W912P821B0017_AMD_0005_Bid Opening.pdf
PDF 5 MB Posted
- Attached to
- Comite River Diversion, White Bayou Rock Chute
- Solicitation number
- W912P821B0017
About this file
This solicitation is for a construction project to excavate a segment of the Comite River Diversion earthen channel and construct a White Bayou rock chute and associated slope protection of the excavated channel in East Baton Rouge Parish, Louisiana. Additional work includes constructing drainage ditches and culverts, clearing and grubbing, and establishing turf. The estimated value is between $10-25 million. This is a total small business set-aside solicitation with bid opening scheduled for December 1, 2020 and questions due by November 17, 2020. The Army Corps of Engineers Engineering District New Orleans is the agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ED-20-011
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above numbered solicitation is hereby amended to incorporate changes to the Specif ications, Draw ings, Bidding Schedule, dial-in teleconference No, AND establish a Bid Opening date/time of 15 December 2020 at 11:00am CST. Bids are due NLT 10:00am CST on 15 December 2020. Bids submitted after 10:00am CST on 15 December 2020 w ill not be accepted.
TELECONFERENCE NO IS CHANGED.
NEW TELECONFERENCE NO IS: 1-844-800-2712
ACCESS No: 1993111965##
Please submit a request to the DOD SAFE link w ithin 24-48 hours of the Bid Opening.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Dec-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P821B0017
X 9B. DATED (SEE ITEM 11)
28-Oct-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Dec-2020
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION 00010, BIDDING SCHEDULE
Pages 0003, 0004, and 0005. Delete these pages in their entirety and substitute the attached revised Pages 0003, 0004, and 0005 therefore.
SECTION 01100
1. Page 5, subparagraph 3(h). Delete this subparagraph in its entirety and substitute the following therefore: “(h) Reserved.”
2. Page 19, subparagraph 9(e), subparagraph titled 6. ITEM SD1- East Baton Rouge Storm Drain 18” Reinforced Concrete Pipe. Delete this subparagraph in its entirety and substitute the following therefore:
“6. ITEM SD1- East Baton Rouge Storm Drain 18” Reinforced Concrete Pipe
DISPOSITION: To be removed and replace by Contractor as needed concurrent with construction. Please contact owner when working in the vicinity of this item.
Thomas A. Stephens, P.E.
Chief Design and Construction Engineer Public Works and Planning Center 1100 Laurel Street Baton Rouge, LA 70802
PH: 225-389-3186 (X-566)
Email: TStephens@brla.gov “
3. Page 24, paragraph 14. Delete this paragraph in its entirety and substitute the following therefore:
“14. ACCESS PLAN
The Contractor shall submit an access plan to be reviewed and approved by the Contracting Officer to include, as a minimum, the following:
(a) Layout drawings showing the location of all equipment, office structures, toilets, and storage areas for materials.
(b) Show mobilization and demobilization routing, low water crossings and locations of large equipment, such as draglines, cranes, and etc. while on the jobsite.
(c) Low water crossings shall be Contractor designed, furnished, maintained, and removed by the Contractor after completion of all work under this contract and before final acceptance thereof. The crossings shall be designed such that flows for a 1-year storm event will not be obstructed in White Bayou. The lower water crossing shall be mailto:TStephens@brla.gov removed when the National Weather Service issues a flash flood advisory or issues a forecast that exceeds the 1-year storm event. No separate measurement or payment will be made for designing, furnishing, maintaining, and removing the low water crossings, but the cost of the same shall be distributed throughout the existing bid items. Rain fall rates are referenced from the NOAA ATLAS 14 point precipitation frequency estimates:
LA – City of Zachary.
Storm Frequency Rain Fall Rate Flow Rate Stage Elevation
1-year 4.3 (in/day)
1.92 (in/hr) 1,140 cfs 74.4 ft
2-year 5.03 (in/day)
2.18 (in/hr) 2,710 cfs 79.1 ft
10-Year 7.5 (in/day) 2.98(in/hr) 4,030 cfs 81.3 ft “
DRAWINGS
SHEET IDENTIFICATION Nos. G-004, G-101, C-502, and CS301. Delete these drawings in their entirety and substitute the attached revised drawings SHEET IDENTIFICATION Nos. G- 004, G-101, C-502, and CS301 therefore.
00010-3 Ed 20-011
SECTION 00010 – BIDDING SCHEDULE
Flood Control, Amite River and Tributaries, Louisiana, Comite River Basin Comite River Diversion Project
Comite River Diversion White Bayou Rock Chute East Baton Rouge Parish, Louisiana
Item DESCRIPTION Estimated
Quantity Unit Unit Price Estimated Amount
BASE WORK
0001 Mobilization and Demobilization 1 JOB
0002* DELETED
0003 Video and Photographic Documentation 1 JOB
0004 Traffic Control 1 JOB
0005 Silt Fence Project Site 4,000 LF
0006 Silt Fence Shared Access Roads 6,670 LF
0007 Storm Water Management 1 JOB
0008 Truck Wash-Down Racks 1 JOB
0009 Channel Excavation 589,251 CY
0010 Drainage Ditch Excavation 3,403 CY
0011 Embankment, Compacted Fill 34,290 CY
0012 Compacted Fill Under Channel Riprap 4,862 CY
0013 Separator Geotextile 84,726 SY
0014 Clearing and Grubbing 1 JOB
0015 Construction Unwatering 1 JOB
0016* Asphalt Paving 250 SY
0017 Access Roads/Staging Areas 1 JOB
0018 Turf Establishment and Maintenance 40.3 AC
0019 Bedding 26,977 TON
0020 Channel Riprap, R90 31,245 TON
00010-4 Ed 20-011
0021 Channel Riprap, R650 27,795 TON
0022 Channel Riprap, R1000 6,601 TON
0023 Channel Riprap, R3500 68,913 TON
TOTAL BASE WORK: $
OPTIONAL WORK (OW)
0024 Silt Fence - OW 1,050 LF
0025 Channel Excavation - OW 11,487 CY
0026 Compacted Fill Under Channel Riprap - OW 829 CY
0027 Separator Geotextile - OW 5,833 SY
0028 Construction Unwatering - OW 1 JOB
0029 Bedding - OW 1,356 TON
0030 Channel Riprap R90 - OW 2,638 TON
0031 Channel Riprap R1000 - OW 8,468 TON
TOTAL OPTIONAL WORK $
TOTAL BASE WORK + OPTIONAL WORK $
*Denotes changes from the previous Bidding Schedule.
**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE
DECLARED NON-RESPONSIVE AND THEREFORE INELIGIBLE FOR
AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2, Rejection of Individual Bids).
00010-5 Ed 20-011
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Plan, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
NOTE 5: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTION WORK Items by written notice to the Contractor. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid.
NOTE 6: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement.
Evaluation of options will not obligate the Government to exercise the option(s).
** If an option is to be exercised at the time of contract award FAR17.208 shall be used in place of FAR 52.217-5.
NOTE 7: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF
OPTIONAL WORK. In the event that OPTION WORK items are exercised under the terms of the contract, the time required for completion of the contract shall be 76 calendar days in addition to the original contract duration of 358 calendar days established for the BASE WORK items specified in the Contract Clause entitled “COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(FAR 52-211-10 – APR 1984)”.
NOTE 8: Should the Optional Work be awarded under this contract, the duration allowed for the awarded Optional Work item(s) will not extend the duration allowed for completion of the Base Work.
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
G1
G2
G3
E2
E1
C1
E3
E4
C2
C3
SD1
N E
W O
R L E
A N
S L
O U
IS
IA
N A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C
M
G-004
C R
M
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S T P
A U
L D
IS
T R
IC
T T
B S
/0
/1
/0
/1
E A
S T B
A T
O N R
O U
G E P
A R
IS
H L
A
C O
M
IT
E R
IV
E R D
IV
E R
S
IO
N P
R O J E
C T
F L
O O
D C
O N
T R
O L
C O
M
IT
E R
IV
E R B
A S
IN
L
A
N E
W O
R L E
A N
S D
IS
T R
IC
T
NEW ORLEANS DISTRICT
of Engineers
US Army Corps
W H
IT
E B
A Y
O U R
O C
K C
H U
T E
G C
W
H -4 -4
G -0
.d g n
E A
S T B
A T
O N R
O U
G E P
A R
IS
H L
O U
IS
IA
N A
W P
B
D
IS
P O
S
IT
IO
N T
A B
L E
S
DISPOSITIONITEM OWNER
DO NOT DISTURB3,341,927.63 774,374.50PP1
(STATE PLANE COORDINATES)
X-COORDINATE
(STATE PLANE COORDINATES)
Y-COORDINATE
PP2 3,341,862.35 774,168.92
PP3 3,341,798.79 773,971.86
PP4 3,341,732.66 773,774.57
PP5 3,341,669.78 773,577.14
PP6 3,341,611.69 773,398.66
PP7 3,341,542.63 773,185.92
PP8 3,341,476.61 772,982.49 DO NOT DISTURB
PP9
PP10
PP11
PP12
PP13
PP14
PP15
PP16
774,914.31
774,895.30
3,346,075.00
3,346,072.45 DO NOT DISTURB
DO NOT DISTURB
PP19
PP18
PP17
774,828.73
774,808.01
774,725.05
775,609.88
776,201.19
776,201.58
776,202.17
3,346,660.97
3,347,010.23
3,346,658.35
3,347,081.59
3,347,154.98
3,347,202.28
3,347,233.10
3,347,057.29
3,347,409.45
775,973.13
775,167.31
DEMCO
DEMCO
DEMCO
DEMCO
DEMCO
DEMCO
DEMCO
DEMCO
ENTERGY
ENTERGY
ENTERGY
ENTERGY
DO NOT DISTURB
DO NOT DISTURB
DEMCO
DEMCO
DEMCO
UNKNOWN
UNKNOWN
UNKNOWN
UNKNOWN
DO NOT DISTURB
DO NOT DISTURB
DO NOT DISTURB
DO NOT DISTURB
COMITE RIVER DIVERSION WHITE BAYOU AND CHANNEL REACH 4 PART 1
POWER POLES WITHIN THE LIMITS OF CONSTRUCTION OF THE
(* *) (2) (B)
(* *) (2) (B)
DO NOT DISTURB
DO NOT DISTURB
(* *) (2) (B)
(* *) (2) (B)
DO NOT DISTURB
DO NOT DISTURB
DO NOT DISTURB
DISPOSITION
ITEM OWNER DESCRIPTION
ENERGY TRANSFER
DIXIE PIPELINE (* *) (2) (B)
ENERGY TRANSFER
24" GAS PIPELINE
30" GAS PIPELINE
GAS PIPELINE
AND POWER POLES
OVERHEAD GUY-WIRES, CABLES,
DO NOT DISTURB
DEMCO AND POWER POLES
OVERHEAD GUY-WIRES, CABLES,
AT&T
DEMCO AND POWER POLES
OVERHEAD GUY-WIRES, CABLES,
OF THE COMITE RIVER DIVERSION WHITE BAYOU AND CHANNEL REACH 4 PART 1
TABULATION OF FACILITIES WITHIN THE LIMITS OF CONSTRUCTION
(* *) (2) (B)
(* *) (2) (B)
(* *) (2) (B)
(* *) (2) (B)
DEMCO AND POWER POLES
OVERHEAD GUY-WIRES, CABLES, DO NOT DISTURB
(* *) (2) (B)COX
AT&T
18" RCPEAST BATON ROUGE PARISH
COMMUNICATION LINE
UNDERGROUND FIBEROPTIC
ENTERGY TRANSMISSION
(*) (1) (B)
DO NOT DISTURB
COMMUNICATION LINE
OVERHEAD CABLES FIBEROPTIC
COMMUNICATION LINE
UNDERGROUND FIBEROPTIC
DO NOT DISTURB
A N
S I
D
-2
-2
(B) CONCURRENT WITH CONSTRUCTION
(2) BY OWNER
BY CONTRACTOR(1)
(* *) RELOCATED
REMOVED AND REPLACED(*)
S SEWER
C COMMNICATION
E ELECTRICAL
G GAS
R E
V
IS
E D T
E X
T
A M
E N
D M
E N
T
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
A
B
C
D
E
F
G
1 98765432
F
IL
E N
A M
E
P L
O T D
A T
A
V D
.8
L O
U
IS
IA
N A S
O U
T H S
T A
T E P
L A
N E
U .S S
U R
V E
Y F
T
.9
B
N A
D
N A
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
O
ID
ALIGNMENT
CENTERLINE
CHUTE CHANNEL
WHITE BAYOU ROCK
ALIGNMENT
CENTERLINE
CHANNEL
COMITE DIVERSION
CENTERLINE ALIGNMENT
ROCK CHUTE CHANNEL
WHITE BAYOU UPSTREAM
ROAD (EBR RIGHT OF WAY)
FROM EXISTING MCHUGH
CONSTRUCTION ACCESS
60' WIDE TEMPOARY
ROAD (EBR RIGHT OF WAY)
FROM EXISTING MCHUGH
CONSTRUCTION ACCESS
60' WIDE TEMPORARY
ZACHARY ROAD
ACCESS FROM LOWER
CONSTRUCTION SITE
32' WIDE TEMPORARY
STAGING AREA
CONTRACTOR
TEMPORARY
CENTERLINE
BAYOU CHANNEL
EXISTING WHITE
SEE DETAIL E7/C-501
ACCESS SURFACING
TEMPORARY CONSTRUCTION
500' LN.FT.X 60' WIDE
SEE DETAIL E7/C-501
ACCESS SURFACING
TEMPORARY CONSTRUCTION
500' LN.FT.X 60' WIDE
SEE DETAIL A1/C-502
ASPHALT ENTRANCE
TEMPORARY CONSTRUCTION
1 2
E1
C1
G1
G2E2
G3
E4
E3
C2 C3
SD1
W O
R L E
A N
S L
O U
IS
IA
N A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M
G-101
C R
M
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S T P
A U
L D
IS
T R
IC
T T
B S
/0
/1
/0
/1
N E
W O
R L E
A N
S D
IS
T R
IC
T
NEW ORLEANS DISTRICT
NORTH
PLAN
GENERAL NOTES
G E
N E
R A
L S
IT
E P
L A
N
H -4 -4
G -1
.d g n
G C
W
A N
S I
D
A1
SCALE: 1"=200'
400'0 200'
A N
D C
O N
S T
R U
C T
IO
N A
C C
E S
S
C O
M
IT
E R
IV
E R D
IV
E R
S
IO
N W
H
IT
E B
A Y
O U R
O C
K C
H U
T E
C O
M
IT
E R
IV
E R B
A S
IN
F L
O O
D C
O N
T R
O L
A M
IT
E R
IV
E R A
N D T
R
IB
U T
A R
IE
S L
O U
IS
IA
N A
E A
S T B
A T
O N R
O U
G E P
A R
IS
H L
O U
IS
IA
N A
C O
M
IT
E R
IV
E R D
IV
E R
S
IO
N P
R O J E
C T
SHEET KEYNOTES
GENERAL SITE PLAN - CONSTRUCTION ACCESS AND WORK LIMITS
SHEET CS204 FOR OPTION. SEE SHEET C-601 FOR OPTIONAL WORK LIMIT.
ESTATE ACQUISITION (BY OTHERS) AND UTILITY COMPENSIBILITY (BY OTHERS) IS COMPLETE. SEE
OPTIONAL WORK AREA: TEMPORARY NO WORK ZONE FOR CONSTRUCTION CONTRACTOR UNTIL REAL 6.
DIXIE PIPELINE (NATURAL GAS) TO BE RELOCATED BY OWNER.5.
LOW COX TELECOMMUNICATION OVERHEAD WIRES ON SHARED DEMCO POWER POLES. 4.
LIMITS OF COMITE DIVERSION CHANNEL CONSTRUCTION STA 69+00 - STA 83+00.3.
NOT USED.2.
REMOVED UNDER THIS CONTRACT. PILES TO BE CUT OFF 3' BELOW CHANNEL INVERT.
SEPARATE CONTRACT PRIOR TO CONSTRUCTION. EXISTING BRIDGE PIERS AND PILINGS TO BE
EXISTING BRIDGE DECK TO BE REMOVED BY CLEARING AND GRUBBING CONTRACTOR UNDER 1.
W P
B
G-004 FOR TABULATION OF UTILITIES.
SEE SHEET ID C-601 FOR TABULATIONS OF WORK LIMITS, CONSTRUCTION ACCESS. SEE SHEET ID 6.
SILT FENCE SHALL BE ERECTED ALONG THE ROW LINE.5.
DEPOSITION OF DEBRIS ON ROADWAYS.
TRUCK WASH DOWN RACKS SHALL BE POSITIONED ADJACENT TO PUBLIC ROADWAYS TO ENSURE NO 4.
ADDITION OF SURFACING MATERIAL AS NECESSARY.
TEMPORARY ACCESS ROADS SHALL BE MAINTAINED BY THE CONTRACTOR BY SHAPING AND THE 3.
APPROVAL OF THE CONTRACTING OFFICER'S REPRESENTATIVE.
TEMPORARY ACCESS ROADS MAY BE CONSTRUCTED WITHIN THE ROW LIMITS AS NEEDED WITH 2.
ACCESS ROADS.
CONTRACTORS ARE PROHIBITED FROM STORING AND STAGING MATERIAL OR EQUIPMENT IN SHARED
REACH #4. THE SHARED ACCESS SHALL BE COORDINATED AMONG INDIVIDUAL CONTRACTORS.
TEMPORARY ACCESS OFF MCHUGH ROAD TO BE SHARED BETWEEN WHITE BAYOU AND CHANNEL 1.
-2
-2
R E
V
IS
E D N
O T
E
A M
E N
D M
E N
T
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
A
B
C
D
E
F
G
1 98765432
F
IL
E N
A M
E
P L
O T D
A T
V D
.8
L O
U
IS
IA
N A S
O U
T H S
T A
T E P
L A
N E
U .S S
U R
V E
Y F
B
N A
D
N A
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
O
ID
SEE SHEET ID CS102
SEE SHEET ID CS103
LOWER ZACHARY ROAD
M C
H U
G H R
O A
D
DISPOSAL AREA
STOCKPILE
PERMISSIBLE
DISPOSAL AREA
STOCKPILE
PERMISSIBLE
DISPOSAL AREA
STOCKPILE
PERMISSIBLE
DISPOSAL AREA
STOCKPLE
PERMISSIBLE
DISPOSAL AREA
STOCKPILE
PERMISSIBLE
A 1+00
A 2+00
A 0+00
A 3+00
A
0A
0A
0A 7+00
A 8+00
A 9+00
A 10+00
A 11+00
A 12+00
A 12+60
Default
N 773005.15
E 3344210.27
Elev 0.00
Default
N 773306.13
E 3344200.96
Elev 0.00
Default
N 773201.46
E 3341547.46
Elev 0.00
79C
Default
N 774312.89
E 3343021.61
Elev 0.00
79D
Default
N 774467.79
E 3343850.93
Elev 0.00
Default
N 774791.21
E 3345577.42
Elev 0.00
80A
Default
N 774788.01
E 3345774.22
Elev 0.00
80B
Default
N 774838.68
E 3346044.81
Elev 0.00
80C
Default
N 774855.31
E 3346109.37
Elev 0.00
Default
N 774686.65
E 3347191.39
Elev 0.00
79B
Default
N 774201.35
E 3342429.92
Elev 0.00
79A
Default
N 774161.36
E 3342208.34
Elev 0.00
Default
N 774097.15
E 3341862.52
Elev 0.00
79A
Default
N 774161.36
E 3342208.34
Elev 0.00
79B
Default
N 774201.35
E 3342429.92
Elev 0.00
C3
Default
N 773939.96
E 3346664.34
Elev 0.00
Elev 0.00
E 3346766.43
N 774785.32
Default
9A
PLM
PLMPLM
PLM
PLM
PLMPLM
PLM
PLM
PLM
PLM
PLM
PLM
PLM
PLM
WORK LIM
ITS
WORK LIMITS
WORK LIMITS
WORK LIMITS
C O
N S
T R
U C
T
IO
N E
A S
E M
E N
T
PP10
PP9
PP1
PP2
PP3
PP4
PP5
PP6
PP7
PP8
PP13
PP12
PP11
PP14
PP15
PP16
PP19PP17
PP18
PIZ
J
J
PIZPIZ PIZ
J
J
J
B 0+00B 1+00B
B 3+50
B 3+00
EDGE OF SHOULDER
30 FT RADIUS
ASPHALT
(WEARING COURSE)
1V ON 4H SLOPE
2' TRANSITION OR
(WEARING COURSE)
1V ON 4H SLOPE
2' TRANSITION OR
EXISTING GROUND
(COMPACTED)
3" CRUSHED STONE BASE COURSE
2" ASPHALT BINDING COURSE
4" ASPHALT WEARING COURSE
GEOTEXTILE FABRIC
SEPARATOR
(WEARING COURSE)
1V ON 4H SLOPE
2' TRANSITION OR
20'
RADIUS
30 FT
W O
R L E
A N
S L
O U
IS
IA
C-502
R
M
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S T P
A U
L D
IS
T R
IC
T T
B S
/0
/1
N E
W O
R L E
A N
S D
IS
T R
IC
T
G
W
H -4 -4
C -5
.d g n
S
IT
E D
E T
A
IL
S
C O
M
IT
E R
IV
E R D
IV
E R
S
IO
N W
H
IT
E B
A Y
O U R
O C
K C
H U
T E
C O
M
IT
E R
IV
E R D
IV
E R
S
IO
N P
R O J E
C T
E A
S T B
A T
O N R
O U
G E P
A R
IS
H L
O U
IS
IA
N A
W P
B
VARIES
ROAD
ACCESS
C/L
VARIES VARIES
SLOPE TO DRAIN
CONSTRUCTION, AND MAINTENANCE OF NEW ACCESS ROAD AND ASPHALT ENTRANCES.
ARE SAMPLES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN,
1. NEW ACCESS ROAD AND ASPHALT ENTRANCE DETAILS AND PLANS
NOTES:
A1
SCALE: NOT TO SCALE
DETAIL-NEW ASPHALT ENTRANCE
LOWER ZACHARY ROAD
(2 O
F
NEW ASPHALT ENTRANCE - SECTION
-2
-2
R E
V
IS
E D D
IM
E N
S
IO
N A
N D R
E M
O V
E D N
O T
E
A M
E N
D M
E N
T
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
A
B
C
D
E
F
G
1 98765432
F
IL
E N
A M
E
P L
O T D
A T
V D
.8
L O
U
IS
IA
N A S
O U
T H S
T A
T E P
L A
N E
U .S S
U R
V E
Y F
B
N A
D
N A
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
O
ID
EXISTING GROUND
12" (R-90) RIPRAP
15'
EXCAVATION
FINISH GRADE
EL 81.0
FILTER FABRIC
GEOTEXTILE SEPARATOR/
7.5'
ALIGNMENT
CENTERLINE
CHANNEL
COMITE DIVERSION
40'
MEET AND MATCH
WHITE BAYOU
EDGE OF EXISTING
(CRUSHED STONE)
12" BEDDING MATERIAL
FILTER FABRIC
GEOTEXTILE SEPARATOR/
12" (R-90) RIPRAP
6" BEDDING STONE
BAYOU CHANNEL
EXISTING WHITE
MEET AND MATCH
SLOPED TO DRAIN
COMPACTED FILL
10' MAX CROWN
MIN MANDATORY EL. 87.5
ELEVATION
PROFILE
VERTICAL
SEMI-COMPACTED FILL
BASED ON ROW
10' MIN CROWN WIDTH VARIES
MAX ALLOWABLE EL 101.5
NE STOCKPILE DISPOSAL
RIPRAP
42" (R-3500)
EXISTING GROUND
15'
EXCAVATION
FINISH GRADE
EL 81.0
7.5'
ALIGNMENT
CENTERLINE
CHANNEL
COMITE DIVERSION
FILTER FABRIC
GEOTEXTILE SEPARATOR/
EL 54.25
9" BEDDING STONE
RIPRAP
36" (R-650)
12" (R-90) RIPRAP
FILTER FABRIC
GEOTEXTILE SEPARATOR/
12" (R-90) RIPRAP
FILTER FABRIC
GEOTEXTILE SEPARATOR/
EL 54.25
100'50'
100'
40' MIN
RIPRAP
42" (R-3500)
RIPRAP
42" (R-3500)
6" BEDDING STONE
6" BEDDING STONE
COMPACTED FILL
EXCAVATION
SLOPED TO DRAIN
COMPACTED FILL
10' MAX CROWN
MIN MANDATORY EL. 87.0
TRANSITION
10' HORIZONTAL
ELEVATION
PROFILE
VERTICAL
SEMI-COMPACTED FILL
BASED ON ROW
10' MIN CROWN WIDTH VARIES
MAX ALLOWABLE EL 100.5
SW STOCKPILE DISPOSAL
EXISTING GROUND
12" (R-90) RIPRAP
15'
EXCAVATION
FINISH GRADE
EL 81.0EL 81.0
FILTER FABRIC
GEOTEXTILE SEPARATOR/
7.5'
ALIGNMENT
CENTERLINE
CHANNEL
COMITE DIVERSION
40' MIN40' MIN
RIPRAP
42" (R-3500)
6" BEDDING STONE
SLOPED TO DRAIN
COMPACTED FILL
10' MAX CROWN
MIN MANDATORY EL. 87.0
SLOPED TO DRAIN
COMPACTED FILL
10' MAX CROWN
MIN MANDATORY EL. 87.5
ELEVATION
PROFILE
VERTICAL
SEMI-COMPACTED FILL
BASED ON ROW
10' MIN CROWN WIDTH VARIES
MAX ALLOWABLE EL 100.5
SW STOCKPILE DISPOSAL
SEMI-COMPACTED FILL
BASED ON ROW
10' MIN CROWN WIDTH VARIES
MAX ALLOWABLE EL 100.5
NW STOCKPILE DISPOSAL
W O
R L E
A N
S L
O U
IS
IA
N A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
M
CS301
C R
M
S T P
A U
L
M
IN
N E
S O
T A
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S T P
A U
L D
IS
T R
IC
T T
B S
/0
/1
/0
/1
N E
W O
R L E
A N
S D
IS
T R
IC
T
NEW ORLEANS DISTRICT
20' 40'0
O
M
IT
E D
IV
E R
IO
N S C
H A
N N
E L
A1
C1
E1
SCALE: 1"=20'
COMITE DIVERSION CHANNEL SECTION 78+00
SCALE: 1"=20'
SCALE: 1"=20'
COMITE DIVERSION CHANNEL SECTION STA 73+00 - STA 76+50
COMITE DIVERSION CHANNEL SECTION STA 79+50 - STA 83+00
G C
W
A N
S I
D H -4 -4
C S .d g n
C O
M
IT
E R
IV
E R D
IV
E R
S
IO
N W
H
IT
E B
A Y
O U R
O C
K C
H U
T E
C O
M
IT
E R
IV
E R B
A S
IN
F L
O O
D C
O N
T R
O L
A M
IT
E R
IV
E R A
N D T
R
IB
U T
A R
IE
S L
O U
IS
IA
N A
E A
S T B
A T
O N R
O U
G E P
A R
IS
H L
O U
IS
IA
N A
C O
M
IT
E R
IV
E R D
IV
E R
S
IO
N P
R O J E
C T
T Y
P
IC
A L S
E C
T
IO
N S
W P
B
GENERAL (CIVIL) NOTES
CROSS SECTIONS ARE SHOWN LOOKING DOWNSTREAM.2.
FLOW ELEVATIONS.
SHEET CS202 FOR COMITE DIVERSION CHANNEL PROFILE AND CENTERLINE
CHANNEL IS TO THE TOP OF RIPRAP SECTION. SEE SHEET CS201 AND
VERTICAL PROFILE ELEVATION AT CENTERLINE OF COMITE DIVERSION 1.
/2
/2
R E
V
IS
E D T
E X
T
A M
E N
D M
E N
T
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N M
A R
K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
A
B
C
D
E
F
G
1 98765432
F
IL
E N
A M
E
P L
O T D
A T
V D
.8
L O
U
IS
IA
N A S
O U
T H S
T A
T E P
L A
N E
U .S S
U R
V E
Y F
B
N A
D
N A
E L E
V A
T
IO
N D
A T
U M
V E
R T
IC
A L C
O N
T R
O L
C O
O R
D
IN
A T
E S
Y S
T E
M
H O
R
IZ
O N
T A
L C
O N
T R
O L
C O
M B
IN
E D F
A C
T O
R
C F
G E
O
ID
0 20 40 60 80 100 120 140 160 180 200 220 240 260-20-40-60-80-100-120-140-160-180-200-220-240-260 74+50
COMITE DIVERSION CHANNEL
E L E
V A
T
IO
N N
A V
D .8
E L E
V A
T
IO
N N
A V
D .8
CL
1V:4 .25H
CL
1V:4.25H
1V:
3H
2% MIN SLOPE TO DRAIN
0 20 40 60 80 100 120 140 160 180 200 220 240 260-20-40-60-80-100-120-140-160-180-200-220-240-260 78+00
COMITE DIVERSION CHANNEL
E L E
V A
T
IO
N N
A V
D .8
E L E
V A
T
IO
N N
A V
D .8
CL
1V:4 .25H
1V:4.25H
GRADE = 0.88%GRADE = 0%
2% MIN SLOPE TO DRAIN
FILTER FABRIC
GEOXTEXTILE SEPARATOR/
6" BEDDING STONE
12" (R-90) RIPRAP
42" (R-1000) RIPRAP
FILTER FABRIC
GEOTEXTILE SEPARATOR/
6" BEDDING STONE
12" (R-90) RIPRAP
42" (R-3500) RIPRAP
0 20 40 60 80 100 120 140 160 180 200 220 240 260-20-40-60-80-100-120-140-160-180-200-220-240-260 81+50
COMITE DIVERSION CHANNEL
E L E
V A
T
IO
N N
A V
D .8
E L E
V A
T
IO
N N
A V
D .8
CL
1V:4 .25H1V:4.25H
1V:
3H
2% MIN SLOPE TO DRAIN2% MIN SLOPE TO DRAIN
| Am_0005 for Comite River Diversion White Bayou Rock Chute_Ed 20-011.pdf |
| Am_0002 |
| 00010_Am_0002 |
| Whites Bayou Amended Plans |
| H-4-48404_CS301 |
| H-4-48404_G-004 |
| H-4-48404_G-101 |
File details come from the government source that posted it. Updated .