vol2AIT_dining.pdf

PDF 20 MB Posted

Attached to
Dining Facility, AIT Complex, Fort Huachuca, AZ
Solicitation number
W912PL-08-R-0013
Issued by

About this file

Vol. 2 AIT Complex Dining Facility at Ft. Huachuca Az

View the file

Other files

File Type Posted
am3.pdf PDF
am2.pdf PDF
Am1.pdf PDF
vol1AIT_dining.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design-Build Request For Proposal

Construct AIT Dining Facility

PN 68572, FY2008

Fort Huachuca, AZ

W912PL-08-R-0013

VOLUME 2 of 2 - TECHNICAL SPECIFICATIONS (DIVISION 01) thru APPENDICES

SECTION 01 10 00

STATEMENT OF WORK

1.0 PROJECT OBJECTIVES

2.0 SCOPE

2.1 DINING FACILITY

2.2 SITE

2.3 GOVERNMENT-FURNISHED GOVERNMENT INSTALL EQUIPMENT (GFGI)

2.4 FURNITURE REQUIREMENTS

3.0 DINING FACILITY

3.1 GENERAL REQUIREMENTS

3.2 FUNCTIONAL AND AREA REQUIREMENTS

4.0 APPLICABLE CRITERIA

4.1 INDUSTRY CRITERIA

4.2 MILITARY CRITERIA

4.3 PRECEDENCE

5.0 GENERAL TECHNICAL REQUIREMENTS

5.1 SITE PLANNING AND DESIGN

5.2 SITE ENGINEERING

5.3 ARCHITECTURE AND INTERIOR DESIGN

5.4 STRUCTURAL DESIGN

5.5 THERMAL PERFORMANCE

5.6 PLUMBING

5.7 ELECTRICAL SYSTEMS

5.8 HEATING, VENTILATING AND AIR CONDITIONING

5.9 ENERGY CONSERVATION

5.10 FIRE PROTECTION

W912PL-08-R-0013

Page 1 of

Section: 01 10 00

5.11 SUSTAINABLE DESIGN

5.12 CONSTRUCTION AND DEMOLITION (C&D) WASTE MANAGEMENT

5.13 SECURITY (ANTI-TERRORISM STANDARDS)

6.0 PROJECT SPECIFIC REQUIREMENTS

6.1 GENERAL

6.2 APPROVED DEVIATIONS

6.3 SITE PLANNING AND DESIGN

6.4 SITE ENGINEERING

6.5 ARCHITECTURE

6.6 STRUCTURAL DESIGN

6.7 THERMAL PERFORMANCE

6.8 PLUMBING

6.9 SITE ELECTRICAL SYSTEMS

6.10 FACILITY ELECTRICAL SYSTEMS

6.11 HEATING, VENTILATING AND AIR CONDITIONING

6.12 ENERGY CONSERVATION

6.13 FIRE PROTECTION

6.14 SUSTAINABLE DESIGN

6.15 ENVIRONMENTAL

6.16 PERMITS

6.17 DEMOLITION

6.18 ADDITIONAL FACILITIES

W912PL-08-R-0013

Page 2 of

1.0 PROJECT OBJECTIVES

The project objective is to design and construct facilities for the military that are consistent with the design and construction practices used for civilian sector projects that perform similar functions to the military projects. For example, a Company

Operations Facility has the similar function as an office/warehouse in the civilian sector; therefore the design and construction practices should be consistent with the design and construction of an office/warehouse building.

Comparison of Military Facilities to Civilian Facilities

It is the Army's objective that these buildings will have a 25-year useful design life before a possible re-use/re-purpose or renovation requirement, to include normal sustainment, restoration, modernization activities and a 50-year building replacement life. Therefore, the design and construction should provide an appropriate level of quality to ensure the continued use of the facility over that time period with the application of reasonable preventive maintenance and repairs that would be industry-acceptable to a major civilian sector project OWNER. The site infrastructure will have at least a 50-year life expectancy with industry-accepted maintenance and repair cycles.

The project site should be developed for efficiency and to convey a sense of unity or connectivity with the adjacent buildings and with the Installation as a whole.

Requirements stated in this contract are minimums. Innovative, creative, and life cycle cost effective solutions, which meet or exceed these requirements are encouraged. Further, the OFFEROR is encouraged to seek solutions that will expedite construction (panelization, pre-engineered, etc.) and shorten the schedule. The intent of the Government is to emphasize the placement of funds into functional/operational requirements. Materials and methods should reflect this by choosing the lowest Type of Construction allowed by code for this occupancy/project allowing the funding to be reflected in the quality of interior/exterior finishes and systems selected.

2.0 SCOPE

2.1. DINING FACILITY (DF): Provide Dining Facilities

This project type is to prepare and serve food in a seated dining area. The seated dining area can also serve as a gathering place for group activities. It is intended to be similar to a college cafeteria facility in the private sector community.

Provide a complete and functional dining facility:

For feeding 1300 trainee soldiers per meal within 90 minutes, three times per day, seven days a week, 52 weeks per year.

Maximum gross area shall be 30,500 square feet. Dining area seating capacity shall be 544 seats

STAFFING. Staffing is based on a 40-hour work week along with the menu, layout, equipment, feeding stations, serving lines and the mission of the organization it supports. The typical anticipated staffing for this size facility would be:

Military Facility Civilian Facility

Dining Facility (DF) College/Corporate Cafeteria

W912PL-08-R-0013

Page 3 of

Manager (1), Assistant Manager (1), Administration (2), Subsistence Clerk (2), Shift Leader (2), First Cook (2), Cooks (44), Headcounter (4), Dishwasher (40), and Maintenance (1) for a total staff of 107 persons. The maximum staffing for a single shift would be 54 persons.

2.2. SITE:

Provide all site improvements necessary to support the new building facilities. Refer to Paragraph 6.

Approximate area available 4.25 acres

2.3. GOVERNMENT-FURNISHED GOVERNMENT-INSTALLED EQUIPMENT (GFGI)

Coordinate with Government on GFGI item requirements and provide suitable structural support, brackets for projectors/VCRs/TVs, all utility connections and space with required clearances for all GFGI items. computers related hardware, copiers, faxes, printers, video projectors, VCRs and TVs are GFGI.

The following are also GFGI items: See Equipment Schedule.

2.4. FURNITURE REQUIREMENTS:

Provide furniture design for all spaces, including existing furniture and equipment to be re-used. Coordinate with the user to define requirements for furniture systems, movable furniture, equipment, existing items to be reused, storage systems, etc.

Early coordination of furniture schedule is required so the facility is complete and usable at turnover. Furniture procurement is not included in this contract.

Provide the following furniture and equipment as part of this contract: see Contract Line item Bid schedule

3.0. FUNCTIONAL AND OPERATIONAL REQUIREMENTS: DINING FACILITY (EPDF)

3.1. GENERAL

Provide a complete and functional dining facility. Provide receiving, storage, preparation, serving, queuing, dining, dishwashing, and all support equipment and facilities. Facility shall be similar to a college or university meal plan cafeteria in general function and quality. Provide equipment that is of a standard typically recognized in the industry as heavy duty and appropriate for college/university use. Provide equipment and associated accessories typical to enable operations to closely monitor safety, reduce energy, and facilitate ease of operation, sanitation and maintenance. Particular care should be given to protection of wall surfaces in high traffic areas.

Vehicular and pedestrian circulation shall insure separation of patron and staff/service areas

Interior design for the dining facility shall be based on an overall comprehensive, coordinated scheme and may utilize a theme for regional or organizational mission. The use of color, texture, and accents shall support the scheme and help create an inviting, cheerful and relaxed atmosphere. Design shall be appropriate for food service and eating activities. Incorporate visual and/or physical separations and transitions between major functions enhancing flow and circulation. Where required as part of this contract, furniture style shall complement and enhance the overall scheme.

Army dining facilities must comply with applicable provisions of Army publication Technical Bulletin TB MED 530. If a conflict exists with other criteria in this RFP, the more stringent criteria apply.

W912PL-08-R-0013

Page 4 of

3.1.1. Accessibility

The dining facility shall be accessible to persons with disabilities. While kitchen and serving equipment shall not be required to be accessible, the pathways through these equipment and serving areas shall be accessible. The Staff and Patron

Restrooms, Dining, and Administrative areas shall also be accessible.

3.1.2. Mechanical System

The facility shall be air conditioned except that the storage and service areas may be ventilated and heated as required by code. The Kitchen, Dishwash, Pot/Pan Washing shall be cooled not to exceed 85 degrees Fahrenheit and heated to maintain temperature no less than 68 degrees Fahrenheit. The Kitchen, Dishwash, Pot/Pan Washing, service spaces, and Restrooms shall maintain a negative pressure while the Dining, Point of Sale and Interior Queuing areas shall have a positive pressure.

Kitchen hood systems shall be UL and NSF approved/certified/listed. Hoods shall be certified to meet the International

Mechanical Code required velocities for the service application. If face discharge hoods are utilized, they shall be provided with tempered makeup air. Makeup air shall be tempered to 85 degrees Fahrenheit for cooling and 60 degrees for heating.

Indicate kitchen hood functions by designating “Condensate Laden Air Hood” and “Grease Laden Air Hood” in the hood schedule. Kitchen hood systems shall be designed and installed in compliance with NFPA 96. Kitchen hoods shall be UL rated in accordance with UL 710.

Special note on Energy Analysis: compliance with paragraph 5.9 of this section is required. Kitchen hoods are excluded from the process loads and are therefore required to be included in the building analysis in accordance with 10CFR433.

3.1.3. Plumbing

In accordance with TB Med 530, all piping shall be concealed to the greatest extent possible. Where metallic piping cannot be concealed it shall be stainless steel or chrome-plated.

In the kitchen, pot and pan washing and dishwashing area, hot water shall be designed to provide 140 degree Fahrenheit at the equipment. General purpose, hand washing sinks and lavatories shall be provided with 110 degree Fahrenheit hot water.

Prior to acceptance, a flood test of the kitchen and dishwashing areas shall be performed to ensure that all floor drains are working properly.

3.1.4. Fire Protection

The fire protection system shall be designed based on the available water source. If the hydraulic calculations based on water flow test for each sprinkler system exceed that of the water supply, a fire pump shall be provided in accordance with applicable criteria.

Provide a kitchen hood fire extinguishing system in accordance with NFPA 96

3.1.5. Electrical Systems

3.1.5.1. Electrical systems, including, but not limited to, interior power, exterior and interior lighting, communication systems, cable television (CATV), public address (PA), card access systems, audio visual systems, fire alarm system, mass notification system, lightning protection and grounding system, and cathodic protection system shall be designed to comply

W912PL-08-R-0013

Page 5 of with the documents listed in applicable criteria. The publications are referred to in the text by basic designation only.

3.1.5.2. Provide general area lighting as well as task and decorative lighting in service and public areas. The use of a variety of fixtures – pendant, surface, sconce, direct, and/or indirect – is encouraged. See TB MED 530 for specific lighting requirements including, but not limited to intensity and protective shielding.

In addition to other receptacles required by this RFP, provide 120 volt duplex wall receptacles in all spaces. The maximum receptacle spacing in offices shall be 12 feet with at least one receptacle on each wall. The maximum spacing between receptacles in other locations shall be 25 feet. Provide a means for connecting a portable generator to support the full building load.

In addition to other receptacles required by this RFP, provide one additional 20 amp electrical circuit with one duplex receptacle at each beverage counter located in a Dining area.

3.1.6. Communications Systems

Data receptacles shall be included in the Offices, Points of Sale, Headcount Area, Dry Storage Room, Mechanical, Electrical, and Telecommunications Room. Telephone receptacles shall be included in the Offices, Dry Storage Room, Mechanical, Electrical, and Telecommunications Room. The facility shall have a building-wide, zoned paging/intercom system with announcement and music (plug-in) capabilities from the Administrative Office. This paging/intercom system may be integrated with the building mass notification system.

Telecommunications design must be performed and stamped by a Registered Communications Distribution Designer

(RCDD) with 2 yrs related experience or person with 5 yrs related experience. The information systems designer must prepare the test plan, and witness and certify the testing of telecommunications cabling. In the I3A Technical Guide, the word

“shall” shall be substituted for the word “should” throughout the document. The I3A Technical Guide shall be considered to be MANDATORY Criteria.

3.1.7. Cable Television

The facility shall include a cable television system. Where not indicated otherwise, Contractor shall provide all power, cable and mounting hardware suitable for 50” minimum flat panel televisions. .

3.1.8. Signage

A comprehensive signage package shall be provided. Signage shall clearly define the major areas of this facility, identify different service areas and types of food served, provide directional information and traffic flow where appropriate, and compliment the interior design scheme. Illumination of signage is not required but can enhance its visibility. Ensure lighting does not conflict or detract from the signage design. .

3.1.9. Doors and Hardware

Provide commercial grade doors and hardware appropriate for the specific application. The doors between the Kitchen and the Servery, between the Kitchen and Receiving Vestibule and into the Dishwashing area, shall be lightweight, high impact resistant, double-swing doors with protective bumpers, pivots, and vision panels.

Page 6 of

72 inch high corner guards are required for all outside corners of walls and columns throughout the facility except in toilets.

Corner guards in kitchen, servery, dishwashing and other utility/service areas shall be stainless steel. Corner guards in

Dining Are and other patron/public spaces shall be architectural type and be part of the SID.

3.1.10. Special Equipment Requirements

Provide the following equipment features in addition to those normally found in a college cafeteria.

Water softener system built into or adjacent to all equipment requiring water such as kettles, where water source does not meet manufacturer’s operating requirements. Individual equipment items may also require filtering per manufacturer’s recommendations.

Centrally controlled low-pressure washing system with remote wall-mounted workstations in the Kitchen, Can Wash, Dishwashing Area, and Receiving Platform. Required accessories include water broom attachment, hose reel, spray nozzle and freeze-proof valves for exterior application in cold areas.

Air curtain/fly fan at interior side of all exterior doors, except for mechanical/electrical rooms and doors for emergency exit only. Air curtain/fly fan shall be full width of door opening.

3.2. Facilities Functional Requirements

Functional floor plans, equipment plans, equipment schedules, finish schedule, and conceptual site plans are provided for this facility in the applicable appendix. Use of these plans for the interior functional arrangement is mandatory. However, the plans may be modified slightly to accommodate local, regulatory, engineering, architectural, life safety, and/or construction requirements. Ceiling heights in dining facilities shall not exceed 14 feet except in areas where clerestories or other daylighting is incorporated to enhance sustainability. All food service equipment shall be certified by the National Sanitation

Foundation, International. Other special requirements are indicated in Table 3-1. Cooking equipment shall be natural gas operated to the maximum extent, except where natural gas is not available at the project site, or as otherwise specified.

Table 3-1 – Dining Special Requirements

Page 7 of

Page 8 of

3.3. GOVERNMENT OR Government VENDOR PROVIDED EQUIPMENT

Equipment identified on the drawings as Vendor provided equipment shall be considered to be Government Furnished.

Government and Vendorfurnished equipment will be delivered prior to final completion of the building. Where indicated, Contractor shall provide an optional bid for Government Furnished equipment items - this option shall exclude items indicated as Vendor provided . In all cases, Contractor shall plan for and coordinate installation of this equipment as well as for Vendor provided equipment, and shall provide clearances, space, power, data, water, drains, conduits, etc as required for equipment to be operational. The Contractor shall consider the heat generated by this all equipment in determining cooling loads. See enclosed kitchen equipment plans for identification of Contractor furnished versus Government and Vendor furnished equipment. In addition, all movable furnishings will be based on the Contractor’s CID and Government furnished unless otherwise indicated as an optional bid item.

3.3.1. Finish Schedule

Finishes indicated in the Table 3-2 Finish Schedule are to be considered as minimum standards that meet the Government’s requirements.

Page 9 of

Table 3-2 – Finish Schedule

Page 10 of

Page 11 of

4.0 APPLICABLE CRITERIA

4.1. INDUSTRY CRITERIA

Applicable design and construction criteria references are listed in Table 1 below. Unless a specific document version or date is indicated, criteria shall be taken from the most current references as of the date of issue of the contract. This list is not intended to include all criteria that may apply or to restrict design and construction to only those references listed. See also Paragraph 3 for additional facility-specific applicable criteria.

Table 1: Industry Criteria

Air Conditioning and Refrigeration Institute (ARI)

ARI 310/380 Packaged Terminal Air-Conditioners and Heat Pumps

ARI 440 Room Fan-Coil and Unit Ventilator

ANSI/ARI 430-99 Central Station Air Handling Units

ARI 445 Room Air-Induction Units

ARI 880 Air Terminals

Air Movement and Control Association (AMCA)

AMCA 210 Laboratory Methods of Testing Fans for Rating

American Architectural Manufacturers Association (AAMA)

AAMA 605 Voluntary Specification Performance Requirements and Test Procedures for High Performance Organic Coatings on Aluminum Extrusions and Panels

AAMA 607.1 Voluntary Guide Specifications and Inspection Methods for Clear Anodic Finishes for Architectural Aluminum

AAMA 1503 Voluntary Test Method for Thermal Transmittance and Condensation Resistance of Windows, Doors, and Glazed Wall Sections

American Association of State Highway and Transportation Officials (AASHTO)

Roadside Design Guide [guardrails, roadside safety devices]

Standard Specifications for Transportation Materials and Methods of Sampling and Testing [Road Construction Materials]

Standard Specifications for Structural Supports for Highway Signs, W912PL-08-R-0013

Page 12 of

Luminaries and Traffic Signals

Guide for Design of Pavement Structures, Volumes 1 and 2 [pavement design guide]

A Policy of Geometric Design of Highways and Streets

American Bearing Manufacturers Association (AFBMA)

AFBMA Std. 9 Load Ratings and Fatigue Life for Ball Bearings

AFBMA Std. 11 Load Ratings and Fatigue Life for Roller Bearings

American Boiler Manufacturers Association (ABMA)

ABMA ISEI Industry Standards and Engineering Information

American Concrete Institute

ACI 318 Building Code Requirements for Structural Concrete

ACI 315 Details and Detailing of Concrete Reinforcement

ACI 530 Building Code Requirements for Masonry Structures

ADA Standards for Accessible Design

28 CFR Part 36

American Institute of Steel Construction (AISC)

Manual of Steel Construction – 13th Edition (or latest version)

American Iron and Steel Institute

AISI/COS NASPEC 2001 North American Specification for the Design of Cold-Formed Steel Structural Members

American National Standards Institute 11 (ANSI)

ANSI Z21.10.1 Gas Water Heaters Vol. 1, Storage water Heaters with Input Ratings of 75,000 Btu per Hour or less

ANSI Z124.3 American National Standard for Plastic Lavatories

ANSI Z124.6 Plastic Sinks

W912PL-08-R-0013

Page 13 of

ANSI Z21.45 Flexible Connectors of Other Than All-Metal Construction for Gas Appliances

ANSI/IEEE C2-2007 National Electrical Safety Code

ANSI/AF&PA NDS-2001 National Design Specification for Wood Construction

American Society of Civil Engineers (ASCE)

ASCE 7 Minimum Design Loads for Buildings and Other Structures

ASCE 37 Design and Construction of Sanitary and Storm Sewers, Manuals and Reports on Engineering Practice [sanitary sewer and storm drain design criteria]

ASCE/SEI 31-03 Seismic Evaluation of Existing Buildings [Existing Building Alteration/Renovation]

ASCE/SEI 41-06 Seismic Rehabilitation of Existing Buildings [Existing Building Alteration/Renovation]

American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE)

ASHRAE 90.1 - 2004 Energy Standard for Buildings Except Low-Rise Residential Buildings

ASHRAE Guideline 1-1996 The HVAC Commissioning Process

ASHRAE Hdbk-IP Handbook Fundamentals I-P Edition

ASHRAE Standard 15 Safety Standard for Refrigeration Systems

ASHRAE Standard 62.1 Ventilation for Acceptable Indoor Air Quality

American Society of Mechanical Engineers International (ASME)

ASME BPVC SEC VII Boiler and Pressure Vessel Code: Section VII Recommended Guidelines for the Care of Power Boilers

ASME A17.1 Safety Code for Elevators and Escalators

American Water Works Association (AWWA)

Standards [standards for water line materials and construction]

American Welding Society

W912PL-08-R-0013

Page 14 of

Welding Handbook

Architectural Woodwork Institute (AWI)

Version 1.2 AWI Quality Standards 7th Edition

Associated Air Balance Council (AABC)

AABC MN-1 National Standards for Testing and Balancing Heating, Ventilating, and Air Conditioning Systems

AABC Associated Air Balance Council Testing and Balance Procedures

ASTM International

ASTM C1060-90(1997) Standard Practice for Thermographic Inspection of Insulation Installations in Envelope Cavities of Frame Buildings

ASTM E 779 (2003) Standard Test Method for Determining Air Leakage Rate by Fan Pressurization

ASTM E1827-96(2002) Standard Test Methods for Determining Airtightness of Buildings Using an Orifice Blower Door

Builders Hardware Manufacturers Association (BHMA)

ANSI/BHMA A156.4 American National Standards for Door Controls – Closers

Building Industry Consulting Service International

Telecommunications Distribution Methods Manual (TDMM)

Customer-Owned Outside Plant Design Manual (CO-OSP)

Code of Federal Regulations (CFR)

49 CFR 192 Transportation of Natural and Other Gas by Pipeline: Minimum Federal Safety Standards

10 CFR 430 Energy Conservation Program for Consumer Products

Consumer Electronics Association

CEA 709.1B Control Network Protocol Specification

W912PL-08-R-0013

Page 15 of

CEA 709.3 Free-Topology Twisted-Pair Channel Specification

CEA 852 Tunneling Component Network Protocols Over Internet Protocol Channels

Electronic Industries Association (EIA)

EIA/TIA 568-B Commercial Building Telecommunications Cabling Standards

ANSI/EIA/TIA 569-B Commercial Building Standard for Telecommunications Pathways and Spaces

J-STD EIA/TIA 607 Commercial Building Grounding and Bonding Requirements for Telecommunications

Federal Highway Administration (FHWA)

Manual on Uniform Traffic Control Devices for Streets and Highways [signage and pavement markings for streets and highways]

FHWA-NHI-01-021 Hydraulic Engineering Circular No. 22, Second Edition, URBAN

DRAINAGE DESIGN MANUAL

Illuminating Engineering Society of North America (IESNA)

IESNA RP-1 Office Lighting

IESNA RP-8 Roadway Lighting

IESNA Lighting Handbook Reference and Application

Institute of Electrical and Electronics Engineers Inc. (IEEE)

Standard for Use of the International System of Units (SI): the Modern Metric System

Standard 1100 Recommended Practice for Powering and Grounding Sensitive Electronic Equipment

International Code Council (ICC)

IBC International Building Code

Note: All references in the International Building Code to the International Electrical Code shall be considered to be references to NFPA 70.

W912PL-08-R-0013

Page 16 of

All references in the International Building Code to the International Fuel Gas Code shall be considered to be references to NFPA 54 and NFPA 58.

All references in the International Building Code to the International Fire Code shall be considered to be references to Unified Facilities Criteria (UFC) 3-600-01.

IMC International Mechanical Code –

Note: For all references to “HEATING AND COOLING LOAD CALCULATIONS”, follow ASHRAE 90.1

Note: For all references to “VENTILATION”, follow

ASHRAE 62.1

IRC International Residential Code

IPC International Plumbing Code

IEC Energy Conservation Code (IEC) – Deleted DEC 2007- Refer to Paragraph 5, ENERGY CONSERVATION requirements.

IGC International Gas Code - not applicable. Follow NFPA 54, National Fuel Gas Code and NFPA 58, Liquified Petroleum Gas Code.

International Organization for Standardization (ISO)

ISO 6781:1983 Qualitative detection of thermal irregularities in building envelopes – infrared method

LonMark International (LonMark)

LonMark Interoperability Guidelines

(available at www.lonmark.org), including: Application Layer Guidelines, Layer 1-6 Guidelines, and External Interface File (XIF) Reference Guide

LonMark Resource Files (available at www.lonmark.org), including Standard Network Variable Type (SNVT) definitions

Metal Building Manufacturers Association (MBMA)

Metal Building Systems Manual

Midwest Insulation Contractors Association (MICA)

National Commercial and Industrial Insulation Standards Manual

National Association of Corrosion Engineers International (NACE)

W912PL-08-R-0013

Page 17 of

NACE RP0169 Control of External Corrosion on Underground or Submerged Metallic Piping Systems

NACE RP0185 Extruded, Polyolefin Resin Coating Systems with Adhesives for Underground or Submerged Pipe

NACE RP0285 Corrosion Control of Underground Storage Tank Systems by Cathodic Protection

NACE RP0286 Electrical Isolation of Cathodically Protected Pipelines

National Electrical Manufacturers Association (NEMA)

National Environmental Balancing Bureau (NEBB)

Procedural Standards Procedural Standards for Testing Adjusting Balancing of Environmental Systems

National Fire Protection Association (NFPA)

NFPA 10 Standard for Portable Fire Extinguishers

NFPA 13 Installation of Sprinkler Systems

NFPA 13R Residential Occupancies up to and Including Four Stories in Height Sprinkler Systems

NFPA 20 Installation of Centrifugal Fire Pumps

NFPA 24 Standard for the Installation of Private Fire Service Mains and Their Appurtenances [underground fire protection system design]

NFPA 30 Flammable and Combustible Liquids Code

NFPA 30A Motor Fuel Dispensing Facilities and Repair Garages

NFPA 31 Installation of Oil Burning Equipment

NFPA 54 National Fuel Gas Code

NFPA 58 Liquefied Petroleum Gas Code

NFPA 70 National Electrical Code

NFPA 72 National Fire Alarm Code

W912PL-08-R-0013

Page 18 of

NFPA 80 Standard for Fire Doors and Fire Windows

NFPA 90a Installation of Air Conditioning and Ventilating Systems

NFPA 96 Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations

NFPA 101 Life Safety Code

NFPA 780 Standard for the Installation of Lightning Protection Systems

National Roofing Contractor’s Association (NRCA)

Roofing and Waterproofing Manual

National Sanitation Foundation, International

NSF/ANSI Std. 2, 3, 4, 5, 6, 7, 8, 12, 13, 18, 20, 21, 25, 29, 35, 36, 37, 51, 52, 59, Food Equipment Standards

ANSI/UL Std. 73, 197, 471, 621, 763

Food Equipment Standards

CSA Std. C22.2 No. 109, 120, 195

Food Equipment Standards

Occupational Safety and Health Administration (OSHA)

Title 29, Part 1926 OSHA Construction Industry Standards, Title 29, Code of Federal Regulations, Part 1926, Safety and Health Regulations for Construction

Plumbing and Drainage Institute (PDI)

PDI G 101 Testing and Rating Procedure for Grease Interceptors with Appendix of Sizing and Installation Data

PDI WH201 Water Hammer Arrestors

Precast Concrete Institute

PCI Design Handbook Precast and Prestressed Concrete

Sheet Metal and Air Conditioning Contractor’s National Association (SMACNA)

W912PL-08-R-0013

Page 19 of

SMACNA HVAC Duct Construction Standards

HVAC Duct Construction Standards - Metal and Flexible

SMACNA Architectural Manual

Architectural Sheet Metal Manual

SMACNA HVAC TAB HVAC Systems - Testing, Adjusting and Balancing

State/Local Regulations

State Department of Transportation Standard Specifications for Highway and Bridge Construction

Sedimentation and Erosion Control Design Requirements

Environmental Control Requirements

Storm Water Management Requirements

Steel Door Institute (SDI)

ANSI A250.8/SDI 100 Standard Steel Doors and Frames

Steel Deck Institute

SDI Diaphragm Design Manual

Steel Joist Institute

Catalog of Standard Specifications and Load Tables for Steel Joists and Joist Girders

Underwriters Laboratories (UL)

UL 96A Installation Requirements for Lightning Protection Systems

UL 300 Standard for Safety for Fire Testing of Fire Extinguishing Systems for Protection of Restaurant Cooking Areas

Uniform Federal Accessibility Guidelines (UFAS)

U.S. Architectural and Transportation Barriers Compliance Board

U.S. DEPARTMENT OF HEATH AND HUMAN SERVICES

W912PL-08-R-0013

Page 20 of

FDA National Food Code

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED-NC

Green Building Rating System for New Construction & Major Renovations, Version 2.2

Application Guide for Multiple Buildings and On-Campus Building Projects

4.2. MILITARY CRITERIA

The project shall conform to the following criteria. Certain design impacts and features due to these criteria are noted for the benefit of the offeror. However, all requirements of the referenced criteria will be applicable, whether noted or not, unless otherwise specified herein.

4.2.1. Energy Policy Act of 2005 (Public Law 109-58)

4.2.2. Executive Order 12770: Metric Usage In Federal Government

(a) Metric design and construction is required except when it increases construction cost. Offeror to determine most cost efficient system of measurement to be used for the project.

4.2.3. TB MED 530: Occupational and Environmental Health Food Sanitation

4.2.4. Unified Facilities Criteria (UFC) 3-410-01FA: Heating, Ventilating, and Air Conditioning - applicable only to the extent specified in paragraph 5, herein.

4.2.5. UFC 3-580-01 Telecommunications Bldg Cabling Systems Planning/Design

4.2.6. UFC 3-600-01 Design: Fire Protection Engineering for Facilities

4.2.7. UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings

4.2.8. UFC 4-023-03 Design of Buildings to Resist Progressive Collapse

(a) Options to use tie force method or alternate path design

4.2.9. UFC 4-021-01 Design and O&M: Mass Notification Systems

4.2.10. Technical Guide for Installation Information Infrastructure Architecture (I3A)

(a) Email: DetrickISECI3Aguide@conus.army.mil

4.2.11. U.S. Army Information Systems Engineering Command (USAISEC) TG for the Integration of SECRET Internet Protocol (IP) Router Network (SIPRNET). See Paragraph 3 for applicability to specific facility type. May not apply to every facility.

4.3. PRECEDENCE

In the event of conflict between References and/or Applicable Military Criteria, the most stringent requirement will apply, unless otherwise specifically noted in the contract.

W912PL-08-R-0013

Page 21 of

5.0 GENERAL TECHNICAL REQUIREMENTS

This paragraph contains general technical requirements. See also Paragraph 3 for facility-specific technical requirements

5.1. SITE PLANNING AND DESIGN

5.1.1. STANDARDS AND CODES: The site planning and design shall conform to APPLICABLE CRITERIA and to paragraph 6, PROJECT SPECIFIC REQUIREMENTS.

5.1.2. SITE PLANNING OBJECTIVES: Group buildings in configurations that create a sense of community and promote pedestrian use. See paragraph 3 for additional site planning requirements relating to building functions.

5.1.3. Provide space at dumpster areas for recycling receptacles. Coordinate with Installation on recycling receptacle types, sizes and access requirements and provide space at dumpster areas to accommodate them.

5.1.4. EXTERIOR SIGNAGE: Provide exterior signage in accordance with Installation Design Guide.

5.1.5. EXISTING UTILITIES: Base utilities maps and capacities for this site are included as part of this RFP. See paragraph 6 for more detailed information.

5.2. SITE ENGINEERING

5.2.1. STANDARDS AND CODES: The site engineering shall conform to APPLICABLE CRITERIA.

5.2.2. SOILS:

5.2.2.1. A report has been prepared to characterize the subsurface conditions at the project site and is appended to these specifications. The report provides a general overview of the soil and geologic conditions with detailed descriptions at discrete boring locations. The Contractor’s team shall include a licensed geotechnical engineer to interpret the report and develop earthwork and foundation recommendations and design parameters in which to base the contractor’s design. If any additional subsurface investigation or laboratory analysis is required to better characterize the site or develop the final design, the Contractor shall perform it under the direction of a licensed geotechnical engineer. There will be no separate payment for the cost of additional tests. If differences between the Contractor’s additional subsurface investigation and the government provided soils report or the reasonably expected conditions require material revisions in the design, an equitable adjustment may be made, in accordance with the provisions of the Differing Site Conditions clause. The basis for the adjustment would be the design and construction appropriate for the conditions described in the Government furnished report or the reasonably expected conditions, in comparison with any changes required by material differences in the actual conditions encountered, in accordance with the terms of contract clause Differing Site Conditions.

5.2.2.2. The contractor’s licensed geotechnical engineer shall prepare a final geotechnical evaluation report, to be submitted along with the first foundation design submittal. This report shall summarize the subsurface conditions and provide recommendations for the design of appropriate foundations, floor slabs, retaining walls, embankments, and pavements. The

Contractor’s geotechnical report shall recommend foundation systems to be used, allowable bearing pressures for footings, lateral load resistance capacities for foundation systems, elevations for footings, grade beams, slabs, etc. Provide an assessment of post-construction settlement potential including total and differential. Provide recommendations regarding lateral earth pressures (active, at-rest, passive) to be used in the design of retaining walls. Include the recommended spectral accelerations and Site Class for seismic design along with an evaluation of any seismic hazards and recommendations for

W912PL-08-R-0013

Page 22 of mitigation, if required. Include calculations to support the recommendations for bearing capacity, settlement, and pavement sections. Include supporting documentation for all recommended design parameters such as Site Class, shear strength, earth pressure coefficients, friction factors, subgrade modulus, California Bearing Ratio (CBR), etc. Provide earthwork recommendations, expected frost penetration, expected groundwater levels, recommendations for dewatering and groundwater control and the possible presence of any surface or subsurface features that may affect the construction of the project such as sinkholes, boulders, shallow rock, old fill, old structures, soft areas, or unusual soil conditions.

5.2.2.3. The DB Contractor and the professional geotechnical engineer consultant shall certify in writing that the design of the project has been developed consistent with the Contractor’s final geotechnical report. The certification shall be stamped by the consulting professional geotechnical engineer and shall be submitted with the first design submission. If revisions are made to the initial design submission, a new certification shall be provided with the final design submission.

5.2.3. VEHICLE PAVEMENTS:

5.2.3.1. Design procedures and materials shall conform to one of the following: 1) the USACE Pavement Transportation

Computer Assisted Structural Engineering (PCASE) program, 2) American Association of State Highway and Transportation

Officials (AASHTO) or, 3) the applicable state Department of Transportation standards in which the project is located. See paragraph 5.2.2.2 and Section 01 33 16 for required information for the Contractor’s geotechnical evaluation report.

Regardless of the pavement design, a minimum flexible pavement section shall consist of 2 inches of asphalt and 6 inches of base, unless specifically identified by the Government to be a gravel road. Roads shall be designed with a life expectance of

25 years with normal maintenance. Parking area for tactical vehicles shall be Portland Cement Concrete (PCC) rigid pavement design. Military tracked vehicles will be designed IAW USACE PCASE. Traffic estimates for each roadway area will be as shown on the drawings or listed in Section 01 10 00 Paragraph 6.4.1. Pavement markings and traffic signage shall comply with the Installation requirements and with the Manual on Uniform Traffic Control Devices.

5.2.3.2. Parking Requirements.

(a) All handicap POV parking lots shall meet the ADA Accessibility Guidelines for accessible parking spaces.

(b) Design POV parking spaces for the type of vehicles anticipated, but shall be a minimum of 9 ft by 18 ft for POVs, except for two wheel vehicles.

5.2.4. CATHODIC PROTECTION: Provide cathodic protection systems for all underground metallic systems and metallic fittings/portions of non-metallic, underground systems, both inside and outside the building 5 foot line. Coordinate final solutions with the installation to insure an approach that is consistent with installation cathodic protection programs.

5.2.5. UTILITIES: See paragraph 6.4.2 for specific information on ownership of utilities and utility requirements. Meter all utilities (gas, water, and electric, as applicable) to each facility. For Government owned utilities, install meters that are wireless data transmission capable as well as have a continuous manual reading option. All meters will be capable of at least hourly data logging and transmission and provide consumption data for gas, water, and electricity. Gas and electric meters will also provide demand readings based on consumption over a maximum of any 15 minute period. Configure all meters to transmit at least daily even if no receiver for the data is currently available at the time of project acceptance. For privatized utilities, coordinate with the privatization utility(ies) for the proper meter base and meter installation.

5.2.6. PERMITS: The CONTRACTOR shall be responsible for obtaining all permits (local, state and federal) required for design and construction of all site features and utilities.

W912PL-08-R-0013

Page 23 of

5.3. ARCHITECTURE AND INTERIOR DESIGN:

This element will be evaluated per APPLICABLE CRITERIA under the quality focus.

5.3.1. STANDARDS AND CODES: The architecture and interior design shall conform to APPLICABLE CRITERIA.

5.3.2. GENERAL: Overall architectural goal is to provide a functional, quality, visually appealing facility that is a source of pride for the installation and delivered within the available budget and schedule.

5.3.3. DELETED

5.3.4. BUILDING EXTERIOR: Design buildings to enhance or compliment the visual environment of the Installation.

Where appropriate, reflect a human scale to the facility. Building entrance should be architecturally defined and easily seen.

When practical, exterior materials, roof forms, and detailing shall be compatible with the surrounding development and adjacent buildings on the Installation and follow locally established architectural themes. Use durable materials that are easy to maintain. Exterior colors shall conform to the Installation Design Guide.

5.3.4.1. Building Numbers: Each building shall have exterior signage permanently attached on two faces of the building indicating the assigned building number or address. Building number signage details and locations shall conform to the

Installation Design Guide.

5.3.5. BUILDING INTERIOR

5.3.5.1. Space Configuration: Arrange spaces in an efficient and functional manner in accordance with area adjacency matrices.

5.3.5.2. Surfaces: Appearance retention is the top priority for building and furniture related finishes. Provide low maintenance, easily cleaned room finishes that are commercially standard for the facility occupancy specified, unless noted otherwise.

5.3.5.3. Color: The color, texture and pattern selections for the finishes of the building shall provide an aesthetically pleasing, comfortable, easily maintainable and functional environment for the occupants. Coordination of the building colors and finishes is necessary for a cohesive design. Color selections shall be appropriate for the building type. The use of color, texture and pattern shall be used to path or way find through the building. Trendy colors that will become dated shall be limited to non-permanent finishes such as carpet and paint. Finishes should be selected with regards to aesthetics, maintenance, durability, life safety and image. Limit the number of similar colors for each material. Color of Ceramic and porcelain tile grout shall be medium range color to help hide soiling. Plastic laminate and solid surface materials shall have patterns that are mottled, flecked or speckled. Finish colors of fire extinguisher cabinets, receptacle bodies and plates, fire alarms / warning lights, emergency lighting, and other miscellaneous items shall be coordinated with the building interior.

Color of equipment items on ceilings (speakers, smoke detectors, grills, etc.) shall match the ceiling color.

5.3.5.4. Circulation: Circulation schemes must support easy way finding within the building.

5.3.5.5. Signage: Provide interior signage for overall way finding and life safety requirements. A comprehensive interior plans shall be from one manufacturer and shall include the flowing sign types: (1) Lobby Directory, (2) Directional Signs;

(3) Room Identification Signs; (4) Building Service Signs; (5) Regulatory Signs; (6) Official and Unofficial Signs (7) Visual

Communication Boards. Use of emblems or logos may also be incorporated into the signage plan.

W912PL-08-R-0013

Page 24 of

5.3.5.6. Window Treatment: Treatment shall be provided in all exterior windows or locations where control of day light coming in windows or privacy at night is required. Uniformity of window covering color and material shall be maintained to the maximum extent possible within a building.

5.3.6. COMPREHENSIVE INTERIOR DESIGN

5.3.6.1. Comprehensive Interior Design (CID): CID includes the Structural Interior Design (SID) and the Furniture, Fixtures and Equipment (FF&E) Design. SID requires the accommodation of required FF&E within the building and the design, selection and coordination of interior finish materials that are integral to or attached to the building structure. The SID provides basic space planning for anticipated FF&E requirements in conjunction with the functional layout of the building and design issues such as life safety, privacy, acoustics, lighting, ventilation, and accessibility. Completion of a SID involves the selection and specification of applied finishes for the building’s interior features including, but not limited to, walls, floors, ceilings, trims, doors, windows, window treatments, built-in furnishings and installed equipment, lighting, and signage. The SID package will include furniture floor plans, finish schedules, finish samples and any supporting interior elevations, details or plans necessary to communicate the building finish design and build out. The FF&E includes the design, selection, specification, color coordination and procurement documentation of the required items necessary to meet the functional, operational, sustainability, and aesthetic needs of the facility. The FF&E package will include placement plans, ordering and finish information on all freestanding furnishings and accessories, and cost estimates and will be coordinated with the Structural Interior Design (SID) interior finish materials. The selection of furniture style, function and configuration will be coordinated with the defined requirements. Examples of FF&E items are workstations, seating, files, tables, beds, wardrobes, draperies and accessories as well as markerboards, tackboards, and presentation screens. Criteria for furniture selection will include function and ergonomic considerations, maintenance, durability, sustainability, comfort and cost. Structural Interior Design (SID) is required for all facility types. FF&E package is required as indicated in Paragraphs 2 and 3.

5.3.6.2. Color, Surface and Signage: Provide a signage package for all reception desks if not provided for in the buildings’ overall signage package.

5.4. STRUCTURAL DESIGN

5.4.1. STANDARDS AND CODES: The structural design shall conform to APPLICABLE CRITERIA.

5.4.2. GENERAL: The structural system needs to be compatible with the intended functions and components that allows for future flexibility and reconfigurations of the interior space.

5.5. THERMAL PERFORMANCE

5.5.1. STANDARDS AND CODES: Building construction and thermal insulation for mechanical systems shall conform to

APPLICABLE CRITERIA.

5.5.2. BUILDING ENVELOPE SEALING PERFORMANCE REQUIREMENT. Design and construct the building envelope for office buildings, office portions of mixed office and open space (e.g., company operations facilities), dining, barracks and instructional/training facilities with a continuous air barrier to control air leakage into, or out of, the conditioned space. Clearly identify all air barrier components of each envelope assembly on construction documents and detail the joints, interconnections and penetrations of the air barrier components. Clearly identify the boundary limits of the building air barriers, and of the zone or zones to be tested for building air tightness on the drawings.

W912PL-08-R-0013

Page 25 of

5.5.2.1. Trace a continuous plane of air-tightness throughout the building envelope and make flexible and seal all moving joints.

5.5.2.2. The air barrier material(s) must have an air permeance not to exceed 0.004 cfm / sf at 0.3” wg [0.02 L/s.m2 @ 75

Pa] when tested in accordance with ASTM E 2178

5.5.2.3. Join and seal the air barrier material of each assembly in a flexible manner to the air barrier material of adjacent assemblies, allowing for the relative movement of these assemblies and components.

5.5.2.4. Support the air barrier so as to withstand the maximum positive and negative air pressure to be placed on the building without displacement, or damage, and transfer the load to the structure.

5.5.2.5. Seal all penetrations of the air barrier. If any unavoidable penetrations of the air barrier by electrical boxes, plumbing fixture boxes, and other assemblies are not airtight, make them airtight by sealing the assembly and the interface between the assembly and the air barrier or by extending the air barrier over the assembly.

5.5.2.6. The air barrier must be durable to last the anticipated service life of the assembly.

5.5.2.7. Do not install lighting fixtures with ventilation holes through the air barrier

5.5.2.8. Provide a motorized damper in the closed position and connected to the fire alarm system to open on call and fail in the open position for any fixed open louvers such as at elevator shafts.

5.5.2.9. Damper and control to close all ventilation or make-up air intakes and exhausts, atrium smoke exhausts and intakes, etc when leakage can occur during inactive periods.

5.5.2.10. Compartmentalize garages under buildings by providing air-tight vestibules at building access points.

5.5.2.11. Compartmentalize spaces under negative pressure such as boiler rooms and provide make-up air for combustion.

5.5.2.12. Performance Criteria and Substantiation: Submit the qualifications and experience of the testing entity for approval.

Demonstrate performance of the continuous air barrier for the opaque building envelope by the following tests:

(a) Test the completed building and demonstrate that the air leakage rate of the building envelope does not exceed

0.25cfm/ft2 at a pressure differential of 0.3” w.g.(75 Pa) in accordance with ASTM’s E 779 (2003) or E-1827-96 (2002).

Accomplish tests using either pressurization or depressurization or both. Divide the volume of air leakage in cfm @ 0.3” w.g.

(L/s @ 75 Pa) by the area of the pressure boundary of the building, including roof or ceiling, walls and floor to produce the air leakage rate in cfm/ft2 @ 0.3” w.g. (L/s.m2 @ 75 Pa). Do not test the building until verifying that the continuous air barrier is in place and installed without failures in accordance with installation instructions so that repairs to the continuous air barrier, if needed to comply with the required air leakage rate, can be done in a timely manner.

(b) Test the completed building using Infrared Thermography testing. Use infrared cameras with a resolution of 0.1deg C or better. Perform testing on the building envelope in accordance with ISO 6781:1983 and ASTM C1060-90(1997). Determine air leakage pathways using ASTM E 1186-03 Standard Practices for Air Leakage Site Detection in Building Envelopes and

Air Barrier Systems, and perform corrective work as necessary to achieve the whole building air leakage rate specified in (a) above. (c) Notify the Government at least three working days prior to the tests to provide the Government the opportunity to witness the tests. Provide the Government written test results confirming the results of all tests.

W912PL-08-R-0013

Page 26 of

5.6. PLUMBING

5.6.1. STANDARDS AND CODES: The plumbing system shall conform to APPLICABLE CRITERIA.

5.6.2. PRECAUTIONS FOR EXPANSIVE SOILS: Where expansive soils are present, the design for underslab piping systemsand underground piping serving chillers, cooling towers, etc, shall include features to control forces resulting from soil heave.