A12. Solicitation Amendment 1-29-2020.pdf
PDF 634 KB Posted
- Attached to
- Cleaning Services - Rend Lake - Benton, IL
- Solicitation number
- W912P920T0011
View the file
Other files
Show 40 more
Latest 50 of 92 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912P920T0011
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to clarify & update Line Items 0028, 1028, 2028, 3028, & 4028 on Section B - Bid Schedule (unit has changed) & 8.3.1.5 PRESSURE WASH (ITEM xx28) in Section C - Statement of Work.
Please review the updated Section B & C and sign to acknow ledge this amendment. This MUST be sibmitted w ith offer.
ALL OTHER TERMS & CONDITIONS REMAIN UNCHANGED.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 37
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Jan-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P920T0011
X 9B. DATED (SEE ITEM 11)
17-Jan-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
29-Jan-2020
CODE
CONTRACTING DIVISION
US ARMY ENGR DIST ST LOUIS
1222 SPRUCE STREET, RM 4.207
ST LOUIS MO 63103-2833
W912P9 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
BID SCHEDULE - SECTION B
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Furnish all labor, equipment, and materials necessary to clean, service, and maintain sanitary conditions, pump vaults and provide pest control services at areas at Rend Lake in accordance with the work schedule and specifications contained herein.
1. All quantities are estimated and are to be used for bid purposes only.
2. Base year work will begin 1 March 2020.
3. All prices must be on a firm price basis.
4. TASK ORDER LIMITATIONS - The amount applicable to task orders are: Guaranteed Minimum Base Year:
$1,000.00; Guaranteed Minimum each Option Year: $1,000.00; Cumulative Maximum per Contract: $1,500,000.00
5. The following are abbreviations listed in the U/M (unit of measurement column):
EA = Each SQFT = Square Feet
6. RENEWAL OPTION NOTICE – This solicitation contains a renewal option clause. The renewal option(s) is (are) to be exercised at the discretion of the Government only and will be binding on the Contractor if a decision is made by the Government to exercise the option(s). Bidders are advised that such options as may be exercised will be exercised at the unit prices indicated for that specific renewal option year.
7. Indefinite Quantity Items are NOT guaranteed. If additional items are required, they will/shall be performed as directed by the Contracting Officer. Payment will be made ONLY for work actually requested and performed to the Government’s satisfaction.
8. OFFER REQUIREMENTS – Award will be made as a whole to one offeror. Offerors must include all items in their offer. Failure to do so will be cause for the Government to deem the offer non-responsive.
BASE YEAR: 1 MARCH 2020 THROUGH 28 FEBRUARY 2021
ITEM DESCRIPTION QTY U/M PRICE AMOUNT
0001 SHOWER BUILDING 411 EA
0002 GUN CREEK SHOWER BUILDING 141 EA
0003 MINI - SHOWER 500 EA
0004 BEACH/BOAT IN AREA SHOWER 178 EA
0005 COMFORT STATION 3699 EA
0006 CABINS 465 EA
0007 PICNIC SHELTER/GAZEBO 982 EA
0008 PICNIC SHELTER 11 86 EA
0009 GRILLS/ FIRE RINGS 29029 EA
0010 BEACHES/BOAT IN AREA 270 EA
0011 REFUSE CONTAINERS 1470 EA
0012 SCHEDULED LITTER PICKUP 1488 EA
0013 ROADWAY LITTER PICKUP 53 EA
0014 SPILLWAY LITTER PICKUP 52 EA
REND LAKE BIKE TRAIL
LITTER PICKUP
12 EA
0016 HUNT/FISH LOTS LITTER PICKUP 24 EA
0017 TRAIL LITTER PICKUP 250 EA
0018 COVERED BENCH CLEANING 30 EA
0019 PLAYGROUND CLEANING 102 EA
PLAYGROUND SURFACE
MAINTENANCE
480 EA
ADMINISTRATION AND
MAINTENANCE BUILDINGS
157 EA
0022 VISITOR CENTER 104 EA
0023 DRY CARPET CLEANING 2 EA
0024 WAX AND BUFF VCT FLOORS 26 EA
0025 EXTERIOR WINDOW CLEANING 26 EA
0026 OVERHANGS (POWER WASH FRONT) 7 EA
0027 OVERHANGS (POWER WASH BACK) 5 EA
0028 PRESSURE WASH 10,000 SQFT
0029 SNOW REMOVAL 25 EA
0030 VEHICLE WASHING 100 EA
0031 VEHICLE WAXING 50 EA
0032 BOAT WASHING 9 EA
0033 BOAT WAXING 6 EA
0034 STRIP/WAX VCT FLOORS 2 EA
0035 TILE CLEANING 26 EA
0036 SOAP DISPENSER CLEANING 12 EA
0037 LIGHT FIXTURE CLEANING 12 EA
0038 MAINTENANCE COMPOUND 4 EA
0039 VAULT PUMPING 40 EA
0040 PEST CONTROL - SHOWER BUILDING 21 EA
PEST CONTROL – GUN CREEK
SHOWER BUILDING
7 EA
0042 PEST CONTROL - MINI-SHOWER 26 EA
0043 PEST CONTROL - BEACH SHOWER 10 EA
0044 PEST CONTROL - COMFORT STATION 251 EA
0045 PEST CONTROL - SHELTER/GAZEBO 83 EA
0046 PEST CONTROL – SHELTER 11 7 EA
0047 PEST CONTROL - FEE BOOTH 28 EA
0048 PEST CONTROL - CABINS 35 EA
PEST CONTROL – ADMINISTRATION
BUILDING/VISITOR CENTER
12 EA
PEST CONTROL – MAINTENANCE
BUILDINGS
12 EA
TOTALS:
OPTION YEAR 1: 1 MARCH 2021 THROUGH 28 FEBRUARY 2022
1001 SHOWER BUILDING 411 EA
1002 GUN CREEK SHOWER BUILDING 141 EA
1003 MINI - SHOWER 500 EA
1004 BEACH/BOAT IN AREA SHOWER 178 EA
1005 COMFORT STATION 3699 EA
1006 CABINS 465 EA
1007 PICNIC SHELTER/GAZEBO 982 EA
1008 PICNIC SHELTER 11 86 EA
1009 GRILLS/ FIRE RINGS 29029 EA
1010 BEACHES/BOAT IN AREA 270 EA
1011 REFUSE CONTAINERS 1470 EA
1012 SCHEDULED LITTER PICKUP 1488 EA
1013 ROADWAY LITTER PICKUP 53 EA
1014 SPILLWAY LITTER PICKUP 52 EA
REND LAKE BIKE TRAIL
LITTER PICKUP
12 EA
1016 HUNT/FISH LOTS LITTER PICKUP 24 EA
1017 TRAIL LITTER PICKUP 250 EA
1018 COVERED BENCH CLEANING 30 EA
1019 PLAYGROUND CLEANING 102 EA
PLAYGROUND SURFACE
MAINTENANCE
480 EA
ADMINISTRATION AND
MAINTENANCE BUILDINGS
157 EA
1022 VISITOR CENTER 104 EA
1023 DRY CARPET CLEANING 2 EA
1025 WAX AND BUFF VCT FLOORS 26 EA
1025 EXTERIOR WINDOW CLEANING 26 EA
1026 OVERHANGS (POWER WASH FRONT) 7 EA
1027 OVERHANGS (POWER WASH BACK) 5 EA
1028 PRESSURE WASH 20,000 SQFT
1029 SNOW REMOVAL 25 EA
1030 VEHICLE WASHING 100 EA
1031 VEHICLE WAXING 50 EA
1032 BOAT WASHING 9 EA
1033 BOAT WAXING 6 EA
1034 STRIP/WAX VCT FLOORS 2 EA
1035 TILE CLEANING 26 EA
1036 SOAP DISPENSER CLEANING 12 EA
1037 LIGHT FIXTURE CLEANING 12 EA
1038 MAINTENANCE COMPOUND 4 EA
1039 VAULT PUMPING 40 EA
1040 PEST CONTROL - SHOWER BUILDING 21 EA
PEST CONTROL – GUN CREEK
SHOWER BUILDING
7 EA
1042 PEST CONTROL - MINI-SHOWER 26 EA
1043 PEST CONTROL - BEACH SHOWER 10 EA
1044 PEST CONTROL - COMFORT STATION 251 EA
1045 PEST CONTROL - SHELTER/GAZEBO 83 EA
1046 PEST CONTROL – SHELTER 11 7 EA
1047 PEST CONTROL - FEE BOOTH 28 EA
1048 PEST CONTROL - CABINS 35 EA
PEST CONTROL – ADMINISTRATION
BUILDING/VISITOR CENTER
12 EA
PEST CONTROL – MAINTENANCE
BUILDINGS
OPTION YEAR 2: 1 MARCH 2022 THROUGH 28 MARCH 2023
2001 SHOWER BUILDING 411 EA
2002 GUN CREEK SHOWER BUILDING 141 EA
2003 MINI - SHOWER 500 EA
2004 BEACH/BOAT IN AREA SHOWER 178 EA
2005 COMFORT STATION 3699 EA
2006 CABINS 465 EA
2007 PICNIC SHELTER/GAZEBO 982 EA
2008 PICNIC SHELTER 11 86 EA
2009 GRILLS/ FIRE RINGS 29029 EA
2010 BEACHES/BOAT IN AREA 270 EA
2011 REFUSE CONTAINERS 1470 EA
2012 SCHEDULED LITTER PICKUP 1488 EA
2013 ROADWAY LITTER PICKUP 53 EA
2014 SPILLWAY LITTER PICKUP 52 EA
REND LAKE BIKE TRAIL
LITTER PICKUP
12 EA
2016 HUNT/FISH LOTS LITTER PICKUP 24 EA
2017 TRAIL LITTER PICKUP 250 EA
2018 COVERED BENCH CLEANING 30 EA
2019 PLAYGROUND CLEANING 102 EA
PLAYGROUND SURFACE
MAINTENANCE
480 EA
ADMINISTRATION AND
MAINTENANCE BUILDINGS
157 EA
2022 VISITOR CENTER 104 EA
2023 DRY CARPET CLEANING 2 EA
2024 WAX AND BUFF VCT FLOORS 26 EA
2025 EXTERIOR WINDOW CLEANING 26 EA
2026 OVERHANGS (POWER WASH FRONT) 7 EA
2027 OVERHANGS (POWER WASH BACK) 5 EA
2028 PRESSURE WASH 20,000 SQFT
2029 SNOW REMOVAL 25 EA
2030 VEHICLE WASHING 100 EA
2031 VEHICLE WAXING 50 EA
2032 BOAT WASHING 9 EA
2033 BOAT WAXING 6 EA
2034 STRIP/WAX VCT FLOORS 2 EA
2035 TILE CLEANING 26 EA
2036 SOAP DISPENSER CLEANING 12 EA
2037 LIGHT FIXTURE CLEANING 12 EA
2038 MAINTENANCE COMPOUND 4 EA
2039 VAULT PUMPING 40 EA
2040 PEST CONTROL - SHOWER BUILDING 21 EA
PEST CONTROL – GUN CREEK
SHOWER BUILDING
7 EA
2042 PEST CONTROL - MINI-SHOWER 26 EA
2043 PEST CONTROL - BEACH SHOWER 10 EA
2044 PEST CONTROL - COMFORT STATION 251 EA
2045 PEST CONTROL - SHELTER/GAZEBO 83 EA
2046 PEST CONTROL – SHELTER 11 7 EA
2047 PEST CONTROL - FEE BOOTH 28 EA
2048 PEST CONTROL - CABINS 35 EA
PEST CONTROL – ADMINISTRATION
BUILDING/VISITOR CENTER
12 EA
PEST CONTROL – MAINTENANCE
BUILDINGS
OPTION YEAR 3: 1 MARCH 2023 THROUGH 29 FEBRUARY 2024
3001 SHOWER BUILDING 411 EA
3002 GUN CREEK SHOWER BUILDING 141 EA
3003 MINI - SHOWER 500 EA
3004 BEACH/BOAT IN AREA SHOWER 178 EA
3005 COMFORT STATION 3699 EA
3006 CABINS 465 EA
3007 PICNIC SHELTER/GAZEBO 982 EA
3008 PICNIC SHELTER 11 86 EA
3009 GRILLS/ FIRE RINGS 29029 EA
3010 BEACHES/BOAT IN AREA 270 EA
3011 REFUSE CONTAINERS 1470 EA
3012 SCHEDULED LITTER PICKUP 1488 EA
3013 ROADWAY LITTER PICKUP 53 EA
3014 SPILLWAY LITTER PICKUP 52 EA
REND LAKE BIKE TRAIL
LITTER PICKUP
12 EA
3016 HUNT/FISH LOTS LITTER PICKUP 24 EA
3017 TRAIL LITTER PICKUP 250 EA
3018 COVERED BENCH CLEANING 30 EA
3019 PLAYGROUND CLEANING 102 EA
PLAYGROUND SURFACE
MAINTENANCE
480 EA
ADMINISTRATION AND
MAINTENANCE BUILDINGS
157 EA
3022 VISITOR CENTER 104 EA
3023 DRY CARPET CLEANING 2 EA
3024 WAX AND BUFF VCT FLOORS 26 EA
3025 EXTERIOR WINDOW CLEANING 26 EA
3026 OVERHANGS (POWER WASH FRONT) 7 EA
3027 OVERHANGS (POWER WASH BACK) 5 EA
3028 PRESSURE WASH 20,000 SQFT
3029 SNOW REMOVAL 25 EA
3030 VEHICLE WASHING 100 EA
3031 VEHICLE WAXING 50 EA
3032 BOAT WASHING 9 EA
3033 BOAT WAXING 6 EA
3034 STRIP/WAX VCT FLOORS 2 EA
3035 TILE CLEANING 26 EA
3036 SOAP DISPENSER CLEANING 12 EA
3037 LIGHT FIXTURE CLEANING 12 EA
3038 MAINTENANCE COMPOUND 4 EA
3039 VAULT PUMPING 50 EA
3040 PEST CONTROL - SHOWER BUILDING 21 EA
PEST CONTROL – GUN CREEK
SHOWER BUILDING
7 EA
3042 PEST CONTROL - MINI-SHOWER 26 EA
3043 PEST CONTROL - BEACH SHOWER 10 EA
3044 PEST CONTROL - COMFORT STATION 251 EA
3045 PEST CONTROL - SHELTER/GAZEBO 83 EA
3046 PEST CONTROL – SHELTER 11 7 EA
3047 PEST CONTROL - FEE BOOTH 28 EA
3048 PEST CONTROL - CABINS 35 EA
PEST CONTROL – ADMINISTRATION
BUILDING/VISITOR CENTER
12 EA
PEST CONTROL – MAINTENANCE
BUILDINGS
OPTION YEAR 4: 1 MARCH 2024 THROUGH 28 FEBRUARY 2025
4001 SHOWER BUILDING 411 EA
4002 GUN CREEK SHOWER BUILDING 141 EA
4003 MINI - SHOWER 500 EA
4004 BEACH/BOAT IN AREA SHOWER 178 EA
4005 COMFORT STATION 3699 EA
4006 CABINS 465 EA
4007 PICNIC SHELTER/GAZEBO 982 EA
4008 PICNIC SHELTER 11 86 EA
4009 GRILLS/ FIRE RINGS 29029 EA
4010 BEACHES/BOAT IN AREA 270 EA
4011 REFUSE CONTAINERS 1470 EA
4012 SCHEDULED LITTER PICKUP 1488 EA
4013 ROADWAY LITTER PICKUP 53 EA
4014 SPILLWAY LITTER PICKUP 52 EA
REND LAKE BIKE TRAIL
LITTER PICKUP
12 EA
4016 HUNT/FISH LOTS LITTER PICKUP 24 EA
4017 TRAIL LITTER PICKUP 250 EA
4018 COVERED BENCH CLEANING 30 EA
4029 PLAYGROUND CLEANING 102 EA
PLAYGROUND SURFACE
MAINTENANCE
480 EA
ADMINISTRATION AND
MAINTENANCE BUILDINGS
157 EA
4022 VISITOR CENTER 104 EA
4023 DRY CARPET CLEANING 2 EA
4024 WAX AND BUFF VCT FLOORS 26 EA
4025 EXTERIOR WINDOW CLEANING 26 EA
4026 OVERHANGS (POWER WASH FRONT) 7 EA
4027 OVERHANGS (POWER WASH BACK) 5 EA
4028 PRESSURE WASH 20,000 SQFT
4029 SNOW REMOVAL 25 EA
4030 VEHICLE WASHING 100 EA
4031 VEHICLE WAXING 50 EA
4032 BOAT WASHING 9 EA
4033 BOAT WAXING 6 EA
4034 STRIP/WAX VCT FLOORS 2 EA
4035 TILE CLEANING 26 EA
4036 SOAP DISPENSER CLEANING 12 EA
4037 LIGHT FIXTURE CLEANING 12 EA
4038 MAINTENANCE COMPOUND 4 EA
4039 VAULT PUMPING 50 EA
4040 PEST CONTROL - SHOWER BUILDING 21 EA
PEST CONTROL – GUN CREEK
SHOWER BUILDING
7 EA
4042 PEST CONTROL - MINI-SHOWER 26 EA
4043 PEST CONTROL - BEACH SHOWER 10 EA
4044 PEST CONTROL - COMFORT STATION 251 EA
4045 PEST CONTROL - SHELTER/GAZEBO 83 EA
4046 PEST CONTROL – SHELTER 11 7 EA
4047 PEST CONTROL - FEE BOOTH 28 EA
4048 PEST CONTROL - CABINS 35 EA
PEST CONTROL – ADMINISTRATION
BUILDING/VISITOR CENTER
12 EA
PEST CONTROL – MAINTENANCE
BUILDINGS
TOTAL BASE YEAR:
TOTAL OPTION YEAR 1:
TOTAL OPTION YEAR 2:
TOTAL OPTION YEAR 3:
TOTAL OPTION YEAR 4:
GRAND TOTAL:
SOW - SECTION C
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
SPECIFICATIONS FOR RECREATION AREA CLEANING, JANITORIAL CLEANING, VAULT PUMPING,
AND PEST CONTROL SERVICES
1. GENERAL
1.1 SCOPE OF WORK. Work shall consist of furnishing all labor, equipment, and materials necessary to clean, service, and maintain sanitary conditions, pump vaults and provide pest control services at areas at Rend Lake in accordance with the specifications contained herein. In addition to performing services, the Contractor is responsible for, but is not limited to, all job planning, programming, scheduling, administration, inspection, quality control, and management necessary to accomplish the required specified services. Contractor shall assure that all work is accomplished in accordance with contract requirements, all applicable laws, regulations and/or written directives issued by the Contracting Officer or his/her authorized representative. All work shall be performed to the satisfaction of the Contracting Officer or authorized representative.
1.2 DEFINITIONS. As used throughout this description/specification, the following terms shall have the meaning set forth below:
a. CONTRACTOR - the term Contractor refers to the prime Contractor and all contractor employees and personnel. The prime Contractor shall be responsible for ensuring all subcontractors comply with the provisions of this contract.
b. CONTRACTOR REPRESENTATIVE - a foreman or superintendent, assigned to represent the interests of the Contractor with regards to all matters involving the contract.
c. CONTRACTING OFFICER (KO) - the term "Contracting Officer" means the person executing this contract on behalf of the Government, and any other officer or civilian employee who is properly designated Contracting Officer; and the term includes, except as otherwise provided in this contract, the authorized representative of a Contracting Officer acting within the limits of their authority.
d. QUALITY CONTROL - the term "Quality Control" refers to action taken by the Contractor and/or their personnel to document, inspect, and control performance of services to ensure they meet the specifications and requirements of this contract.
e. QUALITY ASSURANCE - the term "Quality Assurance" refers to action taken by the government to ensure the Contractor's quality control system is functioning and effective, and the Contractor is
C - 13 providing services, which are in accordance with this contract.
f. Q.A.S.P. - Quality Assurance Surveillance Plan. This is a detailed plan defining Government inspection methods.
g. C.D.R. - the Control Deficiency Report is a written record of unsatisfactory performance by the Contractor as documented by the Quality Assurance Inspection.
h. GRILLS/BRAZIERS - any facility designated as a place to build a fire, including but not limited to, pedestal grills, half-barrel grills, braziers, fire rings, etc.
i. CLEAN (ED) - refers to, but not limited to, facilities free of dirt, garbage, paper, metal, trash, debris, driftwood, plastic, cigarette butts, rocks, animal remains, tree limbs, sticks, algae, moss, glass, bottle caps, pull tabs, tape, thumb tacks, push pins, gravel, mud, sand, grass, vegetation growth (this includes growing within cracks and expansion joints in sidewalk roadways and parking lots), cut grass from all mowing operations, leaves, graffiti, grease, stains, food particles, defecation of any kind, residues, mineral and hard water deposits, insects, spiders, and all nests, webs, ashes, charred wood, soap scum, mold, mildew, water spots, standing water, detergent residue, slippery conditions, and shall be free of offensive odor and disinfected.
j. DISINFECT (ED) – refers to removal of all microorganisms, germs, etc. potentially harmful to man and leave areas safe and sanitary. Areas include, but are not limited to door handles (inside and out), benches, sinks, faucets, countertops, showers (controls and shower head included), toilets and toilet seats, floors, walls, handrails, drinking fountains, tables, feminine hygiene containers, and trash cans.
k. BUILDING INTERIORS - refers to but not limited to all fixtures, floors, inside walls, ceilings, exposed joices, exposed studs, partitions, trash cans, tables, benches, showers, and toilet stools. Fixtures include sinks, soap holders, commodes (lids and risers), urinals, hand dryers, mirrors, light covers and fixtures, trash cans, screens, doors, louvers and ventilation system.
l. BUILDING EXTERIORS - refers to all but not limited to light covers and fixtures, louvers, screens, doors, windows, ventilation systems, recesses, eaves, windows, roofs, walls, signs, and water fountains affixed and adjacent to buildings.
m. IMPACT PAD OR SITES - The terms "impact pad" or "impact site" shall be construed as all graveled, wood chip or concrete areas around playground equipment, picnic tables, grills, camp pad areas using gravel or wood chips as the impact material and timbers or concrete as a perimeter.
n. FULLY CLOTHED - The term "fully clothed" shall be construed as, at a minimum, contractor and employees must wear short sleeved shirts without abusive language and/or pictures, safety shoes as stated in EM 385-1-1, "Safety and Health Requirements Manual", and long pants without holes. No shorts will be allowed.
o. LITTER - refers to, but is not limited to, garbage, trash, debris, paper, metal, plastic, cigarette butts, glass, bottle caps, pull tabs, food, animal remains, driftwood, tree limbs, sticks, grass, vegetation growth, dirt, gravel, mud, sand, rocks, algae, moss, ashes, charred wood, and/or any other foreign material.
p. SEWAGE - refers to liquid, semi-liquid, solid waste matter and associated contaminated litter.
1.3 CONTRACT AREA AND LIMITS. Areas to be maintained will be specified in Appendix B. General location maps are available at the Rend Lake Project Office, 11981 Rend City Road, Benton, IL 62812, where they can be inspected at any time between 0800 and 1500, Monday through Friday (except holidays).
1.3.1 WORK PERIOD. The services listed herein shall be in accordance with Section C.
1.3.2 FACILITIES TO BE SERVICED. The approximate number of facilities per area will be as specified in Appendix B.
1.3.2 SERVICING SCHEDULE. Services will be performed as per the schedule provided by the Contracting Officer or authorized representative.
1.4 UTILITIES. The Contractor shall provide all water and electricity required in the performance of this contract when it cannot be obtained from Government sources. During the winter months and during repair operations water and electricity may be unavailable. Water and electricity may be obtained and utilized by the Contractor from government sources within the recreation areas at no cost to the Contractor or from other sources approved by the Contracting Officer. If water or electricity is obtained from sources other than the Government, all arrangements and payments, if any, shall be the responsibility of the Contractor. The absence of a government water or electric source will not relieve the Contractor of obligation to provide services as scheduled for any facility or area. Raw lake water shall not be used for cleaning.
1.5 SAFETY. All equipment used and work performed shall be in accordance with safety requirements set forth in Corps of Engineers Manual, EM 385-1-1, entitled, "Safety and Health Requirements Manual". Copies of the Safety Manual are available online at the USACE publications site: http://www.publications.usace.army.mil/. Any unsafe work and/or actions will be stopped immediately. All equipment or materials found not to be in conformity with the requirements of EM 385-1-1 shall be removed from Government property immediately.
1.5.1 In order to provide safety controls for protection to life and health of employees and other persons, for prevention of damage to property, materials, supplies, and equipment, and for avoidance of work interruptions in the performance of this contract, the Contractor shall comply with all pertinent provisions of EM 385-1-1, and shall also take or cause to be taken such additional measures necessary for that purpose. Compliance with the provisions of this clause by employees and subcontractors will be the responsibility of the Contractor.
1.5.1.1 In accordance with 385-1-1, Section 03.A.02, the Contractor must have at least two employees on each shift who are qualified to administer first aid and cardiopulmonary resuscitation (CPR) when the total number of employees on that shift is equal to or greater than two. Proof of qualification must be submitted to the Contracting Officer within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance shall one qualified employee be terminated.
1.5.2 Any Corps of Engineers employee may notify the Contractor of any noncompliance with the provisions of this clause and any corrective action required. The Contractor shall, after receipt of such notice, immediately take corrective action. Such notice, when delivered to the Contractor or his/her representative at the site of the work, shall be deemed sufficient to take immediate action. If the Contractor fails or refuses to comply promptly, any Corps of Engineers employee may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall make no part of the time lost due to any such stop orders the subject of claim for extension of time or for excess costs or damages.
1.5.3 PROJECT SAFETY AND HEALTH PLAN. The Contractor is required to develop and submit a detailed, written safety and health plan, which includes a hazard analysis, an accident prevention plan, an indoctrination and training plan, and a hazard communication plan (reference EM385-1-1, Section 1). This plan must indicate in detail the general policies and procedures for safe operation in the accomplishment of this contract.
The plan shall show how the Contractor intends to perform all services in full compliance with the safety and health requirements set forth in EM 385-1-1, entitled "Safety and Health Requirements Manual". The Contractor shall submit the safety and health plan to the Contracting Officer or authorized representative for approval a minimum of five (5) working days prior to the commencement of services under this contract. If the plan is judged not to be adequate and is disapproved by the Government, the Contractor must revise the plan and submit it to the Contracting Officer or authorized representative for acceptance within five (5) working days.
1.5.4 ACCIDENT REPORTING. An accident constitutes an incident or act involving the Contractor, which may or may not have caused obvious damage to persons or property. All accidents shall be reported to the Contracting Officer within 24 hours of occurrence. All serious accidents (those resulting in death or injury requiring medical attention) shall be reported immediately. All accident reporting shall be in accordance with EM385-1-1, Section 01.D ACCIDENT REPORTING AND RECORD KEEPING.
1.5.5 SAFETY EXPOSURE REPORTING. The Contractor shall maintain an accurate record of, and shall submit a monthly "SAFETY EXPOSURE REPORT" to the Contracting Officer in accordance with EM385-1-1 and the manner as prescribed at the pre-work conference. The report will cover hours worked during the previous month, accidents resulting in death, traumatic injury, occupational disease, and damage to property, materials, supplies, and equipment necessary to perform work under this contract. The report will be submitted the first day of the month with the contractors invoice.
1.5.6 SAFETY VESTS. All personnel working within twenty-five feet of highways or roadways are required to wear a "safety orange" reflective vest as required in EM 385-1-1, Section 05.A.11, and ANSI/ISEA 107 Requirements.
1.6 VEHICLES. All vehicles utilized under this contract shall be presentable, serviceable, must meet all safety requirements set forth in EM 385-1-1 (see Section C.1.5, SAFETY), and shall comply with all applicable state and federal motor vehicle regulations. All systems and body panels that were installed at the time of manufacturing, i.e. fenders, brakes on all wheels, speedometers, gas gauges, complete exhaust systems, etc., shall be in good working condition with no malfunctioning parts. Any vehicle utilized under this contract that is found deficient shall be removed in accordance with Section C.4.2.2, INSPECTION OF EQUIPMENT, MATERIALS, AND
SUPPLIES.
1.6.1 IDENTIFICATION OF CONTRACTOR VEHICLES. All Contractor vehicles shall be identified with the company name or logo, type of business, address, and phone number conspicuously displayed on both sides. Professionally done hand lettering, magnetic signs, or pressure sensitive decals with 2" or larger lettering may be used to comply with this specification. The signs shall be subject to the approval of the Contracting Officer or authorized representative and will be provided for review within 30 calendar days of contract award.
1.6.2 The Contractor shall not drive off the paved or gravel access roads onto the grass at any time without prior approval of the Contracting Officer or authorized representative.
1.6.3 No vehicles shall be left unattended for any extended periods of time at any recreation area or elsewhere without prior approval of the Contracting Officer or authorized representative.
1.6.4 Vehicles shall be operated in accordance with state regulations, posted regulations and traffic control signs.
1.6.5 All vehicles utilized under this contract for litter pickup along roadways in the recreation areas, adjacent county/township roads, and along the main dam shall use a bright rotating or strobe, amber light.
The Contracting Officer or authorized representative must approve this light prior to commencement of work. Any light(s) that are deemed unsafe by the KO or authorized representative shall be replaced with an approved light(s) immediately. Any vehicle that is not parked in a designated parking space in the recreation areas shall utilize their hazard lights (four-way flashers).
1.7 OMISSIONS. This contract may duplicate or not cover all specified activities, steps, and/or procedures required to accomplish contract work. In case of omission, the normal industry standards, practices, specifications and/or guides shall prevail. In no instance shall an omission be a reason to perform inferior work, produce a less than acceptable product or service, or to refuse to perform an intended activity.
1.8 OTHER CONTRACTS. The Contractor's attention is called to the fact that other Contractors and Corps of Engineers employees may be in the area for the purpose of performing duties. The Contractor will cooperate fully with all Contractors and Corps of Engineers employees in the area and shall not impede the work of other Contractors and Corps of Engineers employees in any way.
1.9 DAMAGES. The Contractor is responsible for taking any action necessary to protect all supplies, and property, including material and supplies issued by the Government to accomplish a job, against damage, theft, or loss. Government assumes no responsibility for loss or damage to any material, supplies, or property after it is received by, or in the possession of the Contractor. The Contractor, at no cost to the Government, shall replace any Government property lost or stolen due to negligence of the Contractor.
1.9.1 The Contractor shall use reasonable care to avoid damaging buildings, equipment, and vegetation on property. The Contractor shall replace or repair the damage at no expense to the Government within a time frame approved by the Contracting Officer. If the Contractor fails or refuses to make such repairs or replacement, within the time frame, the Contractor shall be liable for the cost to make the repair or replacement, which will be deducted from the contract payment.
1.10 CAUTION. The majority of work areas are located in heavily used recreational areas. All bidders are strongly encouraged to attend a pre-bid conference and inspection. WARNING: IN NO EVENT SHALL A FAILURE TO INSPECT THE SITE CONSTITUTE GROUNDS FOR WITHDRAWL OF BID AFTER OPENING.
1.11 SECURITY. Contractor shall maintain security in accordance with established operating procedure while working in the administration and maintenance buildings and associated compounds. All doors, windows, and gates shall be kept locked at all times. All interior lights shall be turned off when work is completed, except for the visitor center foyer light. Under no circumstances will anyone other than designated personnel of the Contractor, as designated in Section C.2 "PERSONNEL REQUIREMENTS", be permitted to enter the Project Office/Visitor Center and maintenance building and compound work areas.
1.11.1 AT LEVEL I TRAINING. All contractor employees, to include subcontractor employees, requiring access to Army Corps installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to KO or authorized representative, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training will be made available by the KO or authorized representative upon the contract start date.
1.11.2 ACCESS and GENERAL PROTECTION/SECURITY POLICY and PROCEDURES. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by authorized representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the Franklin County Sheriff’s Department and the Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.11.3 iWATCH and/or CORPS WATCH TRAINING. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH, Corps Watch, or See Something, Say Something program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the KO or authorized representative no later than 5 calendar days after completion.
1.11.4 CONTRACTOR/CONTRACTOR EMPLOYEES WILL BE ESCORTED IN AREAS
WHERE THEY MAY BE EXPOSED TO CLASSIFIED and/or SENSITIVE MATERIALS and/or SENSITIVE OR RESTRICTED AREAS. All contractor employees, including subcontractor employees who are not in possession of the appropriate security clearance, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
1.11.5 PRE-SCREEN CANDIDATES USING E-VERIFY PROGRAM. The Contractor must pre-screen Candidates using the E-verify Program (http://www.dhs.gov/E-Verify) website to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the KO or authorized representative no later than 3 business days after the initial contract award.
2. PERSONNEL REQUIREMENTS
2.1 MINIMUM MANPOWER REQUIREMENTS. The Contractor shall provide an adequate number of fully qualified personnel to perform the specified services properly and efficiently within the time limits specified.
If the Contractor is unable to accomplish work in accordance with the requirements of this contract within the times specified, he shall immediately obtain additional personnel as necessary to fulfill the requirements of this contract.
2.2 EMPLOYEE CONDUCT. The majority of work will be performed in the presence of the general public. Thus, the conduct of all contractor employees is critical and will be closely monitored. The Contractor shall be responsible for ensuring that their employees strictly comply with all Federal and State laws. Any illegal or criminal activity may result in the removal of Contractor employee(s) from the project. Any public complaints on contractor employee(s) behavior will result in removal of the employee(s) from the project. (See Section C.2.3)
2.2.1 The Contractor or employees, while working on this contract, shall not consume or be under the influence of alcohol and/or drugs.
2.2.2 All workers are to be fully clothed, in accordance with Section C.1.2.n, FULLY CLOTHED & E.M. 385-1-1, "Safety and Health Requirements Manual", and maintain a neat and clean appearance.
2.2.3 While working on this contract, all workers shall have some form of exterior identification that is easily recognizable to the general public, such as uniforms, hats, t-shirts and/or I.D. badges, to designate them as employees of the Contractor. Prior to beginning work, the Contractor shall submit the identification to the Contracting Officer or authorized Representative for approval.
2.3 REMOVAL OF CONTRACTOR EMPLOYEE. The Contracting Officer may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the Contracting Officer, is incompetent; who endangers persons or property; who interferes with or impedes the public use of the project, or who engages in criminal activity; or whose physical or mental condition is such that it would impair the employee's ability to safely or satisfactorily perform his/her work. Notification to the Contractor shall be verbal or electronic, and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
2.4 SUPERVISION. The Contractor shall establish a defined chain of command including Contractor Representatives, Quality Control Inspectors, and crew leaders. For the purpose of this contract, it is intended that the Contractor Representative and Quality Control inspectors shall be administrative positions whose responsibility is to ensure compliance with contract specifications. The Contractor Representatives and/or Quality Control personnel shall be required to have a copy of the contract in their possession at all times for referral concerning questions of Contractor responsibility.
2.4.1 CONTRACTOR REPRESENTATIVE. The Contractor shall appoint in writing, subject to the approval of the Contracting Officer, a minimum of two Contractor Representatives to serve as supervisors. A minimum of one Supervisor will be on the job site at all times during scheduled cleaning services and have full authority and power to act for the Contractor on items pertaining to overall work performance, management, coordination and supervision, whenever work specified herein is being performed. The Contractor Representative serves as the central point of contact with the Government for performance of all work under this contract. The Contractor Representative shall deal directly with the Contracting Officer or authorized representative for normal day-to-day administration of this contract. These individuals may also serve as Quality Control inspectors (see Section C.2.4.2, QUALITY CONTROL INSPECTOR), provided that their job performance in each category is maintained at an acceptable level to the Contracting Officer.
2.4.1.1 The Contractor shall be responsible for reporting maintenance deficiencies and vandalism in Government facilities either by telephone, electronic communications or completion and submittal of a Maintenance Deficiency Order. The Contractor Representative shall be responsible for ensuring that all Maintenance Deficiency Orders (form LMS 734) are detailed, readable, completed entirely, and submitted to the Contracting Officer or authorized representative. Any maintenance deficiency, which is a hazard to public health or safety, will be reported immediately, all other deficiencies will be reported by 0800 hours the following day.
2.4.2 QUALITY CONTROL INSPECTOR. The Contractor is responsible for ensuring that all work performed under this contract, including any performed by subcontractors, is in accordance with the specifications. To accomplish this, the Contractor shall appoint in writing, subject to the approval of the Contracting Officer, two Quality Control inspectors, who shall be responsible for the requirements set forth in Section C.3, INSPECTIONS.
2.4.3 CREW LEADER. The Contractor shall designate a responsible employee in each work crew to act as work leader, and to complete a daily activity report, which is to be submitted to the Contracting Officer or authorized representative by 0800 hours the following day on which services are performed under this contract.
2.4.3.1 The daily activity report for each work crew shall include the following:
- Crew leader's name
- Date
- Crew designation
- List of location, bid item, time completed
- Location of hot grills
- Location of non-serviced items
- List of any damage, vandalism, or inoperable facilities
3. INSPECTIONS
3.1 CONTRACTOR QUALITY CONTROL. The Contractor is required to establish and maintain an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor's organization is in full compliance with this contract. The Contractor shall designate, in writing, Quality Control inspectors, as described in Section C.2.4.2, QUALITY CONTROL INSPECTOR, whose duty shall be to verify contract compliance of all work performed, to include reviewing each work leader's daily activity report to ensure that it is legible, understandable, and complete, and to notify the Contracting Officer of anything requiring his/her immediate attention.
3.1.1 The Contractor Quality Control inspectors shall provide the Contracting Officer with a copy of all Quality Control reports by 0800 hours of the following day on which services are performed under this contract.
3.2 CONTRACTOR QUALITY CONTROL PLAN. The Contractor is responsible for establishing and maintaining a complete quality control system to insure satisfactory performance of all sections of the contract. This will be assured by the development of a comprehensive Quality Control Plan by the Contractor and supplied to the Contracting Officer at the pre-work conference for acceptance prior to initiating work. If the plan is judged not to be adequate and is disapproved by the Government, the Contractor must revise the plan and submit it to the Contracting Officer for acceptance within five (5) working days.
3.3 GOVERNMENT QUALITY ASSURANCE. The Government will monitor and inspect the Contractor's operation to ensure the Quality Control Plan is in place and is working, and that the Contractor's performance meets all contract specifications. The Government will monitor the Contractor's service performance through a Quality Assurance Surveillance Plan (QASP); see Appendix F, utilizing the random sampling method, the planned sampling method, unscheduled inspection method and/or the 100% inspection method. The Government reserves the right to alter or change the type of inspection plan at its discretion at any time, and to make deductions accordingly. The QASP is included for information purposes only, and will not be made part of any resulting contract.
3.4 REPERFORMANCE AND REINSPECTION. The Government may require the Contractor to re-perform services, not on the random sample, which are found to be deficient by the Quality Assurance inspector.
Should it become necessary for the Government Quality Assurance inspector to perform re-inspections of defective work that was required to be redone (due to failure of the Contractor's Quality Control system to locate and cure these deficiencies prior to the initial Quality Assurance inspection), there will be a re-inspection charge. These charges will be deducted, in accordance with the QASP, from the Contractor's monthly invoice.
3.5 PERFORMANCE EVALUATION MEETINGS. The Contractor, his/her Contractor Representative, and/or Quality Control inspectors shall meet with the Contracting Officer or his/her representatives as often as determined necessary by the Contracting Officer in order to discuss performance. Mutual effort will be made to resolve any and all problems identified.
4. CONTRACTOR FURNISHED EQUIPMENT, MATERIALS, AND SUPPLIES
4.1 GENERAL - Unless otherwise stated, the Contractor shall furnish and maintain all sufficient equipment, materials and supplies required to satisfactorily perform the requirements of this contract.
4.1.1 All equipment shall be maintained in safe operating condition complying with all manufacturer’s requirements and requirements of EM 385-1-1 and in accordance with EM 385-1-1, Section 18.C OPERATING RULES. A regular schedule of preventive maintenance shall be followed on all equipment.
4.1.2 If the Contractor is unable to accomplish work in accordance with the requirements of this contract within the times specified, he shall immediately obtain additional equipment, materials, and supplies necessary to fulfill the requirements of this contract.
4.1.3 All Contractor's equipment, materials, and supplies shall be removed from Government property at the end of each working day unless otherwise approved by the Contracting Officer.
4.2 APPROVAL OF EQUIPMENT, MATERIALS AND SUPPLIES. Prior to commencing work, the Contractor shall attend a pre-work conference at the Rend Lake Project Office and submit to the Contracting Officer, a written statement identifying the grade, type, quantity, mixture, and manner of application of all materials to be used during the contract period; and provide a list of all equipment, materials and supplies available to perform the services listed in this contract. All material, equipment, supplies, and operating procedures must be approved by the Contracting Officer prior to the commencement of work, or prior to implementing any changes.
4.2.1 The Contractor shall be responsible for obtaining " Materials Safety Data Sheets" (MSDS) from the manufacturers for all cleaning solutions or agents, insecticides, enzymes or bacterial agents, disinfectants, graffiti remover, or any other supplies of a chemical nature used in the operation of this contract. All MSDS sheets must be submitted to the Contracting Officer for approval prior to beginning any services required by this contract.
In accordance with EM385-1-1, Section 06.B.01, the Contractor shall inventory the above mentioned items and submit this inventory and material location to the Contracting Officer prior to the commencement of work, or prior to implementing any changes.. The Contractor will also maintain a copy of this inventory and have it available, at all times, at the worksite.
4.2.2 INSPECTION OF EQUIPMENT, MATERIALS AND SUPPLIES. The Contracting Officer or Quality Assurance inspector may inspect all equipment, materials, and supplies at any time when on Government property. Any equipment or supplies found deficient shall be removed from service immediately until such time as deficiencies have been corrected and approved for use by the Contracting Officer. No such removal will reduce the Contractor's obligation to perform all work required within this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
4.3 CREW SUPPLIES. The Contractor shall be responsible for maintaining each cleaning crew with sufficient supplies for performing each days required services.
4.4 MANUFACTURER DIRECTIONS. The Contractor shall be responsible for ensuring that all employees follow the manufacturer’s instructions for use of all materials and supplies.
4.5 CLEANING EQUIPMENT, MATERIALS, AND SUPPLIES. The Contractor shall furnish all required materials and supplies including, but not limited to detergents/soaps, disinfectants, deodorizers, trash cans, trash can liners, enzymes or bacterial agents, deodorant cakes, toilet paper, odor control chemicals, floor cleaner, polish, stain and/or graffiti remover, "out of order" signs, "closed for cleaning" signs, replacement locks, sanitary napkin receptacle liners, baby changing station sanitary liners, mops, brooms, shovels, toilet brushes, cleaning rags, squeegees, wire brushes with scrapers, hoses, sponges, buckets, rakes, blowers, brushes, plungers, towels, pressure washers, safety equipment and any other materials required to clean, service and maintain sanitary conditions as stated in this Contract in a quantity which shall preclude depletion prior to the next scheduled work day’s cleaning.
All materials and supplies must be approved by the Contracting Officer prior to the commencement of work, or prior to implementing any changes. All materials and supplies, once installed on site become property of the government.
4.5.1 DETERGENTS. Only soap, soap compounds, cleansers, and/or biodegradable detergents shall be used. If the Contractor uses a cleaning compound containing disinfectants and deodorants in lieu of applying these materials separately, the label must state that the compound is biodegradable. Non-abrasive cleansers shall be used on all stainless steel and porcelain fixtures and mirrors. The manufacturer's instructions shall be followed in mixing the proper strength solution for application.
4.5.2 DISINFECTANTS. Only standard commercial disinfectants shall be used. The manufacturer's instructions shall be followed in mixing the proper strength solution for application. The disinfectant may be mixed with the cleaning solution if the manufacturer's instructions on the disinfectant's label do not prohibit
it. NOTE: Bleach will not be approved as a disinfectant for floors due to potential safety hazards.
4.5.3 DEODORIZERS. Deodorizers must leave a noticeable and pleasant residual scent. The manufacturer's instructions shall be followed in mixing the proper strength for application. The deodorant may be mixed with the cleaning solution if the manufacturer's instructions on the deodorant's label do not prohibit it.
4.5.4 TRASH CANS, REFUSE CONTAINERS, AND LINERS.
4.5.4.1 KITCHEN TYPE, 13 GALLON TRASH CANS. The Contractor shall provide and maintain, in good working condition, “tall-kitchen” type, 13-gallon, white, non-metallic trash cans with hinged lids, in each unit, or side, of every comfort station, shower building, mini shower, and cabin. There shall be two of the above described trash cans in each side of main campground shower buildings and beach shower buildings, one in the shower area and one placed near the entrance door. It is the Contractor’s responsibility to supply appropriate sized can liners, clean the trash cans, as well as replace them if they are damaged or missing.
4.5.4.2 METALLIC, 55 GALLON REFUSE CONTAINERS. The Contractor shall provide and maintain, in good working condition 55 gallon, metallic refuse containers with hinged lid (1 container in each specified location).
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .