Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Roller Gate Bulkheads & Lifting Beams, newest first.
File Type Posted
18Q0012-0004..pdf PDF
18Q0012-0004-Bid-Schedule.pdf PDF
18Q0012-0003.pdf PDF
05_59_13.pdf PDF
05_59_13.pdf PDF
M-L25-17_G-001.1.pdf PDF
18Q0012-0002.pdf PDF
18Q0012-0001.pdf PDF
LD2425BulkheadLiftBeamsAdvSpecs.7z 7Z file
LD2425_LIFT BM PLANS_DEC'17_TO CT.pdf PDF
LD2425_LIFT_BM_PLANS_DEC'17_TO_CT.zip ZIP file
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDDING SCHEDULE

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount _

SECTION 00 00 10 - 1

LD 25 Roller Gate Bulkhead

0001. Upstream Roller Gate Bulkhead 6 EA $______ $_______

0002. Rubber Seals & Bearing Blocks 6 EA $______ $_______

0003. Pick-Up Castings 12 EA $______ $_______

0004. End Rollers 24 EA $______ $_______

0005. Reaction Rollers 24 EA $______ $_______

0006. Storage Yard Truck 6 EA $______ $_______

0007. Delivery 1 JB $_______

0008. Existing LD 25 Roller Gate 6 EA $______ $_______ Bulkhead Removal

LD 24 Tainter Gate Lifting Beam

0009. LD 24 Tainter Gate Lifting Beam 1 EA $______ $_______

0010. Hook Assembly 2 EA $______ $_______

0011. Sheave Assembly 2 EA $______ $_______

0012. End Rollers 12 EA $______ $_______

0013. Delivery 1 JB $_______

0014. Existing LD 24 Tainter Gate 1 EA $______ $_______ Lifting Beam Removal

LD 25 Tainter Gate Lifting Beam

0015. LD 25 Tainter Gate Lifting Beam 1 EA $______ $_______

0016. Hook Assembly 2 EA $______ $_______

0017. Sheave Assembly 2 EA $______ $_______

0018. End Rollers 12 EA $______ $_______

0019. Delivery 1 JB $_______

0020. Existing LD 25 Tainter Gate 1 EA $______ $_______ Lifting Beam Removal

BIDDING SCHEDULE

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount _

SECTION 00 00 10 - 2

LD 25 Roller Gate Lifting Beam

0021. LD 25 Roller Gate Lifting Beam 1 EA $______ $_______

0022. Hook Assembly 2 EA $______ $_______

0023. Sheave Assembly 2 EA $______ $_______

0024. End Rollers 12 EA $______ $_______

0025. Delivery 1 JB $_______

0026. Existing LD 25 Roller Gate 1 EA $______ $_______ Lifting Beam Removal

ABBREVIATIONS

JB Job EA Each

(See BIDDING SCHEDULE NOTES)

Total _______________

SECTION 00 00 10 - 3

BIDDING SCHEDULE NOTES

1. All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit is shown as job "JB".

2. When bids are solicited on a unit price basis, bidders shall insert in the spaces provided therefor in the SCHEDULE both the "unit price" and the "estimated amount" resulting from applying the said unit price to the estimated quantity shown. In event the bidder quotes only a total price ("estimated amount") in its bid and fails to quote the unit price, the Government will determine such unit price by dividing the total price quoted by the quantity of the item set out in the SCHEDULE. The bidder agrees that the unit price so determined shall be used for the purpose of bid evaluation, award and all payments to the Contractor including final payment.

3. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid and the extension will be corrected accordingly.

4. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.

5. Bidders are required to bid on all items listed on the Bidding Schedule in addition to inserting a total quoted bid in the appropriate space provided. Failure to do so will be considered good cause to disqualify the bid.

6. Equipment Ownership and Operating Expense Schedule (MAR 1995)

(a) This clause does not apply to terminations. See 52.249-9000, Basis for Settlement of Proposals, and FAR Part 49.

(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region V. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.

(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36, Rental Costs. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except

SECTION 00 00 10 - 4

that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.

(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the SAT, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.

File details come from the government source that posted it.