16R0017-0002-Att-1.pdf

PDF 7 KB Posted

Attached to
WOOD RIVER CUTOFF WALL PHASE 2
Solicitation number
W912P9-16-R-0017
Issued by

About this file

Attachment-1

View the file

Other files

File Type Posted
16R0017-0002-Att-4.pdf PDF
16R0017-0002-Att-2.pdf PDF
16R0017-0002-Att-3.pdf PDF
16R0017-0002.pdf PDF
16-R-0017-0001-amend.pdf PDF
16R0017SPECS.pdf PDF
16R0017PLANS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 0 10 SOLICITATION CONTRACT FORM

00 01 00 BIDDING SCHEDULE/INSTRUCTIONS

00 06 00 REPRESENTATIONS AND CERTIFICATIONS

00 07 00 CONTRACT CLAUSES

00 08 00 SPECIAL CONTRACT REQUIREMENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 30 ENVIRONMENTAL PROTECTION

01 13 12 QUALITY CONTROL SYSTEM (QCS)

01 13 20 PROJECT SCHEDULE

01 14 40 CONTRACTOR QUALITY CONTROL

01 15 00 TEMPORARY CONSTRUCTION FACILITIES

01 22 00 MEASUREMENT AND PAYMENT

01 33 00 SUBMITTAL PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 SITE DEMOLITION AND RESTORATION

DIVISION 13 - SPECIAL CONSTRUCTION

13 50 00 GEOTECHNICAL INSTRUMENTATION

DIVISION 31 - EARTHWORK

31 06 00 ENGINEERING FABRIC

31 21 10 STRIPPING

31 21 40 CARE OF WATER

31 22 00 EARTHWORK

31 73 01 SOIL-BENTONITE SLURRY TRENCH CUTOFF WALL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 29 35 ESTABLISHMENT OF TURF

-- End of Project Table of Contents --

File details come from the government source that posted it. Updated .