

NG

R

KM

F1

O R

A Q

U

IN

O O

R A

/s / M ar k

K.

B ag le y

En te r R ev it Fi le N am e

9-

-0

A-201

BU

IL

DI

NG

E

LE

VA

TI

O

NS

M V

N

EV

AD

A

N

EL

LI

S

AI

R

F O

R C

E

BA

SE

FI

N

A L D

ES

IG

N

1/4" = 1'-0"A-201

1 NORTH ELEVATION

1/4" = 1'-0"A-201

2 SOUTH ELEVATION

1/4" = 1'-0"A-201

3 EAST ELEVATION

1/4" = 1'-0"A-201

4 WEST ELEVATION

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

STANDING SEAM METAL ROOF

8" SMOOTH-FACED CMU

W/ INTEGRAL COLOR.

SEE STRUCTURAL FOR

STEPPED CMU BOND

BEAM, TYP.

PERSONNEL DOOR W/ SIDELITE

STANDING SEAM METAL ROOF

8" SMOOTH-FACED CMU W/

INTEGRAL COLOR, TYP.

6'-0"W X 7'-8"H METAL INSULATED

DOUBLE DOOR

EMERGENCY SHOWER/EYEWASH

COMBINATION8'-0"W X 9'-0"H METAL INSULATED

DOUBLE DOOR

STANDING SEAM METAL

ROOF CANOPY COVER

EMERGENCY SHOWER/EYEWASH

COMBINATION

EMERGENCY SHOWER/EYEWASH

COMBINATION

STANDING SEAM METAL

ROOF CANOPY COVER

FIN. GRADE

STANDING SEAM METAL

CANOPY ROOF COVER

L1 L2

L2

BUILDING NUMBER

SIGN. SEE DET. 7/A-540

BUILDING NUMBER SIGN,

SEE DET 7/A-540

DUCT OPENING, SEE MECH.

M

AR

K D

E S C

R

IP

TI

O

N D

AT

E

AP

PR

Ad de d do or s id el ite

3/

/1

O

R A

L2

TOS

0"

TOM

12' - 0"

A-310

A-140

TOS

0"

TOM

12' - 0"

A-310

A-310

A

SHEET

IDENTIFICATION

1 2 3 4

D ra wn B y:

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e:

Pr oj ec t

N o:

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

R ev ie we d by

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S ca le

Pl ot

D at e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct io n

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

JU

N

E

/4

'-0

3/

/2

:4 3:

P

M

HY

DR

AZ

IN

E

FU

EL

S

TO

RA

G E

AN

D

SE

R V

IC

IN

G F

AC

IL

IT

Y

BU

IL

D I

NG

R

KM

F1

O R

A Q

U

IN

O O

R A

/s / M ar k

K.

B ag le y

En te r R ev it Fi le N am e

9-

-0

A-301

B U

IL

DI

N G

S E C

TI

O

N M

V

N

EV

AD

A

N

EL

LI

S

AI

R

F O

R C

E

BA

SE

FI

N

A L D

ES

IG

N

1/4" = 1'-0"A-301

1 BUILDING SECTION 1

1/4" = 1'-0"A-301

2 BUILDING SECTION 2

SCALE:

0 4' 8'

1/4" = 1' - 0"

4' 8'

A-501

M

AR

K D

E S C

R

IP

TI

O

N D

AT

E

AP

PR

Ad de d do or s id el ite

3/

/1

O

R A

USE

INCHES

SIZE,

FACE

TYPEPATTERN

AIR

SYMBOL

DIFFUSER/GRILL

REMARKSSIZE,

INCHES

NECK

CFM

S1 200 10" 4-WAY CEILING 12X12 SA

S1 500 12" 4-WAY CEILING 15X15 SA

S2 500 18X8

DOUBLE

DEFLECTION DUCT MTD - SA

R1 300 10 CEILING 12X12 RA-

E1 300 10X12

EGGRATE

1"X1"X1" DUCT MTD - EA

E1 550 10X18 DUCT MTD - EA

OBD

YES

YES

YES

PROVIDE WITH AIR EXTRACTOR-

EGGRATE

1"X1"X1"

T1 - 6 CEILING 10X10 TA- -

MIN

FAN

DRIVE RPMAIR FLOW VOLTAGEMIN DIA OF

NUMBER AND

WHEELS(S) ININCHES WC

PRESSURE

EXTERNAL

FANS SCHEDULE

REMARKS

CFM

MINIMUM

SYMBOL PHASE HERTZUNIT TYPE

FAN MOTOR

HP

EF-1 600 0.375

ROOF

UPBLAST DIRECT 1 1550 1/8 120 1 60

EF-2 1650 0.5 BELT 1 1390 1/2 120 1 60ROOF

UPBLAST

EF-3 150 0.375 - 1 1050 0.85

AMP 120 1 60CEILING

EF-6 50 0.25 - 1 950 0.62

AMP

120 1 60IN-LINE

SONES

8.3

12.9

4.5

0.9

FEF-1 150 1.25 - 1 2000 1/3 120 1 60IN-LINE

WALL MTD

FEF-2 150 1.25 - 1 2000 1 60

-IN-LINE

WALL MTD

1201/3

EF-5 75 0.25 - 1 950 1 60IN-LINE 0.9

EF-4 75 0.25 - 1 950 1 60IN-LINE 0.9

0.62

AMP

0.62

AMP

PROVIDE WITH EXPLOSION PROOF MOTOR

PROVIDE WITH EXPLOSION PROOF MOTOR

PROVIDE WITH EXPLOSION PROOF MOTOR

PROVIDE WITH EXPLOSION PROOF MOTOR

FILTERS

ARI

CONDITIONSVOLTAGE

DB F

EVAP LVG

EVAPORATOR

SPLIT SYSTEM HEAT PUMP UNIT

SYMBOL REMARKS

FAN COIL SECTION

PHASEVOLTHPIN WC

STATIC PRESSURE

EXTERNAL

SENSIBLE BTUH

MIN CAPACITY

HEATER KW

AUXILLARY

ELECTRICMIN CAPACITY

BTUH REVERSE

HEATING

CYCLE

AIR

OUTDOOR

TEMP FTEMP F

OUTDOOR

AIR

WB F

EVAP ENT

DB F

EVAP ENT

COOLING

TOTAL BTUH

MIN CAPACITYMCA/

MOCP

COMPRESSOR CONDENSING

AIR FLOW NOMINAL

MCA/

HERTZMOCP PHASE

OUTDOOR SECTION MIN UNIT

SEER AT

ARI

CONDITIONS

HSPF AT

MIN UNIT

MINIMUM

CFM

MOTOR

MINIMUM

OUTSIDE

AIR CFM

FC-1

HP-1

750 0.5 1/3 208 27.8/30 20,710 17,700 67 45 115 16,460 27 5 27.8/30 208 1 60 17.0 3.9 MERV-8 4501 113

FILTER

SYMBOLWT LBS

OPERATING

MAXIMUM

MINIMUM FAN

TYPE

NUMBER AND

MIN SIZE

OF WHEELS RPM BRAKE

HP

MIN

MOTOR

HP

MIN OUTPUT

CAPACITY

KW

ENTERING

AIR TEMP

F

LEAVING

AIR TEMP

F

FUEL

TYPE

COIL

TYPE CAPACITY

BTUH

LEAVING

DB F

MAX FACE

VELOCITY

FPM

ELECTRICAL DATA

INCHES WC

PACKAGE MAKE-UP AIR WITH ELECTRIC HEATER AND DX COOLING

REMARKS

HEATING SECTIONSUPPLY FAN

PRESSURE

STATIC

EXTERNAL

CFM

AIR FLOW

SYMBOL

COOLING SECTION

MAU-1 1500 0.5 FWD 1 1010 0.44 3/4 15.5 28 60.8 ELECT DX 55,600 79 240 208 3 60 1850 MERV-8

SIZE

TON

EAT

DB, F

EAT

WB, F

72.5

LEAVING

WB F

61.8

TOTAL ROW

COIL

EER

AHRI

13.3

CAPACITY

BTUH

SENSIBLE

55,600

SIZE

KW

VOLT

PHASE

AMPS

MCA

58.6

MOCP

VOLT PHASE HERTZ

SHEET

IDENTIFICATION

1 2 3 4

D ra w n

By

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e:

Pr oj ec t

N o:

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

R ev ie w ed by

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S ca le

Pl ot

D at e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

M ec h/ El ec t D es ig n Se ct io n

2"

'-0

6/

/2

9:

:1

AM

HY

DR

AZ

IN

E

FU

EL

S

TO

RA

G E

SE

R V

IC

IN

G F

AC

IL

IT

Y

BU

IL

D I

NG

JU

N

E

R

KM

F1

D es ig ne r Au th or

Ap pr ov er

M

EC

H #2

-2

5-

M-601

H V

AC

S

CH

ED

UL

ES

SA

C R

AM

EN

TO

D

IS

TR

IC

T

IN

-H

O U

SE

D

ES

IG

N

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

C he ck er

N

EV

AD

A

N

EL

LI

S

AI

R

F O

R C

E

BA

SE

0%

D

ES

IG

N

S U

BM

IT

T A L

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

AP

PR

F N

1'

4"

6"

FIXED LITE

7'

0"

F1

7'

0" 4"

2"

7'

8" 4"

2"

9'

0" 4"

2"

7'

0" 2"

2"

A B C D E

7'

0" 4"

2"

7'

0"

2"

4" 4'

0"

1' - 4"

F

7'

0"

2"

2" 3'

1' - 4"

G

4' - 0"

4'

0"

A-521

A-521

BLAST RESISTANT

TEMPERED WINDOW

(EXPLOSION PROOF)

L L2

1'X2' LOUVER

FIRE RATED

GLAZING

A

4' - 0"

1'

4"

A-521

A-521

2' - 0"

1'

4"

A-521

A-521

L1

A-521

L2

A-521

SHEET

IDENTIFICATION

1 2 3 4

D ra wn B y:

D es ig ne d by

Su bm itt ed b y:

Si ze

Fi le

N am e:

D at e:

Pr oj ec t

N o:

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

R ev ie we d by

US Army Corps of Engineers ®

" x

4"

C

B

A

Fi le

N o:

Pl ot

S ca le

Pl ot

D at e:

R ev

Sp ec

N o:

Su bm itt al

S ta tu s:

C hi ef

Ar ch ite ct ur al

D es ig n

Se ct io n

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

SA

C

R

AM

EN

TO

D

IS

TR

IC

T

J

S

TR

EE

T

SA

C

R

AM

EN

TO

, C A

JU

N

E

/4

'-0

3/

/2

:4 8:

P

M

HY

DR

AZ

IN

E

FU

EL

S

TO

RA

G E

AN

D

SE

R V

IC

IN

G F

AC

IL

IT

Y

BU

IL

D I

NG

R

KM

F1

O R

A Q

U

IN

O O

R A

/s / M ar k

K.

B ag le y

En te r R ev it Fi le N am e

9-

-0

A-620

D O O

R

SC

HE

DU

LE

M

V

N

EV

AD

A

N

EL

LI

S

AI

R

F O

R C

E

BA

SE

FI

N

A L D

ES

IG

N

DOOR SCHEDULE

DOOR NO. TYPE

DOOR

FIRE

RATING

FRAME

HARDWARE COMMENTS:

SIZE

MATERIAL FINISH UNDER CUT TYPE MATERIAL FINISH

DETAILS

WIDTH HEIGHT THICKNESS HEAD JAMB SILL

101 F 8' - 0" 9' - 0" 1 3/4" HM PNT E HM PNT 1/A-520 2/A-520 9/A-520 HW-1 INSULATED DOOR

101A N 3' - 0" 7' - 0" 1 3/4" HM PNT A HM PNT 5/A-520 5/A-520 11/A-520 HW-3

102 F1 6' - 0" 7' - 8" 1 3/4" HM PNT D HM PNT 1/A-520 2/A-520 9/A-520 HW-2 INSULATED DOOR

102A F 3' - 0" 7' - 0" 1 3/4" HM PNT 1.5 HRS G HM PNT 5/A-520 5/A-520 9/A-520 SIM. HW-4 103 F 3' - 0" 7' - 0" 1 3/4" HM PNT F HM PNT 1/A-520 2/A-520 8/A-520 HW-5 INSULATED DOOR

104 F 3' - 0" 7' - 0" 1 3/4" HM PNT A HM PNT 5/A-520 5/A-520 11/A-520 HW-6

105 L 3' - 0" 7' - 0" 1 3/4" HM PNT C HM PNT 1/A-520 2/A-520 10/A-520 HW-8 INSULATED DOOR 106 L2 6' - 0" 7' - 0" 1 3/4" HM PNT C HM PNT 1/A-520 2/A-520 10/A-520 HW-7 INSULATED DOOR 107 L 3' - 0" 7' - 0" 1 3/4" HM PNT B HM PNT 1/A-520 2/A-520 10/A-520 HW-8 INSULATED DOOR 108 L 3' - 0" 7' - 0" 1 3/4" HM PNT B HM PNT 1/A-520 2/A-520 10/A-520 HW-8 INSULATED DOOR

DOOR SCHEDULE NOTES:

1. DOOR REFERENCED IN THE DOOR SCHEDULE CAN BE FOUND IN A-101.

2. HARDWARE SETS (HW) NOTED ON THIS SCHEDULE CAN BE FOUND IN SPECS SECTION 08 71 00 (TO BE

PROVIDED IN THE NEXT SUBMITTAL).

3. HARDWARE SHALL BE PROVIDED AS REQUIRED AND CONFORM TO BHMA/ANSI.

4. DOOR HARDWARE SHALL BE GRADE I.

5. LOCK AND LATCHES SHALL CONFORM TO ANSI 156.2.

6. ALL STEEL DOORS FOR MAIN ENTRANCE AND CIRCULATION ARE TO BE MAXIMUM DUTY DOOR, LEVEL 4.

ALL OTHER STEEL DOORS ARE HEAVY DUTY DOOR, LEVEL 2.

DOOR TYPES WINDOW YPES

DOOR FRAME TYPES

WINDOW/LOUVER SCHEDULE

Mark

R.O. FRAME DETAILS

Sill Height Remarks (See Notes Below)Width Height Finish Materi al Head Jamb Sill

10 1' - 4" 4' - 0"

A 4' - 0" 4' - 0" ANOD ALUM 2/A-521 3/A-521 4/A-521 3' - 0"

L1 2' - 0" 1' - 4" ANOD ALUM 5/A-521 6/A-521 7/A-521 10' - 0"

L2 4' - 8" 1' - 4" ANOD ALUM 5/A-521 6/A-521 7/A-521 10' - 0" SEE NOTE 1

LOUVER SCHEDULE NOTES:

1. FOR L2 LOUVER TYPE WITHOUT FURRING WALL, SEE DETAILS 2,3 & 4/A-521 (SIMILAR).

2. SEE A-521 FOR REFERENCED DETAILS.

3. SEE A-201 AND MECHANICAL DRAWINGS FOR LOUVER LOCATIONS.

M

AR

K D

E S C

R

IP

TI

O

N D

AT

E

AP

PR

Ad de d do or s id el ite

3/

/1

O

R A

LOUVER TYPES

AM-04

SF-30
A-101
Sheets
A-101 - FLOOR PLAN
A-201 - BUILDING ELEVATIONS
A-301 - BUILDING SECTION
A-620 - DOOR SCHEDULE
A-201
Sheets
A-101 - FLOOR PLAN
A-201 - BUILDING ELEVATIONS
A-301 - BUILDING SECTION
A-620 - DOOR SCHEDULE
A-301
Sheets
A-101 - FLOOR PLAN
A-201 - BUILDING ELEVATIONS
A-301 - BUILDING SECTION
A-620 - DOOR SCHEDULE
M-601_rev
A-620
Sheets
A-620 - DOOR SCHEDULE

File details come from the government source that posted it.