18Q0012-0003.pdf

PDF 423 KB Posted

Attached to
Roller Gate Bulkheads & Lifting Beams Federal contract opportunity
Solicitation number
W912P918Q0012
Issued by
Department of the Army Corps of Engineers Engineering District St Louis

About this file

Amendment 0003

View the file

Other files for this federal contract opportunity

Other files attached to Roller Gate Bulkheads & Lifting Beams, newest first.
File Type Posted
18Q0012-0004..pdf PDF
18Q0012-0004-Bid-Schedule.pdf PDF
05_59_13.pdf PDF
M-L25-17_G-001.1.pdf PDF
05_59_13.pdf PDF
18Q0012-0002.pdf PDF
18Q0012-0001.pdf PDF
18Q0012-0001-Bid.pdf PDF
LD2425BulkheadLiftBeamsAdvSpecs.7z 7Z file
LD2425_LIFT BM PLANS_DEC'17_TO CT.pdf PDF
LD2425_LIFT_BM_PLANS_DEC'17_TO_CT.zip ZIP file
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roller Gate & Lifting Beams

W912P9-18-Q-0012

Amendment 0003

1.) The purpose for this amendment is to Change the following:

Spec changes: 05.59.13

Paragraph 2.1.24 was added based on a question from a potential bidder.

Response Date remains the Same.

QUESTIONS AND ANSWERS:

1.) Regarding the bronze roller bushing Mark: M-503-4, what exactly is the PT Woven Pipe Fabric Liner? How is it contained within/attached to the Bronze C86300 bushing? Is there a company source the engineer had in mind for these?

Answer: SEE SPEC Change.

2.) Section 1.4.3 of the specification says that the fabricator shall be certified under the AISC Bridge fabricator program in the Advanced bridge category. Our firm meets the work experience and is certified in the bridge program as a “Major” / Intermediate category with our fracture critical endorsement. Please confirm that still being recognized under the “Major” category would qualify us to bid the fabrication.

Answer: Per the Specifications, the contractor must have either 1) ABR certification with a Fracture Critical Endorsement or 2) HYD certification per the AISC quality certification program.

3.) With the time required to provide pricing for this bid along with the volatility in the steel market, would a one week extension be allowed.

Answer: No.