R-3000_Arms_Room_Amend_002.pdf

PDF 187 KB Posted

Attached to
Arms, communications, Supply Room Personnel
Solicitation number
W912PB-16-R-3000
Issued by

About this file

Amendment 002

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0010737037-0001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

a) Add questions and answ ers to solicitation. See test

b) Solicitation is not extended. Solicitation still due 31 Dec 2015 at 1300hrs

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Dec-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PB-16-R-3000

X 9B. DATED (SEE ITEM 11)

02-Dec-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Dec-2015

CODE

ECC RCO BAVARIA

AMERIKANISCHE BESCHAFFUNGSSTELLE

GEB 542

92655 GRAFENWOEHR LAGER

GERMANY

W912PB 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PB-16-R-3000

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been added by full text:

QUESTIONS AND ANSWERS

Reference 1: Section 1.6.2 and 1.6.18 of the PWS: Section 1.6.2 Contractor Management states that the contractor must provide a Project Manager;

Section 1.6.18 Key Personnel states the Key Personnel are a Contract Manager and a Alternate Contract Manager Question 1a: Is the Project Manager and the Contract Manager the same individual or two separate labor categories?

Question 1b: Does the Contract manager or Project manager need to be on site?

Answer: Project manager and contract manager are the same person. The primary contract manager or alternate need to be available between 0800 to 1700 hrs.

Reference 2: Subfactor 1: Certifications and Qualifications (Technical Factor) Question 2a: What format does the Government want us to show as proof Certifications and Qualifications?

Question 2b: Does the Government want us to provide resumes? If yes, for which Labor Categories?

Answer: Submitting resumes for "all" your potential employees is appropriate. All personnel that are submitted should have the proper current certifications and qualifications required to perform the PWS. If a certificate for proof is appropriate submit the certificate.

Reference 3: Subfactor 3: Quality Control Plan (QCP) (Technical Factor) and Section 1.6.8 & 1.6.14 of the PWS. The Government requests that we provide our approach to our Quality Control Plan to include Sections 1.6.8 and

1.6.14. Section 1.6.8 of the PWS states that the Quality Control Plan must be developed and maintained NLT 90 days after contract award.

Question 3: Does the Government want our full (draft) Quality Control Plan with our proposal response, or do they prefer a summary of the requirements?

Answer: As part of the solicitation clause 242-4001 Quality Control Plan (QCP) defines what is to be included as a "minimum". Submitting a draft QCP is appropriate.

(End of Summary of Changes)

W912PB-16-R-3000

File details come from the government source that posted it. Updated .