Responses to Questions

View the file

Other files

File Type Posted
Amendment_0003_Conform_Copy.pdf PDF
Amendment_0003.pdf PDF
W912PB-17-R-3019-0001.pdf PDF
W912PB-17-R-3019-0001_Summary_of_Changes.pdf PDF
ELIN_EXHIBITS-A-D.xlsx XLSX spreadsheet
W912PB-17-R-3019.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question 1: ELIN 2.10 (Mob/Demob Direct Push …) Please confirm Grafenwöhr, Vilseck and Freihoels are the potential drilling locations for this ELIN (i.e., not Hohenfels or Garmisch)

ANSWER: ELIN 2.10 IS FOR USAG BAVARIA, HOWVEVER AS STATED GRAFENWOEHR AND

VILSECK ARE THE POTENTIAL SITES FOR THIS ELIN.

Question 2: ELIN 3 (Groundwater Sampling …) We recommend the inclusion of an additional line item (e.g. 3.18) referring to Mobilization/Demobilization of sampling equipment (Groundwater Sampling ELINs 3.6 to 3.9). This item cannot be replaced e.g. by item 1.4.

ANSWER: DECLINED. MOB/DEMOB SHALL BE INCLUDED IN ELINS 3.6 - 3.9 COSTS, NO

BIG EQUIPMENT NECESSARY

Question 3: ELIN 3.10 (Performance of a short pump test …) Please confirm the following assumptions:

*Measurement of groundwater level only by measurement in the pumped Well

ANSWER: NO. ASSUMPTION THAT UP TO 4 SURROUNDING GROUNDWATER WELLS HAVE TO BE

MEASURED DURING THE PUMP TEST

*Sampling and analyses will be covered by ELINS 3.6 to 3.9 (Sampling) and ELIN 10 (Analyses of Water)

ANSWER: CONFIRMED

Question 3a: ELIN 3.16 (Setup and operation of a groundwater drawdown system) This is very difficult to price because the level of effort is dependent on the project-specific parameters. To provide a cost for this ELIN we need to know the following parameters for the “operation of a groundwater drawdown system” including

*duration of the drawdown operation, ANSWER: ASSUME ONE(1) WEEK

*(depth of groundwater table and target draw down depth)

ANSWER: ASSUME: MAXIMUM 5 M DEPTH, 1 - 2 M DRAWDOWN DEPTH

*type of assumed contaminants, ANSWER: ASSUME: TPH, BTEX, VOC, PAH, N-ALKANES (C5 - C9), PFC

Question 3b: ELIN 3.16 (Setup and operation of a groundwater drawdown system) Please confirm the following assumptions for the operation of the drawdown system:

*draw down is conducted by pumping of a single well "OR PUMP SUMP" *pumped and treated water can be discharged freely without a retention system *assumed contaminants for treatment are TPH, PAH, n-alkanes, BTEX, CHC *monitoring of groundwater table in 4 existing monitoring wells

--------NO

*sampling and analyses will be covered by ELINS 3.6 to 3.9 (Sampling) and ELIN 10 (Analyses of Water)--------------NO

ANSWER: ADDED "OR PUMP SUMP" IN FIRST BULLET, REST IS CONFIRMED

Question 4: ELIN 5 (Unknown Substance) Please confirm the following assumptions:

*sampling using standard personal protective equipment including a portable gas detector is sufficient *analyses of soil or fluids by GC-MS screening for VOC and NoVOC is sufficient

ANSWER: ANALYSIS MAINLY OF SOLIDS AND LIQUIDS (EVENTUALLY GAS)

Note: the listed PFC-parameters in Attachment 5 do not present the current list of the Bavarian Environmental Department (LfU), published in April 2017.

ANSWER: WAS NOT AVAILABLE AT THE TIME WHEN THE TABLE OF CONTENTS FOR THIS

CONTRACT WAS PREPARED; SHOULD BE UPDATED IN ATTACHMENT 5 WITH THE CURRENT LFU-LIST, THAT MEANS ADD THE TWO SINGLE PARAMETERS: PFHPS (PERFLUOROHEPTANSULFONIC

ACID) AND H4PFOS (H4-POLYFLUOROOCTANESULFONIC ACID), IF STILL POSSIBLE [Amendment to the solicitation will be forth coming to incorporate this]