1)The purpose of Amendment 0002, is to provide answers to industry questions; extending the Q&A; and extend the Bid Opening. 2) The Q&A period is extended from 29 May 2019 at 2:00pm to 24 June 2019 at 2:00pm. 3) The Bid Opening is extended from 25 June 2019 at 2:00pm to 09 July 2019 at 2:00pm. 4) Please see continuation page for answers to industry questions and changes. In addition, please contact the following for Specifications: Contract Specialist, Ms. Laura D. Temple Contract Specialist, Mr. Anthony.

View the file

Other files for this federal contract opportunity

Other files attached to 2017 Flood Upper Pontchartrain Sector Seepage, newest first.
File Type Posted
B01_-_Signed_W912P819B0041_Bid_Abstract.pdf PDF
Am-0008.pdf PDF
A.02__Amendment_0007.pdf PDF
A.02__Amendment_0006.pdf PDF
2019-07-22-Upper_Pontchartrain_Seepage_-_Questions_and_Clarifications.pdf PDF
A.02__Amendment_0006.pdf PDF
A.02_PART_(III)_AMENDMENT_0006.pdf PDF
A.02__PART_(VI)__AMENDMENT_0006.pdf PDF
A.02__PART(V)_AMENDMENT_0006.pdf PDF
A.02__Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Plans_1.pdf PDF
Plans_2.pdf PDF
19B0041_specs.pdf PDF
Amendment_0001_Final.pdf PDF
Plans.pdf PDF
19B0041_solicitation.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ED 18-070

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Jun-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P819B0041

X 9B. DATED (SEE ITEM 11)

25-Apr-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matterwhere feasible.)

1)The purpose of Amendment 0002, is to provide answers to industry questions; extending the Q&A; and extend the Bid Opening.

2) The Q&A period is extended from 29 May 2019 at 2:00pm to 24 June 2019 at 2:00pm.

3) The Bid Opening is extended from 25 June 2019 at 2:00pm to 09 July 2019 at 2:00pm.

4) Please see continuation page for answers to industry questions and changes. In addition, to be provided with the Specifications, please contact the following:

Contract Specialist, Ms. Laura D. Temple Contract Specialist, Mr. Anthony (Tony) Maiore Email: Laura.d.temple@usace.army.mil Email: Anthony.p.maiore@usace.army.mil Office: (504) 862-2874 Office: (504) 862-1604

5) Except as provided herein, all terms and conditions of the document, as heretofore changed, remains unchanged and in full force and effect

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Jun-2019

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION 00010

Page 00010-5, NOTE: 5. Delete this note in its entirety and substitute the following therefore:

“NOTE 5: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTIONAL WORK Items by written notice to the Contractor. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid. The OPTIONAL WORK item will be exercised within 270 days from issuance of the Notice to Proceed.”

SECTION 33 26 00.00 12

Page 17, paragraph 2.3. Delete this paragraph in its entirety and substitute the following therefore:

“2.3 FILTER PACK

Material for the filter pack around the solid pipes and screens shall be a dry processed sand composed of hard, tough, and durable particles free from adherent coating. The filter pack shall not be crushed stone. The filter pack material shall contain no detrimental quantities of organic matter nor soft, friable, thin, or elongated particles in accordance with the quality requirements in ASTM C 33/C 33M, Table 1 and Table 3, Class 5S, and in ASTM E 11, Table

1. The individual grading curves within the limits shown shall not exhibit abrupt changes in slope denoting skip grading or scalping of certain sizes. The filter pack shall meet the following gradation requirements:

RELIEF WELLS: BR-01 thru BR-15

U.S. STANDARD MAX. PERCENT BY MIN. PERCENT BY

SIEVE NO. WEIGHT PASSING LINE WEIGHT PASSING LINE

No. 14 100 - No. 16 90 - No. 18 75 100 No. 20 52 90 No. 25 25 66 No. 30 10 41 No. 35 0 21 No. 40 - 9 No. 50 - 0 “

Solicitation No. W912P-19-B-0041 Mississippi River and Tributaries (MR&T) Upper Pontchartrain Seepage Control, Item M-225L B/L Sta. 160+00 to B/L Sta. 181+00 East Baton Rouge Parish, Louisiana

Question and Clarifications - Second Round

1. Relief well specification Section 33 26 00.00 12, Paragraph 1.7.3 Drilling Log, Sampling, and Testing” - With the defined requirements for "6. Split Spoon Sampling - the sieves and grain size analysis are required for each Split Spoon sample." Would it be in the best interest of all, to add CLINS for the required Pilot Holes and Lab work due to substantial dollars associated with this process?

Payment for testing will remain part of the unit cost for relief wells. No additional CLINS will be added. Waiting on CD to respond on whether the testing shall be a CLIN or remain as part of the well installation cost.

2. Bid Item 0021 for directional boring of electrical conduits under LA 327 is listed as Optional Work. The electrical drawings do not show any other options for bringing electrical power to the site except for directional boring underneath the roadway. Please clarify the plan for how electrical service will be brought to the site under Bid Item 0006, Electrical Work, for the Base Work, if the Government elects not to exercise Bid Item 0021.

It is highly likely the option work for directional boring will be exercised under this contract. Right of way for accessing the utility poles for providing electricity to the project is in the process of being acquired. There is no alternate plan for providing electrical service under this contract. A separate contract would be prepared for directional boring under the roadway.

3. Please clarify how many days after Award the Government has to exercise the Optional Work item - Bid Item 0021, for directional boring.

It is anticipated the Government will exercise the Optional Work item within 270 contract days. Specifications will be revised.

4. Is there an asphalt paving detail?

No, there is not an asphalt paving detail.

Section 32 12 16.00 12, Paragraph 3.7.1 Placement – Describes the required asphalt thickness for placement on the levee crown and existing ramp.

5. DWG C-01 shows different distances and side slopes for discharge pipe burial versus those shown on DWG C-06 and C-06a. Please clarify the required minimum horizontal, vertical, and side slopes for discharge pipe burial and asphalt pavement replacement.

Drawing C-01 illustrates the removal of asphalt and installation of discharge pipes under the levee access ramp. DWG C-06 and C-06a illustrates the removal of asphalt and installation of discharge pipes at the levee crown and levee slopes for the given stations.

6. The revised specifications issued with Amendment 1 only contain 58 pages.

Please reissue the full solicitation document as a reduced file PDF.

7. Section 33 26 00.00 12, Paragraph 2.3, FILTER PACK:

a. In the chart below in black text is the table from the advertised specification and next to it in red text is what we believe it should be. We are trying to confirm that the values listed are correct as listed. Our supplier is asking the question on how the minimum value is higher than the maximum value?

b. What do the dashes mean in the columns? Does it represent 0 or 100?

The data in the two columns are points on two separate lines on a sieve curve – Max. percent passing line (upper line) and Min. percent passing line (lower line).

The required filter pack for the well must fall within those boundaries. The dashes on the table relate to numbers plotting off the table. Table will be revised for clarification.

Please contact the following to be provided with the specifications.

Contract Specialist, Ms. Laura D. Temple Contract Specialist, Mr. Anthony (Tony) Maiore Email: Laura.d.temple@usace.army.mil Email: Anthony.p.maiore@usace.army.mil Office: (504) 862-2874 Office: (504) 862-1604

#1_Draft
#2_Am_0002
#3_2019-06-04-Upper Pontchartrain Seepage Control - Questions and Clarifica.._

File details come from the government source that posted it.