Line_Item_Breakdown_Pricing_Schedule.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Dillard Dry Dock Services
- Solicitation number
- W912P7-18-T-0009
About this file
Line Item Breakdown_Pricing Schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q_A.pdf | ||
| Drawings_and_Specs.pdf | ||
| Dillard_Drydock_PWS_2018.pdf | ||
| Marin_Wage_Determination.pdf | ||
| Contractor's_Experience_Form.docx | DOCX document | |
| FAR_Provisions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| 2018 John AB DILLARD DRY DOCK | Unit of Measure | Quantity | Amount | ||
| 0001 | Task | SCHDULE ONE & OPTIONAL ITEMS | |||
| 0001AA | 5.3 | DOCKING & BERTHAGE LAY DAYS | Svc | 1 | |
| 0001AB | 5.4 | DRY DOCKING & SERVICES | Svc | 1 | |
| 0001AC | 5.5 | PRESSURE WASH UNDERWATER HULL | Svc | 1 | |
| 0001AD | 5.6 | HULL CLEANING & PAINTING UNDERWATER HULL | Svc | 1 | |
| 0001AE | 5.7 | RECONFIGURE PORT & STBD BOW THRUSTER GRATES | Svc | 1 | |
| 0001AF | 5.8 | RECONFIGURE PORT & STBD BOW THRUSTER GRATES | Svc | 1 | |
| 0001AG | 5.9 | RENEW ZINC ANODES ON HULLS, SEA CHESTS, SHAFTS AND STERNS | Svc | 1 | |
| 0001AH | 5.10 | SONIC SURVEY UNDERWATER HULL PLATING | Svc | 1 | |
| 0001AJ | 5.11 | INSPECT PORT/STBD SEA CHEST & SEA CHEST VALVES (5) | Svc | 1 | |
| 0001AK | 5.12 | INSTALL ¾” STAND PIPE IN PORT & STBD SEA CHEST TO SUPPORT SEA WATER MDE PRIMINING PUMPS | Svc | 1 | |
| 0001AL | 5.13 | ENLARGE PORT HULL HVHC THROUGH-HULL FITTING | Svc | 1 | |
| 0001AM | 5.14 | CORRECT VALVE ORIENTATAION STBD MDE SEA STRAINER | Svc | 1 | |
| 0001AN | 5.15 | INSPECT PORT/STBD SHAFTS STERN/STRUT BEARINGS | Svc | 1 | |
| 0001AP | 5.16 | INSPECT PORT/STBD RUDDER/STOCK STUFFING BOXES | Svc | 1 | |
| 0001AQ | 5.17 | INSPECT/BALANCE/NON-DESTRUCTIVE TEST PORT/STBD SHAFTS | Svc | 1 | |
| 0001AR | 5.18 | MODIFY PORT & STBD SWIM STEP SIDE SHELL | Svc | 1 | |
| 0001AS | 5.19 | FABERICATE & INSTALL SEMI-CLOSED BOW CHALKS ON BOTH THE PORT & STBD BOWS | Svc | 1 | |
| 0001AT | 5.20 | REMOVE & RENEW HEAD DECK NON-SKID SURFACE TREATMENT | Svc | 1 | |
| 0001AU | 5.21 | REMOVE & RENEW PORT & STBD SWIM DECKS NON-SKID SURFACE TREATMENT | Svc | 1 | |
| 0001AV | 5.22 | REMOVE & RENEW WORK DECK NON-SKID SURFACE TREATMENT | Svc | 1 | |
| 0001AW | 5.23 | RENEW PAINT ON FORDECK AND PORT & STBD WALKWAYS | Svc | 1 | |
| 0001AX | 5.24 | INSPECT/REPAIR & PPP EFFER CRANE | Svc | 1 | |
| OPTION 0002 | N/A | Over and Above (Not to Exceed $50,000) | Svc | 1 | (Not to Exceed $50,000 within the PCO Discretion ) |