05_59_13.pdf

PDF 136 KB Posted

Attached to
Roller Gate Bulkheads & Lifting Beams Federal contract opportunity
Solicitation number
W912P918Q0012
Issued by
Department of the Army Corps of Engineers Engineering District St Louis

About this file

Specification 05 5913

View the file

Other files for this federal contract opportunity

Other files attached to Roller Gate Bulkheads & Lifting Beams, newest first.
File Type Posted
18Q0012-0004..pdf PDF
18Q0012-0004-Bid-Schedule.pdf PDF
18Q0012-0003.pdf PDF
05_59_13.pdf PDF
M-L25-17_G-001.1.pdf PDF
18Q0012-0002.pdf PDF
18Q0012-0001.pdf PDF
18Q0012-0001-Bid.pdf PDF
LD2425BulkheadLiftBeamsAdvSpecs.7z 7Z file
LD2425_LIFT BM PLANS_DEC'17_TO CT.pdf PDF
LD2425_LIFT_BM_PLANS_DEC'17_TO_CT.zip ZIP file
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTI ON TABLE OF CONTENTS

DI VI SI ON 05 - METALS

SECTI ON 05 59 13

FABRI CATI ON OF ROLLER GATE BULKHEAD AND BULKHEAD LI FTI NG BEAMS

PART 1 GENERAL

1. 1 REFERENCES

1. 2 SYSTEM DESCRI PTI ON

1. 2. 1 Wel d Tr acki ng Log Templ at e

1. 2. 2 Wel d Tr acki ng Log

1. 2. 3 Wel di ng Pr ocedur e Speci f i cat i ons ( WPS)

1. 2. 4 Fr act ur e Cr i t i cal Member s ( FCM)

1. 2. 4. 1 Wel di ng Pr ocesses

1. 2. 4. 2 Consumabl e Requi r ement s

1. 2. 4. 3 Wel di ng Pr ocedur e Speci f i cat i ons ( WPS)

1. 2. 4. 4 Cer t i f i cat i on and Qual i f i cat i on

1. 2. 4. 5 Mat er i al Handl i ng

1. 2. 4. 6 Tack Wel ds and Tempor ar y Wel ds

1. 2. 4. 7 Wel di ng Pr ocesses

1. 2. 4. 8 Wel d I nspect i on

1. 2. 4. 9 Repai r Wel di ng

1. 3 SUBMI TTALS

1. 4 QUALI TY ASSURANCE

1. 4. 1 Qual i f i cat i on of Wel der s and Wel di ng Oper at or s

1. 4. 2 I nspect or Qual i f i cat i ons

1. 4. 3 Qual i f i cat i on of St r uct ur al St eel Fabr i cat or

1. 4. 4 Test i ng by t he Gover nment

1. 4. 5 Shop Dr awi ngs

1. 5 Li f t i ng Beam Load Test i ng

1. 6 DELI VERY, STORAGE, AND HANDLI NG

PART 2 PRODUCTS

2. 1 FABRI CATI ON

2. 1. 1 St r uct ur al Fabr i cat i on

2. 1. 1. 1 Di mensi onal Tol er ances f or St r uct ur al Wor k

2. 1. 1. 2 St r uct ur al St eel Fabr i cat i on

2. 1. 2 Assembl y

2. 1. 3 Di ssi mi l ar Met al s

2. 1. 4 Mat er i al s Di sposi t i on Recor d

2. 1. 5 Wel ded Connect i ons

2. 1. 5. 1 Wel di ng Pr ocedur e

2. 1. 5. 2 Wel der Per f or mance Qual i f i cat i on of Wel der s and Wel di ng

Operators

2. 1. 5. 3 Wel di ng Pr ocess

2. 1. 5. 4 Wel di ng Techni que

2. 1. 5. 4. 1 Fi l l er Met al

2. 1. 5. 4. 2 Pr eheat and I nt er pass Temper at ur e

2. 1. 5. 5 Wor kmanshi p

2. 1. 5. 5. 1 Pr epar at i on of Base Met al

SECTI ON 05 59 13 Page 1

2. 1. 5. 5. 2 Tack and Tempor ar y Wel ds

2. 1. 5. 5. 3 Wel d Access Hol es

2. 1. 5. 5. 4 Wel d Backi ng Removal

2. 1. 5. 5. 5 Wel d Backi ng Mat er i al Ot her Than St eel

2. 1. 6 Bol t ed Connect i ons

2. 1. 6. 1 Bol t s, Nut s, and Washer s

2. 1. 6. 2 Bol t Hol es

2. 1. 6. 3 Rot at i onal - Capaci t y Test s f or Pr et ensi oned and Sl i p

Cr i t i cal Joi nt s

2. 1. 7 Machi ne Wor k

2. 1. 7. 1 Fi ni shed Sur f aces

2. 1. 7. 2 Unf i ni shed Sur f aces

2. 1. 8 Pi n Hol es

2. 1. 9 Shaf t i ng

2. 1. 10 Lubr i cat i on

2. 1. 11 Mi scel l aneous Pr ovi s i ons

2. 1. 11. 1 Wel dment s

2. 1. 11. 2 Dr ai n Hol es

2. 1. 11. 3 Seal Wel ds

2. 1. 12 Shop Assembl y

2. 1. 12. 1 Bul khead Shop Test St ack

2. 1. 12. 2 Li f t i ng Beam Bal anci ng Pl an

2. 1. 13 Seal s

2. 1. 13. 1 Rubber Seal s

2. 1. 14 React i on Rol l er s

2. 1. 15 Sheaves

2. 1. 16 St r uct ur al St eel

2. 1. 17 St eel Cast i ng, Hi gh St r engt h

2. 1. 18 St eel Cast i ng

2. 1. 19 For gi ngs

2. 1. 20 Br onze

2. 1. 21 Spr i ngs

2. 1. 22 Rol l er Pi ns

2. 1. 23 Non- Fer r ous Cap Scr ews

2. 2 CERTI FI ED TEST REPORTS

2. 2. 1 Gener al

2. 2. 2 Nondest r uct i ve Test i ng

2. 2. 3 I nspect i on of St r uct ur al St eel Wel di ng

2. 2. 3. 1 Vi sual Exami nat i on

2. 2. 3. 2 Nondest r uct i ve Exami nat i on

2. 2. 3. 2. 1 Test i ng Agency

2. 2. 3. 2. 2 Exami nat i on Pr ocedur e and Ext ent

2. 2. 3. 2. 3 Accept abi l i t y of Wel ds

2. 2. 3. 2. 4 Exami nat i on Pr ocedur es

2. 2. 3. 2. 4. 1 Ul t r asoni c Test i ng ( UT)

2. 2. 3. 2. 4. 2 Radi ogr aphi c Test i ng ( RT)

2. 2. 3. 2. 4. 3 Magnet i c Par t i c l e I nspect i on ( MT)

2. 2. 3. 2. 4. 4 Dye Penet r ant I nspect i on ( PT)

2. 2. 4 Wel ds t o be Subj ect t o Nondest r uct i ve Exami nat i on

2. 2. 4. 1 St r uct ur al St eel Non- Fr act ur e Cr i t i cal Member s

2. 2. 4. 2 St r uct ur al St eel Non- Fr act ur e Cr i t i cal Member Fi l l et Wel ds and Par t i al Penet r at i on Wel ds

2. 2. 4. 3 St r uct ur al St eel Fr act ur e Cr i t i cal Member Wel ds

2. 2. 5 Test Coupons

2. 2. 6 Suppl ement al Exami nat i on

2. 2. 7 St r uct ur al St eel Wel di ng Repai r s

2. 2. 8 Cont r ol Di mensi ons

2. 2. 9 Li f t i ng Beam Oper at i on

SECTI ON 05 59 13 Page 2

PART 3 EXECUTI ON

3. 1 I NSTALLATI ON

3. 1. 1 Cl eani ng

3. 1. 2 Al i gnment and Set t i ng

3. 2 PROTECTI ON OF FI NI SHED WORK

3. 3 PAI NTI NG

3. 4 EXI STI NG BULKHEAD AND LI FTI NG BEAM REMOVAL

3. 5 SCRAP SALE PROCEDURE

ATTACHMENTS:

PQR

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 05 59 13 Page 3

SECTI ON 05 59 13

FABRI CATI ON OF ROLLER GATE BULKHEAD AND BULKHEAD LI FTI NG BEAMS

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN SOCI ETY FOR NONDESTRUCTI VE TESTI NG ( ASNT)

ASNT SNT- TC- 1A ( 2014) Recommended Pr act i ce f or Per sonnel Qual i f i cat i on and Cer t i f i cat i on i n Nondest r uct i ve Test i ng

AMERI CAN WELDI NG SOCI ETY ( AWS)

AWS D1. 5M/ D1. 5 ( 2015) Br i dge Wel di ng Code

AWS QC1 ( 2007) St andar d f or AWS Cer t i f i cat i on of Wel di ng I nspect or s

ASTM I NTERNATI ONAL ( ASTM)

ASTM A27 ( 1991) St eel Cast i ngs, Car bon, f or Gener al Applications

ASTM A 148/ A 148M ( 2002) St eel Cast i ngs, Hi gh St r engt h, f or St r uct ur al Pur poses

ASTM A227 ( 1999) St eel Wi r e, Col d- Dr awn f or Mechani cal Spr i ngs

ASTM A 276 ( 2002) St ai nl ess St eel Bar s and Shapes

ASTM A325 ( 2010; E 2013) St andar d Speci f i cat i on f or St r uct ur al Bol t s, St eel , Heat Tr eat ed, 120/ 105 ksi Mi ni mum Tensi l e St r engt h

ASTM A490 ( 2012) St andar d Speci f i cat i on f or St r uct ur al Bol t s, Al l oy St eel , Heat Tr eat ed, 150 ksi Mi ni mum Tensi l e St r engt h

ASTM A563 ( 2007a; R2014) St andar d Speci f i cat i on f or Car bon and Al l oy St eel Nut s

ASTM A 668/ A 668M ( 2002) St eel For gi ngs, Car bon and Al l oy, f or Gener al I ndust r i al Use

ASTM A689 ( 2013) St andar d Speci f i cat i on f or Car bon and Al l oy St eel Bar s f or Spr i ngs

SECTI ON 05 59 13 Page 4

ASTM A 709/ A 709M ( 2017) St andar d Speci f i cat i on f or St r uct ur al St eel f or Br i dges

ASTM B 148 ( 1997; R 2009) St andar d Speci f i cat i on f or Al umi num- Br onze Sand Cast i ngs

ASTM B505 ( 2002) Copper - Base Al l oy Cont i nuous Castings

ASTM C 412 ( 1999) Concr et e Dr ai n Ti l e

ASTM D 395 ( 2001) Rubber Pr oper t y - Compr essi on Set

ASTM D 471 ( 1998e1) Rubber Pr oper t y - Ef f ect of Liquids

ASTM D 573 ( 1999) Rubber - Det er i or at i on i n an Ai r Oven

ASTM D1187/ D1187M ( 1997; R 2002e1) Asphal t - Base Emul si ons f or Use as Pr ot ect i ve Coat i ngs f or Met al

ASTM D 2240 ( 2002a) Rubber Pr oper t y - Dur omet er Hardness

ASTM E165/ E165M ( 2012) St andar d Pr act i ce f or Li qui d Penet r ant Exami nat i on f or Gener al I ndust r y

ASTM E709 ( 2014) St andar d Gui de f or Magnet i c Par t i c l e Exami nat i on

ASTM F436 ( 2011) Har dened St eel Washer s

ASTM F 468 ( 2001a) Nonf er r ous Bol t s, Hex Cap Scr ews, and St uds f or Gener al Use

ASME I NTERNATI ONAL ( ASME)

ASME B4. 1 ( 1967; R 2009) Pr ef er r ed Li mi t s and Fi t s f or Cyl i ndr i cal Par t s

ASME B46. 1 ( 2009) Sur f ace Text ur e, Sur f ace Roughness, Wavi ness and Lay

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2008; Er r at a 2011) Saf et y and Heal t h Requi r ement s Manual

MASTER PAI NTERS I NSTI TUTE ( MPI )

MPI 79 ( Jan 2003) Al kyd Ant i - Cor r osi ve Met al Primer

1. 2 SYSTEM DESCRI PTI ON

Pr ovi de a det ai l ed Wor k Pl an f or f abr i cat i on, i ncl udi ng descr i pt i ons of shop f aci l i t i es, equi pment , number of per sonnel , and r el at ed i nf or mat i on pr i or t o t he Pr e- f abr i cat i on Conf er ence, and pr ocedur es f or saf e conduct

SECTI ON 05 59 13 Page 5 of t he wor k, car ef ul r emoval and di sposi t i on of mat er i al s, pr ot ect i on of pr oper t y t hat i s t o r emai n undi st ur bed, and coor di nat i on wi t h ot her wor k i n pr ogr ess. I ncl ude i n t he pr ocedur es a det ai l ed descr i pt i on of t he met hods and equi pment t o be used f or each oper at i on, and t he sequence of oper at i ons. Whi l e on gover nement pr oper t y al l i t ems shal l be i n accor dance with EM 385- 1- 1. The Wor k Pl an shal l i ncl ude t he r ecommended measur i ng syst em f or ensur i ng di mensi onal t ol er ances. The f abr i cat i on of t he f ol l owi ng l i s t ed st r uct ur es under t hi s cont r act shal l be per f or med accor di ng t o t hi s sect i on of t he speci f i cat i ons:

1. Lock and Dam 25 Rol l er Gat e Bul kheads ( Wi nf i el d, MO)

2. Lock and Dam 25 Rol l er Gat e Bul khead Li f t i ng Beam ( Wi nf i el d, MO)

3. Lock and Dam 25 Tai nt er Gat e Bul khead Li f t i ng Beam ( Wi nf i el d, MO)

4. Lock and Dam 24 Tai nt er Gat e Bul khead Li f t i ng Beam ( Cl ar ksvi l l e, MO)

a. Mat er i al wi t h wel ds wi l l not be accept ed unl ess t he wel di ng i s speci f i ed or i ndi cat ed on t he dr awi ngs or ot her wi se appr oved. Wel di ng shal l not be st ar t ed unt i l wel di ng pr ocedur es, i nspect or s, nondest r uct i ve t est i ng per sonnel , wel der s, wel di ng oper at or s, and t acker s have been qual i f i ed and appr oved. Each Cont r act or per f or mi ng wel di ng shal l mai nt ai n r ecor ds of t he t est r esul t s obt ai ned i n wel di ng pr ocedur e, and wel der , wel di ng oper at or , and t acker per f or mance qualifications.

b. As i t i s used i n t hese speci f i cat i ons, " The Engi neer " r ef er s t o t he Di st r i ct engi neer of r ecor d. The AWS D1. 5M/ D1. 5 def i ni t i on of " The Engi neer " as speci f i ed i n AWS D1. 5M/ D1. 5 sect i on 1. 1. 3 shal l r ef er t o t he Di st r i ct engi neer of r ecor d i n l i eu of t he st at e br i dge engi neer as speci f i ed i n sect i on 1. 1. 3 of AWS D1. 5M/ D1. 5.

c. Schedul e a Pr ef abr i cat i on Conf er ence as soon as possi bl e af t er Not i ce t o Pr oceed and pr i or t o any f abr i cat i on. The Pr ef abr i cat i on Conf er ence shal l i ncl ude, at a mi ni mum, t he Pr i me Cont r act or , Fabr i cat or , t he Fabr i cat or ' s pr i mar y QC r epr esent at i ve, t he COR, t he GQAR, and t he Engi neer of r ecor d f or t he st r uct ur e or st r uct ur es bei ng f abr i cat ed. The Pr ef abr i cat i on Conf er ence shal l occur ei t her at t he Fabr i cat i on Faci l i t i es or a s i mi l ar l ocat i on as deemed appr opr i at e.

1. 2. 1 Wel d Tr acki ng Log Templ at e

Submi t f or appr oval a wel d t r acki ng l og t empl at e, a mi ni mum of 30 days pr i or t o commencement of f abr i cat i on, t o i dent i f y al l necessar y component s t o be addr essed i n t he t r acki ng of al l wel ds f or t he st r uct ur es i n quest i on. A wel d- t r acki ng l og wi l l be devel oped and mai nt ai ned as descr i bed i n t he f ol l owi ng par agr aphs.

1. 2. 2 Wel d Tr acki ng Log

Submi t a l og capabl e of i ndi v i dual l y i dent i f y i ng and t r acki ng ever y wel d on t he pr oj ect . Member i dent i f i cat i on shal l f ol l ow t he number i ng scheme shown on t he shop dr awi ngs. The l og shal l i ncl ude t he member t o be wel ded, member t ype ( FCM and Non- FCM) , t ype of wel d i ncl udi ng t empor ar y and t ack wel ds, wel di ng posi t i on, appl i cabl e WPS r ef er ence, AWS j oi nt pr epar at i on desi gnat i on, name or st ampi ng desi gnat i on of wel der , wel di ng oper at or or t acker , dat e and t i me of compl et i on of wel di ng and/ or t acki ng, name and dat e of CWI vi sual i nspect i on, NDT t est i ng per f or med, i ncl udi ng t he t ype of i nspect i on, dat e( s) of i nspect i on, i nspect or name, and t he accept ance cr i t er i a used, descr i pt i on of def ect s f ound and r eason f or

SECTI ON 05 59 13 Page 6 non- compl i ance, cor r ect i ve act i on t aken, or whet her t he wel d i s accept abl e. Wel d i dent i f i cat i on on t he shop dr awi ng shal l mat ch wel d t r acki ng l og i dent i f i cat i on. A compl et ed l og shal l be bound t oget her f or each st r uct ur e and t wo copi es shal l be submi t t ed t o t he Cont r act i ng Of f i cer i mmedi at el y upon compl et i on of t he f abr i cat i on of each st r uct ur e.

Dr af t copi es of NDT t est i ng shal l be f ur ni shed t o t he Cont r act i ng Of f i cer upon r equest and shal l be avai l abl e on t he shop f l oor dur i ng any inspection.

1. 2. 3 Wel di ng Pr ocedur e Speci f i cat i ons ( WPS)

Submi t a Wel di ng Pr ocedur e Speci f i cat i on ( WPS) , wi t h at t ached PQR and suppor t i ng t est document at i on on f or ms si mi l ar or equi val ent t o t he sampl e f or ms i n AWS D1. 5M/ D1. 5, Annex I I I , f or each wel d, i ncl udi ng pr equal i f i ed wel ds, i n accor dance wi t h par agr aph Wel ded Connect i ons appr oved bef or e f abr i cat i on i s commenced. Wel di ng Pr ocedur e Speci f i cat i ons shal l be i ndi v i dual l y i dent i f i ed and shal l be r ef er enced on t he shop dr awi ngs. I n case of conf l i c t bet ween t hi s speci f i cat i on and AWS D1. 5M/ D1. 5 as appl i cabl e, t hi s speci f i cat i on gover ns.

1. 2. 4 Fr act ur e Cr i t i cal Member s ( FCM)

FCM ar e shown on t he Cont r act Dr awi ngs and i ncl ude al l at t achment s and connect i ons t o t hese member s as def i ned i n AWS D1. 5M/ D1. 5. Al l mat er i al s t o be wel ded shal l be ASTM A 709/ A 709M, gr ade as speci f i ed or shown on t he dr awi ngs, usi ng ki l l ed f i ne- gr ai n mi l l pr act i ce, unl ess ot her wi se shown or speci f i ed. Mi l l r epai r s of base met al ar e pr ohi bi t ed. Toughness shal l meet t he r equi r ement s of ASTM A 709/ A 709M, Tabl e 11, f or Zone 2, unl ess ot her wi se i ndi cat ed or speci f i ed. Al l mat er i al s used f or t he const r uct i on of f r act ur e cr i t i cal component s shal l meet t he r equi r ement s of sect i on 10 of ASTM A 709/ A 709M and shal l i ncl ude mi l l cer t i f i cat i on showi ng t hat t he mat er i al meet s t he necessar y t oughness r equi r ement s.

Wel di ng f or f r act ur e cr i t i cal member s shal l meet al l r equi r ement s of AWS D1. 5M/ D1. 5 Sect i on 12, i ncl udi ng:

1. 2. 4. 1 Wel di ng Pr ocesses

Al l pr ocedur es shal l be qual i f i ed as r equi r ed.

1. 2. 4. 2 Consumabl e Requi r ement s

Al l wel di ng consumabl es shal l be heat or l ot - t est ed by t he manuf act ur er t o det er mi ne conf or mance wi t h t he r equi r ement s of t he Fr act ur e Cont r ol Pl an ( FCP) . Except i ons ar e not al l owed. Toughness t est r esul t s shal l meet t he val ues speci f i ed i n Tabl e 12. 1 of AWS D1. 5M/ D1. 5. Submi t a Fr act ur e Cont r ol Pl an ( FCP) f or wel di ng on al l Fr act ur e Cr i t i cal Member s ( FCM) i n accor dance wi t h AWS D1. 5M/ D1. 5, Sect i on 12. Submi t wel di ng Pr ocedur es, qual i f i cat i ons, and cer t i f i cat i ons showi ng compl i ance wi t h FCP requirements.

1. 2. 4. 3 Wel di ng Pr ocedur e Speci f i cat i ons ( WPS)

Pr equal i f y or qual i f y al l pr ocedur es, i ncl udi ng r epai r wel ds, by t est as r equi r ed and document ed i n t he WPS and Pr ocedur e gui del i nes of

AWS D1. 5M/ D1. 5.

1. 2. 4. 4 Cer t i f i cat i on and Qual i f i cat i on

Wel der s and wel di ng oper at or s shal l meet t he appl i cabl e r equi r ement s of

SECTI ON 05 59 13 Page 7

AWS D1. 5M/ D1. 5.

1. 2. 4. 5 Mat er i al Handl i ng

Mat er i al handl i ng and pr epar at i on, i ncl udi ng t her mal cut t i ng, pr epar at i on of base met al , and st r ai ght eni ng, cur vi ng, camber i ng shal l meet t he appl i cabl e r equi r ement s.

1. 2. 4. 6 Tack Wel ds and Tempor ar y Wel ds

Locat e al l wel ds wi t hi n t he j oi nt and meet t he r equi r ement s of AWS D1. 5M/ D1. 5, Tabl e 12. 2. Tempor ar y wel ds on FCM ar e not per mi t t ed.

1. 2. 4. 7 Wel di ng Pr ocesses

Wel di ng pr ocesses, i ncl udi ng pr eheat , i nt er pass t emper at ur es, and post wel d t her mal t r eat ment shal l meet t he appl i cabl e r equi r ement s.

1. 2. 4. 8 Wel d I nspect i on

Document t he Qual i t y Cont r ol i nspect i on pr ogr am i n t he FCP. Qual i f y al l i nspect or s and NDT t echni c i ans as r equi r ed. I nspect i on pr ocedur es and document at i on ar e as speci f i ed i n t he appl i cabl e sect i ons of AWS D1. 5M/ D1. 5.

St r i ct l y adher e t o cool i ng t i mes.

1. 2. 4. 9 Repai r Wel di ng

Cl assi f y r epai r wel ds as " cr i t i cal r epai r s" or " non- cr i t i cal r epai r s" f or al l r epai r wel di ng. Wel di ng Repai r pl ans f or st eel shal l be submi t t ed and appr oved pr i or t o conduct i ng r epai r s. Wel di ng r epai r pl ans shal l addr ess wel d r epai r s wi t hi n t he wel d as wel l as wel d r epai r s f or base met al di scont i nui t i es. Repai r pr ocedur es shal l f ol l ow t he mi ni mum pr ovi s i ons unl ess speci f i ed ot her wi se. Repai r pr ocedur es must be qual i f i ed and appr oved and subj ect t o t he same QA/ QC i nspect i on r equi r ement s as ot her wel ds. Mi ni mum pr eheat f or r epai r wel di ng shal l be as def i ned i n AWS D1. 5M/ D1. 5 sect i on 12. 17. 6. Al l wel d r epai r s t o f r act ur e cr i t i cal member s shal l be consi der ed cr i t i cal wel ds i n accor dance wi t h AWS D1. 5M/ D1. 5Sect i on 12. 17. 3 and shal l be appr oved by t he engi neer of record.

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Wel di ng Pr ocedur e Speci f i cat i ons ( WPS) ; G, EC- DS Fr act ur e Cont r ol Pl an ( FCP) ; G, EC- DS Wel d Tr acki ng Log Templ at e; G, EC- DS Load Test i ng Pl an; G, EC- DS Li f t i ng Beam Bal anci ng Pl an; G, EC- DS

SD- 02 Shop Dr awi ngs

Shop Dr awi ngs; G, EC- DS

SECTI ON 05 59 13 Page 8

Assembl y; G, EC- DS Wel di ng Repai r s - Non- Fr act ur e Cr i t i cal Member s; G, EC- DS Wel di ng Repai r s - Fr act ur e Cr i t i cal Member s; G, EC- DS Del i ver y/ Shi ppi ng Pl an; G, EC- DS

SD- 03 Pr oduct Dat a

Mat er i al s Di sposi t i on Recor d

The Cont r act or shal l f ur ni sh t he Gover nment t hr ee copi es of al l pur chase and mi l l or der s, shop or der s f or mat er i al s and wor k or der s, i ncl udi ng al l new or der s pl aced by Cont r act or s and ol d or der s ext ended f or each suppl i er . The Cont r act or , at t he t i me of submi t t al of shop dr awi ngs, shal l f ur ni sh a l i s t desi gnat i ng t he mat er i al t o be used f or each i t em.

SD- 06 Test Repor t s

Cer t i f i ed Test Repor t s; G, EC- DS Wel d Tr acki ng Log; G, EC- DS Wi t ness Poi nt s Li f t i ng Beam Load Test i ng; G, EC- DS

SD- 07 Cer t i f i cat es

Wor k Pl an; G, EC- DS Qual i f i cat i on of Wel der s and Wel di ng Oper at or s; G, EC- DS I nspect or Qual i f i cat i ons; G, EC- DS Qual i f i cat i on of St r uct ur al St eel Fabr i cat or ; G, EC- DS

SD- 09 Manuf act ur er ' s Fi el d Repor t s

Cont r ol Di mensi ons; G, EC- DS

1. 4 QUALI TY ASSURANCE

Est abl i sh Wi t ness Poi nt s f or t he I ni t i al QA I nspect i on, I nt er medi at e QA I nspect i ons, and Fi nal I nspect i on as f ol l ows. St ar t t he I ni t i al QA I nspect i on af t er t he Gover nment has det er mi ned t hat t her e i s subst ant i al compl et i on of component s t hat compr i se a r easonabl e sampl i ng of each si gni f i cant FCM and non- FCM det ai l s. The ext ent of compl et i on and det ai l s and t he dat e of t he I ni t i al QA I nspect i on shal l be det er mi ned at t he Pr ef abr i cat i on Conf er ence by t he Gover nment af t er di scussi on wi t h t he Cont r act or . At t hat t i me, pr oduce a det ai l ed schedul e showi ng t he pr ogr essi on of wor k and compl et i on of component s. Thi s schedul e wi l l be updat ed weekl y and pr ovi ded by e- mai l t o t he Cont r act i ng Of f i cer . Gi ve t he Cont r act i ng Of f i cer t wo weeks not i ce pr i or t o t he pr edet er mi ned dat e f or t he I ni t i al QA I nspect i on, i ncl udi ng adj ust ment s f or changes i n schedul e. I nt er medi at e QA I nspect i ons wi l l be conduct ed on an as needed basi s and at t he di scr et i on of t he Gover nment . Al l QA i nspect i ons wi l l follow AWS D1. 5M/ D1. 5 and AASHTO/ NSBA St eel Br i dge Col l abor at i on S 4. 1 - 2002 St eel Br i dge Fabr i cat i on QC/ QA Gui de Speci f i cat i on. Pr ovi de unpai nt ed component s f or each QA NDT and Vi sual I nspect i on. At t hese st ages of const r uct i on, gi ve t he Cont r act i ng Of f i cer t hr ee wor ki ng days t o i nspect t he st r uct ur e. The QA I nspect i on per i od shal l not commence unt i l af t er a mi ni mum per i od of 72 hour s af t er any wel di ng. Af t er t he Cont r act i ng Of f i cer and t he Engi neer of Recor d has i nspect ed t he st r uct ur e, make any changes r equi r ed t o t he st r uct ur e as di r ect ed by t he Cont r act i ng Of f i cer bef or e pr oceedi ng wi t h any addi t i onal wel di ng.

SECTI ON 05 59 13 Page 9

Pr oceed wi t h t he const r uct i on unt i l t he next wi t ness poi nt i s r eached, unl ess i t i s wai ved i n wr i t i ng by t he Cont r act i ng Of f i cer . Each st r uct ur e f abr i cat ed i s subj ect t o a Fi nal Fabr i cat i on I nspect i on pr i or t o pai nt i ng. A Fi nal Fabr i cat i on I nspect i on shal l be conduct ed af t er t he f i r st st r uct ur e i s compl et ed. Fi nal Fabr i cat i on I nspect i ons of addi t i onal st r uct ur es shal l be schedul ed and coor di nat ed wi t h t he Cont r act i ng Of f i cer and t he Engi neer of Recor d. Gi ve t he Cont r act i ng Of f i cer a mi ni mum not i ce of t wo weeks pr i or t o t he Fi nal Fabr i cat i on I nspect i on.

1. 4. 1 Qual i f i cat i on of Wel der s and Wel di ng Oper at or s

Submi t wel der , wel di ng oper at or and t acker qual i f i cat i on cer t i f i cat i on f or each wel der , wel di ng oper at or or t ack wel der t o t he Gover nment Repr esent at i ve/ Cont r act i ng Of f i cer / Engi neer and appr oved bef or e f abr i cat i on i s commenced i n accor dance wi t h par agr aph Wel ded Connect i ons.

A CWI meet i ng t he speci f i ed qual i f i cat i ons shal l appr ove al l wel der qual i f i cat i ons. Wel der s, wel di ng oper at or s, and t ack wel der s shal l be l i mi t ed t o wel di ng pr ocedur es f or whi ch t hey ar e cer t i f i ed. Test wel ds shal l be pr epar ed, wel ded, and t est ed i n accor dance wi t h t he r equi r ement s of AWS D1. 5M/ D1. 5. Bef or e assi gni ng any wel der , wel di ng oper at or , or t acker t o wor k under t hi s cont r act , submi t t he names of t he wel der s, wel di ng oper at or s, and t acker s t o be empl oyed, and cer t i f i cat i on t hat each i ndi v i dual i s qual i f i ed as speci f i ed. The cer t i f i cat i on shal l st at e t he t ype of wel di ng and posi t i ons f or whi ch t he wel der , wel di ng oper at or , or t acker i s qual i f i ed, t he code and pr ocedur e under whi ch t he i ndi v i dual i s qual i f i ed, t he dat e qual i f i ed, and t he name of t he f i r m and per son cer t i f y i ng t he qual i f i cat i on t est s. The cer t i f i cat i on shal l be kept cur r ent f or t he dur at i on of t he cont r act . Wel der and wel di ng oper at or qual i f i cat i on t est r ecor ds shal l be submi t t ed on f or ms si mi l ar or equi val ent t o t he sampl e f or ms i n AWS D1. 5M/ D1. 5, Annex I I I . Al l wel der s per f or mi ng f r act ur e cr i t i cal wel ds under t hi s speci f i cat i on shal l be qual i f i ed accor di ng t o Sect i on 12 of AWS D1. 5M/ D1. 5. Al l wel der s per f or mi ng non f r act ur e cr i t i cal wel ds shal l be qual i f i ed accor di ng t o Sect i on 6 of AWS D1. 5M/ D1. 5. Al l qual i f i cat i ons shal l be cur r ent pr i or t o commenci ng any wor k. Submi t a l og f or each wel der showi ng t hat he/ she i s cur r ent i n t he pr ocess and pr ocedur es bei ng pr oposed f or t hi s wor k.

1. 4. 2 I nspect or Qual i f i cat i ons

Al l i nspect or s, per f or mi ng st r uct ur al st eel i nspect i on i n accor dance wi t h t hese speci f i cat i ons, shal l be qual i f i ed and cer t i f i ed i n conf or mance wi t h AWS QC1. Pr ovi de an AWS Cer t i f i ed Wel di ng I nspect or ( CWI ) as t he pr i mar y poi nt of cont act f or qual i t y cont r ol of wel di ng. When sever al CWI and NDT t echni c i ans ar e wor ki ng, one pr i mar y i ndi v i dual shal l be desi gnat ed as havi ng pr i mar y r esponsi bi l i t y f or al l qual i t y cont r ol i n accor dance wi t h AWS D1. 5M/ D1. 5 Sect i on 6. 1. 2. 2. Non- cer t i f i ed i nspect or s and cer t i f i ed associ at e wel d i nspect or s ( CAWI ) shal l not be used f or i nspect i on under t hese speci f i cat i ons. Al l per sonnel who per f or m NDT shal l be qual i f i ed i n accor dance wi t h: ASNT SNT- TC- 1A NDT Level I I or I I I . Al l per sonnel per f or mi ng NDT shal l be super vi sed by per sonnel possessi ng a Level I I I ASNT NDT cer t i f i cat i on i n accor dance wi t h AWS D1. 5M/ D1. 5 sect i on 6. 1. 3. 4 and sect i on 12. 16. 1. 2. An ASNT Level I I I may conduct t est s i f t hat per son pr ovi des document at i on of havi ng passed a Level I I pr act i cal exami nat i on wi t hi n t he l ast t hr ee ( 3) year s. Submi t copi es of cer t i f i cat es showi ng evi dence of qual i f i cat i ons or cer t i f i cat i ons f or wel di ng i nspect or s and NDT per sonnel .

SECTI ON 05 59 13 Page 10

1. 4. 3 Qual i f i cat i on of St r uct ur al St eel Fabr i cat or

The f abr i cat i ng pl ant and f abr i cat or shal l be cer t i f i ed under t he AI SC ( Amer i can I nst i t ut e of St eel Const r uct i on) Qual i t y Cer t i f i cat i on Pr ogr am, and shal l be desi gnat ed an AI SC Cer t i f i ed Pl ant , Cat egor y ABR ( Cer t i f i ed Br i dge Fabr i cat or - Advanced) wi t h a Fr act ur e Cr i t i cal Endor sement ( FC) or a Cat egor y HYD ( Cer t i f i ed Hydr aul i c Fabr i cat or ) at t i me of bi d. The f abr i cat or or f abr i cat i on pl ant shal l possess f i ve 5 year s document ed exper i ence on pr oj ect s of s i mi l ar scope. Si mi l ar scope means pr oj ect s of s i mi l ar s i ze and si mi l ar amount s of wel di ng and det ai l t ypes. Submi t copi es of t he AI SC cer t i f i cat e i ndi cat i ng t hat t he f abr i cat i on pl ant meet s t he speci f i ed st r uct ur al st eel wor k cat egor y and document ed exper i ence.

The seal s and bear i ng bl ocks ar e excl uded f r om t he AI SC f abr i cat or cer t i f i cat i on r equi r ement s.

1. 4. 4 Test i ng by t he Gover nment

Mat er i al component par t s may be subj ect ed t o any f or m of nondest r uct i ve t est i ng, as di r ect ed by t he Cont r act i ng Of f i cer . Thi s may i ncl ude ul t r asoni c, magnet i c par t i al , dye penet r ant , x- r ay, gamma r ay or any ot her t est t hat wi l l t hor oughl y i nvest i gat e t he par t i n quest i on. The cost of such i nvest i gat i on wi l l be bor ne by t he Gover nment . Any def ect s wi l l be cause f or r ej ect i on and r ej ect ed mat er i al s or par t s shal l be r epl aced and r et est ed at t he Cont r act or ' s expense.

1. 4. 5 Shop Dr awi ngs

Pr epar e al l shop dr awi ngs usi ng a Regi st er ed Pr of essi onal Engi neer or under t he di r ect super vi s i on of a Regi st er ed Pr of essi onal Engi neer .

El ement s of f abr i cat ed i t ems i nadver t ent l y omi t t ed on cont r act dr awi ngs shal l be r et ur ned t o t he Engi neer of Recor d f or det ai l i ng or shal l be det ai l ed by t he f abr i cat or and so i ndi cat ed on t he shop dr awi ngs. Any and al l det ai l s devel oped by t he f abr i cat or shal l be c l ouded on t he shop dr awi ngs f or separ at e appr oval by t he Engi neer of Recor d. Any i t ems desi gned by t he Cont r act or shal l be pr epar ed and seal ed by a Regi st er ed Pr of essi onal Engi neer . No spl i ces shal l be i ncl uded i n t he st r uct ur e wi t hout appr oval of t he Engi neer of Recor d. Each wel d, r equi r ed shal l be pr ovi ded a uni que i dent i f i er t o per mi t t r acki ng on t he wel d t r acki ng l og.

Pr i or t o per f or mi ng any f abr i cat i on of t he HSS st r uct ur es l i s t ed i n par agr aph Syst em Descr i pt i on above, submi t compl et e, det ai l ed shop dr awi ngs t o t he Cont r act i ng Of f i cer and Engi neer of Recor d f or appr oval .

Shop dr awi ngs shal l show compl et e det ai l s of mat er i al s, t ol er ances, connect i ons, and pr oposed wel di ng sequences. As par t of t he shop dr awi ng submi t t al s f or al l l i f i t ng beams, t he Cont r act or shal l pr ovi de an est i mat ed amount of wei ght t hat wi l l be used t o per f or m bal anci ng as r equi r ed by sect i on 2. 1. 12. 2. Shop dr awi ngs shal l i ncl ude cat al og cut s, t empl at es, f abr i cat i on and assembl y det ai l s, and t ype, gr ade, and cl ass of mat er i al s, as appr opr i at e. Al l FCM, i ncl udi ng at t achment s t hat meet t he FCM def i ni t i on, shal l be i dent i f i ed on t he shop dr awi ngs as wel l as al l t empor ar y and t ack wel ds. Each member shal l be i dent i f i ed f ol l owi ng t he number i ng scheme shown on t he dr awi ngs. A t abl e shal l be pr ovi ded cont ai ni ng a l i s t of al l member s and a r ef er ence t o each mat er i al cer t i f i cat e and t est r epor t t hat appl i es t o t hat member . Shop dr awi ngs shal l i dent i f y wel d pr ocedur es and NDE r equi r ed f or each wel d. Any and al l spl i ces shal l be i ncl uded i n t he shop dr awi ngs and cl ouded f or engi neer appr oval .

SECTI ON 05 59 13 Page 11

1. 5 Li f t i ng Beam Load Test i ng

Af t er compl et i on of f abr i cat i on and pr i or t o del i ver y t he cont r act or shal l conduct a l oad t est on t he l i f t i ng beams. The t est shal l consi st of l oad t est i ng t he hooks t o t he l oad i ndi cat ed on t he dr awi ngs. The t est shal l consi st of l oad t est i ng t he f ul l y assembl ed l i f t i ng beam t o t he l oad t est i ndi cat ed on t he dr awi ngs. Load t est i ng shal l be conduct ed i n accor dance wi t h ASME B30. 20- 2013 and ASME B30. 10- 2014. The cont r act or shal l submi t t he t est r epor t s.

The Cont r act or shal l devel op a l oad t est i ng pl an f or al l l i f t i ng beams.

The pl an shal l i ncl ude but not l i mi t ed t o t est l oadi ng conf i gur at i on, t est i ng pr ocedur es, sampl e submi t t al t est i ng r epor t , et c. The t est pl an shal l i ncl ude pr ovi s i ons f or measur i ng t hr oat openi ng of t he hook bef or e and af t er l oad t est .

I n addi t i on t o t he t est i ng r equi r ed per ASME B30. 20- 2013 and ASME B30. 10- 2014 al l wel ds shal l be 100% vi sual l y i nspect ed and magnet i c par t i c l e i nspect ed as i ndi cat ed on t he dr awi ngs or wher e v i sual i nspect i on does not pass.

1. 6 DELI VERY, STORAGE, AND HANDLI NG

Not i f y t he Cont r act i ng Of f i cer at l east 28 days i n advance of del i ver y of t he st r uct ur es. Shi ppi ng of t he st r uct ur es shal l be at t he Cont r act or ' s expense. The st r uct ur es shal l be ar r anged on t he del i ver y vehi c l es such t hat no damage occur s dur i ng shi ppi ng. Submi t a Del i ver y/ Shi ppi ng Pl an showi ng or i ent at i on and l ocat i ons of st r uct ur es on t he del i ver y vehi c l es and t he l ocat i on of t he cr ane dur i ng l oadi ng and of f l oadi ng pr i or t o shi pment f or Gover nment appr oval . Submi t dr awi ngs pr ovi di ng descr i pt i ons of met hods of del i ver i ng t he compl et ed st r uct ur al uni t s, i ncl udi ng det ai l s f or suppor t dur i ng shi pment t o pr event di st or t i on or ot her damages, or i ent at i on and l ocat i on of t he st r uct ur e on t r anspor t equi pment , and spr eader beam t o be used t o i nst al l t he r ol l er gat e bul kheads.

Al l st r uct ur es per t ai ni ng t o Lock and Dam 25 shal l be del i ver ed vi a a Cont r act or f ur ni shed bar ge t o t he pr oj ect near Mi ssi ssi ppi Ri ver mi l e 241 and Wi nf i el d, MO. Cont r act or coor di nat i on f or del i ver y shal l be t hr ough t he St . Loui s Di st r i ct Cont r act i ng Of f i cer . The r ol l er gat e bul kheads shal l be del i ver ed and i nst al l ed i n t he bul khead sl ot s upst r eam of one of t he r ol l er gat es v i a a Cont r act or f ur ni shed bar ge, cr ane, spr eader beam and t he new l i f t i ng beam. The Cont r act or f ur ni shed spr eader beam shal l be used t o connect t he cr ane l i ne t o t he l i f t i ng beam sheave connect i ons. The spr eader beam conf i gur at i on shal l al l ow f or a compl et e ver t i cal pi ck of t he new l i f t i ng beams. Af t er i nst al l at i on of t he r ol l er gat e bul kheads, t he Cont r act or shal l r emove and di spose of t he ol d 102' r ol l er gat e bul kheads and t he ol d l i f t i ng beams. The Cont r act or shal l t hen pl ace t he new l i f t i ng beams and t he st or age yar d t r ucks t o t he upst r eam por t i on of t he st or age yar d on t he upst r eam si de of t he br i dge at t he east end of t he pr oj ect per t he di r ect i on of t he Cont r act i ng of f i cer . The new st or age t r ucks shal l be pl aced on t he t r acks at t he st or age yar d by t he Cont r act or t o ensur e pr oper f i t . Any al t er at i ons t o t he t r ucks shal l be made by t he Contractor.

The l i f t i ng beam per t ai ni ng t o Lock and Dam 24 shal l be del i ver ed and pl aced vi a a Cont r act or f ur ni shed bar ge and cr ane at t he upst r eam por t i on of t he st or age yar d of Lock and Dam 24 l ocat ed on t he east end of t he pr oj ect near Mi ssi ssi ppi Ri ver mi l e 273 and Cl ar ksvi l l e, MO. Cont r act or coor di nat i on f or del i ver y shal l be t hr ough t he St . Loui s Di st r i ct

SECTI ON 05 59 13 Page 12

Cont r act i ng Of f i cer . Dur i ng t he pl acement of t he l i f t i ng beam i n t he st or age yar d, t he cont r act or shal l r emove and di spose of t he l i f t i ng beam t hat i s cur r ent l y l ocat ed i n t he st or age yar d. The Cont r act or shal l pl ace t he new l i f t i ng beam i nt o t he st or age yar d on t he upst r eam si de of t he br i dge per t he di r ect i on of t he Cont r act i ng of f i cer .

PART 2 PRODUCTS

2. 1 FABRICATION

2. 1. 1 St r uct ur al Fabr i cat i on

Mat er i al shal l be st r ai ght bef or e bei ng l ai d of f or wor ked. I f st r ai ght eni ng i s necessar y, i t shal l be done by met hods t hat wi l l not i mpai r t he met al . Shar p k i nks or bends shal l be cause f or r ej ect i on of t he mat er i al . Mat er i al wi t h wel ds wi l l not be accept ed except wher e wel di ng i s def i ni t el y speci f i ed, i ndi cat ed or ot her wi se appr oved. Bends shal l be made by appr oved di es, pr ess br akes or bendi ng r ol l s. Wher e heat i ng i s r equi r ed, pr ecaut i ons shal l be t aken t o avoi d over heat i ng t he met al and i t shal l be al l owed t o cool i n a manner t hat wi l l not i mpai r t he or i gi nal pr oper t i es of t he met al . Pr oposed f l ame cut t i ng of mat er i al , ot her t han st r uct ur al st eel , shal l be subj ect t o appr oval and shal l be i ndi cat ed on det ai l dr awi ngs. Shear i ng shal l be accur at e and al l por t i ons of t he wor k shal l be neat l y f i ni shed. Cor ner s shal l be squar e and t r ue unl ess ot her wi se shown. Re- ent r ant cut s shal l be f i l l et ed r ound t o a mi ni mum r adi us of 1 i nch i n accor dance wi t h AWS D1. 5M/ D1. 5 sect i on 3. 2. 4 unl ess ot her wi se i ndi cat ed or appr oved. Fi ni shed member s shal l be f r ee of t wi st s, bends and open j oi nt s.

2. 1. 1. 1 Di mensi onal Tol er ances f or St r uct ur al Wor k

a. Measur e di mensi ons by an appr oved measur i ng syst em. Submi t t he measur i ng syst em f or appr oval wi t h t he wor k pl an ( i . e. cal i br at ed st eel t ape of appr oxi mat el y t he same t emper at ur e as t he mat er i al bei ng measur ed) . The over al l di mensi ons of an assembl ed st r uct ur al uni t shal l be wi t hi n t he t ol er ances i ndi cat ed on t he dr awi ngs or as speci f i ed f or t he i t em of wor k. Wher e t ol er ances ar e not speci f i ed i n ot her sect i ons of t hese speci f i cat i ons or shown, a var i at i on of 1/ 32 i nch i s per mi ssi bl e i n t he over al l l engt h of component member s wi t h bot h ends mi l l ed and component member s wi t hout mi l l ed ends shal l not devi at e f r om t he di mensi ons shown by not mor e t han 1/ 16 i nch f or member s 30 f eet or l ess i n l engt h and by not mor e t han 1/ 8 i nch f or member s over 30 f eet i n l engt h.

b. St r uct ur e di mensi ons i ndi cat ed ar e based on a st r uct ur e t emper at ur e of 70 degr ees F. Per f or m di mensi onal adj ust ment s t o compensat e f or act ual t emper at ur e var i at i ons dur i ng const r uct i on.

2. 1. 1. 2 St r uct ur al St eel Fabr i cat i on

St r uct ur al st eel may be cut by mechani cal l y gui ded or hand- gui ded t or ches, pr ovi ded an accur at e pr of i l e wi t h a sur f ace t hat i s smoot h and f r ee f r om cr acks and not ches i s obt ai ned. Sur f aces and edges shal l be pr epar ed i n accor dance wi t h AWS D1. 5M/ D1. 5, Subsect i on 3. 2. Hand- gui ded cut s shal l be chi pped, gr ound or machi ned t o sound met al .

2. 1. 2 Assembly

Pr ovi de Assembl y Dr awi ngs i ndi cat i ng t he sequence of f abr i cat i on and

SECTI ON 05 59 13 Page 13 assembl y and pr ovi de det ai l s f or connect i ng t he adj oi ni ng f abr i cat ed component s i n t he shop. Assembl y det ai l s shal l i dent i f y t he r equi r ed or der of assembl y and det ai l s of wi t ness poi nt s as descr i bed i n t hese specifications.

2. 1. 3 Di ssi mi l ar Met al s

Wher e di ssi mi l ar met al s ar e i n cont act , pr ot ect sur f aces wi t h a coat conf or mi ng t o MPI 79 t o pr event gal vani c or cor r osi ve act i on. Wher e al umi num i s i n cont act wi t h concr et e, pl ast er , mor t ar , masonr y, wood, or absor pt i ve mat er i al s subj ect t o wet t i ng, pr ot ect wi t h ASTM D1187/ D1187M, asphal t - base emul si on.

2. 1. 4 Mat er i al s Di sposi t i on Recor d

Submi t t hr ee copi es of al l pur chase and mi l l or der s, shop or der s f or mat er i al s and wor k or der s, i ncl udi ng al l new or der s pl aced by Cont r act or s and ol d or der s ext ended f or each suppl i er . Fur ni sh, at t he t i me of submi t t al of shop dr awi ngs, a l i s t desi gnat i ng t he mat er i al t o be used f or each i t em. Wher e mi l l t est s ar e r equi r ed, pur chase or der s shal l cont ai n t he t est s i t e addr ess and t he name of t he t est i ng agency. Fur ni sh a shi ppi ng bi l l or memor andum of each shi pment of f i ni shed pi eces or member s t o t he pr oj ect s i t e, gi v i ng t he desi gnat i on mar k and wei ght of each pi ece, t he number of pi eces, t he t ot al wei ght , and i f shi pped by r ai l i n car l oad l ot s, t he car i ni t i al and number . Submi t mat er i al r ecor ds bef or e t he begi nni ng of f abr i cat i on. Addi t i onal r equi r ement s f or t hi s submi t t al ar e l i s t ed bel ow.

2. 1. 5 Wel ded Connect i ons

2. 1. 5. 1 Wel di ng Pr ocedur e

a. Wel di ng shal l conf or m t o t he appl i cabl e pr ovi s i ons of AWS D1. 5M/ D1. 5.

Pr i or t o t he st ar t of pr oduct i on wel di ng, submi t a compl et e schedul e of wel di ng pr ocedur es f or a t ypi cal st r uct ur e. The schedul e shal l conf or m t o t he r equi r ement s speci f i ed i n t he pr ovi s i ons of AWS D1. 5M/ D1. 5. The schedul e shal l pr ovi de det ai l ed pr ocedur e speci f i cat i ons and t abl es or di agr ams showi ng t he pr ocedur es t o be used f or each r equi r ed j oi nt .

b. Submi t t o t he Gover nment Repr esent at i ve/ Cont r act i ng Of f i cer s Repr esent at i ve/ Engi neer , a Wel di ng Pr ocedur e Speci f i cat i on f or each wel d t o be made. Submi t Wel di ng Pr ocedur e Speci f i cat i ons and Pr ocedur e Qual i f i cat i on Recor ds ( PQR) t o t he Gover nment Repr esent at i ve/ Cont r act i ng Of f i cer f or appr oval bef or e f abr i cat i on i s commenced. Copi es of t he Wel di ng Pr ocedur e speci f i cat i on and t he r esul t s of t he pr ocedur e qual i f i cat i on t est f or each t ype of wel di ng whi ch r equi r es pr ocedur e qual i f i cat i on shal l be submi t t ed f or appr oval . Submi t t he WPS and PQR wi t h t he shop dr awi ngs. Each WPS shal l be pr epar ed and qual i f i ed i n accor dance wi t h t he appl i cabl e pr ovi s i ons of AWS D1. 5M/ D1. 5. Wel di ng pr ocedur es shal l show t ypes and l ocat i ons of wel ds desi gnat ed or speci f i ed t o r ecei ve nondest r uct i ve exami nat i on and i dent i f y t he wel d as FCM when appl i cabl e. A WPS i s al ways r equi r ed, even i f t he pr ocedur e i s consi der ed pr equal i f i ed i n accor dance wi t h AWS D1. 5M/ D1. 5. Pr oper l y document ed evi dence of compl i ance wi t h al l r equi r ement s of t hese speci f i cat i ons f or pr evi ous qual i f i cat i on t est s shal l est abl i sh t he wel di ng pr ocedur e as pr equal i f i ed. Each pr ocedur e shal l be c l ear l y i dent i f i ed as bei ng ei t her pr equal i f i ed or qual i f i ed by t est s. I f a PQR i s per f or med, a

SECTI ON 05 59 13 Page 14 r epr esent at i ve of t he Gover nment shal l wi t ness t he t est pl at e wel di ng and t he speci men t est i ng. Appr oval of any pr ocedur e, however , wi l l not r el i eve t he Cont r act or of t he r esponsi bi l i t y f or pr oduci ng a f i ni shed st r uct ur e meet i ng al l r equi r ement s of t hese speci f i cat i ons.

Copi es of t he WPS shal l be made avai l abl e f or r ef er ence t o t he wel der s, wel di ng oper at or s and t ack wel der s. A CWI meet i ng t he speci f i ed qual i f i cat i ons shal l appr ove al l WPS' s and PQR' s.

2. 1. 5. 2 Wel der Per f or mance Qual i f i cat i on of Wel der s and Wel di ng Oper at or s

Wel di ng oper at or s, wel der s, and t ack wel der s shal l be qual i f i ed and r equal i f i ed i f necessar y f or t he par t i cul ar t ype of wor k t o be done.

Qual i f i cat i on shal l be i n accor dance wi t h AWS D1. 5M/ D1. 5. Bef or e assi gni ng any wel der , wel di ng oper at or , or t acker t o wor k under t hi s cont r act , submi t t he names of t he wel der s, wel di ng oper at or s, and t acker s t o be empl oyed, and cer t i f i cat i on t hat each i ndi v i dual i s qual i f i ed as speci f i ed. The cer t i f i cat i on shal l st at e t he t ype of wel di ng and posi t i ons f or whi ch t he wel der , wel di ng oper at or , or t acker i s qual i f i ed, t he code and pr ocedur e under whi ch t he i ndi v i dual i s qual i f i ed, t he dat e qual i f i ed, and t he name of t he f i r m and per son cer t i f y i ng t he qual i f i cat i on t est s. Copi es of t he Per f or mance Qual i f i cat i on r ecor ds shal l be submi t t ed t o t he Gover nment Repr esent at i ve and appr oved bef or e f abr i cat i on i s commenced. Requi r e t he wel der and wel di ng oper at or s t o r epeat t he qual i f y i ng t est s when, i n t he opi ni on of t he Gover nment Repr esent at i ve/ Cont r act i ng Of f i cer ' s Repr esent at i ve/ Engi neer , t he wor k i ndi cat es a r easonabl e doubt as t o pr of i c i ency. I n such cases, t he wel der shal l be r ecer t i f i ed, as above, af t er successf ul l y passi ng t he r et est ;

ot her wi se, he/ she shal l be di squal i f i ed unt i l successf ul l y passi ng a r et est . The per i od of ef f ect i veness f or al l wel der and wel di ng oper at or per f or mance qual i f i cat i ons shal l be i n accor dance wi t h AWS D1. 5M/ D1. 5.

Keep t he cer t i f i cat i on cur r ent f or t he dur at i on of t he cont r act . Al l expenses i n connect i on wi t h qual i f i cat i on and r equal i f i cat i on shal l be bor ne by t he Cont r act or .

2. 1. 5. 3 Wel di ng Pr ocess

Wel di ng of st r uct ur al st eel shal l be by an el ect r i c ar c wel di ng pr ocess usi ng a met hod whi ch excl udes t he at mospher e f r om t he mol t en met al and shal l conf or m t o t he appl i cabl e pr ovi s i ons of AWS D1. 5M/ D1. 5 f or al l wel ds. Wel di ng shal l be such as t o mi ni mi ze r esi dual st r esses, di st or t i on and shr i nkage.

2. 1. 5. 4 Wel di ng Techni que

2. 1. 5. 4. 1 Fi l l er Met al

The el ect r ode, el ect r ode- f l ux combi nat i on and gr ade of wel d met al shal l conf or m t o t he appr opr i at e AWS speci f i cat i on f or t he base met al and wel di ng pr ocess bei ng used or shal l be as shown wher e a speci f i c choi ce of AWS speci f i cat i on al l owabl e i s r equi r ed. Wel d met al t oughness shal l meet t he r equi r ement s of AWS D1. 5M/ D1. 5, Tabl es, 4. 1, 4. 2, or 12. 1 as appl i cabl e. The AWS desi gnat i on of t he el ect r odes t o be used shal l be i ncl uded i n t he schedul e of wel di ng pr ocedur es. Onl y l ow hydr ogen el ect r odes shal l be used f or manual shi el ded met al - ar c wel di ng r egar dl ess of t he t hi ckness of t he st eel . A cont r ol l ed t emper at ur e st or age oven shal l be used at t he j ob s i t e as pr escr i bed by AWS D1. 5M/ D1. 5, Subsect i on

12. 6 t o mai nt ai n l ow moi st ur e of l ow hydr ogen el ect r odes. Cont r ol l ed t emper at ur e st or age ovens shal l be power ed at al l t i mes. FCAW f i l l er met al shal l be subj ect ed t o t he st or age and handl i ng r equi r ement s def i ned

SECTI ON 05 59 13 Page 15 in AWS D1. 5M/ D1. 5 sect i on 12. 6. 7. 4. Fi l l er met al s and pr ocesses shal l not be combi ned i n t he same j oi nt or wel d.

2. 1. 5. 4. 2 Pr eheat and I nt er pass Temper at ur e

Per f or m pr eheat i ng as r equi r ed by t he appl i cabl e pr ovi s i ons of AWS D1. 5M/ D1. 5 f or al l wel ds except t hat t he t emper at ur e of t he base met al must be at l east 70 degr ees F. Pr eheat f or f r act ur e cr i t i cal wel ds shal l be as def i ned i n Tabl e 12. 3 and i n accor dance wi t h t he PQR/ WPS. The wel dment s t o be pr eheat ed shal l be s l owl y and uni f or ml y heat ed by appr oved means t o t he pr escr i bed t emper at ur e, hel d at t hat t emper at ur e unt i l t he wel di ng i s compl et ed and t hen per mi t t ed t o cool s l owl y as r equi r ed and i n accor dance wi t h t he appr oved WPS i n or der t o pr event cr acki ng or distortion.

2. 1. 5. 5 Workmanship

Wor kmanshi p f or wel di ng shal l be i n accor dance wi t h AWS D1. 5M/ D1. 5, Sect i on 3 f or al l wel ds and ot her appl i cabl e r equi r ement s of t hese specifications.

2. 1. 5. 5. 1 Pr epar at i on of Base Met al

Pr i or t o wel di ng, i nspect sur f aces t o be wel ded t o assur e compl i ance wi t h t he appl i cabl e sect i ons of AWS D1. 5M/ D1. 5.

2. 1. 5. 5. 2 Tack and Tempor ar y Wel ds

Make t ack and t empor ar y wel ds r equi r ed f or f abr i cat i on and er ect i on i n accor dance wi t h AWS D1. 5M/ D1. 5 under t he cont r ol l ed condi t i ons pr escr i bed her ei n f or per manent wor k. Tack wel ds t hat ar e t o be i ncor por at ed i nt o t he per manent wor k ar e subj ect t o t he same qual i t y r equi r ement s as t he per manent wel ds. Cl ean and f use such t ack wel ds t hor oughl y wi t h t he per manent wel ds. Mul t i pl e- pass t ack wel ds must have cascaded ends.

Remove def ect i ve t ack wel ds bef or e per manent wel di ng. Make al l wel ds usi ng l ow- hydr ogen wel di ng el ect r odes and wi t h wel der s qual i f i ed f or per manent wor k as speci f i ed el sewher e i n t hese speci f i cat i ons. Pr eheat as r equi r ed by AWS D1. 5M/ D1. 5 f or per manent t ack wel ds except t hat t he mi ni mum t emper at ur e must be 70 degr ees F i n any case, r egar dl ess of el ect r ode used. Al l t ack wel ds whi ch wi l l be i ncor por at ed i nt o t he f i nal wel dment must be a maxi mum of 1/ 8 i nch wi t h a mi ni mum l engt h of 1 i nch l ong spaced at a maxi mum of 6 i nch on cent er . I n maki ng t empor ar y wel ds, ar c st r i kes must not be st r uck i n ot her t han wel d l ocat i ons. Each t empor ar y wel d shal l be r emoved as r equi r ed by AWS D1. 5M/ D1. 5, Subsect i on

3. 3. 8. Gr i nd out and f i l l al l ar c st r i kes st r uck out si de t he wel d zone, and i nspect i n accor dance wi t h AWS D1. 5M/ D1. 5.

2. 1. 5. 5. 3 Wel d Access Hol es

Pr ovi de wel d access hol es as shown on t he shop dr awi ngs. I f t he over si t e of i nt er sect i ng out - of - pl ane wel ds i s encount er ed, t he f abr i cat or shal l not i f y t he Cont r act i ng Of f i cer f or t he appr oval of wel d access hol e addi t i ons i n such l ocat i ons. Payment f or t he addi t i on of wel d access hol es not shown on pl ans wi l l be t he Cont r act or ' s r esponsi bi l i t y .

2. 1. 5. 5. 4 Wel d Backi ng Removal

Unl ess ot her wi se i ndi cat ed, r emove al l st eel wel d backi ng mat er i al f r om wel ded j oi nt s. Al l st eel wel d backi ng mat er i al shal l be r emoved pr i or t o

SECTI ON 05 59 13 Page 16 t est i ng. I dent i f y on t he shop dr awi ngs al l wel d backi ng mat er i al t hat cannot be r emoved.

2. 1. 5. 5. 5 Wel d Backi ng Mat er i al Ot her Than St eel

Al l wel d backi ng mat er i al , ot her t han st eel , shal l be qual i f i ed by t est i ng and shal l be i ncl uded i n submi t t ed PQR/ WPS. Var i at i on f r om appr oved wel d backi ng mat er i al wi l l not be per mi t t ed and wi l l r equi r e t he devel opment and t est i ng a new wel d pr ocedur e whi ch addr esses t he change i n backi ng material.

2. 1. 6 Bol t ed Connect i ons

Al l hi gh st r engt h connect i ons shal l be t i ght ened t o a t ensi on not l ess t han t hat gi ven bel ow f or ASTM A325 Bol t s. Ti ght eni ng shal l be done by t ur n- of - nut , di r ect t ensi on i ndi cat or , cal i br at ed wr ench, or al t er nat i ve desi gn bol t met hods.

5/ 8 i nch 19 ki ps

3/ 4 i nch 28 ki ps

7/ 8 i nch 39 ki ps

1 i nch 51 ki ps

1- 1/ 8 i nch 56 ki ps

1- 1/ 4 i nch 71 ki ps

1- 3/ 8 i nch 85 ki ps

1- 1/ 2 i nch 103 ki ps

Al l ot her connect i ons shal l be t i ght ened t o t he snug- t i ght condi t i on. The snug- t i ght condi t i on i s def i ned as t he t i ght ness at t ai ned by ei t her a…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.