AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Please note all questions w ill be cutoff on 08/15/16.

See Page Tw o.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P9-16-R-0027

X 9B. DATED (SEE ITEM 11)

18-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Aug-2016

CODE

CONTRACTING DIVISION

US ARMY ENGR DIST ST LOUIS

1222 SPRUCE STREET, RM 4.207

ST LOUIS MO 63103-2833

W912P9 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P9-16-R-0027

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

AMENDMENT 0004

AMENDMENT OF SOLICITATION

The following items for JONES CUTOFF PUMP STATION NO. 2 AND CINQUE HOMMES PUMP STATION NO. 2, BOIS BRULE are amended as follows:

QUESTIONS AND RESPONSES

- According to the Schedule, Light Fixture “C” is a pole mounted fixture.

There is NO pole specifications. Wood, Steel, Aluminum, Height, Construction,(Wood, Steel, Aluminum), etc.

ANSWER: Please refer to Sec 26 05 00 paragraph 2.1.9.2.2 for pole specifications.

- According to the Schedule, There are 2 fixture “C’s”. I only see ONE on the plans This is per EACH of the Bois Brule pump stations.

ANSWER: The exterior pole mounted fixture shall house (2) 45W LED lamps.

- For the pre‐engineered building manufacture to give quote on the building, they require any point loads for making sure they have figured for any additional framing. Can we get a cut sheet or information on the size and weight of the exhaust muffler or exhaust silencer?

ANSWER: The silencer for both stations is 57 inches long and weighs 140 pounds.

- On the Diesel Engine and accessories. Can we get a list of the accessories?

Plumber / Fitter wanting to make sure if it includes all the flex connections or etc, so he know what all they need to include.

ANSWER: The flexible connections for the fuel system are included in the Government furnished equipment. The flexible connection for the air starter is not included.

- Can the 5‐E‐Z coating requirement please be relaxed to a coal tar epoxy? In past experience we have found that pipe manufacturers will not apply this coating.

ANSWER: Please bid per the specifications.

- The specifications and contract drawings require contractor designed temporary earth retention to allow for deep excavations near the existing pump station and relief at the proposed Cinque Hommes Pump Station No. 2.

The nearby borings CH‐05‐15 and CH‐06‐15 indicate the soil strata that is expected to be retained during these deep excavations. Please provide strength data in these soils. The boring logs only show moisture contents and Atterberg Limits, however unconfined compressive strengths or blow counts were not provided in the upper 25 to 30 feet of the soil profile. This information will be required in order to prepare a scope of work and price, and ultimately a design for the required earth retention that will meet the specifications.

ANSWER: See attached information.

W912P9-16-R-0027

- Section 13 – 1 states to include both volumes on 1 CD; however, 14 ‐1 states to include the price proposal on a CD. Do you want 1 CD with bother volumes on it or two separate CDs for each volume?

ANSWER: Please send it separately.

- Amendment 3 added Attachment A, which is to be included in Volume 1. Is this form to be completed for every PPQ that is submitted? Also will you be changing the page limit with the addition of Attachment A?

ANSWER: Please note Attachment A is a cover sheet to be completed with each PPQ. It will not be counted in the page limit number.

- Can you please tell me what percentage of work must the prime contractor perform on this project?

ANSWER: Please note the minimum percentage is 15%.